ITEM No CODE Abstract of Cost-Original

SUB-HEADS AND ITEM OF WORK Estimate


QUANTITY RATE (Rs) UNIT AMOUNT (Rs)

9
State 12.1 Providing
MAHARASHTRA corrugated G.S. sheet roofing including DIVISION PUNE
Branch CIVIL vertical / curved surface fixed with polymer coated SUB-DIVISION PUNE-III
J or L
CONSTRUCTION
Name of Work : hooks, bolts and nuts 8 mm diameter with
RESTORATION OF JAYAKAR BUNGALOW AT NFAI,LAW COLLEGE ROAD,PUNE
bitumen and G.I. limpet washers or with G.I. limpet
ITEM No CODE washers filled with
SUB-HEADS ANDwhite
ITEMlead,
OFincluding
WORK a coat of QUANTITY RATE (Rs) UNIT AMOUNT (Rs)
approved steel primer and two coats of approved
1 1.1 Carriage of Materials by mechanical transport
paint on overlapping of sheets complete (up to any
including loading, unloading and stacking :
pitch in horizontal/ vertical or curved surfaces),
1.1 1.1.2 Earth - Lead  55.00          386.07 cum        21,234.00 SR
excluding the30 Kmof purlins, rafters and trusses and
cost
1.2 1.1.3 including cutting- Lead
Manure or sludge to size
20 Kmand shape wherever  18.70          266.71 cum         4,987.00 SR

2 2.6 required.
Earth work in excavation by mechanical means
9.1 12.1.1 (Hydraulic
1.00 mm thickexcavator) / manual
with zinc coating means
not lessover
thanareas
275  810.00         1,030.5 sqm       8,34,705.00 SR
(exceeding
gm/m² 30cm in depth. 1.5 m in width as well as 0
10 12.3 10 sqm on plan) including disposal of excavated
Extra for circular cutting in C.G.S. sheet roofing for
earth, lead upto 50m and lift upto 1.5m, disposed
making opening of area exceeding 40 sq. decimeter:
earth to be levelled and neatly dressed.

       41,078.00 SR
10.1 12.3.1 1.00 mm thick  22.00          252.95 metre         5,565.00
2.1 2.6.1 All kinds of soil  264.00          155.60 cum SR
11 13.37 White washing with lime to give cement
an evenconcrete
shade : of
3 4.1 Providing and laying in position
11.1 13.37.1 New workgrade
specified (threeexcluding
or more coats)
the cost of centering and  1,130.00           16.20 sqm        18,306.00 SR

12 13.69 shuttering -on


Polishing Allwood
work work
up to plinth level : mixed wax
with ready
3.1 4.1.2 1:1½:3of(1approved
polish Cement: brand
1½ coarse sand: 3 graded
and manufacture : stone  8.80         5,970.6 cum        52,541.00 SR

12.1 13.69.1 aggregate


New work 20    mm nominal size)  786.00           85.150 sqm        66,928.00 SR
3.2
13
4.1.10
14.9 1:5:10
Renewal (1ofcement : 5 of
old putty coarse
glasssand
panes : 10 graded stone
(length)  40.00
 333.00         4,004.0
          23.15 cum
metre         7,709.00 SR
      1,60,160.00
SR
aggregate 40 mm nominal size) 0
14 14.15 Renewing wooden battens in roofs, including
4 4.3 Centering
making goodand shuttering
the holes in wall andincluding
paintingstrutting,
with oil
propping
type wood preservative of approved for
etc. and removal of form work : and
brand
4.1 4.3.1 Foundations, footings, basesincluding
for columns  75.00          196.45 sqm        14,734.00 SR
manufacture complete, removal of
5 6.34 rubbish to the dumping ground
Brick work with non modular fly ash within 50 metres
bricks
lead :
conforming to IS:12894, class designation 10
14.1 14.15.1 Sal woodcompressive
battens  0.50        68,145.7 cum        34,073.00 SR
average strength in super structure
0
15 14.16 above plinth
Renewing level up
wooden to floor
beams V level
in roofs in :
including making
5.1 6.34.2 Cement mortar 1:6 (1 cement : 6 Coarse
good the holes in walls and painting with oil type sand)  8.00         6,006.2 cum        48,050.00 SR

wood preservative of (second


approvedsort)brand and 0
6 7.7 Coursed rubble masonry with hard
manufacture
stone complete,
in foundation & plinthincluding
with : removal of
6.1 7.7.1 rubbish to the dumping ground within 50 metres  40.00         4,229.7 cum       1,69,188.00 SR
Cement mortar 1:6 (1 cement : 6 coarse sand)
lead : 0
715.1 10.25
14.16.1 Steel work welded in built up sections/ framed
Not exceeding 4.00 metres in length.
14.16.1.1
work, including cutting, hoisting, fixing in position        35,184.00 SR
15.1.1 Sal wood beams  0.50        70,367.6 cum
and applying a priming coat of approved steel 5
16 14.17 Raking out joints in lime or cement mortar and  907.00           26.55 sqm        24,081.00 SR
primer using structural steel etc. as required.
7.1 10.25.2 preparing the surface for re-pointing or
In gratings, frames, guard bar, ladder, railings, replastering,  375.00           90.10 kg        33,788.00 SR
including disposal
brackets, gates of rubbish
and similar works to the dumping
8 11.16 ground within 50 metres lead.
Precast terrazo tiles 22 mm thick with graded
17 14.26 Providing and fixing 25 mm thick shutters for cup
marble chips of size upto 12 mm, laid in floors, and
board etc. :
landings, jointed with neat cement slurry mixed
17.1 14.26.1 Panelled or panelled & glazed
with pigment to match the shutters
shade of : the tiles,
17.1.1 14.26.1.1 including class
Superior rubbingteakand polishing
wood including complete,
nickel on 20
plated  10.00         3,442.1 sqm        34,421.00 SR
mm thick
bright bed of
finished M.S.cement
pianomortar
hinges1:4 with(1 necessary
cement:4 0
coarse
screws.sand) :
8.1
18
11.16.2
14.34 Medium
Providingshade pigment
and fixing 150using
mm bright50% white
finished cement
floor  138.00
 50.00          943.70
         210.75 sqm
each        10,538.00 SR
      1,30,231.00
SR
and 50% ordinary cement
brass door stopper with rubber cushion, necessary
brass screws etc. to suit shutter thickness complete

AEC-III/CCW/PUNE/NFAI JAYAKAR REVISED Page 21 of 15


ITEM No CODE SUB-HEADS AND ITEM OF WORK QUANTITY RATE (Rs) UNIT AMOUNT (Rs)

19
29 14.40
15.11 Removing and
Providing mortar
fixing
fromchromium
and cleaning
plated stones
brass butt
and
hinges with
concrete articles
necessary
(net quantity
chromium
of stacks
plated
of cleaned
brass
screws etc.will
materials complete.
be measured):
19.1
29.1 14.40.1
15.11.1 125x70x4
In lime mortar
mm (ordinary type)  200.00
 4.00          139.40
         177.10 each
cum          708.00 SR
       27,880.00

20
29.2 14.43
15.11.2 In cement mortar
Removing white or colour wash by scrapping and  200.00
 14.00          254.35
           7.60 cum
sqm         1,520.00 SR
        3,561.00

30 15.12 sand papering and preparing


Dismantling doors, windowsthe and
surfaceclerestory
smooth
including necessary repairs to scratches
windows (steel or wood) shutter including etc.
complete architrave, holdfasts etc. complete and
chowkhats,
21 14.71 Varnishing with50
flatting  1,309.00           44.50 sqm        58,251.00 SR
stacking within metresvarnish
lead : of approved brand
30.1 15.12.1 and
Of area 3 sq. metres and belowcoats on old work.
manufacture one or more  44.00          141.25 each         6,215.00 SR

30.2 15.12.2 Of area beyond 3 sq. metres  15.00          193.85 each         2,908.00 SR
22 15.1 Demolishing lime concrete manually/ by  4.00          311.65 cum         1,247.00 SR
31 15.14 Dismantling wood work in frames, trusses, purlins
mechanical means and disposal of material within
and rafters up to 10 metres span and 5 metres height
50 metres lead as per direction of Engineer- in-
including stacking the material within 50 metres
charge.
23 15.2 lead :
Demolishing cement concrete manually/ by
31.1 15.14.1 Of sectional area 40 square centimetres and above  6.00         1,718.8 cum        10,313.00 SR
mechanical means including disposal of material
0
within 50 metres lead as per direction of Engineer -
32 15.18 Dismantling  170.00            2.15 kg          366.00 SR
in - charge. steel work in built up sections in
23.1 15.2.1 angles,
Nominaltees,concrete
flats and 1:3:6
channels
or including all gusset
richer mix (i/c  4.00          892.70 cum         3,571.00 SR
plates, bolts,
equivalent nuts,
design mix)cutting rivets, welding etc.
24 15.3 including dismembering and stacking within 50  2.00         1,302.3 cum         2,605.00 SR
Demolishing R.C.C. work manually/ by mechanical
metres lead. 0
15.23
means including stacking of steel bars and disposal
33 Dismantling tile work in floors and roofs laid in
of unserviceable material within 50 metres lead as
cement mortar including stacking material within
per direction of Engineer - in- charge.
50 metres lead.
33.1 15.23.1 For thickness brick
of tileswork
10 mm to 25 mm  49.00           28.20 sqm         1,382.00 SR
25 15.7 Demolishing manually/ by mechanical
33.2 15.23.2 For
meansthickness
includingof tiles aboveof25serviceable
stacking mm and up to 40
material  363.00           43.95 sqm        15,954.00 SR
mm
and disposal of unserviceable material within 50
34 15.28 metres lead asroofing
Dismantling per direction of Engineer-in-charge.
including ridges, hips, valleys
and gutters etc., and stacking the material within 50
25.1 15.7.3 In lime lead
metres mortar
of:  5.00          311.65 cum         1,558.00 SR

34.1
26 15.28.1
15.8 G.S. Sheet mortar from bricks and cleaning bricks
Removing  289.00           62.80 sqm        18,149.00 SR

35 15.31 including stacking


Dismantling tiled within
roofinga with
lead of 50 m (stacks
battens, of
boarding  722.00           77.35 sqm        55,847.00 SR
cleaned
etc. bricks shall
complete be measured):
including stacking of serviceable
26.1 15.8.2 From brick
material andwork in lime of
disposal mortar
unserviceable material  1,500.00         1,994.2 1,000 nos         2,991.00 SR

withinbrick
50 metres 5
26.2 15.8.3 From work lead.
in cement mortar  1,000.00         2,502.0 1,000 nos         2,502.00 SR
36 15.37 Dismantling wooden trellis masonry
work excluding frames  30.00           24.300 sqm          729.00 SR
27 15.9 Demolishing stone rubble manually/ by
but including stacking the serviceable
mechanical means including stacking of serviceable material
within
material50 and
metres lead. of unserviceable material
disposal
37 15.39 Dismantling wooden
within 50 metres lead boardings in lining
as per direction of walls
of Engineer-
and partitions,
in-charge : excluding supporting members but
27.1 15.9.1 including stacking
In lime mortar within 50 metres lead :  2.00          424.35 cum          849.00 SR

