Professional Documents
Culture Documents
MEGA TOWER - Project Brief
MEGA TOWER - Project Brief
MEGA TOWER - Project Brief
EDSAcornerJ.VargasAvenue,MandaluyongCity,Philippines
PROJECT BACKGROUND
EDSA
MRT LINE
HOTEL BUS STATION MRT STATION SHAW BLVD
C-5
ORTIGAS AVE.
SCHOOL HOSPITAL JULIA VARGAS AVE.
ACCESSIBILITY | MRT-3 & PTI
ELEVATED WALKWAY
ACCESSIBILITY | MM SUBWAY
(Future Development)
PUBLIC
TRANSPORT
INTERCHANGE
ACCESS TO
MEGA FASHION HALL
FIRE EXIT
MAIN TOWER
TOWER
LOBBY ENTRANCE
DROP OFF
ORTIGASCENTER TRAFFICSCHEME
ROUTES TO/FROM MEGA TOWER
SM MEGAMALL | MALL PROFILE
1991
350,000 Weekday
500,000 Weekend
BUILDING A BUILDING B
AIRPORT
TAXI STAND
BUS TERMINAL
UV EXPRESS
INTERCONNECTING TO NAIA :
WALKWAY EDSA SOUTH BOUND
GROUND FLOOR LOBBY
FLOOR PLAN
LOW ZONE : 7F –23F
M E G A F A S H I O N H A L L
E D S A
G A R D E N W A Y ( S H A N G R I - L A )
FLOOR PLAN
MID ZONE : 14F –38F
M E G A F A S H I O N H A L L
E D S A
G A R D E N W A Y ( S H A N G R I - L A )
FLOOR PLAN
HIGH ZONE : 39F –51F
M E G A F A S H I O N H A L L
E D S A
G A R D E N W A Y ( S H A N G R I - L A )
COVERAGE OF LEASE USABLE AREA COMMON AREA LEASABLE AREA
USABLE AREA EFFICIENCY SQM SHARE (15%) SQM SQM
EXCLUDING
86% 1,850.45 296.07 2,146.52
HALLWAY
INCLUDING 296.07 +
92% 2,039.38 2,146.52
HALLWAY 188.93 (Hallway)
LEASABLE AREA
ELEVATOR LOBBY
PARKING FACILITY
TELCO ENTRY POINTS
BUILDING A BUILDING B
• SM Green Movement
• SM Investments Corporation – Path to Sustainable Growth
• SM Investments Corporation – Sustainability Reports
• SMIC Sustainability Report 2019
• SM Prime Holdings Inc – Sustainability Programs
• ASEAN Sustainability E-Summit 2021
• 140MW of renewable energy by 2022
MEGA TOWER |
GREEN BUILDING DESIGN
RENT (PHP/SqM/Mo) PHP 900.00 (for Bare Shell, with smooth cement floor)
Maricris Cruz
0917-8602724
maricris.cruz@smsupermalls.com