Plant Maintenance Work Order

Lab No:
WO NO.
2009545
Priority : P2 Next PS
Model Unit : HIN 500-FM260JD
Unit No : R-11 Component: ENGINE Sample Date: 20-Jul-23
Location : MHS Lab Received Date: 25-Jul-23 Date Raise Rekom: 26-Jul-23
ASSIGMENTS ESTIMATED
Originator : Conmon HO Estimated Duration :
Assigned To : Dian Hidayat / Yoga G.P. Schedule Start Date :
Actioned By : Labour Internal Schedule Completed :
Comp Group :
Work Order Description
Fe Si and PQ at high level. Cr at medium level. Indicate contaminant/ dirt entry and excessive wear Cylinder liner valve train
oil pump crankshaft thrust bearing Pistons ring piston. Check abnormal noise. Check valve mechanism or adjust necessary.
Check oil pressure and oil level. Check filter cut. Check Turbocharger and Oil Cooler leak. Check Dust entry point. Inspect air
induction system leakage. Check air filter blocked. Check contaminant source Check oil consumption. Check cooling system
and abnormal operating temperature. Check performance and blow-by. Repair necessary. (Febri)

Si, Fe, Al, DEBRIS masih tinggi, pengecekan sebelumnya air cleaner buntu - sudah dibersihkan.
1. Cek adanya kebocoran Air Intake System
2. Cek Air Cleaner
3. Cek Adanya Abnormal pada performa Engine
4. Cek Abnormal pada Asap Muffler
5. Cek Abnormal Noise Engine
6. Cutting Filter Engine NEXT PS
7. Cek adanya kebocoran di area Engine
8. Resample Oli NEXT PS

Dilengkapi oleh Tradeperson / Supervisor


ACTUAL
Start Date: Completion Date: Current (SMU):
Start Time: Completion Time: Total Actual Duration:

After Maintenance Remarks / Job yang dilakukan & Temuan saat pengecekan-Repair

Delay Reasons

Nama Mekanik:
Mekanik TTD: Date:
Leader/SPV TTD: Date: