Item Wise Rate Tender
Item Wise Rate Tender
Item Wise Rate Tender
Date: 14/12/2020
5 Footing Works
a. Simple Cft. 120.00
b. Eccentric Cft. 140.00
c. Special (I.E., Box, Raft & Combined) Cft. 150.00
d. Footing Up to Size (4’ X 4’) Nos 2000.00
6 Filling Of Earth
a. Excavated Earth Refilling Cft. 4.00
b. Earth From Outside Cft. 5.00
c. Road Compacting with Hammering (Up To 6" Tk) Sft. 16.00
g. Single Coat Rough (Inside) Extra 2 Rs/Sft for Out-Side Sft. 24.00
h. Kadi Tappa Stair Plaster Rft. 26.00
i. Chhajja Plaster Sft. 25.00
j. Patta Upto 6" Thick (Outside) Rft. 24.00
k. Ghisi Rft. 20.00
l. Roller Finish Plaster (Single Coat) Sft. 30.00
m. Gun Plaster (Single Coat) Sft. 26.00
n. Vatta Rft. 20.00
o. Tapak In Slab Rft. 25.00
25 Water Tank (U.G.) & For 0.H Water Tank Lead 10% Litre 7.00
/ Floor Consider
Extra
26 Fixing Steel Grill Sft 20.00
31 M.S. Plate (With Hold Fast) Fixing In R.C.C Without Nos 500.00
Welding Works (Labor)
30 Departmental Labors
a. Carpenter/ Fitter Day 800.00
b. Helper Day 600.00
c. Mason Day 1000.00
d. Male Labor Day 500.00
e. Female Labor Day 475.00
7. Payment against the bill for the work done shall be made within 5 days, falling in it
Contractor shall not be responsible for delay in completion of the work.
8. The owner should store necessary material near the site within 50 feet Range.
9. Water, watchman, and Electrification arrangements shall be provided at the site by the
owner.
10. Rates for the extra items shall be negotiated with the advice of the architect.
11. The above rates are valid for 12 months from the date of submitting the same.
12. Measurement of slab & R.C.C. wall shall be taken full and thickness of slab or wall
shall not be deducted from the depth of beam or column.
13. Arrangements for curing and watchman for 24 hr. shall be arranged by the owner.
14. In the above rates (10 % / Floor/10' HT) lead will be charged extra.
15. During the construction work, all labor is staying on-site till the work will be
complete or provide an optional area for accommodation.
16. All work will be carried out at the owner’s risk & cost so all expenses regarding
damages, site maintenance costs any penalties, and remedies work should be carried
out at the owner’s cost.
17. For exposed work touching work for the RCC member will be carried out by the
owner, touching work cost for the exposed work should be charged extra.
18. Concreting work Quantity more than 50 C.M.shell be carried out by R.M.C Only and
for that, no deduction in rate shall be entertained.