Professional Documents
Culture Documents
Steel Design - Assignment No 8
Steel Design - Assignment No 8
Steel Design - Assignment No 8
B1
Plastic Modulus
𝑍𝑥 = [120(65)(83.5) + 51(4.8)(25.5)](2)
𝑍𝑥 = 1303.82𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(1303.82𝑥103 )
𝑀𝑝 = 323.35 𝑘𝑁 ∙ 𝑚
𝐿𝜃 𝐿 𝐿𝜃
𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑊𝑢 ( )( ) 𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑃𝑢 ( )
2 2 2
𝑘𝑁 𝑃𝑢 = 646.7 𝑘𝑁
𝑊𝑢 = 323.35
𝑚
Collapse Load if FS = 1.5
Collapse Load if FS = 1.5
𝑃𝑢 = 1.5(646.7)
𝑊𝑢 = 1.5(323.35)
𝑃𝑢 = 970.05 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 485.03
𝑚
If FS = 1.5
If FS = 1.5
B2
Plastic Modulus
𝑍𝑥 = 2[250(60)(106) + 76(5.9)(38)]
𝑍𝑥 = 3214.08𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(3214.08𝑥103 )
𝑀𝑝 = 797.09 𝑘𝑁 ∙ 𝑚
Collapse mechanism
Collapse mechanism
By Virtual Work
By Virtual Work
𝐿𝜃 𝐿
𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑊𝑢 ( )( ) 𝐿𝜃
2 2 𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
16𝑀𝑝 16(797.09 )
𝑊𝑢 = = 8𝑀𝑝 8(797.09)
𝐿2 52 𝑃𝑢 = =
𝐿 5
𝑘𝑁
𝑊𝑢 = 510.14 𝑃𝑢 = 1275.34 𝑘𝑁
𝑚
𝑊𝑢 = 1.5(510.14) 𝑃𝑢 = 1.5(1275.34)
𝑘𝑁 𝑃𝑢 = 1913.01 𝑘𝑁
𝑊𝑢 = 765.21
𝑚
If FS = 1.5 If FS = 1.5
B3(D1-D2)
Plastic Modulus
𝑍𝑥 = 2[350(65)(108.5) + 76(11.8)(38)]
𝑍𝑥 = 5004.91𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(5004.91𝑥103 )
𝑀𝑝 = 1242.46 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
𝐿𝜃
𝑊𝑢 𝐿2 𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
𝑀𝑝 = 2
11.656
6𝑀𝑝 6(1242.46)
11.656𝑀𝑝 11.656(1242.46) 𝑃𝑢 = =
𝑊𝑢 = = 𝐿 6
𝐿2 62
𝑘𝑁 𝑃𝑢 = 1242.46 𝑘𝑁
𝑊𝑢 = 402.28
𝑚 Collapse Load if FS = 1.5
Collapse Load if FS = 1.5
𝑃𝑢 = 1.5(1242.46)
𝑊𝑢 = 1.5(402.28)
𝑃𝑢 = 1863.69 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 603.42
𝑚
If FS = 1.5 If FS = 1.5
B3(D1-E1)
Plastic Modulus
𝑍𝑥 = 2[350(65)(108.5) + 76(11.8)(38)]
𝑍𝑥 = 5004.91𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(5004.91𝑥103 )
𝑀𝑝 = 1242.46 𝑘𝑁 ∙ 𝑚
By Virtual Work
By Virtual Work
𝐿𝜃
𝐿𝜃 𝐿 𝑀𝑝 (2𝜃) = 𝑃𝑢 ( )
𝑀𝑝 (2𝜃) = 𝑊𝑢 ( ) ( ) 2
2 2
4𝑀𝑝 4(1242.46)
8𝑀𝑝 8(1242.46 ) 𝑃𝑢 = =
𝑊𝑢 = 2 = 𝐿 6
𝐿 62
𝑃𝑢 = 828.31 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 276.10
𝑚 Collapse Load if FS = 1.5
Collapse Load if FS = 1.5
𝑃𝑢 = 1.5(823.31)
𝑊𝑢 = 1.5(276.10)
𝑃𝑢 = 1242.20 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 414.15
𝑚
If FS = 1.5 If FS = 1.5
B4
Plastic Modulus
𝑍𝑥 = 2[350(65)(134) + 101.5(6.9)(50.75)]
𝑍𝑥 = 6168.09𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(6168.09𝑥103 )
𝑀𝑝 = 1529.68 𝑘𝑁 ∙ 𝑚
By Virtual Work
By Virtual Work 𝐿𝜃
𝑀𝑝 (2𝜃) = 𝑃𝑢 ( )
2
𝐿𝜃 𝐿
𝑀𝑝 (2𝜃) = 𝑊𝑢 ( )( )
2 2 4𝑀𝑝 4(1529.68 )
𝑃𝑢 = =
𝐿 4
8𝑀𝑝 8(1529.68 )
𝑊𝑢 = =
𝐿2 42 𝑃𝑢 = 1529.68 𝑘𝑁
𝑘𝑁 Collapse Load if FS = 1.5
𝑊𝑢 = 764.84
𝑚
𝑃𝑢 = 1.5(1529.68)
Collapse Load if FS = 1.5
𝑃𝑢 = 2294.52 𝑘𝑁
𝑊𝑢 = 1.5(764.84)
𝑘𝑁
𝑊𝑢 = 1147.26
𝑚
If FS = 1.5 If FS = 1.5
B5
Plastic Modulus
𝑍𝑥 = 2[400(85)(169.5) + 127(7.9)(63.5)]
𝑍𝑥 = 11653.42𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(11653.42𝑥103 )
𝑀𝑝 = 2890.05 𝑘𝑁 ∙ 𝑚
Collapse mechanism
Collapse mechanism
By Virtual Work
𝐿𝜃
By Virtual Work 𝑀𝑝 (2𝜃) = 𝑃𝑢 ( )
2
𝐿𝜃 𝐿
𝑀𝑝 (2𝜃) = 𝑊𝑢 ( )( ) 4𝑀𝑝 4(2890.05 )
2 2 𝑃𝑢 = =
𝐿 5
8𝑀𝑝 8(2890.05 )
𝑊𝑢 = = 𝑃𝑢 = 2312.04 𝑘𝑁
𝐿2 52
𝑘𝑁 Collapse Load if FS = 1.5
𝑊𝑢 = 924.82
𝑚
𝑃𝑢 = 1.5(2312.04)
Collapse Load if FS = 1.5
𝑃𝑢 = 3468.06 𝑘𝑁
𝑊𝑢 = 1.5(924.82)
𝑘𝑁
𝑊𝑢 = 1837.23
𝑚
If FS = 1.5
If FS = 1.5
B6
Plastic Modulus
𝑍𝑥 = 2[500(90)(197.5) + 152.5(8.9)(76.25)]
𝑍𝑥 = 1984.48𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(1984.48𝑥103 )
𝑀𝑝 = 492.15 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
Collapse mechanism
Collapse mechanism
By Virtual Work
At x = 0.414L 𝐿𝜃
𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
𝑊𝑢 𝐿2 2
𝑀𝑝 =
11.656 6𝑀𝑝 6(492.15)
𝑃𝑢 = =
11.656𝑀𝑝 11.656(492.15) 𝐿 6
𝑊𝑢 = =
𝐿2 62 𝑃𝑢 = 429.15 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 159.35 Collapse Load if FS = 1.5
