WORLEYPARSONS
2 PROJECT,
8015-0152-WP05-00-000-IF-PN-12001_Rev 00.docx
Uncontrolled copy, if printed.
FORMATION DEVELOPMENT FEED
WORLEYPARSONS
2 PROJECT,
CONTENT
1 INTRODUCTION .......................................................................................................... 4
1.1 Objective ......................................................................................................................................................... 4
8015-0152-WP05-00-000-IF-PN-12001_Rev 00.docx
Uncontrolled copy, if printed.
FORMATION DEVELOPMENT FEED
WORLEYPARSONS
2 PROJECT,
1 INTRODUCTION
( ), in partnership with the Company of , is
currently planning to develop its upstream production facilities and infrastructure to meet a target
of 1.2MMBOPD of production in the 2 oil field in Southern . The field consists
of two primary reservoirs, and , which will be developed as separate projects. It
is envisaged that the reservoir will produce up to 650MBOPD of the 1.2MMBOPD
targeted from the entire field. Presently the development is in the FEED (Define) phase
of project execution and design.
WorleyParsons has been contracted to execute the FEED phase of the Development
Project. The development includes well pads, gathering systems, water injection facilities, gas
and water treatment, a gas turbine power plant, a light oil export pipeline and tank farm
upgrades, tie-ins to the natural gas liquids and gas export systems and further expansion of
supporting facilities and infrastructure as necessary.
The Project aims to produce a comprehensive FEED Package in order to allow the progression of
the Project to the EPC (Execute) Phase.
1.1 Objective
The major objective of the plan is to define the interface management process for the FEED
phase of the project.
The Interface Management Plan has the following objectives
1. All physical interfaces as well as project interfaces are clearly identified;
2. Define what are technical interfaces
3. Define interfaces with other support offices
4. Define interfaces with
5. Define interfaces with Sub Contractors
6. Define template for the Interface Register
7. Clearly define the scope of Interface Management (IFM) process within the Project;
8. Describes methods and processes for managing internal and external interfaces.
9. Interface Management Scope of Work for EPC phase is developed
This Plan shall be read in conjunction with Project Execution Plan.
1.2 Scope
The interface plan shall cover
1. Engineering Interfaces (Technical interfaces)
2. Interface with other WorleyParsons offices
3. External Interfaces
• Interface with
• Interface with Subcontractors
• Interface with Vendors
8015-0152-WP05-00-000-IF-PN-12001_Rev 00.docx
Uncontrolled copy, if printed.
FORMATION DEVELOPMENT FEED
WORLEYPARSONS
2 PROJECT,
Term/Abbreviation Description
IP Interface Point
SOC Company
8015-0152-WP05-00-000-IF-PN-12001_Rev 00.docx
Uncontrolled copy, if printed.
FORMATION DEVELOPMENT FEED
WORLEYPARSONS
2 PROJECT,
3 REFERENCES
8015-0152-WP05-00-000-IF-PN-12001_Rev 00.docx
Uncontrolled copy, if printed.
FORMATION DEVELOPMENT FEED
WORLEYPARSONS
2 PROJECT,
4 GENERAL
The various facilities involved under the project have been indicated on the Master Plot Plan
Drawing 8015-0152-WP05-00-000-PI-DB-12001 titled MASTER PLOT PLAN (MPP)
FACILITIES.
The complete project has been divided into various work packs. The preparation of engineering
deliverables and the EPC execution has been planned according to work packs. The Table-1
provides the current contracting strategy for the various EPC and PC packages and the PC, EPC,
Interface table identifies which packages have interface with one another.
