Madhyanchal Vidhyut Vitran Nigam Ltd.

, Lucknow
SUMMARY - SCHEDULE- P-1
Name of Tenderer: M/S ……………………………………………………………..

Name of town: Lucknow Date of Opening:


Tender Spec. No.: MEDCO-592/R-APDRP-B/2012

Summary of Price Schedule for implementation of various electrical system improvement works in Lucknow town of MVVNL on turnkey basis under
SCADA R-APDRP (Part-B)
Total Package cost incl. suppy prices, F&I charges, erection &
Sl. No. Name of town
commissioning charges and all taxes & duties. (Rs.)
1 2 3
i) Lucknow 0.00
A Total Package Cost 0.00
B Discount offered, if any on A above (……….. %)
C Net Package Cost (A-B)
Net Package Cost in words Rs. ……………………………………………………………………

Signature:
Name:
Designation:

Page 1
Madhyanchal Vidhyut Vitran Nigam Ltd.,Lucknow
Price Schedule & Bill Of Quantities
Name of Tenderer: M/S ……………………………………………………………..
Name of town: Lucknow Date of Opening:
Tender Spec. No.: MEDCO-592/R-APDRP-B/2012

Summary of Price Schedule for implementation of various electrical system improvement works in Lucknow town of MVVNL on turnkey basis under SCADA R-APDRP (Part-B)

Unit rate of
Unit rate of Total Unit prices
supply incl. F& Total Value of
erection incl. incl. Supply, F&I,
I with all taxes item Reference
Sl. No. Items Unit Qty. service tax Erection & all
& duties (Rs.) Price schedule
(Rs./Unit) taxes (Rs./Unit)
(Rs./Unit) (4x7)
(5+6)
1 2 3 4 5 6 7 8 9
A 33 kV Works
A-1 33 kV Lines
1 33kV Line on 11 Mtr. STP (SP 55) with ACSR Dog km. 0.00 0.00 0.00 0.00 0.00 A-1-a
2 33kV Line on 9 Mtr. PCC Pole with ACSR Dog km. 0.00 0.00 0.00 0.00 0.00 A-1-b
3 33kV Line on 13 Mtr STP (SP-72) with ACSR Panther km. 0.00 0.00 0.00 0.00 0.00 A-1-c
4 33kV Line on 11 Mtr. STP (SP 55) with ACSR Raccoon km. 0.00 0.00 0.00 0.00 0.00 A-1-d
5 33 kv Bus bar on panther Conductor km. 0.00 0.00 0.00 0.00 0.00 A-1-e
6 Reconductoring of 33 kV feeder with ACSR Dog Conductor km. 0.00 0.00 0.00 0.00 0.00 A-1-f
7 Reconductoring of 33 kV feeder with ACSR Panther Conductor km. 0.00 0.00 0.00 0.00 0.00 A-1-g
8 33 kV Line on (3X300) sq.mm. double circuit XLPE cable km. 428.60 0.00 0.00 0.00 0.00 A-1-h
9 1 No. 33KV Railway crossing No. 0.00 0.00 0.00 0.00 0.00 A-1-i
10 33 KV River Crossing on C type Tower for 350 mtr Span No. 0.00 0.00 0.00 0.00 0.00 A-1-j
11 Conversion of 33kV Overhead line to Underground km. 0.00 0.00 0.00 0.00 0.00 A-1-k

A-2 33/11 kV sub-station New


1 1x5 MVA No. 0 0.00 0.00 0.00 0.00 A-2-a
2 2x5 MVA No. 9 0.00 0.00 0.00 0.00 A-2-b
3 1x10 MVA No. 0 0.00 0.00 0.00 0.00 A-2-c
4 2x10 MVA S/S No. 6 0.00 0.00 0.00 0.00 A-2-d
5 1x5 MVA (with Released Power Transformer) No. 0 0.00 0.00 0.00 0.00 A-2-e
6 2x5 MVA (with Released Power Transformers) No. 0 0.00 0.00 0.00 0.00 A-2-f

A-3 33/11 kV sub-station : Additional transformer


1 5 MVA No. 2 0.00 0.00 0.00 0.00 A-3-a
2 10 MVA No. 0 0.00 0.00 0.00 0.00 A-3-b
3 5 MVA (Released) No. 0 0.00 0.00 0.00 0.00 A-3-c
TOTAL 2 0.00
A-4 33/11 KV sub-station : Transformer Capacity Enhancement
1 5 to 10 MVA No. 12 0.00 0.00 0.00 0.00 A-4-a

Page 2
Unit rate of
Unit rate of Total Unit prices
supply incl. F& Total Value of
erection incl. incl. Supply, F&I,
I with all taxes item Reference
Sl. No. Items Unit Qty. service tax Erection & all
& duties (Rs.) Price schedule
(Rs./Unit) taxes (Rs./Unit)
(Rs./Unit) (4x7)
(5+6)
1 2 3 4 5 6 7 8 9
2 8 to 10 MVA No. 2 0.00 0.00 0.00 0.00 A-4-a
3 3 to 5 MVA No. 0 0.00 0.00 0.00 0.00 A-4-b
4 5 to 8 MVA No. 0 0.00 0.00 0.00 0.00 A-4-c
5 3 to 5 MVA (with released t/f) No. 0 0.00 0.00 0.00 0.00 A-4-d
6 5 to 8 MVA (with released t/f) No. 0 0.00 0.00 0.00 0.00 A-4-e

A-5 Renovation and Modernization of 33/11kV S/S A-5


1 VCB
a 33 KV SCADA Compatible with Structure. No. 257 0.00 0.00 0.00 0.00 A-5
b 11 KV Incomer (SCADA Compatible) No 141 0.00 0.00 0.00 0.00 A-5
c 11 KV Outgoing ( SCADA Compatible ) No. 558 0.00 0.00 0.00 0.00 A-5
d 11 KV retrofitted motor for spring charging exisitng 11 KV VCB panel No 49 0.00 0.00 0.00 0.00 A-5
2 Numeric Relay
a Differential Relays for 33kv VCB No. 73 0.00 0.00 0.00 0.00 A-5
b O/C & E/F Relays for 33kv VCB No. 0 0.00 0.00 0.00 0.00 A-5
c Differential Relays for 11KV VCB No. 0 0.00 0.00 0.00 0.00 A-5
d O/C & E/F Relays for 11 kv VCB No. 0 0.00 0.00 0.00 0.00 A-5
3 33/11 KV PTR Marshelling box No. 282 0.00 0.00 0.00 0.00 A-5
4 Control panel 33 kV for double transformer No. 0 0.00 0.00 0.00 0.00 A-5
5 Control panel 33 kV for single feeder No. 0 0.00 0.00 0.00 0.00 A-5
6 11 kV Bus coupler No. 23 0.00 0.00 0.00 0.00 A-5
7 33 kV LA No. 68 0.00 0.00 0.00 0.00 A-5
8 33 kV Line isolator No. 45 0.00 0.00 0.00 0.00 A-5
9 33 kv Bus isolator No. 26 0.00 0.00 0.00 0.00 A-5
10 33 kV CT (200/100/1 A) No. 153 0.00 0.00 0.00 0.00 A-5
11 33 kV PT(Line & Bus) No. 365 0.00 0.00 0.00 0.00 A-5
12 11 kV XLPE cable 300 sq. mm. mtr 0 0.00 0.00 0.00 0.00 A-5
13 11 kV XLPE cable 185 sq. mm. mtr 72.92 0.00 0.00 0.00 0.00 A-5
14 Trans. Protn.& Oil leakage LS 0 0.00 0.00 0.00 0.00 A-5
15 Temp. indicator for Wdg. & Oil LS 0 0.00 0.00 0.00 0.00 A-5
16 ONAN/ONAF; Cooling/Exaust Fan LS 0 0.00 0.00 0.00 0.00 A-5
17 Battery Set No. 0 0.00 0.00 0.00 0.00 A-5
18 Civil Works Repairing of C/Room & S/Yard LS 0 0.00 0.00 0.00 0.00 A-5
19 Earthing Works No. 282 0.00 0.00 0.00 0.00 A-5
20 Lightening post at switch yard No. 0 0.00 0.00 0.00 0.00 A-5
21 Strengthning of earth mat No. 0 0.00 0.00 0.00 0.00 A-5
22 Bus extension complete with structure No. 0 0.00 0.00 0.00 0.00 A-5

Page 3
Unit rate of
Unit rate of Total Unit prices
supply incl. F& Total Value of
erection incl. incl. Supply, F&I,
I with all taxes item Reference
Sl. No. Items Unit Qty. service tax Erection & all
& duties (Rs.) Price schedule
(Rs./Unit) taxes (Rs./Unit)
(Rs./Unit) (4x7)
(5+6)
1 2 3 4 5 6 7 8 9
23 Reconditioning of power transformer plinth No. 0 0.00 0.00 0.00 0.00 A-5
24 33 kV Post Insulator No. 0 0.00 0.00 0.00 0.00 A-5
25 S/S Fencing Job 0 0.00 0.00 0.00 0.00 A-5
26 Cable Fault Locater HT No. 0 0.00 0.00 0.00 0.00 A-5
27 Chemical Pipe earthing of equipments Job 0 0.00 0.00 0.00 0.00 A-5
28 33KV Bus Coupler No. 51 0.00 0.00 0.00 0.00 A-5
29 Auto Reclosure (SCADA Compatible) No. 46 0.00 0.00 0.00 0.00 A-5
30 11kV sectionalizer (SCADA Compatible) No. 377 0.00 0.00 0.00 0.00 K-2

A-6 33 kv Bay extension No. 16 Cost to borne by the Department.