𝑚
𝑃𝑢 = 1.5(429.15)
Collapse Load if FS = 1.5
𝑃𝑢 = 738.23 𝑘𝑁
𝑊𝑢 = 1.5(159.35)
𝑘𝑁
𝑊𝑢 = 239.03
𝑚
If FS = 1.5 If FS = 1.5
B7
Plastic Modulus
𝑍𝑥 = 2[430(85)(169.5) + 127(7.9)(63.5)]
𝑍𝑥 = 12517.87𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(12517.87𝑥103 )
𝑀𝑝 = 3104.43 𝑘𝑁 ∙ 𝑚
Collapse mechanism
Collapse mechanism
By Virtual Work
By Virtual Work
𝐿𝜃
𝐿𝜃 𝐿 𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑊𝑢 ( ) ( )
2 2
8𝑀𝑝 8(3104.43)
16𝑀𝑝 16(3104.43) 𝑃𝑢 = =
𝐿 6
𝑊𝑢 = 2 =
𝐿 62
𝑃𝑢 = 4139.43 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 1379.75 Collapse Load if FS = 1.5
𝑚
𝑊𝑢 = 1.5(1379.75) 𝑃𝑢 = 6028.86 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 2069.63
𝑚
If FS = 1.5 If FS = 1.5
For Beams Along Gridline 2
B1
Plastic Modulus
𝑍𝑥 = [120(65)(83.5) + 51(4.8)(25.5)](2)
𝑍𝑥 = 1303.82𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(1303.82𝑥103 )
𝑀𝑝 = 323.35 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
By Virtual Work
At x = 0.414L
𝐿𝜃
𝑀𝑝 (𝜃 + 2𝜃) = 𝑃𝑢 ( )
𝑊𝑢 𝐿2 2
𝑀𝑝 =
11.656 6𝑀𝑝 6(323.35)
𝑃𝑢 = =
11.656𝑀𝑝 11.656(323.35) 𝐿 4
𝑊𝑢 = =
𝐿2 42 𝑃𝑢 = 485.03 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 235.56 Collapse Load if FS = 1.5
𝑚
𝑊𝑢 = 1.5(235.56) 𝑃𝑢 = 727.55 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 353.34
𝑚
If FS = 1.5
If FS = 1.5
B2
Plastic Modulus
𝑍𝑥 = 2[250(60)(106) + 76(5.9)(38)]
𝑍𝑥 = 3214.08𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(3214.08𝑥103 )
𝑀𝑝 = 797.09 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
By Virtual Work
At x = 0.414L
𝐿𝜃
𝑊𝑢 𝐿2 𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
𝑀𝑝 = 2
11.656
6𝑀𝑝 6(797.09)
11.656𝑀𝑝 11.656(797.09) 𝑃𝑢 = =
𝑊𝑢 = = 𝐿 5
𝐿2 52
𝑃𝑢 = 956.51 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 371.64
𝑚 Collapse Load if FS = 1.5
𝑊𝑢 = 1.5(371.64) 𝑃𝑢 = 1434.77 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 557.46
𝑚
If FS = 1.5
If FS = 1.5
B3 (C2-D2 & D2-E2)
Plastic Modulus
𝑍𝑥 = 2[350(65)(108.5) + 76(11.8)(38)]
𝑍𝑥 = 5004.91𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(5004.91𝑥103 )
𝑀𝑝 = 1242.46 𝑘𝑁 ∙ 𝑚
By Virtual Work
By Virtual Work
𝐿𝜃
𝐿𝜃 𝐿 𝑀𝑝 (2𝜃) = 𝑃𝑢 ( )
𝑀𝑝 (2𝜃) = 𝑊𝑢 ( ) ( ) 2
2 2
4𝑀𝑝 4(1242.46)
8𝑀𝑝 8(1242.46 ) 𝑃𝑢 = =
𝑊𝑢 = 2 = 𝐿 6
𝐿 62
𝑃𝑢 = 828.31 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 276.10
𝑚 Collapse Load if FS = 1.5
Collapse Load if FS = 1.5
𝑃𝑢 = 1.5(823.31)
𝑊𝑢 = 1.5(276.10)
𝑃𝑢 = 1242.20 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 414.15
𝑚
If FS = 1.5 If FS = 1.5
B4
Plastic Modulus
𝑍𝑥 = 2[350(65)(134) + 101.5(6.9)(50.75)]
𝑍𝑥 = 6168.09𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(6168.09𝑥103 )
𝑀𝑝 = 1529.68 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
By Virtual Work
At x = 0.414L
𝐿𝜃
𝑀𝑝 (𝜃 + 2𝜃) = 𝑃𝑢 ( )
𝑊𝑢 𝐿2 2
𝑀𝑝 =
11.656 6𝑀𝑝 6(1529.68)
𝑃𝑢 = =
11.656𝑀𝑝 11.656(1529.68) 𝐿 4
𝑊𝑢 = =
𝐿2 42 𝑃𝑢 = 2294.52 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 1114.37 Collapse Load if FS = 1.5
𝑚
𝑊𝑢 = 1.5(1114.37) 𝑃𝑢 = 3441.78 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 1671.56
𝑚
If FS = 1.5
If FS = 1.5
B5
Plastic Modulus
𝑍𝑥 = 2[400(85)(169.5) + 127(7.9)(63.5)]
𝑍𝑥 = 11653.42𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(11653.42𝑥103 )
𝑀𝑝 = 2890.05 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
By Virtual Work
At x = 0.414L
𝐿𝜃
𝑊𝑢 𝐿2 𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
𝑀𝑝 = 2
11.656
6𝑀𝑝 6(2890.05)
11.656𝑀𝑝 11.656(2890.05) 𝑃𝑢 = =
𝑊𝑢 = = 𝐿 5
𝐿2 52
𝑃𝑢 = 2312.04 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 1347.46
𝑚 Collapse Load if FS = 1.5
𝑊𝑢 = 1.5(1347.46) 𝑃𝑢 = 3468.06 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 2021.19
𝑚
If FS = 1.5 If FS = 1.5
B6
Plastic Modulus
𝑍𝑥 = 2[500(90)(197.5) + 152.5(8.9)(76.25)]
𝑍𝑥 = 1984.48𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(1984.48𝑥103 )
