CHILLER CHECKLIST

SL YES NO REMARKS
NO. DESCREPTION

Whether the chiller received is of


1.
approved make.

Whether the Factory test certificate is


2.
received with the material.

Whether the material received is as per


3.
specification.

Whether the Technical submittal & GI


4.
drawing is approved.

Whether the erection is done as per


5.
specification & drawing.

Whether the adhesive is done properly


6.
as per specification

Whether the chiller supplied is having


7.
proper invoice/delivery Chelan

Whether the chiller is supplied with


8. proper packing and with no damage to
the packing.

Whether the chiller accessories like plant


10. manager, bms accessories etc were
supplied.

Whether the chiller packing is properly


removed without any damage to the
11.
chiller/chiller accessories during
erection.

Whether the lifting/shifting of chiller is


12. done as per manufacturer’s instruction
during erection.

Whether the chiller base is provided at


13.
site as per manufacturer’s instruction.

Whether the positioning of chiller is


14.
done properly.

Page 1 of 2
Whether all safety measures taken
15.
during chiller erection.

Whether the chiller testing &


16. commissioning is done as per
manufacturer’s instructions.

Whether the testing & commissioning is


done by authorized
17.
engineers/technicians from chiller
manufacturer.

Whether the testing & commissioning


18.
report is submitted by testing authority.

HLL CONTRACTOR

NAME NAME

PLACE PLACE

DATE DATE

SIGINATURE SIGINATURE

DESIGINATION DESIGINATION

Page 2 of 2