B 11kV Works
B-1 New Line on Bare Conductor
1 11kV New Line on 11 Mtr. STP (SP 55) with ACSR Dog Km. 129.16 0.00 0.00 0.00 0.00 B-1-a
2 11kV New Line on 11 Mtr. STP (SP 55) with Raccoon Conductor Km. 0 0.00 0.00 0.00 0.00 B-1-b
3 11kV New Line on 9 Mtr. PCC Pole with ACSR Dog Km. 0 0.00 0.00 0.00 0.00 B-1-c
4 11kV New Line on 9 Mtr. PCC Pole with Raccoon Conductor Km. 0 0.00 0.00 0.00 0.00 B-1-d
5 11kV New Line on 11 Mtr. STP (SP 55) with Rabbit Conductor Km. 24.25 0.00 0.00 0.00 0.00 B-1-e
6 11kV New Line on 9 Mtr. PCC Pole with Rabbit Conductor Km. 0 0.00 0.00 0.00 0.00 B-1-f

B-2 New Line on XLPE insulated Cables


1 11kV Over Head Line on 3x95 Sq. mm. AB Cable Km. 0 0.00 0.00 0.00 0.00 B-2-a
2 11kV Over Head Line on 3x50 Sq. mm. AB Cable Km. 0 0.00 0.00 0.00 0.00 B-2-b
3 11kV Underground Line on 3x300 Sq. mm. XLPE Cable Km. 0 0.00 0.00 0.00 0.00 B-2-c
4 11kV Underground Line on 3x185 Sq. mm. XLPE Cable Km. 188.28 0.00 0.00 0.00 0.00 B-2-d
5 11kV Underground Line on 3x120 Sq. mm. XLPE Cable Km. 0 0.00 0.00 0.00 0.00 B-2-e
6 11 KV Line at Railway crossing No. 0 0.00 0.00 0.00 0.00 B-2-f
7 Overhead 11 KV line on existing poles by HT ABC/ XLPE 3x95 sq.mm Km. 0 0.00 0.00 0.00 0.00 B-2-g
8 Overhead 11 KV line on existing poles by HT ABC/ XLPE 3x50 sq.mm Km. 0 0.00 0.00 0.00 0.00 B-2-h
9 11kV Underground Line on 3x50 Sq. mm. XLPE Cable Km. 0 0.00 0.00 0.00 0.00 B-2-i

B-3 Reconductoring of Existing Lines


1 Reconductoring of 11kV Feeders by ACSR Dog Km. 0 0.00 0.00 0.00 0.00 B-3-a
2 Reconductoring of 11 kv feeder by Raccoon Km. 0 0.00 0.00 0.00 0.00 B-3-b
3 Reconductoring of 11 KV feeders from Weasel to ABC of size 3x120mm2 Km. 0 0.00 0.00 0.00 0.00 B-3-c
4 Reconductoring of 11 kv feeder by Rabbit Km. 78.55 0.00 0.00 0.00 0.00 B-3-d

B-4 11 kv Bay extension No. 0 0.00 0.00 0.00 0.00 B-4-a

Page 4
Unit rate of
Unit rate of Total Unit prices
supply incl. F& Total Value of
erection incl. incl. Supply, F&I,
I with all taxes item Reference
Sl. No. Items Unit Qty. service tax Erection & all
& duties (Rs.) Price schedule
(Rs./Unit) taxes (Rs./Unit)
(Rs./Unit) (4x7)
(5+6)
1 2 3 4 5 6 7 8 9

C-1 Distribution Transformer Sub-stations


1 400 KVA, 11/0.433kV Distribution Transformer S/S No. 26 0.00 0.00 0.00 0.00 C-1-a
2 250 KVA,11/0.433kV Distribution Transformer S/S No. 314 0.00 0.00 0.00 0.00 C-1-b
3 160 KVA, 11/0.433kV Distribution Transformer S/S No. 0 0.00 0.00 0.00 0.00 C-1-c
4 100 KVA, 11/0.433kV Distribution Transformer S/S No. 0 0.00 0.00 0.00 0.00 C-1-d
5 63 KVA, 11/0.433kV Distribution Transformer S/S No. 0 0.00 0.00 0.00 0.00 C-1-e
6 25 KVA 11/0.433kV Distribution Transformer S/S No. 0 0.00 0.00 0.00 0.00 C-1-f
7 400 KVA Compact Sub Station No. 0 0.00 0.00 0.00 0.00 C-1-g
8 250 KVA, 11/0.433kV Distribution Transformer S/S with released T/f No. 0 0.00 0.00 0.00 0.00 C-1-h
9 160 KVA,11/0.433kV Ditribution Transformer S/S with released T/f No. 0 0.00 0.00 0.00 0.00 C-1-i
10 100 KVA,11/0.433kV Distribution Transformer S/S with released T/f No. 0 0.00 0.00 0.00 0.00 C-1-j
11 63 KVA,11/0.433kV Distribution Transformer S/S with released T/f No. 0 0.00 0.00 0.00 0.00 C-1-k
12 16 KVA 1 Ph 11/0.250 kV new Distribution Transformer S/S No. 0 0.00 0.00 0.00 0.00 C-1-l
13 10 KVA 1 Ph 11/0.250 kV new Distribution Transformer S/S No. 0 0.00 0.00 0.00 0.00 C-1-m
14 Dismentaling charges of old Distribution T/F
a 1000 KVA No. 0 NTQ 0.00 0.00 0.00 C-1-n
b 750 KVA No. 0 NTQ 0.00 0.00 0.00 C-1-n
c 630 KVA No. 0 NTQ 0.00 0.00 0.00 C-1-n
d 500 KVA No 0 NTQ 0.00 0.00 0.00 C-1-n
e 400 KVA No. 0 NTQ 0.00 0.00 0.00 C-1-n

C-2 Distribution Transformer Sub-stations (Capacity Augmentation)


1 From 25KVA to 63KVA No. 0 0.00 0.00 0.00 0.00 C-2-a
2 From 25KVA to 100KVA No. 0 0.00 0.00 0.00 0.00 C-2-b
3 From 63KVA to 100KVA No. 0 0.00 0.00 0.00 0.00 C-2-b
4 From 63KVA to 160 KVA No. 0 0.00 0.00 0.00 0.00 C-2-c
5 From 63KVA to 250 KVA No. 0 0.00 0.00 0.00 0.00 C-2-d
6 From 100 KVA to 160 KVA No. 0 0.00 0.00 0.00 0.00 C-2-c
7 From 100 KVA to 250 KVA No. 0 0.00 0.00 0.00 0.00 C-2-d
8 From 100 KVA to 400 KVA No. 0 0.00 0.00 0.00 0.00 C-2-e
9 From 160 KVA to 250 KVA No. 0 0.00 0.00 0.00 0.00 C-2-d
10 From 160 KVA to 400 KVA No. 0 0.00 0.00 0.00 0.00 C-2-e
11 From 250 KVA to 400 KVA No. 0 0.00 0.00 0.00 0.00 C-2-f
12 From 400 KVA to 630 KVA No. 0 0.00 0.00 0.00 0.00 C-2-g
13 From 25 KVA to 63 KVA (Released T/f) No. 0 0.00 0.00 0.00 0.00 C-2-h
14 From 25 KVA to 100 KVA (Released T/f) No. 0 0.00 0.00 0.00 0.00 C-2-i
15 From 63 KVA to 100 KVA (Released T/f) No. 0 0.00 0.00 0.00 0.00 C-2-i
16 From 100 KVA to 160 KVA (Released T/f) No. 0 0.00 0.00 0.00 0.00 C-2-j

Page 5
Unit rate of
Unit rate of Total Unit prices
supply incl. F& Total Value of
erection incl. incl. Supply, F&I,
I with all taxes item Reference
Sl. No. Items Unit Qty. service tax Erection & all
& duties (Rs.) Price schedule
(Rs./Unit) taxes (Rs./Unit)
(Rs./Unit) (4x7)
(5+6)
1 2 3 4 5 6 7 8 9
17 From 100 KVA to 250 KVA (Released T/f) No. 0 0.00 0.00 0.00 0.00 C-2-k
18 From 160 KVA to 250 KVA (Released T/f) No. 0 0.00 0.00 0.00 0.00 C-2-k

D LT Lines:
D-1 Line on Bare Conductor
1 New LT Line on Raccoon Conductor Km. 0 0.00 0.00 0.00 0.00 D-1-a
2 Replacement of Existing LT Line with Raccoon Conductor Km. 0 0.00 0.00 0.00 0.00 D-1-b

D-2 New LT Line on ABC


1 3x150+1x16+1x120sq. mm. Km. 0 0.00 0.00 0.00 0.00 D-2-a
2 3x120+1x16+1x95 Sq. mm. Km. 41.70 0.00 0.00 0.00 0.00 D-2-b
3 3x95+1x16+1x70 Sq.mm Km. 0 0.00 0.00 0.00 0.00 D-2-c
4 3x70+1x16+1x50 Sq.mm Km. 0 0.00 0.00 0.00 0.00 D-2-d
5 3x50+1x16+1x35 Sq. mm. Km. 0 0.00 0.00 0.00 0.00 D-2-e
6 New LT Line U/G Cable Km. 0 0.00 0.00 0.00 0.00

D-3 Replacement of existing LT line by ABC-


1 3x150+1x16+1x120sq. mm. Km. 193.96 0.00 0.00 0.00 0.00 D-3-a
2 3x120+1x16+1x95 Sq. mm. Km. 319.62 0.00 0.00 0.00 0.00 D-3-b
3 3x95+1x16+1x70 Sq. mm. Km. 1518.02 0.00 0.00 0.00 0.00 D-3-c
4 3x50+1x16+1x35 Sq. mm. Km. 0.00 0.00 0.00 0.00 0.00 D-3-d

D-4 Replacement of existing LT Overhead system into Underground system -

Conversion of L.T. Overhead Lines into Underground Lines by 3.5x400 Sqmm.