       10,798.00 SR
37.1 15.39.2 Thickness above 10 mm up to 25 mm  112.00           29.75 sqm         3,332.00
27.2 15.9.2 In cement mortar  12.00          899.85 cum SR
37.2 15.39.3 Thickness above 25 mm up to 40 mm  75.00           34.95 sqm         2,621.00 SR
28 15.10 Dismantling dressed stone work ashlar face stone
38 15.42 Dismantling
work, marble work or precast water
C.I. or asbestos rain pipe work
concrete with
fittings and clamps including stacking the
manually/ by mechanical means including stacking material
within 50 metres lead
of serviceable and : disposal of unserviceable
38.1 15.42.2 material
100 within
mm dia pipe50 metres lead as per direction of  21.00           28.60 metre          601.00 SR

39 15.56 Engineer-in-charge :
Dismantling old plaster or skirting raking out joints  1,034.00           20.05 sqm        20,732.00 SR
28.1 15.10.1 In lime mortar  2.00          536.80 cum         1,074.00 SR
and cleaning the surface for plaster including
28.2 15.10.2 In cementofmortar
disposal rubbish to the dumping ground within  2.00         1,052.7 cum         2,105.00 SR

50 metres lead. 0

AEC-III/CCW/PUNE/NFAI JAYAKAR REVISED Page 43 of 15


ITEM No CODE SUB-HEADS AND ITEM OF WORK QUANTITY RATE (Rs) UNIT AMOUNT (Rs)

40 15.60 Disposal of building rubbish / malba / similar  123.00          123.70 cum        15,215.00 SR
unserviceable, dismantled or waste materials by
mechanical means, including loading, transporting,
unloading to approved municipal dumping ground
or as approved by Engineer-in-charge, beyond 50 m
initial lead, for all leads including all lifts involved.

41 16.69 Providing and laying at or near ground level factory  7.00         5,295.9 cum        37,071.00 SR
made kerb stone of M-25 grade cement concrete in 0
position to the required line, level and curvature,
jointed with cement mortar 1:3 (1 cement: 3 coarse
sand), including making joints with or without
grooves (thickness of joints except at sharp curve
shall not to more than 5mm), including making
drainage opening wherever required complete etc.
as per direction of Engineer-in-charge (length of
finished kerb edging shall be measured for
payment). (Precast C.C. kerb stone shall be
approved by Engineer-in-charge).
42 17.7 Providing and fixing wash basin with C.I. brackets,
15 mm C.P. brass pillar taps, 32 mm C.P. brass
waste of standard pattern, including painting of
fittings and brackets, cutting and making good the
walls wherever require:
42.1 17.7.1 White Vitreous China Wash basin size 630x450 mm  4.00         2,331.1 each         9,325.00 SR
with a pair of 15 mm C.P. brass pillar taps 5
42.2 17.7.4 White Vitreous China Flat back wash basin size  4.00         1,807.1 each         7,228.00 SR
550x 400 mm with single 15 mm C.P. brass pillar 0
tap
43 17.35 Providing and fixing soil, waste and vent pipes :
43.1 17.35.1 100 mm dia
43.1.1 17.35.1.2 Centrifugally cast (spun) iron socket & spigot  54.00          917.75 metre        49,559.00 SR
(S&S) pipe as per IS: 3989
44 17.58 Providing lead caulked joints to sand cast
iron/centrifugally cast (spun) iron pipes and fittings
of diameter :
44.1 17.58.1 100 mm  11.00          243.75 each         2,681.00 SR

45 23.2 Supplying and stacking of good earth at site  55.00          320.90 cum        17,650.00 SR
including royalty and carriage up to 1 km (earth
measured in stacks will be reduced by 20% for
payment).
46 23.4 Supplying and stacking at site dump manure from
approved source, including carriage up to 1 km
(manure measured in stacks will be reduced by 8%
for payment):
46.1 23.4.2 Screened through sieve of I.S. designation 16 mm  18.70          189.75 cum         3,548.00 SR

47 23.7 Fine dressing of the ground  550.00          194.05 100 sqm         1,067.00 SR

48 23.8 Spreading of sludge, dump manure and/ or good  75.00           27.85 cum         2,089.00 SR
earth in required thickness as per direction of
Officer-in-charge (Cost of sludge, dump manure
and / or good earth to be paid separately).

AEC-III/CCW/PUNE/NFAI JAYAKAR REVISED Page 5 of 15


ITEM No CODE SUB-HEADS AND ITEM OF WORK QUANTITY RATE (Rs) UNIT AMOUNT (Rs)

49 23.10 Grassing with selection No.1 grass including


watering and maintenance of the lawn for 30 days
or more till the grass forms a thick lawn, free from
weeds and fit for mowing including supplying good
earth, if needed (the grass and good earth shall be
paid for separately).
49.1 23.10.2 With grass Turf  550.00          701.80 100 sqm         3,860.00 SR