𝑀𝑝 = 492.15 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
Collapse mechanism
Collapse mechanism
By Virtual Work
At x = 0.414L 𝐿𝜃
𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
𝑊𝑢 𝐿2 2
𝑀𝑝 =
11.656 6𝑀𝑝 6(492.15)
𝑃𝑢 = =
11.656𝑀𝑝 11.656(492.15) 𝐿 6
𝑊𝑢 = =
𝐿2 62 𝑃𝑢 = 429.15 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 159.35 Collapse Load if FS = 1.5
𝑚
𝑃𝑢 = 1.5(429.15)
Collapse Load if FS = 1.5
𝑃𝑢 = 643.73𝑘𝑁
𝑊𝑢 = 1.5(159.35)
𝑘𝑁
𝑊𝑢 = 239.03
𝑚
If FS = 1.5 If FS = 1.5
B7
Plastic Modulus
𝑍𝑥 = 2[430(85)(169.5) + 127(7.9)(63.5)]
𝑍𝑥 = 12517.87𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(12517.87𝑥103 )
𝑀𝑝 = 3104.43 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
𝐿𝜃
𝑊𝑢 𝐿2 𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
𝑀𝑝 = 2
11.656
6𝑀𝑝 6(3104.43)
11.656𝑀𝑝 11.656(3104.43) 𝑃𝑢 = =
𝑊𝑢 = = 𝐿 6
𝐿2 62
𝑘𝑁 𝑃𝑢 = 3104.43 𝑘𝑁
𝑊𝑢 = 1005.15
𝑚 Collapse Load if FS = 1.5
Collapse Load if FS = 1.5
𝑃𝑢 = 1.5(3104.43)
𝑊𝑢 = 1.5(1005.15)
𝑃𝑢 = 4656.65 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 1507.73
𝑚
If FS = 1.5 If FS = 1.5
For Beams Along Gridline 3
B1
Plastic Modulus
𝑍𝑥 = [120(65)(83.5) + 51(4.8)(25.5)](2)
𝑍𝑥 = 1303.82𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(1303.82𝑥103 )
𝑀𝑝 = 323.35 𝑘𝑁 ∙ 𝑚
𝐿𝜃 𝐿 𝐿𝜃
𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑊𝑢 ( )( ) 𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑃𝑢 ( )
2 2 2
𝑘𝑁 𝑃𝑢 = 646.7 𝑘𝑁
𝑊𝑢 = 323.35
𝑚
Collapse Load if FS = 1.5
Collapse Load if FS = 1.5
𝑃𝑢 = 1.5(646.7)
𝑊𝑢 = 1.5(323.35)
𝑃𝑢 = 970.05 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 485.03
𝑚
If FS = 1.5
If FS = 1.5
B2
Plastic Modulus
𝑍𝑥 = 2[250(60)(106) + 76(5.9)(38)]
𝑍𝑥 = 3214.08𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(3214.08𝑥103 )
𝑀𝑝 = 797.09 𝑘𝑁 ∙ 𝑚
Collapse mechanism
Collapse mechanism
By Virtual Work
By Virtual Work
𝐿𝜃 𝐿
𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑊𝑢 ( )( ) 𝐿𝜃
2 2 𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
16𝑀𝑝 16(797.09 )
𝑊𝑢 = = 8𝑀𝑝 8(797.09)
𝐿2 52 𝑃𝑢 = =
𝐿 5
𝑘𝑁
𝑊𝑢 = 510.14 𝑃𝑢 = 1275.34 𝑘𝑁
𝑚
𝑊𝑢 = 1.5(510.14) 𝑃𝑢 = 1.5(1275.34)
𝑘𝑁 𝑃𝑢 = 1913.01 𝑘𝑁
𝑊𝑢 = 765.21
𝑚
If FS = 1.5 If FS = 1.5
B3(C3-D3)
Plastic Modulus
𝑍𝑥 = 2[350(65)(108.5) + 76(11.8)(38)]
𝑍𝑥 = 5004.91𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(5004.91𝑥103 )
𝑀𝑝 = 1242.46 𝑘𝑁 ∙ 𝑚
Collapse mechanism
Collapse mechanism
By Virtual Work
By Virtual Work
𝐿𝜃
𝐿𝜃 𝐿 𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑊𝑢 ( ) ( )
2 2
8𝑀𝑝 8(1242.46 )
16𝑀𝑝 16(1242.46 ) 𝑃𝑢 = =
𝐿 6
𝑊𝑢 = 2 =
𝐿 62
𝑃𝑢 = 1656.61 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 552.20 Collapse Load if FS = 1.5
𝑚
𝑊𝑢 = 1.5(552.20) 𝑃𝑢 = 2484.92 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 828.30
𝑚
If FS = 1.5 If FS = 1.5
B3(D3-E3)
Plastic Modulus
𝑍𝑥 = 2[350(65)(108.5) + 76(11.8)(38)]
𝑍𝑥 = 5004.91𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(5004.91𝑥103 )
𝑀𝑝 = 1242.46 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
𝐿𝜃
𝑊𝑢 𝐿2 𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
𝑀𝑝 = 2
11.656
6𝑀𝑝 6(1242.46)
11.656𝑀𝑝 11.656(1242.46) 𝑃𝑢 = =
𝑊𝑢 = = 𝐿 6
𝐿2 62
𝑘𝑁 𝑃𝑢 = 1242.46 𝑘𝑁
𝑊𝑢 = 402.28
𝑚 Collapse Load if FS = 1.5
Collapse Load if FS = 1.5
𝑃𝑢 = 1.5(1242.46)
𝑊𝑢 = 1.5(402.28)
𝑃𝑢 = 1863.69 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 603.42
𝑚
If FS = 1.5 If FS = 1.5
B4
Plastic Modulus
𝑍𝑥 = 2[350(65)(134) + 101.5(6.9)(50.75)]
𝑍𝑥 = 6168.09𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(6168.09𝑥103 )
𝑀𝑝 = 1529.68 𝑘𝑁 ∙ 𝑚
𝐿𝜃 𝐿 𝐿𝜃
𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑊𝑢 ( ) ( ) 𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑃𝑢 ( )
2 2 2
𝑘𝑁 𝑃𝑢 = 764.84 𝑘𝑁
𝑊𝑢 = 1529.68
𝑚
Collapse Load if FS = 1.5
Collapse Load if FS = 1.5
𝑃𝑢 = 1.5(764.84)
𝑊𝑢 = 1.5(1529.68)
𝑃𝑢 = 1147.26 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 2294.52
𝑚
If FS = 1.5 If FS = 1.5
B5
Plastic Modulus
𝑍𝑥 = 2[400(85)(169.5) + 127(7.9)(63.5)]
𝑍𝑥 = 11653.42𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(11653.42𝑥103 )
𝑀𝑝 = 2890.05 𝑘𝑁 ∙ 𝑚
Collapse mechanism
Collapse mechanism
By Virtual Work
By Virtual Work
𝐿𝜃 𝐿
𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑊𝑢 ( )( ) 𝐿𝜃
2 2 𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
16𝑀𝑝 16(2890.05)
𝑊𝑢 = = 8𝑀𝑝 8(2890.05)
𝐿2 52 𝑃𝑢 = =
𝐿 5
𝑘𝑁
𝑊𝑢 = 1849.63 𝑃𝑢 = 4624.08 𝑘𝑁
𝑚
𝑊𝑢 = 1.5(1849.63) 𝑃𝑢 = 1.5(4624.08)
𝑘𝑁 𝑃𝑢 = 6936.12 𝑘𝑁
𝑊𝑢 = 2774.45
𝑚
If FS = 1.5
If FS = 1.5
B6
Plastic Modulus
𝑍𝑥 = 2[500(90)(197.5) + 152.5(8.9)(76.25)]
𝑍𝑥 = 1984.48𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(1984.48𝑥103 )
𝑀𝑝 = 492.15 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
Collapse mechanism
Collapse mechanism
By Virtual Work
At x = 0.414L 𝐿𝜃
𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
𝑊𝑢 𝐿2
𝑀𝑝 = 6𝑀𝑝 6(492.15)
11.656 𝑃𝑢 = =
𝐿 6
11.656𝑀𝑝 11.656(492.15)
𝑊𝑢 = = 𝑃𝑢 = 429.15 𝑘𝑁
𝐿2 62
𝑘𝑁
𝑊𝑢 = 239.03
𝑚
If FS = 1.5
If FS = 1.5
B7
Plastic Modulus
𝑍𝑥 = 2[430(85)(169.5) + 127(7.9)(63.5)]
𝑍𝑥 = 12517.87𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(12517.87𝑥103 )
𝑀𝑝 = 3104.43 𝑘𝑁 ∙ 𝑚
By Virtual Work
By Virtual Work
𝐿𝜃
𝐿𝜃 𝐿 𝑀𝑝 (2𝜃) = 𝑃𝑢 ( )
𝑀𝑝 (2𝜃) = 𝑊𝑢 ( ) ( ) 2
2 2
4𝑀𝑝 4(3104.43 )
8𝑀𝑝 8(3104.43 ) 𝑃𝑢 = =
𝑊𝑢 = 2 = 𝐿 6
𝐿 62
𝑃𝑢 = 2069.62 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 689.87
𝑚 Collapse Load if FS = 1.5
Collapse Load if FS = 1.5
𝑃𝑢 = 1.5(2069.62)
𝑊𝑢 = 1.5(689.87)
𝑃𝑢 = 3104.43 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 1034.81
𝑚
If FS = 1.5
If FS = 1.5
For Beam Along Gridline A
B8
Plastic Modulus
𝑍𝑥 = 2[250(60)(106) + 76(8.9)(38)]
𝑍𝑥 = 3214.08𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(3214.08𝑥103 )
𝑀𝑝 = 797.09 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
By Virtual Work
At x = 0.414L
𝐿𝜃
𝑊𝑢 𝐿2 𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
𝑀𝑝 = 2
11.656
6𝑀𝑝 4(797.09)
11.656𝑀𝑝 11.656(797.09) 𝑃𝑢 = =
𝑊𝑢 = = 𝐿 5
𝐿2 52
𝑃𝑢 = 956.51 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 371.64
𝑚 Collapse Load if FS = 1.5
𝑊𝑢 = 1.5(371.64) 𝑃𝑢 = 1434.77 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 557.46
𝑚
If FS = 1.5
If FS = 1.5
B9
Plastic Modulus
𝑍𝑥 = 2[150(30)(50) + 38(4.3)(19)]
𝑍𝑥 = 51.21𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(51.21𝑥103 )
𝑀𝑝 = 12.7 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
By Virtual Work
At x = 0.414L
𝐿𝜃
𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
𝑊𝑢 𝐿2 2
𝑀𝑝 =
11.656 6𝑀𝑝 4(12.7)
𝑃𝑢 = =
11.656𝑀𝑝 11.656(12.7) 𝐿 2.5
𝑊𝑢 = =
𝐿2 2.52 𝑃𝑢 = 30.48 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 23.68 Collapse Load if FS = 1.5
𝑚
𝑃𝑢 = 1.5(30.48)
Collapse Load if FS = 1.5
𝑃𝑢 = 45.72 𝑘𝑁
𝑊𝑢 = 1.5(23.68)
𝑘𝑁
𝑊𝑢 = 35.52
𝑚
2.5 m 2.5 m
If FS = 1.5
If FS = 1.5
45.72 kN
35.52 kN/m
2.5 m
2.5 m
B10
Plastic Modulus
𝑍𝑥 = 2[420(75)(164.5) + 127(7.9)(63.5)]
𝑍𝑥 = 10440.29𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(10440.29𝑥103 )
𝑀𝑝 = 2601.75 𝑘𝑁 ∙ 𝑚
Collapse mechanism
Collapse mechanism
By Virtual Work
By Virtual Work
𝐿𝜃 𝐿
𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑊𝑢 ( )( ) 𝐿𝜃
2 2 𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
16𝑀𝑝 16(2601.75 )
𝑊𝑢 = = 8𝑀𝑝 8(2601.75 )
𝐿2 52 𝑃𝑢 = =
𝐿 5
𝑘𝑁
𝑊𝑢 = 1665.12 𝑃𝑢 = 4162.8 𝑘𝑁
𝑚
𝑊𝑢 = 1.5(1183.96) 𝑃𝑢 = 1.5(4162.68)
𝑘𝑁 𝑃𝑢 = 6244.2 𝑘𝑁
𝑊𝑢 = 2497.68
𝑚
If FS = 1.5 If FS = 1.5
B11(A1-A2)
Plastic Modulus
𝑍𝑥 = 2[300(85)(144) + 101.5(50.75)(11.2)]
𝑍𝑥 = 7459.35𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(7459.35𝑥103 )
𝑀𝑝 = 1849.93 𝑘𝑁 ∙ 𝑚
Collapse mechanism
Collapse mechanism
By Virtual Work
By Virtual Work
𝐿𝜃 𝐿
𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑊𝑢 ( )( ) 𝐿𝜃
2 2 𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