1 Km. 0 0.00 0.00 0.00 0.00 D-4-a
Cable
Conversion of L.T. Overhead Lines into Underground Lines by 3.5x240 Sqmm.
2 Km. 0 0.00 0.00 0.00 0.00 D-4-b
Cable
Conversion of L.T. Overhead Lines into Underground Lines by 3.5x120 Sqmm.
3 Km. 0 0.00 0.00 0.00 0.00 D-4-c
Cable
Conversion of L.T. Overhead Lines into Underground Lines by 3.5x50 Sqmm.
4 Km. 0 0.00 0.00 0.00 0.00 D-4-d
Cable
5 LT Distribution Boards (Type A-1) for 1000 & 630 KVA DTs No. 0 0.00 0.00 0.00 0.00
6 LT Distribution Boards (Type A-2) for 400 KVA DTs No. 0 0.00 0.00 0.00 0.00
7 LT Distribution Boards (Type A-3) for 250 & 160 KVA DTs No. 0 0.00 0.00 0.00 0.00
8 LT Distribution Boards (Type A-4) for 100 KVA DTs No. 0 0.00 0.00 0.00 0.00
9 LT Distribution Boards (Type A-5) for 63 & 25 KVA DTs No. 0 0.00 0.00 0.00 0.00 D-4-e
10 LT Distribution Boards (Type B-1) No. 0 0.00 0.00 0.00 0.00
11 LT Distribution Boards (Type B-2) No. 0 0.00 0.00 0.00 0.00

Page 6
Unit rate of
Unit rate of Total Unit prices
supply incl. F& Total Value of
erection incl. incl. Supply, F&I,
I with all taxes item Reference
Sl. No. Items Unit Qty. service tax Erection & all
& duties (Rs.) Price schedule
(Rs./Unit) taxes (Rs./Unit)
(Rs./Unit) (4x7) D-4-e
(5+6)
1 2 3 4 5 6 7 8 9
12 LT Distribution Boards (Type B-3) No. 0 0.00 0.00 0.00 0.00
13 LT Distribution Boards (Type C) No. 0 0.00 0.00 0.00 0.00

Provision of XLPE/PVC insulated armoured Al. LT cable for consumer


E E-1
connections
1 2x4 Sq mm Km. 0 0.00 0.00 0.00 0.00 E-1-a
2 4x6 Sq mm Km. 0 0.00 0.00 0.00 0.00 E-1-b
3 4x10 Sq mm Km. 0 0.00 0.00 0.00 0.00 E-1-c
4 4x16 Sq mm Km. 0 0.00 0.00 0.00 0.00 E-1-d

F Capacitor Bank
F-1 Installation of 11 kV Capacitor Bank with APFC Panels at 33/11kV S/s
1 3.96 MVAr No. 125 0.00 0.00 0.00 0.00 F-1-a
2 1.98 MVAr No. 0 0.00 0.00 0.00 0.00 F-1-b

F-2 Installation of fixed LT Capacitor Bank at DT Substations F-2


1 4 KVAr No. 0 0.00 0.00 0.00 0.00 F-2-a
2 8 KVAr No. 0 0.00 0.00 0.00 0.00 F-2-b
3 10 KVAr No. 497 0.00 0.00 0.00 0.00 F-2-c
4 16 KVAr No. 221 0.00 0.00 0.00 0.00 F-2-d
6 25 KVAr No. 1125 0.00 0.00 0.00 0.00 F-2-e
7 40 KVAr No. 1258 0.00 0.00 0.00 0.00 F-2-f
8 63 KVAr No. 442 0.00 0.00 0.00 0.00 F-2-g
10 100 KVAr No. 135 0.00 0.00 0.00 0.00 F-2-h

G HVDS
1 Conversion of bare LT line to 11 kV HT Line Km. 0 0.00 0.00 0.00 0.00 G-1-a

H Metering
H-1 Supplying and installation of following Distribution T/F Metering System H-1-a
1 For 400 kVA No. 27 0.00 0.00 0.00 0.00 H-1-a-v
2 For 250 kVA No. 314 0.00 0.00 0.00 0.00 H-1-a-iv
3 For 160 kVA No. 0 0.00 0.00 0.00 0.00 H-1-a-iii
4 For 100 kVA No. 0 0.00 0.00 0.00 0.00 H-1-a-iii
5 For 63 kVA No. 0 0.00 0.00 0.00 0.00 H-1-a-ii
6 For 25 kVA No. 0 0.00 0.00 0.00 0.00 H-1-a-i
7 For 16 & 10 kVA 1 Ph. DT (in group of Transformer at 11 KV side) No. 0 0.00 0.00 0.00 0.00 H-1-a-j

Page 7
Unit rate of
Unit rate of Total Unit prices
supply incl. F& Total Value of
erection incl. incl. Supply, F&I,
I with all taxes item Reference
Sl. No. Items Unit Qty. service tax Erection & all
& duties (Rs.) Price schedule
(Rs./Unit) taxes (Rs./Unit)
(Rs./Unit) (4x7)
(5+6)
1 2 3 4 5 6 7 8 9
8 Street Light Automation and Metering System No. 0 0.00 0.00 0.00 0.00 H-1-b
9 Consumer Meter (1-Phase) No. 99050 0.00 0.00 0.00 0.00 H-1-c-i
10 Consumer Meter (3-Phase) No. 1908 0.00 0.00 0.00 0.00 H-1-c-ii
12 AMR compatible meter for 25KW and above consumer No. 2060 0.00 0.00 0.00 0.00 H-1-c-iii

I MOBILE SERVICE CENTRE


1 Mobile service centre at 33/11 kv Sub Stations No. 0 0.00 0.00 0.00 0.00 I-1-a

J Others
1 400 KVA Trolly Mounted mobile sub-station for emergency No 69 0.00 0.00 0.00 0.00 J-1-a
2 250 KVA Trolly Mounted mobile sub-station for emergency No 0 0.00 0.00 0.00 0.00 J-1-b
3 Meter Pillar Boxes suitable for 6 consumer meter No. 0 0.00 0.00 0.00 0.00 J-1-c
Provision of LT Distribution box on each LT circuit for control and protection
4 J-1-d
of outgoing LT Circuit.
a For 400 kVA DT No. 1000 0.00 0.00 0.00 0.00 J-1-d-1
b For 250 kVA DT No. 630 0.00 0.00 0.00 0.00 J-1-d-2
c For 160 & 100 kVA DT No. 600 0.00 0.00 0.00 0.00 J-1-d-3
d For 63 kVA DT No. 730 0.00 0.00 0.00 0.00 J-1-d-4
5 Stay insulators No. 18978 0.00 0.00 0.00 0.00 Annexure-30
Provision of stay to maintain proper sag and ground clearance and to keep the
6 No. 15660 0.00 0.00 0.00 0.00 K-1
support and straight position.
7 Replacement of Old LT Cable at DTs Sub stations J-1-e
a Replacement of old /used LT Lead/ cable of existing transformer 25 KVA Nos. 0 0.00 0.00 0.00 0.00 J-1-e-1
b Replacement of old /used LT Lead/ cable of existing transformer 63 KVA Nos. 0 0.00 0.00 0.00 0.00 J-1-e-2
c Replacement of old /used LT Lead/ cable of existing transformer 100 KVA Nos. 0 0.00 0.00 0.00 0.00 J-1-e-3
d Replacement of old /used LT Lead/ cable of existing transformer 160 KVA Nos. 0 0.00 0.00 0.00 0.00 J-1-e-4
e Replacement of old /used LT Lead/ cable of existing transformer 250 KVA Kms. 14.35 0.00 0.00 0.00 0.00 J-1-e-5
8 Extra outgoing 11 kV XLPE cable for Reducing break down at 33 kV S/s No. 0 0.00 0.00 0.00 0.00 J-1-f
9 11 KV Installation of 3way RMUs with 2 nos FPI (SCADA Compatible) No. 172 0.00 0.00 0.00 0.00 J-1-g
10 11KV Installation of 4way RMUs with 2 nos FPI (SCADA Compatible) No. 0 0.00 0.00 0.00 0.00 J-1-g-1
11 11 kV Line :-Standalone Communicable FPI No. 0 0.00 0.00 0.00 0.00 J_1_g
12 Installation of 3 way RMU for 33KV No. 0 0.00 0.00 0.00 0.00 J-2-g
13 Strengthening of existing 11 KV feeders. Km. 0 0.00 0.00 0.00 0.00 J-1-h
14 Welding/ Plinthing/Repairing of damaged poles (STP) No. 5718 0.00 0.00 0.00 0.00 J-1-i
15 Additional/Replacement of pole (STP- 11 Mts) No. 0 0.00 0.00 0.00 0.00 Annex-17
16 Additional/Replacement of pole (STP- 9 Mts) No. 0 0.00 0.00 0.00 0.00 Annex-29
17 Additional/Replacement of pole (PCC- 8.5 Mts) No 0 0.00 0.00 0.00 0.00 Annex-29