50 Supply and filling with approved gardening soil  27.50         2,346.4 cUM        64,528.00 M
23.501 6 R
supplied by contractor as sub base for preparation
Land
scaping for grasscrete areas -    flat and sloping mound areas
RA1 in layers not exceeding 20 cms in depth,
consolidating each deposited layer by ramming and
watering lead within site limits and as directed by
the engineer.
51 23.502 Providing of Grasscrete GC-3,(3”) Formers 80 mm  550.00         1,211.0 sQM       6,66,067.00 M
Land 3 R
deep laid on a consolidated sub-base with a
scaping
RA 2 10/20mm binding layer of sand. Steel mesh
reinforcement to BS4483 reference A193 (6mm
dia),weighing 1.776kgs/m2.
Concrete 30MN/m2 at 28 days with air Entrainment
of 3%.10mm maximum aggregated and 100mm
slump placed around formers and mesh and leveled
to tops of formers.
Void Former size: 600x600x80mm
Paving Depth: 80 mm
Reinforcement: A252
Concrete Coverage: 10.50m2/m3
52 23.503 Top soil Coverage: 12m2/m3 supplied  345.00         1,449.0 sQM       4,99,922.00 M
Providing and fixing in position khandaki stone
Land 5 R
(Natural Black Basalt paving cobble stone) of size
scaping
RA3 100mmx100mmx30mm over 20mm thick base of
cement plaster 1:3 and jointed with cement slurry /
pigment including rubbing and polishing etc
complete as per the direction of the engineer in
charge.
53 50.16 Providing and fixing a Teak Wood Computer Table  5.00        43,771.0 Each       2,18,855.00 M
Furniture 0 R
of size 3000 X 600 mm, For the Heritage Building,
RA 1
as shown in the detailed drawing, using 75 X75 X
800 mm vertical sections of 8 Nos. and 25 X 100
mm horizontal members at the centre and the
periphery, including 50 X 30 mm horizontal foot
rest 100 mm above ground level, and 30 mm thk.
teak wood table top as per dimensions as shown in
the drawing excluding    fittings, fixtures but
including all    the necessary    brass    screws 30mm,
fevicol, etc. and two coats of melamine polish to
exposed surface, all inclusive, etc. complete as per
drawing item no 1 of Drg no ID-400 A
54 50.17 Providing and fixing a Teak Wood Reception table  1.00        40,257.0 Each        40,257.00 M
Furniture 0 R
with side unit of size 1800 X 600 mm, For the
RA 2
Heritage Building, as shown in the detailed
drawing, as per dimensions as shown in the
drawing. excluding    fittings and fixtures but
including all the necessary brass screws 30mm ,
fevicol, etc. and two coats of melamine polish to
exposed surface, all inclusive, etc. complete as per
drawing item no 2 of Drg no ID-400 A
AEC-III/CCW/PUNE/NFAI JAYAKAR REVISED Page 6 of 15
ITEM No CODE SUB-HEADS AND ITEM OF WORK QUANTITY RATE (Rs) UNIT AMOUNT (Rs)

55
60 50.18
50.23 Providing and fixing aa Teak
Teak Wood
Wood TBook
V Unit
rack
of with
size  2.00
 1.00        63,296.0
       31,694.0 Each        63,388.00 M
       63,296.00
Furniture 0 R
storageX of350
2580 sizeX 900
350 Xmm
900with
mm,50Formm
thethk.
Heritage
T W
RA 83
partition ofassize
Building, shown 750inX the 2100 detailed
mm, For drawing,
the Heritageas per
dimensionsas as
Building, shown shown in the
in detailed
the drawing drawing, excluding
as per
fittings, fixtures
dimensions as shownbut including
in the drawing all    the excluding
necessary
screws, fevicol,
fittings, fixtures etc. but including
and two coats all    the
of melamine
necessary
polish   screws
brass  to exposed 30mm surface,
and fittings, all fixtures,
inclusive, screws,
etc.
complete etc.
fevicol,   asand
per twodrawingcoatsitemof melamine
no 3 of Drg polishno ID-to
400 A. surface, all inclusive, etc. complete as per
exposed
56 50.19 Providing andnofixing  1.00        31,151.0 Each        31,151.00 M
drawing item 8 of    aDrgTeak Wood Book
no ID-401 A rack of
Furniture 0 R
size 1500 X 300 X 1220 mm, For the Heritage
61 RA 4
50.24  1.00        39,775.0 Each        39,775.00 M
Providing
Building, as andshown
fixingina Teak Wood Tdrawing,
the detailed V Unit of as size
per
Furniture 0 R
2470
dimensionsX 350 X as 350shownmm, inForthe thedrawing
Heritage excluding
Building,
RA9
as shownfixtures
fittings, in the detailed drawing,all 
but including as  per
thedimensions
necessary
as
brass    screws 30mm, fevicol, etc. and two  coats
shown in the drawing excluding  fittings,
of
fixtures but including all   
melamine polish to exposed surface, all inclusive, the necessary brass
screws
etc. complete30mmas, per fevicol,
drawing etc.item andnotwo 4 ofcoats Drg no of
melamine
ID-400 A polish to exposed surface, all inclusive,
57 50.20 Providing andas fixing a Teak Wood Reception Table  1.00        77,494.0 Each        77,494.00 M
etc. complete per drawing item no 9 of    Drg no
Furniture 0 R
of size 1800
ID-401 A X 600 mm with detached storage unit
62 RA 5
50.25  1.00       1,20,999. Each       1,20,999.00 M
Providing
of size 1500 andX fixing
350 mm, a Teak
For Wood StorageBuilding,
the Heritage unit for
Furniture 00 R
the shop area
as shown in the with Sliding
detailed door storage
drawing, as per unit of size
dimensions
RA 10
1560
as shown X 450inXthe 800drawing
mm including excluding  detached open
  fittings,
shelf
fixtures unit
butofincluding
size 2100all X  600 X 800 mm,
the necessary For the
Telescopic
Heritage Building, as shown
drawer channel300mm, brsss    inscrews the detailed
30mm,
drawing,
fevicol, etc. as and
per two dimensions
coats of melamineas shownpolish in theto
drawing excluding    fittings, fixtures
exposed surface, all inclusive, etc. complete as per but including
all    the item
drawing necessary
no 5 ofbrass Drg no   screws
ID-40030mm, A. fevicol,
etc. and two coats of melamine polish to exposed
58 50.21 Providing  27.00        65,005.0 Each      17,55,135.00 M
surface, alland fixing etc.
inclusive, a Teakcomplete WoodasBook rack of
per drawing
Furniture 0 R
size 2100 X 300 X
item no 10 of    Drg no ID-401 A 2200 mm, For the Heritage
RA 6
Building,
. as shown in the detailed drawing, as per
63 50.26 Providing  1.00        63,116.0 Each        63,116.00 M
dimensionsandasfixing shown a Teak
in the Wood and glass
drawing display
excluding
Furniture 0 R
unit for fixtures
fittings, the shopbut area of size all 
including 3560x800x600mm
  the necessary
RA 11
For
brass  the  screws
Heritage Building,
30mm, as shown
fevicol, etc. andintwothe coats
detailed of
drawing, as per dimensions
melamine polish to exposed surface, all inclusive, as shown in the
drawing
etc. complete excluding 
as per  drawing
fittings, fixtures
item no but 6 .of including
Drg no
all   
ID-400 Athe necessary brass    screws 30mm ,8mm float
59 50.22 Providing and fixing a Teak Wood
glass shelves with chamferd edge,    fevicol, etc. and and glass Book  1.00        36,218.0 Each        36,218.00 M
Furniture 0 R
storage
two coats& of shelves
melamine of sizepolish
2100x2200x300mm,
to exposed surface, For
RA 7
the inclusive,
all Heritage etc. Building,
complete. as as shown in the detailed
per drawing item no
drawing,
11 of    Drgasno per ID-402 dimensions
A as shown in the
drawing excluding    fittings, fixtures but including
64 50.27 Providing  3.00        78,902.0 Each       2,36,706.00 M
Furniture
all    the    and fixing brass 
necessary a Teak  Wood
screwsBed 30mm,of size 1800
fevicol,
X 0 R
RA 12 8mm thick float glass sheet etc. and two coats600
1830 X 450 including two side tables of size of
X 450 X 350
melamine mm to
polish andexposed
TW back rest ofall
surface, size 3060 X
inclusive,
100 X 900 mm,
etc. complete as perFor the Heritage
drawing item no 7Building,
of    Drg no as
shown
ID-401 A in the detailed drawing excluding    fittings,
fixtures but including all    the necessary Telescopic
drawer channel300mm, brass    screws 30mm of
approved quality , fevicol, etc. and two coats of
melamine polish to exposed surface, all inclusive,
etc. complete as per drawing item no 12 of    Drg no
ID-402 A

