Accomplishment Works With Highlighted Keyplan & Photos

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

Quantity Done

Quantity Done Accomplishment I


LEVEL I ACTIVITY I (Previous Remarks
(Recent) (%)
Report)
Unit D is on Hold+ _,,,.
Concrete Topping (Pilete for
62m 62m 65.54% Cladding Pilete
150mm Drywalls)
Remains

Drywall Framing (Horizontal On going activity+


32.11m 54m 59.6%
Support) Unit D is on Hold
32nd
Drywall Framing (Vertical I On going activity+
48.7m 64.7m 71.41 % Unit D is on Hold
Studs)

On going activity+
Ceiling Framing (Hanger) 485.8m 2 485.8m 2 37.47%
Unit D is on Hold

Concrete Topping (Pilete)


I 48.3m
I 79.3m
I 91%
I On going activity ,,.,.

'yJI L 1

33rd
Drywall Framing (Soffit and
, Pilete Tracks) I 0
I 0
I 0
I Preparation (Hauling
of Materials)

Units and Hallway Not


Ceiling Framing 0 0 0 Completely
handovered