PVsyst TRIAL
PVsyst - Simulation report
Grid-Connected System
PVsyst TRIAL
PVsyst TRIAL
Author
PVsyst TRIAL
Project: PROYECTO - HUANCAVELICA
Variant: Nueva variante de simulación
PVsyst V7.2.17
VC0, Simulation date:
14/08/22 17:07
PVsyst TRIAL
with v7.2.17
Project summary
Geographical Site Situation Project settings
Alto La Villa Latitude -17.19 °S Albedo 0.20
Peru Longitude -70.94 °W
Altitude 1373 m
Time zone UTC-5
Meteo data
Alto La Villa
PVGIS api TMY
System summary
PVsyst TRIAL
Grid-Connected System No 3D scene defined, no shadings
System information
PV Array Inverters
Nb. of modules 30 units Nb. of units 3 units
Pnom total 9.60 kWp Pnom total 9.00 kWac
Pnom ratio 1.067
Results summary
Produced Energy 18828 kWh/year Specific production 1961 kWh/kWp/year Perf. Ratio PR 82.67 %
PVsyst TRIAL
Project and results summary
Main results
Loss diagram
Special graphs
Table of contents
PVsyst TRIAL
PVsyst TRIAL
14/08/22 PVsyst Evaluation mode Page 2/6
Project: PROYECTO - HUANCAVELICA
Variant: Nueva variante de simulación
PVsyst V7.2.17
VC0, Simulation date:
14/08/22 17:07
PVsyst TRIAL
with v7.2.17
General parameters
Grid-Connected System No 3D scene defined, no shadings
PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane Transposition Perez
Tilt/Azimuth 20 / -90 ° Diffuse Imported
Circumsolar separate
PVsyst TRIAL
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model M320 Wp 120 cells Model IPG 3S
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 320 Wp Unit Nom. Power 3.00 kWac
Number of PV modules 30 units Number of inverters 3 units
Nominal (STC) 9.60 kWp Total power 9.0 kWac
Modules 3 Strings x 10 In series Operating voltage 250-750 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.07
Pmpp 8.76 kWp
U mpp 303 V
I mpp 29 A
PVsyst TRIAL
Total PV power Total inverter power
Nominal (STC) 10 kWp Total power 9 kWac
Total 30 modules Number of inverters 3 units
Module area 50.6 m² Pnom ratio 1.07
Cell area 45.0 m²
Array losses
Thermal Loss factor DC wiring losses LID - Light Induced Degradation
Module temperature according to irradiance Global array res. 173 mΩ Loss Fraction 2.0 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s
PVsyst TRIAL
IAM loss factor
Incidence effect (IAM): Fresnel, AR coating, n(glass)=1.526, n(AR)=1.290
PVsyst TRIAL
14/08/22 PVsyst Evaluation mode Page 3/6
Project: PROYECTO - HUANCAVELICA
Variant: Nueva variante de simulación
PVsyst V7.2.17
VC0, Simulation date:
14/08/22 17:07
PVsyst TRIAL
with v7.2.17
Main results
System Production
Produced Energy 18828 kWh/year Specific production 1961 kWh/kWp/year
Performance Ratio PR 82.67 %
PVsyst TRIAL
Balances and main results
PVsyst TRIAL
February 193.4 76.65 18.73 193.7 190.6 1580 1530 0.823
March 209.5 73.61 18.50 208.7 205.2 1709 1655 0.826
April 188.9 54.22 18.69 184.3 180.5 1514 1467 0.829
May 166.9 43.41 17.53 162.5 158.3 1351 1311 0.841
June 157.1 31.15 18.10 153.2 148.7 1269 1232 0.838
July 168.4 36.23 17.32 163.9 159.4 1361 1319 0.839
August 190.4 47.29 17.56 185.2 180.8 1525 1478 0.832
September 209.6 59.13 18.23 203.5 199.4 1661 1609 0.824
October 240.4 72.63 17.98 233.8 229.5 1896 1837 0.818
November 239.0 78.74 18.32 235.4 231.4 1905 1846 0.817
December 236.6 85.65 17.90 234.0 230.2 1904 1846 0.821
Year 2412.6 746.75 18.10 2372.5 2325.3 19428 18828 0.827
PVsyst TRIAL
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
PVsyst TRIAL
14/08/22 PVsyst Evaluation mode Page 4/6
Project: PROYECTO - HUANCAVELICA
Variant: Nueva variante de simulación
PVsyst V7.2.17
VC0, Simulation date:
14/08/22 17:07
PVsyst TRIAL
with v7.2.17
Loss diagram
2413 kWh/m² Global horizontal irradiation
-2.00%
-2.10%
-8.52% PV loss due to temperature
PVsyst TRIAL
PVsyst TRIAL
14/08/22 PVsyst Evaluation mode Page 5/6
Project: PROYECTO - HUANCAVELICA
Variant: Nueva variante de simulación
PVsyst V7.2.17
VC0, Simulation date:
14/08/22 17:07
PVsyst TRIAL
with v7.2.17
Special graphs
Diagrama entrada/salida diaria
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL