Professional Documents
Culture Documents
Connection Print PDF
Connection Print PDF
To___________________
-------------------------------------------------------------------------------------------------------------------------------------
REPORT
The required Rooftop Solar PV System under Net Metering Arrangement with meter (s) has been installed & tested and
found OK.
PARTICULARS
MF MF MF
kWhe kVas kWh