Download as pdf
Download as pdf
You are on page 1of 7
HILTI HKD FLUSH ANCHOR Technical Datasheet Update: Jan-23 a HKD Flush anchor Everyday standard manual set flush anchor for single anchor applications ~ Simple and well proven HKD = Approved, tested and confirmed (M8-M20) by everyday jobsite experience ~ Reliable setting thanks to simple visual check ~ Versatile HKD-S(R) - For medium-duty fastening with (M6-M20) bolts or threaded rods - Available in various materials and sizes for maximized coverage of ible applications HKD-E(R) Possinie 2pm (M6-M20) Concrete Static! (non-cracked) quasi-static European PROFIS Hammer. Technical contrity Engineering riled holes ‘Assessment design sofware Approvals / certificates Authority / Laboratory No. / date of issue European Technical Assessment *) | CSTB, Mame-la-Vallée ETA-02/0032 / 2020-11-04 Hilti technical data Hilt '@) _Alldata given inthis section according to ETA-02/0032, issue 2015-01-07. 3 of 7 Cia ‘All data in this section applies to: ~ Correct setting (See setting instruction) = No edge distance and spacing influence = Concrete as specified in the table - Stee! failure - Minimum base material thickness = Concrete C 20/25, facie = 25 Nimm* = Screw or rod with steel grade 5.8 (carboon steel) and / or A4-70 (stainless steel) Effective anc! th for static Effective anchorage depth he _[mm]| 25 | 25 | 25 | 25 30 | 40 | 30 | 40 65 | 80 Characteristic resistance i} Tension HKD-S, HKD-E HKD-SR, HKD-ER HKD Shear HKD-S,HKD-E Vex [KN] HKD-SR, HKD-ER HKD Tension HKD-S, HKD-E HKD-SR, HKD-ER HKD x | 4 Shear HKD-S,HKD-E Vrs [kN] | 3.9 / - | - | - | 39 HKD-SR, HKD-ER at] - [- |= [42 Recommended loads "! Hilti technical data ETA-02/0032, issued 2020-11-04 lAnchor size j i z/s i i i B/2/2|2 i HKD. 29|29|29/29| - |38| 36 | 38 | 59 | 83 |12,3] 168 Tension HKD-S,HKD-E New [kN] 29] - | - | - | 38/38 | 36 | 38 | 59 | 83 [123/168 HKD-SR. HKD-ER [as|- | - | - [3s[sae] - | - [59 [a3 [123/168 HKD. 29|29|29/29| - |49|52 [57 | 63 |105|19,3| 283 Shear HKD-S,HKD-E Vac [kN] | 28] - | - | - | 28/39] 42/39/46 | 81 [125/198 HKD-SR. HKD-ER 29|-|-|- [30/39] - | - [49] 88 |15.1|240 taken from national regulations. “3 With overall paral safety factor fr acon y= 1,6, The partal safety feciors for action depend on the iype of loading and shall be Mechanical properties [Anchor size we [ma | mio | wiz | Mie | M20 HKD 570 570 570 570 640 590 Neon onSte “AKD-S, HKO-E fa [Nimma | 560 | 560 | sto | s10 | - | 460 HKD-SR, HKD-ER- 540 540 540 540 a 540 HKD 460 460 460 480 510 470 Yield strength — HKD-S, HKD-E fe [Nimm?] | 440 440 410 410 z 375 HKD-SR, HKD-ER 355 355 355 355 - 355 st HKD 20,7 26,7 32,7 60,1 105 167, Stressed HKD-S, HKD-E Ae [mm] cross-section OER 209 | 261 | 208 | sa7 | - | 163 idomert’ct HKD 32,3, 54.6 82,9 184 431 | 850 n HKD-S, HKD-E Ww [mm] | resistance “HKD-SR, HKD-ER 50 79 110 264 602 | 1191 Char. bending With 5.8 Gr. Stee! 76 | 187 | 374 | 655 | 167 | 325 eves Hee gg Ml] | oe | x | on | ter | ase Material quality Part Material HKD Cold formed ste! / galvanised to min. 5 ym Anchor body HKD-S, HKD-E Stee! Fe/Zn5 galvanised to min. 5 ym HKD-SR, HKD-ER_ Stainless steel, 1.4401, 1.4404, 1.4571 HKD Cold formed stee! Expansion plug _| HKD-S, HKO-E Cold