LVP - I.V. Fluid Ffs Project
LVP - I.V. Fluid Ffs Project
PROJECT AT A GLANCE
MANUFACTARING OF
LAREGE VOLUME PARENTERAL
IN PLASTIC BOTTLES
(F. F. S. TECHNOLOGY)
Prepared by
I am very much eager to hear your final decision about the Production capacity and
Technology you are deciding. But my advice is to go for Indian established BFS
Technology first. However, the final decision is up to you. Once it is finalized we can go
ahead with the Project works.
1. Finalization of Land by making sure of: Water availability, Quality of water, Pollution
free environment, Road Access, Electric HT Supply availability, Manpower
availability and drainage for treated waste water.
2. Location sketch of Land and verification of Land Documents.
3. Measurement of Land and NOC from adjacent land owners.
4. Design of Building Layout depends on the technology and capacity by considering the
expansion plan.
5. Project Report and Financial Projections.
6. URS of Machines and Equipment's
7. Approvals from all statutory departments and Bank
8. Selection of necessary Manpower
9. Starting of construction and selection of Machinery's.
10. Purchase orders as per URS to approved selected vendors.
11. Make sure to complete the Building works within 6 months except paneling works
and finishing jobs and erection works starts on 6th month and all commissioning works
should complete by 9th Month.
12. Set up and completion of Quality Control Lab and Quality Assurance System
13. Recruitment of necessary Manpower, Production, QC, QA and Engineering Heads
and Maintenance Team
14. Documentation works
15. Performance Qualification and Validation of all equipment's start and should
complete within 1 month.
16. Water system Validation, Area Validation, HVAC system Validation and Steam
system Validation completion within 2 months.
17 Application for Licensing (Test License - Stability Study) and get ready for Joint
Inspection
18 Grant of License - 28D
19. Process Validation and Approvals of Protocols, SOPs, Master Formulas and other
Documentations.
20. Commercial Productions.
Approximate 16 Months strict, Pre-Planned, arranged, scheduled works for the successful
commissioning of Project.
I am ready to help at any way for the completion and commissioning of the Project as per
your requirement.
Ease in operation
Zero leakages
I.V. Fluids
1. Intravenous
2. Subcutaneous
3. Intramuscular
4. Intraspinal
At 1657 by Sir Christopher Wren was firstly beginning the injections by vain in living
animals.
The term parenteral came from the Greek word Para enteran means
Beside the intestine refers to the rout of administration of drugs by injection under or
through one or more layer of skin or muscular membrane or vain.
Developments in I.V. Industry
1. In the later heart of 19th century developed the hot air and steam
Sterilization and the bacteria retaining filter.
2. In 1920 Dr. Florence Seaward provided proof that the chills and fever occurred
during I.V. Fluid administration is due to the presence of waste material of
microorganism (pyrogen) which can eliminate from water by Multy Column
Distillation Process.
3. Discover of High Efficacy Particulate Air (HEPA) Filter and Laminar Air Flow
(LAF) it help for to prevention of Microbial and other contaminations in the product
4. In 1972 Dr. J.F Cooper discover the method of determine the presence of pyrogen
by Limulus Amibocite Lisate (LAL) Test.
Advantages
The basic Purpose of administering I.V. FLUID is to establish and maintain adequate
composition of fluids and Electrolytes in the patients, who suffer from variety of
diseases.
1. Carbohydrate solutions
3. Electrolytes Solutions
5. Antibiotic Solutions
6. Antifungal solutions
7. Dialysis fluids
8. Irrigation Solutions
9. Amino Acid–Transfusions
10. Synthetic plasma volume substitutes (Dextran, Haemaccel, and Icoccel etc.)
PRODUCTS
The basic Purpose of administering I.V. FLUID is to establish and maintain adequate
composition of fluids and Electrolytes in the patients, who suffer from variety of
diseases.
W.F.I D.M
Unloading
Sterilization Saturated
ntinued Steam
from from boiler
previous page
Leak test
Physical verification
Visual inspection
F.G. Stock
F. G. Dispatch