Symmetra PX

Preventive Maintenance
Site Form
APC Service Representative:
Company: APC Korea Service Request Number:
Company Address: Service Engineer:
City: Seoul State:
Date of Service:
Service Start Time: Service End Time:
# Hours on Site: Total Travel Time:

Location of the System :


Unit Type: Serial Number:
Company Name: Telephone:
Street Address:
City: State: Zip Code:
Installation Location:

Alt. Cont. Name:

Service Bulletins: List any Service Bulletins completed during this Site Visit.

System Configuration Information:


1. Does the system have a Service Bypass Panel?
2. If yes, record the SBP Type.
3. Does the system have a transformer?
4. If yes, record the transformer type.
5. Does the system have internal batteries?
6. Does the system have external batteries? / If yes, how many installed XR frame
7. Record the battery amount. Main Frame
XR 1
XR 2
XR 3
XR 4

Symmetra PX Monthly site form


Environment: Yes/No
1. What type of room is the system located in (data center, computer room, etc.,)?
2. Is the System environment suitable for operation?
3. Is there sufficient clearance around the system for service?
4. Is there signs of damage to the system?
5. Measure and record the ambient temperature. Specify Celsius or Fahrenheit.
6. Do the fans pass visual inspection?
7. Record the active alarm

InfraStruXureTM Equipment Preparation For IR Scans: Yes/No


1. Is the system On with loads applied?
2. Is the physical barrier in place?
3. List any terminations that are excessively warm?

ON-LINE DISPLAY READINGS:


1. Record the input voltages from the display interface:
L1 Input L2 Input L3 Input
2. Record the input currents from the display interface:
L1 Input L2 Input L3 Input
3. Record the Battery voltages from the display interface :
Bat 1: Bat 2:
4. Record the Output Voltages from the display interface:
L1 Output L2 Output L3 Output
5. Record the Output Currents from the display interface:
L1 Output L2 Output L3 Output
6. Record the total load kW from the display interface:
Load (kW) Load (kVA)
7. Record the total load % from the display interface:
Load (%)

Battery Performance Check Yes/No


1. Record the Run Time displayed in the UPS PowerView
2. Perform a System Selt Test to verify battery integrity.
3. Verify the UPS returns to Normal Operation.
4. Record any problems encountered and corrective action suggested:

Final UPS and PDU Checks: Yes/No


1. The interior and exterior of the system is clean and free of debris.
2. The system is fully operational and the parameters are properly set on the UPS PowerView displays.
3. All of the UPS diagnostic parameters have been reviewed and all subsystems are ON and OK.
4. The event logs have been cleared prior to leaving the site.
5. Record any additional comments in the space provided below:

Customer Name : Signature/Date : Phone :

APC Name : Signature/Date : Phone :

Symmetra PX Monthly site form