COPPER PIPING CHECKLIST

SL YES NO REMARKS
NO. DESCREPTION

Whether the technical submittal is


1.
submitted for approval/approved.

Whether the copper pipe supplied is of


3.
approved make.

Whether the copper pipe supplied is of


4.
approved specification.

Whether the copper pipe supplied is


5.
having proper invoice/delivery Chelan.

Whether the copper pipe supplied is


6.
having factory test certificate.

Whether the copper pipe is supplied


7.
without damage.

Whether the copper piping is done as


8.
per specification.

Whether the joints were properly


9.
brazed.

Whether the pressure testing of pipes


10.
were completed as per specification.

Whether the testing & commissioning is


17. done by authorised
engineers/technicians.

Whether the testing & commissioning


18.
report is submitted by testing authority.

HLL CONTRACTOR

NAME NAME

PLACE PLACE

Page 1 of 2
DATE DATE

SIGINATURE SIGINATURE

DESIGINATION DESIGINATION