REPUBLIC OF THE PHILIPPINES

PROVINCE OF THE CAMARINES SUR


MUNICIPALITY OF BALATAN

PROJECT NAME: REHABILITATION OF MULTI-PURPOSE BUILDING


PROJECT LOCATION: BRGY. TAPAYAS, BALATAN, CAMARINES SUR

PROGRAM EVALUATION AND REVIEW TECHNIQUE / CRITICAL PATH METHOD


(PERT / CPM)
NETWORK

START FINISH
A B C D
1 2 3 4 5
4 20 2 9

PROJECT COMPLETION TIME = 35 CALENDAR DAYS


BLUE ARROW IS THE CRITICAL PATH

PREPARED BY: CHECKED AND VERIFIED:

ENGR. BILLY JOE S. SIRON ENGR. EDNA P. LOJO


ENGINEER II MUNICIPAL ENGINEER