Page 8
Unit rate of
Unit rate of Total Unit prices
supply incl. F& Total Value of
erection incl. incl. Supply, F&I,
I with all taxes item Reference
Sl. No. Items Unit Qty. service tax Erection & all
& duties (Rs.) Price schedule
(Rs./Unit) taxes (Rs./Unit)
(Rs./Unit) (4x7)
(5+6)
1 2 3 4 5 6 7 8 9
18 Guarding of 11 kV Line Km. 0 0.00 0.00 0.00 0.00 Annex-28
TOTAL 0.00
K R & M of Existing Distribution S/S
Reconditioning of following rating 11/0.4 KV Transformer and installation of
1 K-1
Distribution box for LT Protection
a 1000 KVA No. 30 0.00 0.00 0.00 0.00 K-1
b 630 KVA No. 100 0.00 0.00 0.00 0.00 K-1
c 400 KVA No. 278 0.00 0.00 0.00 0.00 K-1
d 250 KVA No. 190 0.00 0.00 0.00 0.00 K-1
e 160 KVA No. 39 0.00 0.00 0.00 0.00 K-1
f 100 KVA No. 83 0.00 0.00 0.00 0.00 K-1
g 63 KVA No. 147 0.00 0.00 0.00 0.00 K-1
h 25 KVA No. 164 0.00 0.00 0.00 0.00 K-1
i 16 KVA No. 14 0.00 0.00 0.00 0.00 K-1
j 10 KVA No. 12 0.00 0.00 0.00 0.00 K-1
Total DT 1057
2 Copper L-Piece of size 400x50x6 mm for LT Bushing Rod of transformer No. 2114 0.00 0.00 0.00 0.00 K-1
3 11KV TPMO No. 2449 0.00 0.00 0.00 0.00 K-1
4 11 KV Fuse Set No. 1453 0.00 0.00 0.00 0.00 K-1
5 Lightning arrestor 11 KV No. 5556 0.00 0.00 0.00 0.00 K-1
7 MS Channel 100X50X2028mm(Dropper for fuse set) No. 1586 0.00 0.00 0.00 0.00 K-1
8 Holding clamps for top channel, TPMO & fuse set etc. with bolts & nuts No. 9513 0.00 0.00 0.00 0.00 K-1
9 Filling of transformer oil in DT (Av. 20 Ltrs. Per DT) Ltrs. 21140 0.00 0.00 0.00 0.00 K-1
10 Repairing of Plinth of transformer (250 kVA and above) No. 299 0.00 0.00 0.00 0.00 K-1
11 Painting of DP structure Job 1057 0.00 0.00 0.00 0.00 K-1
12 Repairing of fencing No. 319 0.00 0.00 0.00 0.00 K-1

13 Earthing of pole by MS earthing rod of 20x2500 mm. and 6 SWG earthing wire etc. No. 1586 0.00 0.00 0.00 0.00 K-1

14 Repairing of Plinth/Grounting of Poles/ Support No. 529 0.00 0.00 0.00 0.00 K-1
15 G.I. Barbed wire Kg. 529 0.00 0.00 0.00 0.00 K-1
16 11 kV Danger board with clamp with N&B No. 529 0.00 0.00 0.00 0.00 K-1
17 11 kV Stay complete (As per Annex 27) No. 529 0.00 0.00 0.00 0.00 K-1
18 LT Aluminium unarmoured XLPE Single Core Cable of following size:-
a 1x630 Sq.mm. Mtr. 16920 0.00 0.00 0.00 0.00 K-1
b 1x400 Sq.mm. Mtr. 7600 0.00 0.00 0.00 0.00 K-1
c 1x240 Sq.mm. Mtr. 780 0.00 0.00 0.00 0.00 K-1
d 1x120 Sq.mm. Mtr. 1660 0.00 0.00 0.00 0.00 K-1
e 1x70 Sq.mm. Mtr. 2940 0.00 0.00 0.00 0.00 K-1

Page 9
Unit rate of
Unit rate of Total Unit prices
supply incl. F& Total Value of
erection incl. incl. Supply, F&I,
I with all taxes item Reference
Sl. No. Items Unit Qty. service tax Erection & all
& duties (Rs.) Price schedule
(Rs./Unit) taxes (Rs./Unit)
(Rs./Unit) (4x7)
(5+6)
1 2 3 4 5 6 7 8 9
f 1x50 Sq.mm. Mtr. 3280 0.00 0.00 0.00 0.00 K-1
LT Aluminium unarmoured XLPE 1 Core Cable of following size for outgoing
18
feeders:-
a 1x240 Sq.mm. Mtr. 15540 0.00 0.00 0.00 0.00 K-1
b 1x120 Sq.mm. Mtr. 2340 0.00 0.00 0.00 0.00 K-1
c 1x95 Sq.mm. Mtr. 1245 0.00 0.00 0.00 0.00 K-1
d 1x70 Sq.mm. Mtr. 4665 0.00 0.00 0.00 0.00 K-1
19 ACSR Weasel conductor for jumpering Mtr. 13210 0.00 0.00 0.00 0.00 K-1
20 Extra for Al. tape , binding wire, jointing sleeves, PG clamps etc. LS (Per t/f) 1057 0.00 0.00 0.00 0.00 K-1

21 Al. crimping lugs (630/400/240/120/95/70/50/35 ) sq.mm. LS (Per t/f) 1057 0.00 0.00 0.00 0.00 K-1
22 Transformer Earthing (Chemical pipe earthing) No. 2114 0.00 0.00 0.00 0.00 K-1
23 11 kV LA Earthing (Chemical Pipe Earthing) No. 1057 0.00 0.00 0.00 0.00 K-1
24 Conversion of Pilca cable into XLPE cable wherever required Km 2.20 0.00 0.00 0.00 0.00 K-1
GRAND TOTAL 0.00
Signature:
Name:
Designation:

Page 10
Cost of 1Km. 33KV Line on 11 Mtr. Steel Tubular Pole with ACSR Dog
A-1-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Single support 11 mtr. STP (SP-55)
1 Nos. 16 B/O 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-1)
Section double pole on 11 mtr. STP
2 Nos. 1 B/O 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-2)
Extra stay at small angle locations
3 Nos. 2 B/O 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-10)
Extra Stud Pole of 11 Mtr STP
4 complete with clamps, grouting, Nos. 1 B/O 0.00 0.00 0.00 0.00 0.00 0.00
concreting, plinthing
5 ACSR Dog Conductor Km. 3.09 B/O 0.00 0.00 0.00 0.00 0.00 0.00
6 Alluminium jointing sleeves Nos. 3 B/O 0.00 0.00 0.00 0.00 0.00 0.00

Extra for cradle guarding at


Road/Communication Lines /11kv
7 Nos. 0.5 B/O 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
line/ 33 kV line crossing on 13 Mtr.
STP SP-72 (as per Annex-12)

Guarding of 33 kV Line (as per


8 Km. 1 B/O 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
annex-11)
9 Tree cutting compensation Km. 1 B/O NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1Km. 33KV Line on 9 Mtr. PCC Pole with ACSR Dog
A-1-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Single support on 9 Mtr PCC Pole
1 Nos. 16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-7)
Section double pole on 9 Mtr. PCC
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-8)
Stud Pole of 9 Mtr PCC Pole
3 complete with clamps, grouting, Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
concreting, plinthing
Extra stay at small angle locations
4 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-10)
5 ACSR Dog Conductor Km. 3.09 0.00 0.00 0.00 0.00 0.00 0.00
6 Alluminium jointing sleeves Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

Extra for cradle guarding at


Road/Communication Lines /11kv
7 Nos. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
line/ 33 kV line crossing on 11 Mtr.
STP SP-55 (as per Annex-13)

Guarding of 33 kV Line (as per


8 Km. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-11)
9 Tree cutting compensation Km. 1 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1Km. 33KV Line on 13 Mtr. Steel Tubular Pole with ACSR Panther
A-1-c
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value of Unit Service Unit Total value Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. supply Erection Tax Erection of Erection prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges incl. service Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. tax Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax (Rs.) all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Single support on 13 Mtr STP (SP-
1 Nos. 16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
72) (as per Annex-4)
Section double pole on 13 Mtr.
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
STP(as per Annex-5)
Stud Pole of 13 Mtr STP complete
3 with clamps, grouting, concreting, Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
plinthing
Extra stay at small angle locations
4 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-10)
5 ACSR Panther Conductor Km. 3.09 0.00 0.00 0.00 0.00 0.00 0.00
6 Alluminium jointing sleeves Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

Extra for cradle guarding at


Road/Communication Lines /11kv
7 Nos. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
line/ 33 kV line crossing on 13 Mtr.
STP SP-72 (as per Annex-12)

Guarding of 33kV Line (as per


8 Km. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-11)
9 Tree cutting compensation Km. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1Km. 33KV Line on 11 Mtr. Steel Tubular Pole with ACSR Raccoon
A-1-d
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Single support on 11 Mtr ST Pole
1 Nos. 16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(SP-55) (as per Annex-1)
Section double pole on 11 Mtr. STP
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-2)
Extra stay at small angle locations
3 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-10)
Stud Pole of 11 Mtr STP complete
4 with clamps, grouting, concreting, Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
plinthing
5 ACSR Raccoon Conductor Km. 3.09 0.00 0.00 0.00 0.00 0.00 0.00
6 Alluminium jointing sleeves Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

Extra for cradle guarding at


Road/Communication Lines /11kv
7 Nos. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
line/ 33 kV line crossing on 13 Mtr.
STP SP-72 (as per Annex-12)

Guarding of 33kV Line (as per


8 Km. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-11)
9 Tree cutting compensation Km. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 33 KV Bus Bar on ACSR Panther
A-1-e
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total value Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection of Erection prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges incl. service Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. tax Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax (Rs.) all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 ACSR Panther Mtr. 150 0.00 0.00 0.00 0.00 0.00 0.00

2 (a) 33 kV Post Insulator No. 6 0.00 0.00 0.00 0.00 0.00 0.00

Structure for 33 kV Post Insulator


(b) Set 2 0.00 0.00 0.00 0.00 0.00 0.00
with plinth & foundation
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Reconductoring of 33 KV 1 km Line with ACSR Dog Conductor
A-1-f
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 ACSR Dog Conductor Km. 3.09 0.00 0.00 0.00 0.00 0.00 0.00
2 Armour Rod with Ferrule Sets. 48 0.00 0.00 0.00 0.00 0.00 0.00
3 Alluminium Binding wire Kg. 5 0.00 0.00 0.00 0.00 0.00 0.00
4 Repacement of following items 0.00 0.00

i STP 11 Mtr SP-55 (as per Annex-1) No. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

X-Arm Channel 100x50 mm long V-


ii No. 4 0.00 0.00 0.00 0.00 0.00 0.00
Type
X-Arm holding back clamp with
iii No. 4 0.00 0.00 0.00 0.00 0.00 0.00
bolts and nuts
iv F Clamp for 33 kV No. 4 0.00 0.00 0.00 0.00 0.00 0.00
v E-Bracket for 33 kV No. 2 0.00 0.00 0.00 0.00 0.00 0.00
vi 33 kV Pin Insulator No. 12 0.00 0.00 0.00 0.00 0.00 0.00
vii 33 kV Pin with Nut No. 12 0.00 0.00 0.00 0.00 0.00 0.00
viii Stone Pad (300x300x75 mm) No. 4 0.00 0.00 0.00 0.00 0.00 0.00
ix Alluminium Paint Ltrs 4 0.00 0.00 0.00 0.00 0.00 0.00
x Red Oxide Paint Ltrs 8 0.00 0.00 0.00 0.00 0.00 0.00
Concreting of support (0.44 Cu.m.
xi No. 4 0.00 0.00 0.00 0.00 0.00 0.00
each)
33 kV Stay complete (as per Annex-
xii No. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10)

Earthing of pole by MS earthing rod


xiii of 20x2500 mm. and 6 SWG earthing Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
wire etc.

Guarding of 33kV Line (as per


5 Km. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
annex-11)
Dismantelling of the old line
Ckt.
6 materials and cartage it to nearest 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Km.
town store
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Reconductoring of 1 Km. 33 KV Line with ACSR Panther
A-1-g
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Single support on 13 Mtr STP (SP-
1 Nos. 16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
72) (as per Annex-4)
Section double pole on 13 Mtr. STP
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-5)
Stud Pole of 13 Mtr STP complete
3 with clamps, grouting, concreting, Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
plinthing
Extra stay at small angle locations
4 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-10)
5 ACSR Panther Conductor Km. 3.09 0.00 0.00 0.00 0.00 0.00 0.00
6 Alluminium jointing sleeves Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

Extra guarding Road/Communication


7 Lines /11kv line crossing on 13 Mtr. Nos. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
STP (as per Annex-12)

Guarding of 33kV Line (as per


8 Km. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
annex-11)
Dismantelling of the old line
Ckt.
9 materials and cartage it to nearest 1 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Km.
town store
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
COST OF 1 km 33kV Underground line on 3x300 Sq. mm. XLPE Cable Double Circuit
A-1-h
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total value Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection of Erection prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply (Rs.) Charges (Rs./ Charges incl. service Supply, F&I, (Rs.)
Sl. item. Unit) be tax Prices with (4x11) (Rs./ Unit) Unit) incl. tax Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ all taxes service tax (Rs.) all taxes
Clearly) Unit) (Rs./Unit) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (6+7+8+9+10 (13+14) (11+15)
)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 33kV 3x300 mm2 XLPE cable Mtrs. 2200 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit outdoor
2 for 33 kV 3x300 Sq. mm. XLPE Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
Cable
Heat Shrinkable Cable jointing kit
3 straight through for 33 kV 3x300 Sq. Nos. 8 0.00 0.00 0.00 0.00 0.00 0.00
mm. XLPE Cable
Section double pole on 11 mtr long
4 No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
STP (as per Annex-2)
5 GI Pipe 6" Diameter Mtr. 20 0.00 0.00 0.00 0.00 0.00 0.00
Road Restoration Chages for Pucca
6 km 0.2 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Road Crossing
Road Restoration Chages for
7 km 0.8 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Kucchha Road Crossing

8 Pipe (Hume/HDPE) for Cable Laying Mtr. 50 0.00 0.00 0.00 0.00 0.00 0.00

Cable laying charges including cost


9 km 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
of Bricks, sand,clamps etc.
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 No. 33 KV Railway Crossing by 3x300 Sq. mm. XLPE Cable
A-1-i
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total value Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection of Erection prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges incl. service Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) Unit) incl. tax Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax (Rs.) all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 33kV XLPE cable 3x300 mm2 Mtrs. 300 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit outdoor
2 for 33 kV 3x300 Sq. mm. XLPE Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
Cable
Hume Pipe for cable laying (Pipe to
3 Mtr. 80 0.00 0.00 0.00 0.00 0.00 0.00
be laid by HDD Method)
Cable laying including cost of
4 material eg., Bricks, Sand, clamps Job 1 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
etc.
5 G.I. Pipe 50 mm. diameter Mtr. 12 0.00 0.00 0.00 0.00 0.00 0.00
Extra for 33kV double pole-11 mtr
6 No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
long STP (as per Annex-2)
Railway crossing documentation and
7 Job 1 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
approval fee etc.
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 33 KV River Crossing on C-Type tower for 350 mtr Span
A-1-j
For Supply For Erection Total

Specify, Other Unit Total Unit


Unit F & Total Unit Total value
direct or Unit Ex- Taxes & Erection prices incl.
Sl. I charges FOR Dest. Total value Unit of Erection Total Value
Items Unit Qty. bought E.D. S.T. duties (to Service Charges Supply, F&I,
No. Work incl. any Supply Prices of supply Erection incl. service of Item
out (Rs./ (Rs./ be Tax incl. Erection &
Price (Rs./ tax with all taxes (Rs.) Charges tax (Rs.)
item. Unit) Unit) specified (Rs./ Unit) service tax all taxes
Unit) (Rs./ (Rs./Unit) (4x11) (Rs./ Unit) (Rs.) (4x17)
Clearly) (Rs.) (Rs./Unit)
Unit) (6+7+8+9+10) (4x15)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Mild Steel 'C' type tower including
1 MT 8.94 0.00 0.00 0.00 0.00 0.00 0.00
nut bolt & washer and tamplet
2 ACSR Dog Conductor Km 1.15 0.00 0.00 0.00 0.00 0.00 0.00
3 Galvanized Earth wire 6/10 SWG Km 0.4 0.00 0.00 0.00 0.00 0.00 0.00
4 Pipe type earthing complete No. 2 0.00 0.00 0.00 0.00 0.00 0.00
5 Tower Accessories 0.00 0.00
a SMC Danger Plate No. 2 0.00 0.00 0.00 0.00 0.00 0.00
b SMC Number Plate No. 2 0.00 0.00 0.00 0.00 0.00 0.00
c Phase Plate No. 2 0.00 0.00 0.00 0.00 0.00 0.00
d Barbed wire Kg 10 0.00 0.00 0.00 0.00 0.00 0.00
6 Hardware Fittings 0.00 0.00
a Single Tension No. 6 0.00 0.00 0.00 0.00 0.00 0.00
b Double Tension No. 6 0.00 0.00 0.00 0.00 0.00 0.00
c Earth wire clamp with bolt and nuts No. 2 0.00 0.00 0.00 0.00 0.00 0.00
33 kV Disc Insulator B&S type 70
7 No. 180 0.00 0.00 0.00 0.00 0.00 0.00
KN
8 33 kV Disc Fittings B&S type 70 KN No. 180 0.00 0.00 0.00 0.00 0.00 0.00

Estimated Cost of the Erection


9 Escavation of Soil M3 239.6 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
11 Concreting
1:2:4 Mix Including the cost of
a shoring,shuttering,devouring and M3 31.23 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
cement (Grade 43 Opc),sand
c Pipe type Earthing No. 2 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
COST OF Conversion of 1 km. of 33kV Overhead line to Underground
A-1-k
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total value Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection of Erection prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply (Rs.) Charges (Rs./ Charges incl. service Supply, F&I, (Rs.)
Sl. item. Unit) be tax Prices with (4x11) (Rs./ Unit) Unit) incl. tax Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ all taxes service tax (Rs.) all taxes
Clearly) Unit) (Rs./Unit) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (6+7+8+9+10 (13+14) (11+15)
)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 33kV 3x300 mm2 XLPE cable Mtrs. 2200 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit outdoor
2 for 33 kV 3x300 Sq. mm. XLPE Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
Cable
Heat Shrinkable Cable jointing kit
3 straight through for 33 kV 3x300 Sq. Nos. 8 0.00 0.00 0.00 0.00 0.00 0.00
mm. XLPE Cable
Section double pole on 11 mtr long
4 No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
STP (as per Annex-2)
5 GI Pipe 6" Diameter Mtr. 20 0.00 0.00 0.00 0.00 0.00 0.00
Road Restoration Chages for Pucca
6 km 0.2 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Road Crossing
Road Restoration Chages for
7 km 0.8 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Kucchha Road Crossing