16𝑀𝑝 16(1849.93 )
𝑊𝑢 = = 8𝑀𝑝 8(1849.93)
𝐿2 52 𝑃𝑢 = =
𝐿 5
𝑘𝑁
𝑊𝑢 = 1183.96 𝑃𝑢 = 2959.89 𝑘𝑁
𝑚
𝑊𝑢 = 1.5(1183.96) 𝑃𝑢 = 1.5(2959.89)
𝑘𝑁 𝑃𝑢 = 4439.84 𝑘𝑁
𝑊𝑢 = 1775.94
𝑚
If FS = 1.5 If FS = 1.5
B11(A3-A4)
Plastic Modulus
𝑍𝑥 = 2[300(85)(144) + 101.5(50.75)(11.2)]
𝑍𝑥 = 7459.35𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(7459.35𝑥103 )
𝑀𝑝 = 1849.93 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
Wu Pu
5m
5m
Collapse mechanism
Collapse mechanism
By Virtual Work
At x = 0.414L 𝐿𝜃
𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
𝑊𝑢 𝐿2
𝑀𝑝 =
11.656 6𝑀𝑝 4(331.20 )
𝑃𝑢 = =
𝐿 5
11.656𝑀𝑝 11.656(331.20 )
𝑊𝑢 = =
𝐿2 52 𝑃𝑢 = 264.96 𝑘𝑁
𝑘𝑁 Collapse Load if FS = 1.5
𝑊𝑢 = 154.42
𝑚
𝑃𝑢 = 1.5(264.96)
Collapse Load if FS = 1.5
𝑃𝑢 = 397.44 𝑘𝑁
𝑊𝑢 = 1.5(154.42)
𝑘𝑁
𝑊𝑢 = 231.63
𝑚
5m
5m
If FS = 1.5
If FS = 1.5
397.44 kN
231.63 kN/m
5m
5m
B12
Plastic Modulus
𝑍𝑥 = 2[200(45)73.5 + 51(25.5)(4.8)]
𝑍𝑥 = 1335.48𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(1335.48𝑥103 )
𝑀𝑝 = 331.20 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
2.5 m
Collapse mechanism
Collapse mechanism
By Virtual Work
At x = 0.414L 𝐿𝜃
𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
𝑊𝑢 𝐿2
𝑀𝑝 =
11.656 6𝑀𝑝 4(331.20 )
𝑃𝑢 = =
𝐿 2.5
11.656𝑀𝑝 11.656(331.20 )
𝑊𝑢 = =
𝐿2 2.52 𝑃𝑢 = 529.92 𝑘𝑁
𝑘𝑁 Collapse Load if FS = 1.5
𝑊𝑢 = 617.67
𝑚
𝑃𝑢 = 1.5(529.92)
Collapse Load if FS = 1.5
𝑃𝑢 = 794.88 𝑘𝑁
𝑊𝑢 = 1.5(617.67)
𝑘𝑁
𝑊𝑢 = 926.51
𝑚
529.92 kN
2.5 m
If FS = 1.5
If FS = 1.5
794.88 kN
2.5 m
For Beam Along Gridline B
B8
Plastic Modulus
𝑍𝑥 = 2[250(60)(106) + 76(8.9)(38)]
𝑍𝑥 = 3214.08𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(3214.08𝑥103 )
𝑀𝑝 = 797.09 𝑘𝑁 ∙ 𝑚
Collapse mechanism
Collapse mechanism
By Virtual Work
By Virtual Work
𝐿𝜃 𝐿
𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑊𝑢 ( )( ) 𝐿𝜃
2 2 𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
16𝑀𝑝 16(797.09 )
𝑊𝑢 = = 8𝑀𝑝 8(797.09)
𝐿2 52 𝑃𝑢 = =
𝐿 5
𝑘𝑁
𝑊𝑢 = 510.14 𝑃𝑢 = 1275.34 𝑘𝑁
𝑚
𝑊𝑢 = 1.5(510.14) 𝑃𝑢 = 1.5(1275.34)
𝑘𝑁 𝑃𝑢 = 1913.01 𝑘𝑁
𝑊𝑢 = 765.21
𝑚
If FS = 1.5 If FS = 1.5
B9
Plastic Modulus
𝑍𝑥 = 2[150(30)(50) + 38(4.3)(19)]
𝑍𝑥 = 51.21𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(51.21𝑥103 )
𝑀𝑝 = 12.7 𝑘𝑁 ∙ 𝑚
``
𝐿𝜃 𝐿 𝐿𝜃
𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑊𝑢 ( )( ) 𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑃𝑢 ( )
2 2 2
𝑘𝑁 𝑃𝑢 = 40.64 𝑘𝑁
𝑊𝑢 = 32.51
𝑚
Collapse Load if FS = 1.5
Collapse Load if FS = 1.5
𝑃𝑢 = 1.5(40.64)
𝑊𝑢 = 1.5(32.51)
𝑃𝑢 = 60.96 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 48.77
𝑚
If FS = 1.5
If FS = 1.5
B10
Plastic Modulus
𝑍𝑥 = 2[420(75)(164.5) + 127(7.9)(63.5)]
𝑍𝑥 = 10440.29𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(10440.29𝑥103 )
𝑀𝑝 = 2601.75 𝑘𝑁 ∙ 𝑚
Collapse mechanism
Collapse mechanism
By Virtual Work
By Virtual Work
𝐿𝜃 𝐿
𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑊𝑢 ( )( ) 𝐿𝜃
2 2 𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
16𝑀𝑝 16(2601.75 )
𝑊𝑢 = = 8𝑀𝑝 8(2601.75 )
𝐿2 52 𝑃𝑢 = =
𝐿 5
𝑘𝑁
𝑊𝑢 = 1665.12 𝑃𝑢 = 4162.8 𝑘𝑁
𝑚
𝑊𝑢 = 1.5(1183.96) 𝑃𝑢 = 1.5(4162.68)
𝑘𝑁 𝑃𝑢 = 6244.2 𝑘𝑁
𝑊𝑢 = 2497.68
𝑚
If FS = 1.5 If FS = 1.5
B11(B1-B2)
Plastic Modulus
𝑍𝑥 = 2[300(85)(144) + 101.5(50.75)(11.2)]
𝑍𝑥 = 7459.35𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(7459.35𝑥103 )
𝑀𝑝 = 1849.93 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
5m 5m
Collapse mechanism
Collapse mechanism
By Virtual Work
At x = 0.414L 𝐿𝜃
𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
𝑊𝑢 𝐿2
𝑀𝑝 =
11.656 6𝑀𝑝 4(1849.93 )
𝑃𝑢 = =
𝐿 5
11.656𝑀𝑝 11.656(1849.93 )
𝑊𝑢 = =
𝐿2 52 𝑃𝑢 = 1479.94 𝑘𝑁
𝑘𝑁 Collapse Load if FS = 1.5
𝑊𝑢 = 862.51
𝑚
𝑃𝑢 = 1.5(1479.94)
Collapse Load if FS = 1.5
𝑃𝑢 = 2219.91 𝑘𝑁
𝑊𝑢 = 1.5(862.51)
𝑘𝑁
𝑊𝑢 = 1293.77
𝑚
5m
5m
If FS = 1.5
If FS = 1.5
5m
5m
B11(B3-B4)
Plastic Modulus
𝑍𝑥 = 2[300(85)(144) + 101.5(50.75)(11.2)]