PC/ EPC
Work
Contract Contract Title Summary SOW
Package
Index
Single Well Pads Y690, Y744,
Civil Construction of
PC 1 #1 Y765, Y831 and Cluster Well Pad
Priority Well Pads & Roads
Y10 and roads to them
Cluster Well Pads Y8, Y13, Y15,
Civil Construction of
PC 2 #2 Y16, Y2, and Y18 and roads to
Priority Well Pads & Roads
them
Mechanical Construction & Single Appraisal Wells Y690,
PC 3
Hook-up of Appraisal Wells Y765, Y744 and Y831
Civil Works for three (3) Civil Construction of
PC 4A Cluster Well Pads Y5, Y11 and Well Pads & Roads (Phase 2 -
Y12 package # 1)
Civil Works for three (3) Civil Construction of
PC 4B Cluster Well Pads Y1, Y4 and Well Pads & Roads (Phase 2 -
Y7 package # 2)
Civil Works for three (3) Civil Construction of
PC 5A Cluster Well Pads Y3, Y6 and Well Pads & Roads (Phase 3 -
Y14 package # 1)
Civil Works for three (3) Civil Construction of
PC 5B Cluster Well Pads Y9, Y17 and Well Pads & Roads (Phase 3 -
Y19 package # 2)
Construction of Main
PC 6 A Main Access & Haulage Roads
Access & Haulage Roads
Construction of
PC 7 C Security Perimeter Fence
Security Perimeter Fence
Design & Construction of
EPC 1 B Accommodation Camp Accommodation Camp
8015-0152-WP05-00-000-IF-PN-12001_Rev 00.docx
Uncontrolled copy, if printed.
FORMATION DEVELOPMENT FEED
WORLEYPARSONS
2 PROJECT,
PC/ EPC
Work
Contract Contract Title Summary SOW
Package
Index
Central Processing Facilities (CPF)
EPC of Processing
EPC 2A D, E, Facilities: CPF / GTP / SRU Gas Treatment Plant (GTP)
(excluding Sulfur Handling)
Sulfur Recovery Unit (SRU)
Well Pad Facilities / Gathering Power Distribution, Surface
EPC 2B G, IA
Network / Power Distribution facilities and hook-up of well pads
EPC of Power Plant
EPC 3 F Power Plant
(Work Package F )
EPC of Storage Tanks
EPC 4 H Storage Tanks at PS-1 Tank Farm
at PS-1 Tank Farm
EPC of Oil & Gas
EPC 5 IB Oil & Gas Export Pipelines
Export Pipelines
EPC of Water
EPC 6 J Water Injection Facilities
Injection Facilities
EPC of Sulfur
EPC 7 K Sulfur Handling Facilities (SHF)
Handling Facilities
8015-0152-WP05-00-000-IF-PN-12001_Rev 00.docx
Uncontrolled copy, if printed.
FORMATION DEVELOPMENT FEED
WORLEYPARSONS
2 PROJECT,
EPC2B
PC 1 PC 2 PC 3 PC 4A PC 4B PC 5A PC 5B PC 6 PC 7 TBA EPC 1 EPC 2A EPC 3 EPC 4 EPC 5 EPC 6 EPC 7
PC 1 VOID X NO X NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO
PC 2 X VOID NO NO X NO NO X NO NO NO NO NO NO NO NO NO NO X
PC 3 NO NO VOID NO NO NO NO NO NO NO NO X X NO NO NO X NO X
PC 4A X NO NO VOID NO NO NO NO NO NO NO NO NO NO NO NO NO NO X
NO NO
PC 4B NO X NO NO VOID NO NO NO NO NO NO NO NO NO NO NO X
PC 5A NO NO NO NO NO VOID NO X NO NO NO NO NO NO NO NO NO NO X
NO NO
PC 5B NO NO NO NO NO NO VOID X NO NO NO NO NO NO NO NO X
PC 6 NO X NO NO NO X X VOID NO NO X X X NO NO NO NO NO NO
PC 7 NO NO NO NO NO NO NO NO VOID X NO NO NO NO NO NO NO NO X
TBA NO NO NO NO NO NO NO NO X VOID X X X X NO NO NO NO X
EPC 1 NO NO NO NO NO NO NO X NO X VOID NO NO NO NO NO NO NO X
EPC 2A NO NO X NO NO NO NO X NO X NO VOID X X X X NO NO X
EPC2B NO NO X NO NO NO NO X NO X NO X VOID X NO X X NO X
EPC 3 NO NO NO NO NO NO NO NO NO X NO X X VOID NO NO NO NO NO
EPC 4 NO NO NO NO NO NO NO NO NO NO NO X NO NO VOID X NO NO NO
EPC 5 NO NO NO NO NO NO NO NO NO NO NO X X NO X VOID X NO X
EPC 6 NO NO X NO NO NO NO NO NO NO NO NO X NO NO X VOID NO X
EPC 7 NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO VOID NO
NO X X X X X X NO X X X X X NO NO X X NO VOID
8015-0152-WP05-00-000-IF-PN-12001_Rev 00.docx
This document is property of the COMPANY and it shall not be disclosed to third parties, or reproduced, without permission of the COMPANY.This document is tracked by ( ).