8 Pipe (Hume/HDPE) for Cable Laying Mtr. 50 0.00 0.00 0.00 0.00 0.00 0.00

Cable laying charges including cost


9 km 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
of Bricks, sand,clamps etc.
Dismentalling of existing line and
10 km 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
cartage to nearest store
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
COST OF 1x5 MVA, 33/11kV NEW SUB-STATIONS
A-2-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & I Total Unit Total value Unit Service Unit Total value Total Unit Total Value of
bought Work Price (Rs./ (Rs./ Taxes & charges FOR Dest. of supply Erection Tax Erection of Erection prices incl. Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges incl. service Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) Unit) incl. service tax Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ Unit) (Rs./Unit) tax (Rs.) all taxes
Clearly) (6+7+8+9+10) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Terminal Gantry Structure Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
33 kV Main bus bar complete with
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
structure
3 33 kV Pin Insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
4 33 kV Pin with Nut Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
5 33KV Isolator 0.00 0.00
i) 33KV Line Isolator Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
ii) 33KV Bus Isolator Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Isolator with
iii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Plinth & foundation
6 33KV Post Insulator 0.00 0.00
i) 33KV Post Insulator Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Post Insulator (3
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
nos.) with Plinth & foundation
7 33KV Lightning Arrestor 0.00 0.00
i) 33KV Lightning Arrestor Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Lightning
ii) Arrester (3 nos.) with Plinth & Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
foundation
8 33/11KV Power Transformer 0.00 0.00
i) 5 MVA Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
90 lbs Rail pieces for transformer
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
44.64 Kg/M, 6.92 Mtr. long
Power Transformer Plinth of size
3.46x4.46 Mtr. having 0.5 Mtr.
iii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
below ground level and 0.4 Mtr.
above ground level.
9 33 KV VCB 0.00 0.00
i) 33 kV VCB Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV VCB with plinth
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
& foundation
10 33kV Single Phase CT 0.00 0.00
i) 33 kV 1 Ph CT 200/100/1 Amp. Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
Structure 33 kV Single Phase CT (3
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
11 33kV 1 Ph PT 0.00 0.00
i) 33kV 1 Ph PT 33kV/110 V Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Single PT (3
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
12 33kV Control Panel 0.00 0.00
33kV Control panel for single T/F
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
without differential relay
33kV Control panel for single feeder
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
without differential relay
13 11 KV VCB Switchgears with 0.00 0.00
Incoming CTR 800/400/5A,
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
350MVA
Outgoing CTR 400/200/5A 350
ii) Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
MVA
iii) Bus Coupler 350 MVA Nos. 0 0.00 0.00 0.00 0.00 0.00 0.00
11 KV 3 Core Al. XLPE Insulated
14 0.00 0.00
Cable
i) 3x300mm sq. M 60 0.00 0.00 0.00 0.00 0.00 0.00
ii) 3x185mm sq. M 240 0.00 0.00 0.00 0.00 0.00 0.00
Laying of 11 KV U/G cable
iii) M 300 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
includnig cost of sand and bricks
Heat Shrinkable jointing kit
15 suitable for 11kV XLPE 3x300
Sq.mm. cable size
i) Outdoor termination kit Sets 2 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Sets 2 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
16 suitable for 11kV XLPE 3x185 0.00 0.00
Sq.mm. cable size
i) Outdoor termination kit Set 3 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Set 3 0.00 0.00 0.00 0.00 0.00 0.00
24 Volt battery and battery
17 Set 1 0.00 0.00 0.00 0.00 0.00 0.00
charger with cabinet complete
18 Control Cable 0.00 0.00
i) 4x2.5 mm sq. M 100 0.00 0.00 0.00 0.00 0.00 0.00
ii) 2x2.5 mm sq. M 100 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of substation complete as
19 0.00 0.00
per specification
i) Indoor earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
ii) Outdoor switchyard earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
Chemical Pipe earthing as per
iii) No. 5 0.00 0.00 0.00 0.00 0.00 0.00
specification as additional earthing

11kV Feeder Double Pole structure


20 on 11kV STP alongwith fitting (as No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
per Annex-15)

FRP fencing with gate switchyard


21 Job 1 0.00 0.00 0.00 0.00 0.00 0.00
(as per Specification)
22 Outdoor switchyard lighting Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
63KVA 11/0.433 KV 3 Ph sub-
station T/F complete with double
pole & accessories with TPMO
23 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Switch, Fuse Set, Fixing clamps
and Earthing etc. complete (as per
Annex-14)
24 Painting of Structures Job 1 0.00 0.00 0.00 0.00 0.00 0.00
Lighting of S/S building induding
25 supply & fixing of fitings (As per Job 1 0.00 0.00 0.00 0.00 0.00 0.00
Specification)

T & P of Sub-Station &


26 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Switchgears (As per Specification)

Fire Fighting equipments for


27 switchyard & Control room (As 0.00 0.00
per Specification)
4.5 Kg. CO2 fire extinguisher,
(i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
portable type
5 kg. Dry chemical powder fire
(ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
extinguisher, portable type
Fire buckets (4 nos.) with stand filled
(iii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
with dry sand
Rubber matting 20 sq. mm. thick
28 No. 2 0.00 0.00 0.00 0.00 0.00 0.00
size (1 X 2 mtr.)

29 S/S name board (SMC) with stand No. 1 0.00 0.00 0.00 0.00 0.00 0.00
30 Protection Board complete No. 2 0.00 0.00 0.00 0.00 0.00 0.00
Control Room Building, Boundry,
31 Development of site, Water Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sanitation etc. (as per Annex-16)
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
COST OF 2x5 MVA, 33/11kV NEW SUB-STATIONS
A-2-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value of Unit Erection Service Unit Total Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. supply Charges (Rs./ Tax Erection value of prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Unit) (Rs./ Unit) Charges Erection Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Terminal Gantry Structure Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
33 kV Main bus bar complete with
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
structure
3 33KV Pin Insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
4 33 kV Pin with Nut Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
5 33KV Isolator 0.00 0.00
i) 33KV Line Isolator Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
ii) 33KV Bus Isolator Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Isolator with
iii) Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Plinth & foundation
6 33KV Post Insulator 0.00 0.00
i) 33KV Post Insulator Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Post Insulator (3
ii) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
nos.) with Plinth & foundation
7 33KV Lightning Arrestor 0.00 0.00
i) 33KV Lightning Arrestor Nos. 9 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Lightning
ii) Arrester (3 nos.) with Plinth & Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
foundation
8 33/11KV Power Transformer 0.00 0.00
i) 5 MVA Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
90 lbs Rail pieces for transformer
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
44.64 Kg/M, 6.92 Mtr. long
Power Transformer Plinth of size
3.46x4.46 Mtr. having 0.5 Mtr.
iii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
below ground level and 0.4 Mtr.
above ground level.
9 33 KV VCB 0.00 0.00
i) 33 kV VCB Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV VCB with Plinth
ii) Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
& foundation
10 33kV Single Ph CT 0.00 0.00
i) 33 kV 1 Ph CT 200/100/1 Amp. Nos. 9 0.00 0.00 0.00 0.00 0.00 0.00
Structure 33 kV Single Phase CT (3
ii) Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
11 33kV 1 Ph PT 0.00 0.00
i) 33kV 1 Ph PT 33kV/110 V Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Single PT (3
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
12 33kV Control Panel 0.00 0.00
33kV Control panel for double T/F
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
without differential relay
33kV Control panel for single feeder
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
without differential relay
13 11 KV VCB Switchgears with 0.00 0.00
Incoming CTR 800/400/5A,
i) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
350MVA
Outgoing CTR 400/200/5A 350
ii) Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
MVA
iii) Bus Coupler 350 MVA Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
11 KV 3 Core Al. XLPE Insulated
14 0.00 0.00
Cable
i) 3x300mm sq. M 120 0.00 0.00 0.00 0.00 0.00 0.00
ii) 3x185mm sq. M 480 0.00 0.00 0.00 0.00 0.00 0.00
Laying of 11 KV U/G cable
iii) M 600 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
includnig cost of sand and bricks
Heat Shrinkable jointing kit
15 suitable for 11kV XLPE 3x300
Sq.mm. cable size
i) Outdoor termination kit Sets 4 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Sets 4 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
16 suitable for 11kV XLPE 3x185 0.00 0.00
Sq.mm. cable size
i) Outdoor termination kit Set 6 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Set 6 0.00 0.00 0.00 0.00 0.00 0.00
24 Volt battery and battery
17 Set 1 0.00 0.00 0.00 0.00 0.00 0.00
charger with cabinet complete
18 Control Cable 0.00 0.00
i) 4x2.5 mm sq. M 200 0.00 0.00 0.00 0.00 0.00 0.00
ii) 2x2.5 mm sq. M 200 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of substation complete as
19 0.00 0.00
per specification
i) Indoor earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
ii) Outdoor switchyard earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
Chemical Pipe earthing as per
iii) No. 10 0.00 0.00 0.00 0.00 0.00 0.00
specification as additional earthing

11kV Feeder Double Pole structure


20 on 11kV STP alongwith fitting (as No. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
per Annex-15)
FRP fencing with gate switchyard
21 Job 1 0.00 0.00 0.00 0.00 0.00 0.00
(as per Specification)

22 Outdoor switchyard lighting Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
63KVA 11/0.433 KV 3 Ph sub-
station T/F complete with double
pole & accessories with TPMO
23 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Switch, Fuse Set, Fixing clamps
and Earthing etc. complete (as per
Annex-14)
24 Painting of Structures Job 1 0.00 0.00 0.00 0.00 0.00 0.00
Lighting of S/S building induding
25 supply & fixing of fitings (As per Job 1 0.00 0.00 0.00 0.00 0.00 0.00
Specification)

T & P of Sub-Station &


26 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Switchgears (As per Specification)

Fire Fighting equipments for


27 switchyard & Control room (As 0.00 0.00
per Specification)
4.5 Kg. CO2 fire extinguisher,
(i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
portable type
5 kg. Dry chemical powder fire
(ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
extinguisher, portable type
Fire buckets (4 nos.) with stand filled
(iii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
with dry sand
Rubber matting 20 sq. mm. thick
28 No. 2 0.00 0.00 0.00 0.00 0.00 0.00
size (1 X 2 mtr.)

29 S/S name board (SMC) with stand No. 1 0.00 0.00 0.00 0.00 0.00 0.00
30 Protection Board complete No. 1 0.00 0.00 0.00 0.00 0.00 0.00

Control Room Building, Boundry,


31 Development of site, Water Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sanitation etc. (as per Annex-16)

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
COST OF 1x10 MVA, 33/11kV NEW SUB-STATIONS
A-2-c
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Unit) Charges Erection Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Terminal Gantry Structure Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
33 kV Main bus bar complete with
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
structure
3 33 kV Pin Insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
4 33 kV Pin with Nut Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
5 33KV Isolator 0.00 0.00
i) 33KV Line Isolator Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
ii) 33KV Bus Isolator Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Isolator with
iii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Plinth & foundation
6 33KV Post Insulator 0.00 0.00
i) 33KV Post Insulator Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Post Insulator (3
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
nos.) with Plinth & foundation
7 33KV Lightning Arrestor 0.00 0.00
i) 33KV Lightning Arrestor Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Lightning
ii) Arrester (3 nos.) with Plinth & Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
foundation
8 33/11KV Power Transformer 0.00 0.00
i) 10 MVA Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
90 lbs Rail pieces for transformer
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
44.64 Kg/M, 6.92 Mtr. long
Power Transformer Plinth of size
3.46x4.46 Mtr. having 0.5 Mtr.
iii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
below ground level and 0.4 Mtr.
above ground level.
9 33 KV VCB 0.00 0.00
i) 33 kV VCB Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Structure of 33 kV VCB with plinth
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
& foundation
10 33kV Single Ph CT 0.00 0.00
i) 33 kV 1 Ph CT 200/100/1 Amp. Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
Structure 33 kV Single Phase CT (3
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
11 33kV 1 Ph PT 0.00 0.00
i) 33kV 1 Ph PT 33kV/110 V Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Single PT (3
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
12 33kV Control Panel 0.00 0.00
33kV Control panel for single T/F
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
with differential relay
33kV Control panel for single feeder
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
without differential relay
13 11 KV VCB Switchgears with 0.00 0.00
Incoming CTR 800/400/5A,
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
350MVA
Outgoing CTR 400/200/5A 350
ii) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
MVA
iii) Bus Coupler 350 MVA Nos. 0 0.00 0.00 0.00 0.00 0.00 0.00
11 KV 3 Core Al. XLPE Insulated
14 0.00 0.00
Cable
i) 3x300mm sq. M 90 0.00 0.00 0.00 0.00 0.00 0.00
ii) 3x185mm sq. M 320 0.00 0.00 0.00 0.00 0.00 0.00
Laying of 11 KV U/G cable
iii) M 410 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
includnig cost of sand and bricks
Heat Shrinkable jointing kit
15 suitable for 11kV XLPE 3x300
Sq.mm. cable size
i) Outdoor termination kit Sets 3 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Sets 3 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
16 suitable for 11kV XLPE 3x185 0.00 0.00
Sq.mm. cable size
i) Outdoor termination kit Set 4 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Set 4 0.00 0.00 0.00 0.00 0.00 0.00
24 Volt battery and battery
17 Set 1 0.00 0.00 0.00 0.00 0.00 0.00
charger with cabinet complete
18 Control Cable 0.00 0.00
i) 4x2.5 mm sq. M 100 0.00 0.00 0.00 0.00 0.00 0.00
ii) 2x2.5 mm sq. M 100 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of substation complete as
19 0.00 0.00
per specification
i) Indoor earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
ii) Outdoor switchyard earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
Chemical Pipe earthing as per
iii) No. 5 0.00 0.00 0.00 0.00 0.00 0.00
specification as additional earthing

11kV Feeder Double Pole structure


20 on 11kV STP alongwith fitting (as No. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
per Annex-15)

FRP fencing with gate switchyard


21 Job 1 0.00 0.00 0.00 0.00 0.00 0.00
(as per Specification)
22 Outdoor switchyard lighting Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

63KVA 11/0.433 KV 3 Ph sub-


station T/F complete with double
pole & accessories with TPMO
23 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Switch, Fuse Set, Fixing clamps
and Earthing etc. complete (as per
Annex-14)
24 Painting of Structures Job 1 0.00 0.00 0.00 0.00 0.00 0.00
Lighting of S/S building induding
25 supply & fixing of fitings (As per Job 1 0.00 0.00 0.00 0.00 0.00 0.00
Specification)
T & P of Sub-Station &
26 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Switchgears (As per Specification)

Fire Fighting equipments for


27 switchyard & Control room (As 0.00 0.00
per Specification)
4.5 Kg. CO2 fire extinguisher,
(i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
portable type
5 kg. Dry chemical powder fire
(ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
extinguisher, portable type
Fire buckets (4 nos.) with stand filled
(iii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
with dry sand
Rubber matting 20 sq. mm. thick
28 No. 2 0.00 0.00 0.00 0.00 0.00 0.00
size (1 X 2 mtr.)

29 S/S name board (SMC) with stand No. 1 0.00 0.00 0.00 0.00 0.00 0.00
30 Protection Board complete No. 2 0.00 0.00 0.00 0.00 0.00 0.00

Control Room Building, Boundry,


31 Development of site, Water Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sanitation etc. (as per Annex-16)

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
COST OF 2x10 MVA, 33/11kV NEW SUB-STATIONS
A-2-d
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value of
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Terminal Gantry Structure Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
33 kV Main bus bar complete with
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
structure
3 33 kV Pin Insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
4 33 kV Pin with Nut Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
5 33KV Isolator 0.00 0.00
i) 33KV Line Isolator Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
ii) 33KV Bus Isolator Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Isolator with
iii) Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Plinth & foundation
6 33KV Post Insulator 0.00 0.00
i) 33KV Post Insulator Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Post Insulator (3
ii) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
nos.) with Plinth & foundation
7 33KV Lightning Arrestor 0.00 0.00
i) 33KV Lightning Arrestor Nos. 9 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Lightning
ii) Arrester (3 nos.) with Plinth & Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
foundation
8 33/11KV Power Transformer 0.00 0.00
i) 10 MVA Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
90 lbs Rail pieces for transformer
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
44.64 Kg/M, 6.92 Mtr. long
Power Transformer Plinth of size
3.46x4.46 Mtr. having 0.5 Mtr.
iii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
below ground level and 0.4 Mtr.
above ground level.
9 33 KV VCB 0.00 0.00
i) 33 kV VCB Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV VCB with Plinth
ii) Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
& foundation
10 33kV Single Ph CT 0.00 0.00
i) 33 kV 1 Ph CT 200/100/1 Amp. Nos. 9 0.00 0.00 0.00 0.00 0.00 0.00
Structure 33 kV Single Phase CT (3
ii) Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
COST OF 2x10 MVA, 33/11kV NEW SUB-STATIONS
A-2-d
11 33kV 1 Ph PT 0.00 0.00
i) 33kV 1 Ph PT 33kV/110 V Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Single PT (3
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
12 33kV Control Panel 0.00 0.00
33kV Control panel for double T/F
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
with differential relay
33kV Control panel for single feeder
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
without differential relay
13 11 KV VCB Switchgears with 0.00 0.00
Incoming CTR 800/400/5A,
i) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
350MVA
Outgoing CTR 400/200/5A 350
ii) Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
MVA
iii) Bus Coupler 350 MVA Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
11 KV 3 Core Al. XLPE Insulated
14 0.00 0.00
Cable
i) 3x300mm sq. M 180 0.00 0.00 0.00 0.00 0.00 0.00
ii) 3x185mm sq. M 480 0.00 0.00 0.00 0.00 0.00 0.00
Laying of 11 KV U/G cable
iii) M 660 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
includnig cost of sand and bricks
Heat Shrinkable jointing kit
15 suitable for 11kV XLPE 3x300
Sq.mm. cable size
i) Outdoor termination kit Sets 6 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Sets 6 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
16 suitable for 11kV XLPE 3x185 0.00 0.00
Sq.mm. cable size
i) Outdoor termination kit Set 6 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Set 6 0.00 0.00 0.00 0.00 0.00 0.00
24 Volt battery and battery
17 Set 1 0.00 0.00 0.00 0.00 0.00 0.00
charger with cabinet complete
18 Control Cable 0.00 0.00
i) 4x2.5 mm sq. M 200 0.00 0.00 0.00 0.00 0.00 0.00
ii) 2x2.5 mm sq. M 200 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of substation complete as
19 0.00 0.00
per specification
i) Indoor earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
ii) Outdoor switchyard earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
Chemical Pipe earthing as per
iii) No. 10 0.00 0.00 0.00 0.00 0.00 0.00
specification as additional earthing