𝑍𝑥 = 7459.35𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(7459.35𝑥103 )
𝑀𝑝 = 1849.93 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
Wu Pu
5m
5m
Collapse mechanism
Collapse mechanism
By Virtual Work
At x = 0.414L 𝐿𝜃
𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
𝑊𝑢 𝐿2
𝑀𝑝 =
11.656 6𝑀𝑝 4(331.20 )
𝑃𝑢 = =
𝐿 5
11.656𝑀𝑝 11.656(331.20 )
𝑊𝑢 = =
𝐿2 52 𝑃𝑢 = 264.96 𝑘𝑁
𝑘𝑁 Collapse Load if FS = 1.5
𝑊𝑢 = 154.42
𝑚
𝑃𝑢 = 1.5(264.96)
Collapse Load if FS = 1.5
𝑃𝑢 = 397.44 𝑘𝑁
𝑊𝑢 = 1.5(154.42)
𝑘𝑁
𝑊𝑢 = 231.63
𝑚
5m
5m
If FS = 1.5
If FS = 1.5
397.44 kN
231.63 kN/m
5m
5m
B12
Plastic Modulus
𝑍𝑥 = 2[200(45)73.5 + 51(25.5)(4.8)]
𝑍𝑥 = 1335.48𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(1335.48𝑥103 )
𝑀𝑝 = 331.20 𝑘𝑁 ∙ 𝑚
2.5 m 2.5 m
Collapse mechanism
Collapse mechanism
By Virtual Work
By Virtual Work
𝐿𝜃 𝐿
𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑊𝑢 ( )( ) 𝐿𝜃
2 2 𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
16𝑀𝑝 16(331.20 )
𝑊𝑢 = = 8𝑀𝑝 8(331.20)
𝐿2 2. 52 𝑃𝑢 = =
𝐿 2.5
𝑘𝑁
𝑊𝑢 = 847.87 𝑃𝑢 = 1059.84 𝑘𝑁
𝑚
𝑊𝑢 = 1.5(847.87) 𝑃𝑢 = 1.5(1059.84)
𝑘𝑁 𝑃𝑢 = 1589.76 𝑘𝑁
𝑊𝑢 = 1271.81
𝑚
2.5 m 2.5 m
If FS = 1.5 If FS = 1.5
2.5 m 2.5 m
Plastic Modulus
𝑍𝑥 = 2[250(60)(106) + 76(8.9)(38)]
𝑍𝑥 = 3214.08𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(3214.08𝑥103 )
𝑀𝑝 = 797.09 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
By Virtual Work
At x = 0.414L
𝐿𝜃
𝑊𝑢 𝐿2 𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
𝑀𝑝 = 2
11.656
6𝑀𝑝 6(797.09)
11.656𝑀𝑝 11.656(797.09) 𝑃𝑢 = =
𝑊𝑢 = = 𝐿 5
𝐿2 52
𝑃𝑢 = 956.51 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 371.64
𝑚 Collapse Load if FS = 1.5
𝑊𝑢 = 1.5(371.64) 𝑃𝑢 = 1434.77 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 557.46
𝑚
If FS = 1.5
If FS = 1.5
B9
Plastic Modulus
𝑍𝑥 = 2[150(30)(50) + 38(4.3)(19)]
𝑍𝑥 = 51.21𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(51.21𝑥103 )
𝑀𝑝 = 12.7 𝑘𝑁 ∙ 𝑚
``
Propped beam with UDL Propped beam with Point Load at Midspan
By Virtual Work
At x = 0.414L
𝐿𝜃
𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
𝑊𝑢 𝐿2 2
𝑀𝑝 =
11.656 6𝑀𝑝 6(12.7)
𝑃𝑢 = =
11.656𝑀𝑝 11.656(12.7) 𝐿 2.5
𝑊𝑢 = =
𝐿2 2.52 𝑃𝑢 = 30.48 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 3450.05 Collapse Load if FS = 1.5
𝑚
𝑃𝑢 = 1.5(30.48)
Collapse Load if FS = 1.5
𝑃𝑢 = 45.72 𝑘𝑁
𝑊𝑢 = 1.5(23.68)
𝑘𝑁
𝑊𝑢 = 35.52
𝑚
2.5 m 2.5 m
If FS = 1.5
If FS = 1.5
45.72 kN
35.52 kN/m
2.5 m
2.5 m
B10
Plastic Modulus
𝑍𝑥 = 2[420(75)(164.5) + 127(7.9)(63.5)]
𝑍𝑥 = 10440.29𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(10440.29𝑥103 )
𝑀𝑝 = 2601.75 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
By Virtual Work
At x = 0.414L
𝐿𝜃
𝑊𝑢 𝐿2 𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
𝑀𝑝 = 2
11.656
6𝑀𝑝 6(2601.75)
11.656𝑀𝑝 11.656(2601.75) 𝑃𝑢 = =
𝑊𝑢 = = 𝐿 5
𝐿2 52
𝑃𝑢 = 3122. 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 1213.04
𝑚 Collapse Load if FS = 1.5
𝑊𝑢 = 1.5(1213.04) 𝑃𝑢 = 4683.15 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 1819.56
𝑚
3122.1 kN
1213.04 kN/m
If FS = 1.5 If FS = 1.5
4683.15 kN
1819.56 kN/m
B11(C1-C2)
Plastic Modulus
𝑍𝑥 = 2[300(85)(144) + 101.5(50.75)(11.2)]
𝑍𝑥 = 7459.35𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(7459.35𝑥103 )
𝑀𝑝 = 1849.93 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
Collapse mechanism
Collapse mechanism
By Virtual Work
By Virtual Work
𝐿𝜃
𝑀𝑝 (2𝜃) = 𝑃𝑢 ( )
𝐿𝜃 𝐿 2
𝑀𝑝 (2𝜃) = 𝑊𝑢 ( )( )
2 2
4𝑀𝑝 4(1849.93 )
𝑃𝑢 = =
8𝑀𝑝 8(1849.93 ) 𝐿 5
𝑊𝑢 = =
𝐿2 52
𝑃𝑢 = 1479.94 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 591.98 Collapse Load if FS = 1.5
𝑚
𝑊𝑢 = 1.5(591.98) 𝑃𝑢 = 2219.91 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 887.97
𝑚
If FS = 1.5
If FS = 1.5
Plastic Modulus
𝑍𝑥 = 2[300(85)(144) + 101.5(50.75)(11.2)]
𝑍𝑥 = 7459.35𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(7459.35𝑥103 )
𝑀𝑝 = 1849.93 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
Wu Pu
5m
5m
Collapse mechanism
Collapse mechanism
By Virtual Work
At x = 0.414L 𝐿𝜃
𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
𝑊𝑢 𝐿2
𝑀𝑝 =
11.656 6𝑀𝑝 4(331.20 )
𝑃𝑢 = =
𝐿 5
11.656𝑀𝑝 11.656(331.20 )
𝑊𝑢 = =
𝐿2 52 𝑃𝑢 = 264.96 𝑘𝑁
𝑘𝑁 Collapse Load if FS = 1.5
𝑊𝑢 = 154.42
𝑚
𝑃𝑢 = 1.5(264.96)
Collapse Load if FS = 1.5
𝑃𝑢 = 397.44 𝑘𝑁
𝑊𝑢 = 1.5(154.42)
𝑘𝑁
𝑊𝑢 = 231.63
𝑚
5m
5m
If FS = 1.5
If FS = 1.5
397.44 kN
231.63 kN/m
5m
5m
B12
Plastic Modulus
𝑍𝑥 = 2[200(45)73.5 + 51(25.5)(4.8)]
𝑍𝑥 = 1335.48𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(1335.48𝑥103 )
𝑀𝑝 = 331.20 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
2.5 m
Collapse mechanism
Collapse mechanism
By Virtual Work
At x = 0.414L 𝐿𝜃
𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
𝑊𝑢 𝐿2
𝑀𝑝 =
11.656 6𝑀𝑝 4(331.20 )
𝑃𝑢 = =
𝐿 2.5
11.656𝑀𝑝 11.656(331.20 )
𝑊𝑢 = =
𝐿2 2.52 𝑃𝑢 = 529.92 𝑘𝑁
𝑘𝑁 Collapse Load if FS = 1.5
𝑊𝑢 = 617.67
𝑚
𝑃𝑢 = 1.5(529.92)
Collapse Load if FS = 1.5
𝑃𝑢 = 794.88 𝑘𝑁
𝑊𝑢 = 1.5(617.67)
𝑘𝑁
𝑊𝑢 = 926.51
𝑚
529.92 kN
2.5 m
If FS = 1.5
If FS = 1.5
794.88 kN
2.5 m
For Beam Along Gridline D
B8
Plastic Modulus
𝑍𝑥 = 2[250(60)(106) + 76(8.9)(38)]
𝑍𝑥 = 3214.08𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(3214.08𝑥103 )
𝑀𝑝 = 797.09 𝑘𝑁 ∙ 𝑚
Collapse mechanism
Collapse mechanism
By Virtual Work
𝐿𝜃
By Virtual Work 𝑀𝑝 (2𝜃) = 𝑃𝑢 ( )
2
𝐿𝜃 𝐿
𝑀𝑝 (2𝜃) = 𝑊𝑢 ( )( ) 4𝑀𝑝 4(797.09 )
2 2 𝑃𝑢 = =
𝐿 5
8𝑀𝑝 8(797.09 )
𝑊𝑢 = = 𝑃𝑢 = 637.67 𝑘𝑁
𝐿2 52
𝑘𝑁
𝑊𝑢 = 382.61
𝑚
If FS = 1.5 If FS = 1.5
B9
Plastic Modulus
𝑍𝑥 = 2[150(30)(50) + 38(4.3)(19)]
𝑍𝑥 = 51.21𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(51.21𝑥103 )
𝑀𝑝 = 12.7 𝑘𝑁 ∙ 𝑚
``
Propped beam with UDL Propped beam with Point Load at Midspan
By Virtual Work
At x = 0.414L
𝐿𝜃
𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
𝑊𝑢 𝐿2 2
𝑀𝑝 =
11.656 6𝑀𝑝 6(12.7)
𝑃𝑢 = =
11.656𝑀𝑝 11.656(12.7) 𝐿 2.5
𝑊𝑢 = =
𝐿2 2.52 𝑃𝑢 = 30.48 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 3450.05 Collapse Load if FS = 1.5
𝑚
𝑃𝑢 = 1.5(30.48)
Collapse Load if FS = 1.5
𝑃𝑢 = 45.72 𝑘𝑁
𝑊𝑢 = 1.5(23.68)
𝑘𝑁
𝑊𝑢 = 35.52
𝑚
2.5 m 2.5 m
If FS = 1.5
If FS = 1.5
45.72 kN
35.52 kN/m
2.5 m
2.5 m
B10
Plastic Modulus
𝑍𝑥 = 2[420(75)(164.5) + 127(7.9)(63.5)]
𝑍𝑥 = 10440.29𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(10440.29𝑥103 )
𝑀𝑝 = 2601.75 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
By Virtual Work
At x = 0.414L
𝐿𝜃
𝑊𝑢 𝐿2 𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
𝑀𝑝 = 2
11.656
6𝑀𝑝 6(2601.75)
11.656𝑀𝑝 11.656(2601.75) 𝑃𝑢 = =
𝑊𝑢 = = 𝐿 5
𝐿2 52
𝑃𝑢 = 3122. 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 1213.04
𝑚 Collapse Load if FS = 1.5
𝑊𝑢 = 1.5(1213.04) 𝑃𝑢 = 4683.15 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 1819.56
𝑚
3122.1 kN
1213.04 kN/m
If FS = 1.5 If FS = 1.5
4683.15 kN
1819.56 kN/m
B11(D1-D2)
Plastic Modulus
𝑍𝑥 = 2[300(85)(144) + 101.5(50.75)(11.2)]
𝑍𝑥 = 7459.35𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(7459.35𝑥103 )
𝑀𝑝 = 1849.93 𝑘𝑁 ∙ 𝑚
Collapse mechanism
Collapse mechanism
By Virtual Work
By Virtual Work
𝐿𝜃 𝐿
𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑊𝑢 ( )( ) 𝐿𝜃
2 2 𝑀𝑝 (𝜃 + 2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
16𝑀𝑝 16(1849.93 )
𝑊𝑢 = = 8𝑀𝑝 8(1849.93)
𝐿2 52 𝑃𝑢 = =
𝐿 5
𝑘𝑁
𝑊𝑢 = 1183.96 𝑃𝑢 = 2959.89 𝑘𝑁
𝑚
𝑊𝑢 = 1.5(1183.96) 𝑃𝑢 = 1.5(2959.89)
𝑘𝑁 𝑃𝑢 = 4439.84 𝑘𝑁
𝑊𝑢 = 1775.94
𝑚
If FS = 1.5 If FS = 1.5
B11(D3-D4)
Plastic Modulus
𝑍𝑥 = 2[300(85)(144) + 101.5(50.75)(11.2)]
𝑍𝑥 = 7459.35𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(7459.35𝑥103 )
𝑀𝑝 = 1849.93 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
5m 5m
Collapse mechanism
Collapse mechanism
By Virtual Work
At x = 0.414L 𝐿𝜃
𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
𝑊𝑢 𝐿2
𝑀𝑝 =
11.656 6𝑀𝑝 4(1849.93 )
𝑃𝑢 = =
𝐿 5
11.656𝑀𝑝 11.656(1849.93 )
𝑊𝑢 = =
𝐿2 52 𝑃𝑢 = 1479.94 𝑘𝑁
