Professional Documents
Culture Documents
CB Budetformats 2020-21-22 POD ECSA
CB Budetformats 2020-21-22 POD ECSA
24.5
525
Major Variations - RE 2017-18 Major Variations - RE 2018-19
Cost of TDP
Name of
Sl.No Entity/Group/ Name of TDP Original(i Last
Division Revised
n lacs) Approved
subject to
approval,
2 POD/ECSA SST variability study in the regional ocean domains around India 4.00
already
proposed
subject to
Synergetic Application of Oceansat-3 data to study regional circulation and approval,
3 POD/ECSA 6.00
biogeochemistry in the north tropical Indian Ocean already
proposed
Annexure - C3
ates 2018-19 & Budget Estimates 2019-2020
evelopment Programme - Budget Summary
(` in Lakhs)
Budget Expected
Cum. Exp. Budget
Revised Estimates Starting Planned Expected Page No. date of
Up to End Estimates
Estimates 2022- Date of Date of Date of Reference Payment Remarks
of the 2021-22(in
2021-22 2023(in the TDP Completion Completion for Write Up (Q1/Q2/Q3/Q
2020-21 lacs)
lacs) 4)
Estimation of
Evapotranspiration over
1 TDP061718016 North-West India 10.24 0.24
Region using Satellite
Remote Sensing
Ecological studies of
2 Hooghly estuary and its
TDP061819036 6.00 0.00
environment using
remote sensing 95
Identification of landing
4 TDP061819041 sites for planetary 6.00 0.00
studies
Selection of appropriate
method for Downscaling
5 TDP061819043 for Actual 2.50 0.00
Evapotranspiration
product
Understanding the
productivity of Cyclonic
6 vs Anti-Cyclonic
TDP061819047 3.20 0.00
mesoscale eddies:
Using satellite derived
parameters.
Assessment of
Groundwater depletion
and its impact on
7 aquifer health in hard
TDP061819056 6.00 0.00
rock areas using
GRACE satellite data
and Ground water well
observations
Design and
9 TDP061819062 development of 45.00 0.00
octocopter
Estimation of new
production using in situ
11 TDP061920001 & remote sensing data 2.00 0.00
products in the Indian
Ocean region
Estimation of surface
storage retention in
12 relation with rainfall
TDP061920009 4.50 0.00
variability and
catchment
characteristics
Importance of rock
14 water interaction on
TDP061920011 14.00 0.00
ground water Quality in
Kuhi area, Maharastra
Authentication,
Authorization &
15 TDP061920012 Accountability( AAA) for 2.00 0.00
Bhuvan geospatial web
services
Study on forest
classification methods
16 and techniques for
TDP061920013 6.00 0.00
improving classification
performances using IRS
satellite data
Development of soil
surface roughness
17 TDP061920014 measurement 4.80 0.00
instrument based on
AIRS sensor
Harmonization of IRS
18 sensor data for building
TDP061920015 3.00 0.00
an analysis ready data
set
AI based feature
19 TDP061920016 extraction using high 5.00 0.00
resolution spatial data
Discrimination of
irrigated and rainfed
20 TDP061920017 crop using multi spectral 4.00 0.00
and field data derived
indices
Geospatial assessment
21 TDP061920018 of urban growth on 20.00 0.00
sustainability
Semi automated p\
object-based image
23 analysis approach for
TDP061920020 4.60 0.00
deriving hydro-
geomorphic units for
ground water mappiung
Vulnerability mapping of
rural areas to migration
24 TDP061920025 in Indian Himalayan 16.70 0.00
region using machine
learning techniques
31-03-2020 13-08-2019
31-03-2019 13-08-2019
31-03-2021 13-08-2019
01-03-2021 13-08-2019
31-03-2021 13-08-2019
31-03-2022 13-08-2019
31-03-2021 26-08-2019
31-03-2020 13-08-2019
31-03-2021 16-08-2019
31-03-2020 13-08-2019
31-03-2021 09-08-2019
31-03-2022 06-08-2019
31-03-2022 06-08-2019
31-03-2022 06-08-2019
31-03-2022 06-08-2019
31-03-2022 06-08-2019
31-03-2022 06-08-2019
31-03-2021 06-08-2019
31-03-2022 07-08-2019
31-03-2022 07-08-2019
31-03-2022 07-08-2019
31-03-2021 07-08-2019
31-03-2022 08-08-2019
31-03-2023 29-08-2019
115.35 0
Annexure - C4
Centre/Unit: NATIONAL REMOTE SENSING CENTRE
Budget Estimates 2021-2022
Advance R & D - Summary
(In Lakhs)
Expected Page No.
Date of Ref. in
Completi Vol- II for
on write up
13 14
Budget Estimates FY
Technical Facilities/Infrastructure
Centre/Unit:NATIONAL REMOTE SENSING CENTRE (NRSC)
(` in Lakhs)
Cum.
Budget Page No.
Entity/Area/ Cost of the Exp. Up Relative
Sl.No Item Description & Supplier Rep / Aug Estimates Ref. for
Group Equipment to Priority
2021-2022 write up
2019-20
1 2 3 4 5 6 11 12 13
Replacement / Augmentation
1 AS&DM 0.00 0.00 0.00
2 SDRISA 0.00 0.00 0.00
3 DPPA&WA 0.00 0.00 0.00
4 RSA 0.00 0.00 0.00
5 ECSA 0.00 0.00 0.00
6 RC 0.00 0.00 0.00
7 PPEG 0.00 0.00 0.00
8 Common Facility 0.00 0.00 0.00
9 Jeedimetla Outreach 0.00 0.00 0.00
Sub Total R&A 0.00 0.00 0.00
11 Enhanced Bhuvan Services 0.00 0.00 0.00
12 Virtual Groundstation 0.00 0.00 0.00
13 NICES 0.00 0.00 0.00
14 Ku Band DRS (GISAT-GS) 0.00 0.00 0.00
Total - Technical Facilities 0.00 0.00 0.00
Facility Replacement / Augmentation
0.00
0.00
0.00
BE
Annexure - C5
###
###
Probable
RFP Date of Indent/ Probable
Payment Indent/ PO no.
Status Indenting PO no. PO date
date
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
9
1
2
0
1
0
1
### 2
### 0
1
5
0
### 0
2
2
3
### 3
###
###
###
2017E0333301
###
###
###
###
###
###
0
0
3
2
5
### 9
-
4
### .
1
0
L
2
0
1
0606S0203601
7
0
0606S0203701
0
0606S0203702
3
0
0606S0203703
9
2
6
0
-
NEW
1
2
7
.
0
8
0
0
2017E0321502
3
5
L
6
7
0606S0403701
-
6
.0606S0303701
7
5
0606S0303702
L
0606S0303703
0606S0303704
t0
0
t3
o
1
7
O
5
&
2
-
M
0
3
0
1
6
7
L
0
2
6
0
0
S1
3
0606S0303705
0
3
7
3
1
0
0
6
0
0606S0303707
-3
3
7
1
3
0
2
8
5
4
L
2
-
0
1
1
.
7
2
0
0
L
3
2
3
0
8
1
7
7
-0
5
0
5
### 3
5
L060630803612
3
2
### 9 0
### 1 -
7
### 0
2
### 0 .
### 3 8
5
### 8 3
### 8 L
-
### 9
### .
### 7
5
L
n
O
c
### t
o
### b
### e
r
### ,
###
### 2
0
### 1
### 7
.
###
3
)060631703601
### F
### i2
l
### 0 e1
### 7
### 0 s0
e3
n
4
t2
4
t2
o
0
1
I7
.0
o
0
3
F3
### o 0
r2
2
e0
v1
a7
u
0
a0
t3
i3
o
4
n
4
060641303502
###
###
###
0
6
### 0
0
6
6
060610203602
1
0
0
6
2
1
0
0
3
2
6
0
060610203702
0
3
1
7
060670103911
0
###
1
9
1
8
2
-
3
4
..
9
4
0
0
2
LL
0
2
2
1
0
0
7
1
1
0
7
7
0
0
3
0
0
2
3
3
3
5
1
8
5
5
2
4
-
-
-6
1
9
.3
4
0
2
6
L
L
2
L
0
2
1
0
7
1
0
7
0
0
3
0
4
3
8
3
9
060632303602
0
0.00 0
-
-
### 1 9
2
0.00 0.00 0.00 0.00 0.00 0.00 .0
6
7
L
2
L
0
1
7
0
0
3
3
9
1
-
0
2
2
6
2
-
1
8
.
1
4
c
r
0.00 0.00 0.00 0.00 0.00 0.00 .
2
0
1
7
0
0
3
2
2
5
L
2
0
1
7
0
0
3
3
9
9
-
3
L
Revised Estimates CY & Budget Estimates FY
Production/Industry Interface
Centre/Unit:NATIONAL REMOTE SENSING CENTRE (NRSC)
Cum. Budget
Expected Revised
Sl. Entity/Area/ Name of the Total Exp. Up Estimates Present
Item Description date of Estimates
No. Group Industry Partner Cost to PY CY (2018- Status
Payment CY(2018-19)
(2017-18) 19)
1 2 3 4 5 6 7 8 9 10
Total
(CY: Current Year, FY: Forcast Year, PY: Previous Year)
Annexure - C6
(` in Lakhs)
Page
Budget
No.
Estimates
Ref. for
FY(2019-20)
write up
11 12
DETAILS OF OPERATIONS AND MAINTENANCE
(Rs.in L)
Sl.No Line Item Entity Object CoDescription BE 2020-2RE 2020-2BE 2021-22
1 06061020PPEG 2101 AMC of Library systems 4.05 4.05
2 06061020PPEG 1701 Specific consumables for Library 0.90 0.90
5 06061020PPEG 1701 Spares for DTP systems, printing & binding 0.90 0.90
related machines
Adobe inDesign, Photoshop, Illustrator &
6 06061020PPEG 9001 0.90 0.90
Acrobat S/W
7 06061020PPEG 1701 MPF Printing Consumables 3.60 3.60
Binding of journals/preservation/pest
21 06061020PPEG 1902 1.80 1.80
control
22 06061020PPEG 1902 Books, reports, journals etc 45.00 45.00
Subscriptions of journals over internet & CD
23 06061020PPEG 1902 76.50 76.50
ROM databases
24 06061020PPEG 518 AMC for Readers,Controllers, etc.,- ACS 10.80 10.80
Specialised Consumables for ID card printing
25 06061020PPEG 1702 2.70 2.70
- ACS
QA lab instruments maintenance and
28 06061030SR&QA 1702 0.90 0.90
consumables
29 06061030SR&QA 9001 IT Machinery & Equipment 2.70 2.70
30 06061030SR&QA 1206 ISO Programme recertification 3.60 3.60
31 06061030SR&QA 1206 Test standards, reference books, training & 5.40 5.40
Quality Day
33 06061060TrO 1901 Digital Data and Satellite Imagery for 0.90 0.90
training
97 06064210RSAA OFF 1901 Satellite data cost : common pool :RSAA 13.50 13.50
138 06065010AS&DM 1700 Spares for Aircraft & Ground survey 94.50 94.50
equipment
Aircraft Maintenance and Interiror
139 06065010AS&DM 1301 127.67 127.67
Refurbishment
Main.of Sensor Equip.& Interface S/W
140 06065010AS&DM 1301 49.50 49.50
(ALTM-DC, LFDC )
Pilots expenditure (Training, Proficiency
141 06065010AS&DM 1801 1.80 1.80
checks)
145 06067010P&GA 518 Elec, DG Sets, UPS , etc Maintenance 16.20 16.20
146 06067010P&GA 518 AMC of Spacenet / ISROnet & related equip 9.00 9.00
& Leased lines
147 06067010P&GA 518 AMC for Avaya & siemens tel exchange 10.80 10.80
148 06067010P&GA 2101 Operations and maintenance of Fire Tender 7.20 7.20
152 06067010P&GA 1702 VHF sets for Antenna feed/hub to control 0.90 0.90
room communication
Maintenance of X-ray machine & Walky-
153 06067010P&GA 518 18.00 18.00
talky at Balanagar
154 06067010P&GA 518 AMC for CCTV related systems 9.00 9.00
155 06067010P&GA 1701 Security aids and fire prevention at NRSC, 8.73 8.73
Shadnagar
Fire extinguishers(B.nagar, S'nagar, old
156 06067010P&GA 1701 9.00 9.00
Airport)
AMC for Fire extinguishers(B.nagar, S'nagar,
157 06067010P&GA 518 7.20 7.20
old Airport)
158 06067010P&GA 1200 Safety awarness programms, seminars etc 3.60 3.60
167 06067040CMG 518 Main. Of DG set and UPS , Pump house at 10.80 10.80
Shadnagar
168 06067040CMG 1701 AC related 9.00 9.00
169 06067040CMG 1701 STAAD PRO/Revitt /3Ds max SOFTWARE 0.90 0.90
170 06067040CMG 1701 Spares for LED street light fittings at NRSC 4.50 4.50
Shadnagar
Supply of spares for DG sets at NRSC
171 06067040CMG 1701 4.50 4.50
Shadnagar
172 06067040CMG 9001 AutoCad S/W 0.90 0.90
175 06067040CMG 518 AMC provision for VRF facilities 0.90 0.90
Spares switchgear & measuring
176 06067040CMG 1701 instruments,accessories for 6 0.90 0.90
389 0606E010OSG 1701 Calibration and transport of IOP profiler 4.50 4.50
411 0606E020ECSA OFF 1702 Consumables & Accessories for instruments 9.00 9.00
422 0606E020ECSA OFF 1301 Atmospheric Instruments maintenance & 4.50 4.50
Calibration, etc
425 0606S010SDR&ISA 2103 PCB design / fabrication works (RF&BSD+ 13.50 13.50
RDASD+ HDG)
426 0606S010SDR&ISA 9001 IT related Machinery & Equipment 0.90 0.90
427 0606S010SDR&ISA 1702 Spares for Electrical Systems at AGEOS 1.80 1.80
428 0606S010SDR&ISA 1200 Hiring of crane services & logistics 1.80 1.80
429 0606S020RF&BSG 2101 Payment for WPC Licence fee 108.00 108.00
434 0606S040HDD 1702 Components, spares, PCB assembly tools 10.80 10.80
443 0606S030AM&TSG 1700 Work benches for ASMD Lab-2nos 0.00 0.00
Spares, Materials, consumables, tools for
444 0606S030AM&TSG 1701 4.50 4.50
fabrication works
DETAILS OF ADMINISTRATIVE EXPENSES
Balance
Budget Budget
Sl. Sanctioned Cum. Exp. Present available
Name of the Work Estimates Estimates
No. Cost Up to PY Status beyond FY
2020-21 2021-22
(3-4-8-9)
1 2 3 4 5 6 9 10
A. Works Under Progress
Expected date of
Payment
(Q1/Q2/Q3/Q4)
Annexure-C8
Revised Estimates CY & Budget Estimates FY
Housing
Centre/Unit:NATIONAL REMOTE SENSING CENTRE (NRSC)
(in Lakhs)
Balance Expected
Budget Budget avaliable date of
Sl sanction Cum. Exp. Present
Name of work Estimates Estimates beyond Payment
No ed Cost Up to PY Status
2018-19 2021-22 FY (Q1/Q2/Q3/
( 3-4-8-9) Q4)
1 2 3 4 5 6 9 10
Actuals during PY Budget Estimates Exp. Up to July of Exp. from Aug- Revised Estimates
2019-20 CY 2020-21 CY 2020-21 Feb CY 2020-21 CY 2020-21
Particulars
No. Amount No. Amount No. Amount No. Amount No. Amount
1 2 3 4 5 6 7 8 9 10 11
(Rupees in Lakhs)
Budget Estimates
FY 2021-22
No. Amount
12 13
0.00
0.00
Revised Estimates CY & Budget Estimates FY
Facility Operations & Maintenance - Budget Summary
1 2 3 4 5 6 7
Annexure - C15
(` in Lakhs)
Expected
Major reasons for Variation date of
in BE FY Payment
w.r.t. RE CY (Q1/Q2/Q3/
Q4)
8 Obj.Head
Annexure-C17
REVISED ESTIMATES CY 2018-19 & BUDGET ESTIMATES FY 2019-20
STATEMENT SHOWING DETAILS OF OFFICE VEHICLES & FUNCTIONAL VEHICLES
CENTRE/UNIT: NATIONAL REMOTE SENSING CENTRE, HYDERABAD
(` in Lakhs)
No.of Budget Estimates BE 2018-19 Revised Estimates RE 2018-19
Budget Estimates BE 2019-20
Type of existing Replacement Addition Replacement Addition Replacement Addition
Sl.No vehicles
Vehicle
as on end
of PY2014- No Amount No Amount No Amount No Amount No Amount No
1 15 2 5 6 7 8 9 10 11 12 13 14 15
A OFFICE VEHICLES
1 BUSES -
2 MINIBUSES
3 CARS
4 VAN
5 JEEP
6 SUV/MUV
7 MOTOR
8 CYCLE
MOPED
9 Battery
Operated Car
10 QRT-CISF
11 Others
( Specify)
TOTAL-A 24+7=31 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
B FUNCTIONAL VEHICLES
1 Truck
2 Mini Truck
3 Fire Tender
4 Ambulance
Exhibition Van
5
6 Delivery Van
7 Hauler
8 Fork Lift
9 Tractor
10 Trailer
Explosive Van
11
12 Road Tanker
Others
13 ( Specify)
TOTAL-B
Grand Total
(A+B) 33 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
(` in Lakhs)
mates BE 2019-20
Addition
Amount
16
0.00
0
Revised Estimates CY (2018-19) & Budget Estimates FY(2019-20)
Details of Foreign Travel Expenditure
1 2 3 4 5 6 7 8 9 10 11 12 13 14
NRSC
Rs. In
Lakhs
et Estimates FY(2021-22)
International
Co-operation
Total
No. of No. of
Amoun
Deputati Deputat Amount
t
ons ions
15 16 17 18
0 0.00 0 0.00