AEC-III/CCW/PUNE/NFAI JAYAKAR REVISED Page 87 of 15


ITEM No CODE SUB-HEADS AND ITEM OF WORK QUANTITY RATE (Rs) UNIT AMOUNT (Rs)

65
70 50.28
50.33 Providing and fixing
fixing aa Teak
TeakWood
WoodWardrobe
TV Unit of
of size  3.00
 2.00        45,673.0
       24,593.0 Each        73,779.00 M
       91,346.00
Furniture 0 R
2250 X 400
1000 500 X
X 600
1800mm,
mmFor
with
thedesk
Heritage
of size
Building,
900 X
RA 18
13
500shown
as X 130 in themm, detailed
For the drawing,
Heritageas perBuilding,
dimensions as
as shown
shown in theindetailed
the drawingdrawing,excluding 
as per dimensions
  fittings, as
fixturesinbut
shown theincluding
drawingall  excluding 
  the necessary
  fittings,Telescopic
fixtures
drawer
but including
channel300mm,
all    the brass necessary   screws
  brass 30mm screws of
approvedfevicol,
30mm, qualityetc. , fevicol,
and two etc.coats
and twoof melamine
coats of
melamine
polish to polish
exposed to exposed
surface,surface,
all inclusive,
all inclusive, etc.
etc. complete
complete as per as per
drawing
drawing itemitemno 18no & 13 19of  of 
  Drg  Drg
no
ID-402
no ID-403 A A
66
71 50.29
50.34 Providing and and fixing
supplying a Teakteak Wood woodTablechair of sizeof  42.00
 2.00        25,976.0
       11,315.0 Each        51,952.00 M
      4,75,230.00
Furniture 0 R
2050 X 1000
approved design
X 800 andmm, quality
For the including
Heritagefoam Building,
base
RA 19
14
as shown
sitting and in the
the detailed
back rest drawing,
with as premium
per dimensions
quality
as shown
selected fabric
in andthe cushion
drawingas excluding 
per design,  including
fittings,
fixtures
TW legs,but backincluding
rest and hand all    rest,
the etc.
necessary
complete brassas
screws
per attached
Providing 30mm,  sketch
and supplying  fevicol,
teak wood etc.coffee
andchair
twoof coats
approved of
72 50.35 melamine polishincluding
to exposed surface,  9.00        21,918.0 Each       1,97,262.00 M
design and quality foam base sittingalland
inclusive,
the back
Furniture 0 R
etc.with
rest complete
premium as quality
per drawing selecteditem nowith
fabric 14 of    Drg no
comfortable
RA 20
hand
ID-402rest Aand cushion as per design, including TW legs, back
67 50.30 Providing
rest and hand rest, and etc.fixing
complete a as Teak Wood sketch(Note:
per attached Reception  1.00        33,494.0 Each        33,494.00 M
Furniture All the fittings and fixtures of furniture shall be provided 0 R
counter type II of size 1350 X 600 X 800 mm, For
RA 15 as per the suggestions and directions of the Architect
the Heritage Building, as shown in the detailed
consultant and it will be paid separately as extra item
drawing,
based on theasrate perderived
dimensions as shown in
by the Engg-in-charge the
as per
73 51.1 drawing excluding 
Providing and applying   fittings, fixtures
Pointing but including
to masonry walls  907.00          445.00 Sqm       4,03,615.00 M
LMR R
all  to  first
then thesort necessary Telescopic Heritage
ashlar stone masonaryof drawer
channel300mm,
Building    in 1:3 brass    screws
lime mortar 30mm
(1part lime ofandapproved
3 part
RA 10 quality , fevicol, etc. and two coats of melamine
goa, quartzite Sand) including masking joints with
polish totape
masking exposed
to ensure surface,
line levelall & inclusive,
thicknessetc. of
complete
mortar as per
joints drawing
using sharp item no 15
spatulae & of    Drg
tools by no ID-
skilled
402trained
& A masons including raching joints curing
68 50.31 Providing and fixing a Teak Wood Back storage  1.00        57,785.0 Each        57,785.00 M
Furniture etc. complete.
74 51.2 with
Removal drawers and shelves
of old tar, varnish, of sizeold1750 X 600
paint, from X 800
old  1,309.00
0
         600.00 Sqm       7,85,400.00 R
M
RA 16
PMC mm, For the Heritage Building, as shown in the R
wooden surface carefully using flame torch keeping
2014-
detailed
min. 10 drawing,
cm distance as per
from dimensions
the wooden as shown
surfaceinwith the
15/78491-
22-5 P- drawing excluding    fittings,
necessary precautions, etc. complete fixtures but including
75 137
51.3 all    and
Providing the fixing 
necessary
  Ist quality Telescopic
Burma teakdrawer wood  210.00         3,698.0 Sqm       7,76,580.00 M
PWD- channel300mm, brass    screws
plank ceiling 20 mm thick tounged and groved 30mm of approved 0 R
2015/16
quality
including , fevicol,
iron screws,etc. andscaffolding,
two coats if of necessary,
melamine
4/16   
BDQ3 polish to exposed surface,
including melamine polish on under side and one all inclusive, etc.
P-108 complete as per drawing
coat of coal tar on upper side complete. item no 16 of    Drg no ID-
403 A
69 50.32 Providing and fixing a Teak Wood Storage unit with  1.00        29,127.0 Each        29,127.00 M
76 51.4
Furniture Providing and fixing Ist quality (Superior Quality)  1.50       2,68,881.0 Cum       4,03,322.00 M
open shelves of size 1700 X 600 X 800 mm, For the R
PMC
RA 17 00 R
Burma Teakwood in structural members like beams,
2014- Heritage Building, as shown in the detailed
15/78496- columns, Joist, rafters, purlins,battens, purlin
drawing, as per dimensions as shown in the
22-8 cleats,hip rafters,jack rafters, ridges, wall plates,
P-138
drawing excluding    fittings, fixtures but including
post plates and posts, pedestals or any other
all    the necessary brass    screws 30mm, fevicol,
wooden members etc. including removing
etc. and two coats of melamine polish to exposed
damage/decayed wood members,fixing stainless
surface, all inclusive, etc. complete as per drawing
steel screws, cutting, sawing,making proper wood
item no 17 of    Drg no ID-403 A
jonery, scaffolding if necessary all iron work and
applying one coat of primer or as directed by
Enginner Incharge etc. complete

AEC-III/CCW/PUNE/NFAI JAYAKAR REVISED Page


Page109 of 15
ITEM No CODE SUB-HEADS AND ITEM OF WORK QUANTITY RATE (Rs) UNIT AMOUNT (Rs)

77
85 51.14
51.5 Providing and and fixing
laying Mangalore
intergral Lime tiled roofing
based water with  720.00
 45.00          780.00
        2,082.0 Sqm        93,690.00 M
      5,61,600.00
PWD-
LMR 0 R
class "AA"
proofing tretament
tiles including
for balconies,
securing terraces,
the last course
roofs,
2015/16
of tiles nearpreparation
including the eaves with of surface
steel flatas40required,
mm x 3 mm The
RA 13
2/17   
BDQ2 and 1.22
item consists
mm of wirefollowing
fixing country
methodteak - Stages
woodinvolved
sloping
P-111 -battens
Applying of 25and x 12 grouting
mm teak a slurry
wood horizontal
coat of neat battens
lime
of 50mm
(2.75 Kg/x Sq.m)
25mm over admixedthe slopping
with proprietory
battens, allwater iron
work and
proofing compound
coal tarring
(Conforming the battens
to IS 2645) complete
over
(Excluding
the slab, including
ridge & hip cleaning
tiles) the Spec.surface
No.: Bd.R.2,
before
Page No. 450
treatment
78 51.6 Providing and surface.
fixing Mangalore tile ridge and hip  33.00          170.00 Metre         5,610.00 M
PWD-
1. Clean the After removal of existing
tiles of class "AA" including scaffolding if R
2015/16 layer.
3/17    necessary, pointing with
2. Bell fruit + gud paani coating,, coloured cement mortar
BDR3 and curing
3. Lime complete.
mortar Spec.bat
and brick No.: Bd.R.3,
laying- ( 1Page
lime No. : 3
P-111 450 sand ) - thk.ness minimum 150mm, keep
black
79 51.7 Providing andasfixing valley gutter of 22 B.W.G.  56.00         2,375.0 Metre       1,33,000.00 M
PWD-
setting period 1 week.
(0.8mm) plain galvanised iron sheets 0 R
2015/16 4. Surface finishing and levelling with120 limecm wide
mortar-
7a/17    with teak
25 to 40mm wood planking 20 mm thick including
BDR10 two coats of
5. Jaggery watercoal-tarring the upper
and beating surfacetoofremove
the surface plank
P-112 (excluding painting to underside of plank) Spec.
surface cracks. And also to remove excess water.
No.: Bd. R. 10, Page No. 455
6. Goa sand + lime -    pre final    finishing layer
80 51.8 Providing and fixing  132.00          782.00 Metre       1,03,224.00 M
LMR
7. Lime ghotai- finalIstfinished
quality burmalayer toteak wood
required
eaves board 15cm wide and 25mm thick plain R
slope and treating similarly the adjoining walls up
RA14 decorative type including scaffolding and painting
to 300 mm Height. including rounding of junctions
with twoand
of walls coats etc.etc.
slabs complete
complete.
81
86 51.9
51.15 Providing, and
Providing supplying
injecting & fixing
lime slurry/ashlarsslaked fine stone
lime  110.00
 153.00         2,509.0
          83.00 Metre
Kg       2,75,990.00
       12,699.00 M
PMC
LMR 0 R
coping of
mortar groutsizeincluding
320 mm long, 500 mm
structuring of width
crack & in 150the
2014-
RA15
15/78498- mm thick
body of ain cracked
cement mortarMasonary 1:3 including
walls of pointingheritage
22-10 P- in Cementusing
building slurry,natural
raking adhetives
joints, curing, in lime loading
slurry &
139 unloading
mortar    ofetc. complete.: 3 Goa sand)including coat
1:3(1Lime
82 51.11 Providing
of materials, andmachinery
laying Rough requiredShahabadfor the work, Stone  180.00          546.00 Sqm        98,280.00 M
PWD- R
Flooring
lobour 40mm.to
charges 45 mm. thick & of required
etc. complete.
2015/16
87 51.16 Providing
width in plain/ and Applying
diamondinpattern inernal on  25 a bedto 40 of mm1:6  900.00          818.00 Sqm       7,36,200.00 M
1b/12   
PMC R
BDM-1A thick
C.M. lime plaster in
including base coat
cement usingstriking
float, river sand and
joints,
2014-
P-87 second
pointingcoat in silicamortar
in cement sand final coat    in
1:3 curing andlime putty
cleaning
15/78533-
22-12 P- (lime + sand +Spec.
etc. complete. jaggery No.:+ Bd.M.1
bale fruit Page + linseed
No. 379 oil) in
139 proportion (1:1:2:4 one part Molasis, 1 part brick
83 51.12 Providing2 part
powder, andlime laying Rough
& 4 part sand)Shahabad
in plain finish Stone to  97.00          615.00 Sqm        59,655.00 M
PWD- R
Flooring 50mm
stone/brick to 60mm slaking
wall including thick and of limeof required
not less
2015/16
1c/12    widthfor
than in 1plain/ diamond jaggery
day, preparing pattern on slurry,a bed baleoffruit,
1:6
BDM-1B C.M. of
raking including
joints up cementto 10 mmfloat, striking double
thick including joints,
P-87 pointing in cement
scaffolding, curing etc. mortar 1:3 curing and cleaning
complete.
etc. complete Spec. No.: Bd.M.1 Page No. 379
88 51.17 Providing and applying melamine polish of  1,309.00          694.00 Sqm       9,08,446.00 M
PWD-
84 51.13 required
Providingfinish to the partial
and fixing wood work khandakiby spraystone machine
flooring  110.00         5,027.0 Sqm       5,52,970.00 R
M
2015/16
LMR including knotting and preparing the evenofsurface 0 R
6/13    of 200 to 250mm depth including dressing upper
BDN by scraping,applying
surface of stone to required french polishing,scaffolding
size and shape, using if
RA
P-100 requireddressed
etc. complete.
finely Newasa(2trap coats)stone fixed in lime
09 mortar of thickness 25 to 40mm , ashlar finished
89 51.18 Providing and applying boiled  1,309.00           20.00 Sqm        26,180.00 M
PWD-
joint, including filling joint withlinseed oil in
pointing in lime
two
coats to the old/ new wood work, including R
15/16 mortar 1:3(1 Lime : 3 Goa sand), dressing,
1b/13 knotting, preparing
cleaning, curing, the surface,
watering, scaffolding etc.
etc. complete.
BDN 1.1 complete as directed.

AEC-III/CCW/PUNE/NFAI JAYAKAR REVISED Page 12


11 of 15
ITEM No CODE SUB-HEADS AND ITEM OF WORK QUANTITY RATE (Rs) UNIT AMOUNT (Rs)

90 51.19 Providing and fixing Ist quality (Superior Quality)  6.00       2,01,181. Cum      12,07,086.00 M
PMC 00 R
Teakwood for ornamental art work in structural
2014-
15/78488 wooden members like beams, decorative columns,
-22-2 arches, joist,rafters,purlins,battens,purlin cleats,hip
P-137 rafters, jack rafters,ridges,wall plates, post plates
and posts, pedestals or any other wooden members
etc. including removing damage/decayed wood
members, exclusive of wooden railing,balusters etc.
fixing stainless steel screws, cutting, sawing,
making proper wood jonery, scaffolding if
necessary all iron work and applying one coat of
primer or as directed by Engineer
Incharge etc. complete

91 51.20 Providing and constructing 300mm. high, 25mm  68.00         1,220.0 Metre        82,960.00 M
PMC 0 R
thick Ist quality Burma Teak Wood Skirting for
2014-
15/78346- Auditorium, etc. The job consisting of securing
20-6 50x50mm. T.W. Vertical Battens over the M.S.
P-116 Angles’ Framework Verticals, screwing 50x150mm.
T.W. Skirting tiles to the vertical battens mentioned
above, as per Drawings and Details. Job including
shaping of the skirting tiles, chamfering the upper
corner of the tiles, applying one coat of Anti
Termite Paint to all Battens, applying two coats of
Melamine Polish tothe Skirting material and
finishing the job as directed.
92 51.21 Providing antitermite treatment to the wooden  59.00           45.00 Each         2,655.00 M
PWD- R
frames of doors or windows of the existing building
15/16
46/21 as per I.S. 6313 (Part-III) by drilling 6 mm dia.
BDW holes at four corners on one side and four corners
P-179 on other side at a down ward angle of about 45% at
the junction of wood work and masonry and
injecting 150 ml. of chlorodane 5% W.C. and
sealing by filling putty etc. complete covering 2
years guarantee.
93 51.22 Providing antitermite treatment to the joints of  140.00           33.00 Each         4,620.00 M
PWD- R
wooden beams or joint and wooden    false ceiling
15/16
47/21 used for the roof work of the existing building as
BDW per I.S. 6313 (Part-III) by drilling 6 mm dia. holes
P-180 at a downward angle of about 45% at the junction
of wood work and masonry and injecting 80 ml. of
chlordane 5% W.C. and sealing by filling putty etc.
complete covering 2 years guarantee. Spec. No. :
As directed by Engineer-in-charge.