When it is printed, it shall be considered as “For information only”.The controlled copy is the version, and thus, it is the document holder’s responsibility to make sure that the latest version is in use.
FORMATION DEVELOPMENT FEED
WORLEYPARSONS
2 PROJECT,
5 INTERFACES
Interface point (IP) is defined as the interface
a) Between two PC contracts or between two EPC contract packages or between any PC
and EPC contractors
b) Between the project and any other existing and/or external facility
Any interface that satisfies either of the above conditions shall be considered as the interface
point for the FEED project.
In the FEED phase of the project the Interfaces are broadly categorized into two main categories
a) Engineering Interfaces (Technical Interfaces) – These are the interfaces that are
physical interfaces identified on the various engineering deliverables and are numbered
as per the Interface Numbering Philosophy. The interface register will identify these
interfaces separately for each discipline.
b) Coordination Interface – These are interfaces with other offices of WorleyParsons and
with the subcontractors which are described in the various procedures such as Work
Share Execution Plan and subcontract scope of work documents.
8015-0152-WP05-00-000-IF-PN-12001_Rev 00.docx
This document is property of the COMPANY and it shall not be disclosed to third parties, or reproduced, without permission of the
COMPANY.This document is tracked by ( ). When it is printed, it shall be considered as “For
information only”.The controlled copy is the version, and thus, it is the document holder’s responsibility to make sure that the latest
version is in use.
FORMATION DEVELOPMENT FEED
WORLEYPARSONS
2 PROJECT,
8015-0152-WP05-00-000-IF-PN-12001_Rev 00.docx
Uncontrolled copy, if printed.
FORMATION DEVELOPMENT FEED
WORLEYPARSONS
2 PROJECT,
YY – Discipline
Y– Project ID
• For each discipline the sequential number shall start from 05001
• Tie-in between two work packs but within the same EPC package is not considered as an
interface point.
8015-0152-WP05-00-000-IF-PN-12001_Rev 00.docx
Uncontrolled copy, if printed.
FORMATION DEVELOPMENT FEED
WORLEYPARSONS
2 PROJECT,
7 RESPONSIBILITIES
The Plan intends to cover all interface aspects. However interdisciplinary interfaces and
administrative interfaces which are managed by normal work processes (e.g. engineering
documents reviews, design reviews, project coordination, administration and HR activities, etc.)
are out of the scope of the Plan.
8015-0152-WP05-00-000-IF-PN-12001_Rev 00.docx
Uncontrolled copy, if printed.
FORMATION DEVELOPMENT FEED
WORLEYPARSONS
2 PROJECT,
8015-0152-WP05-00-000-IF-PN-12001_Rev 00.docx
Uncontrolled copy, if printed.
FORMATION DEVELOPMENT FEED
WORLEYPARSONS
2 PROJECT,
8015-0152-WP05-00-000-IF-PN-12001_Rev 00.docx
Uncontrolled copy, if printed.
FORMATION DEVELOPMENT FEED
WORLEYPARSONS
2 PROJECT,
APPENDIX-1
8015-0152-WP05-00-000-IF-PN-12001_Rev 00.docx
Uncontrolled copy, if printed.
FORMATION DEVELOPMENT FEED
WORLEYPARSONS
2 PROJECT,
Note -1 Identification of the PC or EPC contractor (e.g. PC1, PC2, EPC 1, EPC 2 etc.)
Note -2 Short description of the interface
Note -3 Document numbers where the interface has been indicated e.g. P&ID number
Note -4 Identification of the PC or EPC contractor responsible for completing the interface
Note -5 Date / month / year based on the overall project execution schedule.
Note – 6 TP is applicable only for piping and pipeline tie-in points
8015-0152-WP05-00-000-IF-PN-12001_Rev 00.docx
This document is property of the COMPANY and it shall not be disclosed to third parties, or reproduced, without permission of the COMPANY.This document is tracked by ( ).
When it is printed, it shall be considered as “For information only”.The controlled copy is the version, and thus, it is the document holder’s responsibility to make sure that the latest version is in use.