formed stee! HKD-SR, HKD-ER Stainless steel, 1.4401, 1.4404, 1.4571 Anchor dimensions of HKD, HKD-S, HKD-E, HKD-SR, HKD-ER Eff. anchorage depth hw _(mm}| 25 | 25 | 25 | 25 | 30 | 30 | 40 | 30 | 40 | 50 | 65 | 80 [Anchor diameter di __[mm]| 7,9 |9,95|11,9| 14,9) 8 | 9,95 | 9,95 | 11,8 11,95 | 14.9 |19,75|24,75 Plug diameter dz (mm| 5.1 |635/ 81 | 97 | 5 | 65 |6.35| 8.2 | 8.2 |103|13.8/ 16.4 Plug length hh {mmj| 10 | 7 | 7 | 72] 15 | 12 | 16 | 12 | 16 | 20 | 29 | 30 ‘Anchor body Expansion plugs ey fl 3 a HKD-E and HKD ER, — Setting details Effective embedment 1, immj| 25 | 25 | 25 | 25 | 30 | 30 | 40 | 30 | 40 | 50 eran ameter of 4, fmm} 8 | 10 | 12 | 18 | 8 | 10 | 10 | 12 | 12 | 15 | 20 | 25 Guttng diameter of ges {mm]| 845 | 10,5 | 12,5 | 185 | 8.45| 10,5 | 10.5| 125 [125 | 15,5 | 20,5| 25.5 Depth of drole hv® _(mmj| 27 | 27 | 27 | 27 | 32 | 33 | 43 | 33 | 43 | 5a | 70 | 85 Screwing depth nn (mmj) 6 | 8 | 10/12] 6) 8 | 8 | 10| 10 | 12) 16| 2 Thread engagement |... tmmj| 12 |115| 12 | 12 |125/145|17.5|127| 18 |235|305| 42 Diameter of dearance Diameter of clearance 4 fmm] 7 | 9 | 12| 14 | 7 | 9 | 9 | 12| 12 | 14 | 18 | 22 Max.torque moment Twa (Nmj| 4 | 6 | 15 | 35 | 4 | 8 | 8 | 18 | 15 | 36 | 60 | 100 '2) With anchor size MTOx30 only rod sto be used. Installation rent Rotary hammer for setting TE1-TE3 (Machine setting tool__ HSO-M (6x25/30_| 6x25/30 | 10x26/30 | 10x40 | 12x50 | 16x65 Hand setting tool Say 6x25/30 | 8x25/30 | 10x25/30 | 10x40 | 12x50 | 16x65 (Other tools hammer, torque wrench, blow out pump ‘Setting paramaters Minimum base material aim ‘how {mm}| 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 Minimum spacing and S~= {mm| 60 | 60 | 60 | 60 | 60 | 60 | 80 | 60 | 80 | 125 | 130 160 minimum edge distance HKD-S (R)/HKD-E(R) ¢.., (mm}| 88 | 88 | 88 | 88 | 105 | 105 | 140 | 105 | 140 | 175 | 230 | 280 Minimum spacing Sem {mm]| 60 | 60 | 60 | 60 | 60 | 60 | 80 | 60 | 0 | 125 | 130| 160 HKD 2 [mm]] 140 | 140 | 140 | 140 | 105 | 105 | 140 | 105 | 140 | 175 | 230 | 280 Minimum edge distance cen {mm]| 100 | 100 | 100 | 100 | 80 | 80 | 140 | 80 | 140 | 175 | 230 | 280 HKD 's 2 (mm)| 150 | 150 | 150 | 150 | 120 120| 80 | 120| 80 | 125| 130] 160 Critical spacing and 5... (mm}| 200 | 200 | 200 | 200 | 210 | 210 | 280 | 210 | 20 | 350 | 465 | 560 ledge distance for Splfting failure HKD Caw {mm| 100 | 100 | 100 | 100 | 105 | 105 | 140 | 105 | 140 | 175 | 227 | 260 Critical spacing and ‘edge distance for” Sn (mm]| 80 | 80 | 80 | 80 | 90 | 90 | 120 90 | 120 | 150 | 195 | 240 ‘concrete cone failure HKD / HKDS-{R) / can [mm]| 40 | 40 | 40 | 40 | 45 | 45 | 60 | 45 | 60 | 75 | 97 | 120 HKO-E(R) ‘Critical spacing and Sreereeaeg 24 sase imm| 176 | 176 | 176 | 176 | 210 | 210 | 280 | 210 | zao | 350 | 456 | 560 Ppaeng sonar 88 | 88 | 88 | 88 | 105 | 105 | 140 | 105 | 140 | 175 | 227 | 280 HKD-S(R)/HKD-E(R)_ = {mm} For spacing (edge distance) smaile tan critical spacing (erical edge distance) the design loads have to be reduced. *For detailed information on installation see instruction for use given with the package of the product. Setting instruction 1. Drilling 2. Cleaning 3._Inserting the anchor “4. Setting tools 7._ Attaching the belonging washer ")¢..

You might also like