PROJECT: CRIMSON RESORT & SPA BORACAY DATE PREPARED: JULY 27, 2018
LOCATION: BORACAY ISLAND, MALAY, AKLAN DATE ACCEPTED:
This is to certify that the (Subcontracto UNITEC RESOURCES INC is handing over the area
as stated below to ecoSolutions .
In case defects have been discovered after the hand over, we shall rectify such defects at no cost to
ecoSolutions.
KENDARILL M. MOTIN
SUBCON REPRESENTATIVE ecoSolutions REPRESENTATIVE
Drawings/Specs Reference:
EE 3.10
Attachment:
FUNCTIONALITY FORM
KEYPLAN
This is to certify that we have fully inspected/surveyed the above mentioned area being handed
over to us and we are now ready to proceed with our work.
Handover to: