The document is a maintenance defect record for a mining unit. The electrical harnesses and sensors on the unit failed due to a short circuit. To repair the unit, the electrical harnesses and sensors need to be replaced. A total of 48 hours of work is estimated for an auto electrician to complete the required maintenance task of changing out the faulty parts.
Original Description:
Original Title
Om . Dr 22 . Electrical Haenesses Got Short Circuit . 21 07 2023
The document is a maintenance defect record for a mining unit. The electrical harnesses and sensors on the unit failed due to a short circuit. To repair the unit, the electrical harnesses and sensors need to be replaced. A total of 48 hours of work is estimated for an auto electrician to complete the required maintenance task of changing out the faulty parts.
The document is a maintenance defect record for a mining unit. The electrical harnesses and sensors on the unit failed due to a short circuit. To repair the unit, the electrical harnesses and sensors need to be replaced. A total of 48 hours of work is estimated for an auto electrician to complete the required maintenance task of changing out the faulty parts.
Operator Pre-Start: Operator Pre-Start Number: Description: Electrical harnesses got Short circuit and sensors failed Symptom:
Cause:
Action Required: Change electrical harnesses and sensors
Part Number Part Description Qty
522-7620 Harness mast ECM 13 M 1 522-1012 Harness mast flex 1 514-1260 Harness as valve 1 514-1093 Harness front chassis 1 514-1098 Harness as box 1 382-2001 Fuel water separator sensor 1 320-3065 Air flushing sensor 1 320-3065 Compressor oil pressure sensor 1 Labour Activity Qty Hrs Each Total Hrs Labour Activity Qty Hrs Each Total Hrs Fitter Auto Electrician 2 24 48 HV Electrician Boiler Maker
Other Resources (Crane / IT etc.) / Planning Notes
Total Time to Complete Maintenance Task Duration: 48 Hrs
Raised By: NORIDDINE MHAND /210245 Signature: NM
------------------------------------------------------- OFFICE USE ONLY ------------------------------------------------------- Defect Type Priority Action Person Responsible Emergency Complete immediately Maintenance Supervisor Breakdown Complete within 7 days ✘ Corrective Complete within 60 days Maintenance Planner Project Complete within 90 days
Plant Defect Record Complete? Yes Reviewed By:
Plant Defect Record entered into JDE? Yes Entered By: