Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

HANDOVER OF COMPLETED WORKS

PROJECT: CRIMSON RESORT & SPA BORACAY DATE PREPARED: JULY 27, 2018
LOCATION: BORACAY ISLAND, MALAY, AKLAN DATE ACCEPTED:

This is to certify that the (Subcontracto UNITEC RESOURCES INC is handing over the area
as stated below to ecoSolutions .
In case defects have been discovered after the hand over, we shall rectify such defects at no cost to
ecoSolutions.

Area and Scope of Work:


HARNESSING OF WIRES @ PANEL LVSGA, LVSGB, DBA, DBB.

Prepared by: Handover to:

KENDARILL M. MOTIN
SUBCON REPRESENTATIVE ecoSolutions REPRESENTATIVE

Drawings/Specs Reference:
EE 3.10

Attachment:
FUNCTIONALITY FORM
KEYPLAN

This is to certify that we have fully inspected/surveyed the above mentioned area being handed
over to us and we are now ready to proceed with our work.

Area and Scope of Work:


HARNESSING OF WIRES @ PANEL LVSGA, LVSGB, DBA, DBB.

Accepted by: Noted by:

ecoSolutions REPRESENTATIVE DCI REPRESENTATIVE

Handover to:

You might also like