𝑘𝑁 Collapse Load if FS = 1.5
𝑊𝑢 = 862.51
𝑚
𝑃𝑢 = 1.5(1479.94)
Collapse Load if FS = 1.5
𝑃𝑢 = 2219.91 𝑘𝑁
𝑊𝑢 = 1.5(862.51)
𝑘𝑁
𝑊𝑢 = 1293.77
𝑚
5m
5m
If FS = 1.5
If FS = 1.5
5m
5m
B12
Plastic Modulus
𝑍𝑥 = 2[200(45)73.5 + 51(25.5)(4.8)]
𝑍𝑥 = 1335.48𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(1335.48𝑥103 )
𝑀𝑝 = 331.20 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
By Virtual Work
At x = 0.414L
𝐿𝜃
𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
𝑊𝑢 𝐿2 2
𝑀𝑝 =
11.656 6𝑀𝑝 6(1849.93)
𝑃𝑢 = =
11.656𝑀𝑝 11.656(1849.93) 𝐿 6
𝑊𝑢 = =
𝐿2 2.52 𝑃𝑢 = 1849.93 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 3450.05 Collapse Load if FS = 1.5
𝑚
𝑃𝑢 = 1.5(1849.93)
Collapse Load if FS = 1.5
𝑃𝑢 = 2774.90 𝑘𝑁
𝑊𝑢 = 1.5(4735.82)
𝑘𝑁
𝑊𝑢 = 5175.08
𝑚
If FS = 1.5 If FS = 1.5
For Beams Along Gridline E
B8
Plastic Modulus
𝑍𝑥 = 2[250(60)(106) + 76(8.9)(38)]
𝑍𝑥 = 3214.08𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(3214.08𝑥103 )
𝑀𝑝 = 797.09 𝑘𝑁 ∙ 𝑚
Collapse mechanism
Collapse mechanism
By Virtual Work
𝐿𝜃
By Virtual Work 𝑀𝑝 (2𝜃) = 𝑃𝑢 ( )
2
𝐿𝜃 𝐿
𝑀𝑝 (2𝜃) = 𝑊𝑢 ( )( ) 4𝑀𝑝 4(797.09 )
2 2 𝑃𝑢 = =
𝐿 5
8𝑀𝑝 8(797.09 )
𝑊𝑢 = = 𝑃𝑢 = 637.67 𝑘𝑁
𝐿2 52
𝑘𝑁
𝑊𝑢 = 382.61
𝑚
If FS = 1.5 If FS = 1.5
B9
Plastic Modulus
𝑍𝑥 = 2[150(30)(50) + 38(4.3)(19)]
𝑍𝑥 = 51.21𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(51.21𝑥103 )
𝑀𝑝 = 12.7 𝑘𝑁 ∙ 𝑚
``
2.5 m
2.5 m
Collapse mechanism
Collapse mechanism
By Virtual Work
𝐿𝜃
By Virtual Work 𝑀𝑝 (2𝜃) = 𝑃𝑢 ( )
2
𝐿𝜃 𝐿
𝑀𝑝 (2𝜃) = 𝑊𝑢 ( )( ) 4𝑀𝑝 4(797.09 )
2 2 𝑃𝑢 = =
𝐿 2.5
8𝑀𝑝 8(12.7)
𝑊𝑢 = = 𝑃𝑢 = 20.32 𝑘𝑁
𝐿2 2.52
𝑘𝑁
𝑊𝑢 = 24.39
𝑚
2.5 m
2.5 m
If FS = 1.5
If FS = 1.5
30.48 kN
24.39 kN/m
2.5 m
B10
Plastic Modulus
𝑍𝑥 = 2[420(75)(164.5) + 127(7.9)(63.5)]
𝑍𝑥 = 10440.29𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(10440.29𝑥103 )
𝑀𝑝 = 2601.75 𝑘𝑁 ∙ 𝑚
Collapse mechanism
Collapse mechanism
By Virtual Work
By Virtual Work
𝐿𝜃
𝐿𝜃 𝐿 𝑀𝑝 (2𝜃) = 𝑃𝑢 ( )
𝑀𝑝 (2𝜃) = 𝑊𝑢 ( ) ( ) 2
2 2
4𝑀𝑝 4(2601.75)
8𝑀𝑝 8(2601.75 ) 𝑃𝑢 = =
𝑊𝑢 = 2 = 𝐿 5
𝐿 52
𝑃𝑢 = 2081.4 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 832.56
𝑚 Collapse Load if FS = 1.5
𝑊𝑢 = 1.5(832.56) 𝑃𝑢 = 3122.1 𝑘𝑁
𝑘𝑁
𝑊𝑢 = 1248.84
𝑚
If FS = 1.5
If FS = 1.5
B11(E1-E2)
Plastic Modulus
𝑍𝑥 = 2[300(85)(144) + 101.5(50.75)(11.2)]
𝑍𝑥 = 7459.35𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(7459.35𝑥103 )
𝑀𝑝 = 1849.93 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
Wu Pu
5m
5m
Collapse mechanism
Collapse mechanism
By Virtual Work
At x = 0.414L 𝐿𝜃
𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
𝑊𝑢 𝐿2
𝑀𝑝 =
11.656 6𝑀𝑝 4(331.20 )
𝑃𝑢 = =
𝐿 5
11.656𝑀𝑝 11.656(331.20 )
𝑊𝑢 = =
𝐿2 52 𝑃𝑢 = 264.96 𝑘𝑁
𝑘𝑁 Collapse Load if FS = 1.5
𝑊𝑢 = 154.42
𝑚
𝑃𝑢 = 1.5(264.96)
Collapse Load if FS = 1.5
𝑃𝑢 = 397.44 𝑘𝑁
𝑊𝑢 = 1.5(154.42)
𝑘𝑁
𝑊𝑢 = 231.63
𝑚
5m
5m
If FS = 1.5
If FS = 1.5
397.44 kN
231.63 kN/m
5m
5m
B11(E3-E4)
Plastic Modulus
𝑍𝑥 = 2[300(85)(144) + 101.5(50.75)(11.2)]
𝑍𝑥 = 7459.35𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(7459.35𝑥103 )
𝑀𝑝 = 1849.93 𝑘𝑁 ∙ 𝑚
Propped beam with UDL Propped beam with Point Load at Midspan
5m 5m
Collapse mechanism
Collapse mechanism
By Virtual Work
At x = 0.414L 𝐿𝜃
𝑀𝑝 (2𝜃 + 𝜃) = 𝑃𝑢 ( )
2
𝑊𝑢 𝐿2
𝑀𝑝 =
11.656 6𝑀𝑝 4(1849.93 )
𝑃𝑢 = =
𝐿 5
11.656𝑀𝑝 11.656(1849.93 )
𝑊𝑢 = =
𝐿2 52 𝑃𝑢 = 1479.94 𝑘𝑁
𝑘𝑁 Collapse Load if FS = 1.5
𝑊𝑢 = 862.51
𝑚
𝑃𝑢 = 1.5(1479.94)
Collapse Load if FS = 1.5
𝑃𝑢 = 2219.91 𝑘𝑁
𝑊𝑢 = 1.5(862.51)
𝑘𝑁
𝑊𝑢 = 1293.77
𝑚
5m
5m
If FS = 1.5
If FS = 1.5
5m
5m
B12
Plastic Modulus
𝑍𝑥 = 2[200(45)73.5 + 51(25.5)(4.8)]
𝑍𝑥 = 1335.48𝑥103 𝑚𝑚3
𝑀𝑝 = 𝐹𝑦 𝑍𝑥 = 248(1335.48𝑥103 )
𝑀𝑝 = 331.20 𝑘𝑁 ∙ 𝑚
2.5 m
2.5 m
Collapse mechanism
Collapse mechanism
By Virtual Work
𝐿𝜃
By Virtual Work 𝑀𝑝 (2𝜃) = 𝑃𝑢 ( )
2
𝐿𝜃 𝐿
𝑀𝑝 (2𝜃) = 𝑊𝑢 ( )( ) 4𝑀𝑝 4(331.20)
2 2 𝑃𝑢 = =
𝐿 2.5
8𝑀𝑝 8(331.20)
𝑊𝑢 = = 𝑃𝑢 = 529.92 𝑘𝑁
𝐿2 2.52
𝑘𝑁
𝑊𝑢 = 739.88
𝑚
2.5 m
2.5 m
If FS = 1.5
If FS = 1.5
794.88 kN
739.88 kN/m
2.5 m