94 51.23 Providing and laying lead sheet of 400mm to  142.00         9,053.0 Sqm      12,85,526.00 M
PMC 0 R
900mm width and upto 1mm thick including proper
2014-
15/78534- fixing jointing, soldering joints,    including
22-13 scaffolding if necessary and as directed by in
P-139 charge etc. complete
95 51.24 Providing and applying Bitumen layer at 2 kg. per  36.00          133.00 Sqm         4,788.00 M
PWD- R
square meter over the terrace, structural slab
15/16
2/9 including cleaning the surface for waterproofing as
BDJ3 directed complete Spec. No.: Bd.J.3 Page No. 356
P-77

AEC-III/CCW/PUNE/NFAI JAYAKAR REVISED Page 13 of 15


ITEM No CODE SUB-HEADS AND ITEM OF WORK QUANTITY RATE (Rs) UNIT AMOUNT (Rs)

96
104 51.33
51.25 Providing and
Removal of Pigeon
fixing partly
fouling,
Ist quality
using burma
hand held
teak  161.00
 120.00        11,004.0
         180.00 Sqm        28,980.00 M
     13,20,480.00
. LMR
LMR 0 R
scrapers
wood andbypartly
application
glazed of panelled
organicwithsolvent-based
6mm thk.
removerglass
wired whichwith
is rinsed
bevelling
from atthe edges,
surface single
with low
or
RA 11
1
pressureleafhot
double doorwater
shutterscarefully/
with 45 mm, gentlythickwithout
styles
damaging
and rails historic
and 25surface,
mm thicketc. complete.
burma teak wood
97 51.26 channels
Cleaning without door frames
of Organic Growth withlike oxidised brass
algae, moss,  180.00          229.00 Sqm        41,220.00 M
LMR R
lichen, includig
fittings etc. usingmelamine
low pressure
polish lance
etc. complete.
or brushing
with soft brushes with the use of biocide treatment.
105 RA 2
51.34 Providing and Fixing  60.00        17,350.0 Sqm      10,41,000.00 M
Diluted Biocide coatfully panelled Ist
application by quality
using
LMR 0 R
burma teak wood
pneumatic spray. single or double leaf door shutters
98 51.27 with 45 Removal
Careful mm thick vegetation
styles and andrails biological
and 25 mm thick
growth  15.00         3,733.0 One Job        55,995.00 M
RA 12
LMR burma teak wood panels withour door
from super structure, gaps, niches, structural frames with 0 R
oxidised
members brass fittingsever
and where melamine
requiredpolishing etc.
with careful
RA 3 complete
desimantling    of necesarry required masonry at
Total     1,83,48,530.00
required height ,and injecting chemicals to kill the
centralCost
Add plantIndex 
blub  or@5.71%
core as directed
(On SR&DR , including
Total       1,23,174.01
nessary scaffolding
2,157,163.00 ) and disposing the removed
material within
Add 5% on PWD item due to 500m radius
Corporation limit as     1,23,926.00
directed .etc .complete. Size of Shrub or Sapling :      1,85,95,630.00
Total
Girth 0 - 2", Height 1' - 2'
99 51.28 Add Contingencies
Removal of flower @3%
bed all along the periphery of  47.00          211.00 Sqm     5,57,869.00
        9,917.00 M
LMR R
the
Say Heritage building and stacking the materials as     1,91,53,499.00
directed with all leads lifts, complete.
RA 4 Rupees One Crore Fifty Three Thousand Four Hundred and Ninety        48,600.00
Nine Only
100 51.29 Removal of enamel paint from painted stone  135.00          360.00 Sqm M
LMR R
surfaces, carefully without damaging the historic
stone surface, manually using diluted costic soda,
RA 5
water pressure jets cleaning method with Low
pressure and mild wet abrasive
ASSISTANT ENGINEER(CIVIL)-P process. Making
ASSISTANT the
ENGINEER(C)-III
surface even by hand scarpping, providing and
applying mathiv/ tichiv surface finish, etc.
complete.
101 51.30 Removal of paint from brick wall surface, carefully  34.00          438.00 Sqm        14,892.00 M
LMR R
without damaging the historic brick facade and
ornamental work, manually using pressure water
RA 6
jets and chemicals where needed, making the
surface even and polished by hand scrapping tools,
providing and applying sealent complete

102 51.31 Removing cement or lime pointing from basalt  720.00          157.00 Sqm       1,13,040.00 M
LMR R
stone carefully, without damaging the existing
flooring, with the disposal of unserviceable material
RA 7
within 50 metres lead and lift.
103 51.32 Cleaning of Mettalic Stains/paint and rust of Iron  35.00          179.00 Sqm         6,265.00 M
LMR R
railings & Application of anti rust coat, removal by
using oxypropane flame at proper tempreture
RA 8
without damaging the wrought iron surface, rust
can be removed by wire brushing or applying
chenically neutral are based on a combination of
acid and alkali materials. Prepare the surface for
paintings and coatings, complete.

AEC-III/CCW/PUNE/NFAI JAYAKAR REVISED Page 15