11kV Feeder Double Pole structure


20 on 11kV STP alongwith fitting (as No. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
per Annex-15)
COST OF 2x10 MVA, 33/11kV NEW SUB-STATIONS
A-2-d

FRP fencing with gate switchyard


21 Job 1 0.00 0.00 0.00 0.00 0.00 0.00
(as per Specification)

22 Outdoor switchyard lighting Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
63KVA 11/0.433 KV 3 Ph sub-
station T/F complete with double
pole & accessories with TPMO
23 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Switch, Fuse Set, Fixing clamps
and Earthing etc. complete (as per
Annex-14)
24 Painting of Structures Job 1 0.00 0.00 0.00 0.00 0.00 0.00
Lighting of S/S building induding
25 supply & fixing of fitings (As per Job 1 0.00 0.00 0.00 0.00 0.00 0.00
Specification)

T & P of Sub-Station &


26 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Switchgears (As per Specification)

Fire Fighting equipments for


27 switchyard & Control room (As 0.00 0.00
per Specification)
4.5 Kg. CO2 fire extinguisher,
(i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
portable type
5 kg. Dry chemical powder fire
(ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
extinguisher, portable type
Fire buckets (4 nos.) with stand filled
(iii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
with dry sand
Rubber matting 20 sq. mm. thick
28 No. 2 0.00 0.00 0.00 0.00 0.00 0.00
size (1 X 2 mtr.)

29 S/S name board (SMC) with stand No. 1 0.00 0.00 0.00 0.00 0.00 0.00
30 Protection Board complete No. 2 0.00 0.00 0.00 0.00 0.00 0.00

Control Room Building, Boundry,


31 Development of site, Water Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sanitation etc. (as per Annex-16)

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
COST OF 1x5 MVA (Released), 33/11kV NEW SUB-STATIONS
A-2-e
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Terminal Gantry Structure Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
33 kV Main bus bar complete with
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
structure
3 33 kV Pin Insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
4 33 kV Pin with Nut Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
5 33KV Isolator 0.00 0.00
i) 33KV Line Isolator Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
ii) 33KV Bus Isolator Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Isolator with
iii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Plinth & foundation
6 33KV Post Insulator 0.00 0.00
i) 33KV Post Insulator Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Post Insulator (3
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
nos.) with Plinth & foundation
7 33KV Lightning Arrestor 0.00 0.00
i) 33KV Lightning Arrestor Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Lightning
ii) Arrester (3 nos.) with Plinth & Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
foundation
8 33/11KV Power Transformer 0.00 0.00
i) 5 MVA (Old) Nos. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
90 lbs Rail pieces for transformer
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
44.64 Kg/M, 6.92 Mtr. long
Power Transformer Plinth of size
3.46x4.46 Mtr. having 0.5 Mtr.
iii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
below ground level and 0.4 Mtr.
above ground level.
9 33 KV VCB 0.00 0.00
i) 33 kV VCB Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV VCB with plinth
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
& foundation
10 33kV Single Ph CT 0.00 0.00
i) 33 kV 1 Ph CT 200/100/1 Amp. Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
Structure 33 kV Single Phase CT (3
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
11 33kV 1 Ph PT 0.00 0.00
i) 33kV 1 Ph PT 33kV/110 V Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Single PT (3
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
12 33kV Control Panel 0.00 0.00
33kV Control panel for single T/F
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
without differential relay
33kV Control panel for single feeder
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
without differential relay
13 11 KV VCB Switchgears with 0.00 0.00
Incoming CTR 800/400/5A,
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
350MVA
Outgoing CTR 400/200/5A 350
ii) Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
MVA
iii) Bus Coupler 350 MVA Nos. 0 0.00 0.00 0.00 0.00 0.00 0.00
11 KV 3 Core Al. XLPE Insulated
14 0.00 0.00
Cable
i) 3x300mm sq. M 60 0.00 0.00 0.00 0.00 0.00 0.00
ii) 3x185mm sq. M 240 0.00 0.00 0.00 0.00 0.00 0.00
Laying of 11 KV U/G cable
iii) M 300 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
includnig cost of sand and bricks
Heat Shrinkable jointing kit
15 suitable for 11kV XLPE 3x300
Sq.mm. cable size
i) Outdoor termination kit Sets 2 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Sets 2 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
16 suitable for 11kV XLPE 3x185 0.00 0.00
Sq.mm. cable size
i) Outdoor termination kit Set 3 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Set 3 0.00 0.00 0.00 0.00 0.00 0.00
24 Volt battery and battery
17 Set 1 0.00 0.00 0.00 0.00 0.00 0.00
charger with cabinet complete
18 Control Cable 0.00 0.00
i) 4x2.5 mm sq. M 100 0.00 0.00 0.00 0.00 0.00 0.00
ii) 2x2.5 mm sq. M 100 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of substation complete as
19 0.00 0.00
per specification
i) Indoor earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
ii) Outdoor switchyard earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
Chemical Pipe earthing as per
iii) No. 5 0.00 0.00 0.00 0.00 0.00 0.00
specification as additional earthing
11kV Feeder Double Pole structure
20 on 11kV STP alongwith fitting (as No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
per Annex-15)
FRP fencing with gate switchyard
21 Job 1 0.00 0.00 0.00 0.00 0.00 0.00
(as per Specification)
22 Outdoor switchyard lighting Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
63KVA 11/0.433 KV 3 Ph sub-
station T/F complete with double
pole & accessories with TPMO
23 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Switch, Fuse Set, Fixing clamps
and Earthing etc. complete (as per
Annex-14)
24 Painting of Structures Job 1 0.00 0.00 0.00 0.00 0.00 0.00
Lighting of S/S building induding
25 supply & fixing of fitings (As per Job 1 0.00 0.00 0.00 0.00 0.00 0.00
Specification)

T & P of Sub-Station &


26 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Switchgears (As per Specification)

Fire Fighting equipments for


27 switchyard & Control room (As 0.00 0.00
per Specification)
4.5 Kg. CO2 fire extinguisher,
(i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
portable type
5 kg. Dry chemical powder fire
(ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
extinguisher, portable type
Fire buckets (4 nos.) with stand filled
(iii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
with dry sand
Rubber matting 20 sq. mm. thick
28 No. 2 0.00 0.00 0.00 0.00 0.00 0.00
size (1 X 2 mtr.)

29 S/S name board (SMC) with stand No. 1 0.00 0.00 0.00 0.00 0.00 0.00
30 Protection Board complete No. 2 0.00 0.00 0.00 0.00 0.00 0.00

Control Room Building, Boundry,


31 Development of site, Water Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sanitation etc. (as per Annex-16)

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
COST OF 2x5 MVA (Released), 33/11kV NEW SUB-STATIONS
A-2-f
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value of
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Terminal Gantry Structure Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
33 kV Main bus bar complete with
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
structure
3 33KV Pin Insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
4 33 kV Pin with Nut Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
5 33KV Isolator 0.00 0.00
i) 33KV Line Isolator Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
ii) 33KV Bus Isolator Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Isolator with
iii) Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Plinth & foundation
6 33KV Post Insulator 0.00 0.00
i) 33KV Post Insulator Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Post Insulator (3
ii) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
nos.) with Plinth & foundation
7 33KV Lightning Arrestor 0.00 0.00
i) 33KV Lightning Arrestor Nos. 9 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Lightning
ii) Arrester (3 nos.) with Plinth & Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
foundation
8 33/11KV Power Transformer 0.00 0.00
i) 5 MVA Nos. 2 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
90 lbs Rail pieces for transformer
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
44.64 Kg/M, 6.92 Mtr. long
Power Transformer Plinth of size
3.46x4.46 Mtr. having 0.5 Mtr.
iii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
below ground level and 0.4 Mtr.
above ground level.
9 33 KV VCB 0.00 0.00
i) 33 kV VCB Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV VCB with Plinth
ii) Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
& foundation
10 33kV Single Ph CT 0.00 0.00
i) 33 kV 1 Ph CT 200/100/1 Amp. Nos. 9 0.00 0.00 0.00 0.00 0.00 0.00
Structure 33 kV Single Phase CT (3
ii) Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
11 33kV 1 Ph PT 0.00 0.00
i) 33kV 1 Ph PT 33kV/110 V Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Single PT (3
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
12 33kV Control Panel 0.00 0.00
33kV Control panel for double T/F
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
without differential relay
33kV Control panel for single feeder
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
without differential relay
13 11 KV VCB Switchgears with 0.00 0.00
Incoming CTR 800/400/5A,
i) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
350MVA
Outgoing CTR 400/200/5A 350
ii) Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
MVA
iii) Bus Coupler 350 MVA Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
11 KV 3 Core Al. XLPE Insulated
14 0.00 0.00
Cable
i) 3x300mm sq. M 120 0.00 0.00 0.00 0.00 0.00 0.00
ii) 3x185mm sq. M 480 0.00 0.00 0.00 0.00 0.00 0.00
Laying of 11 KV U/G cable
iii) M 600 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
includnig cost of sand and bricks
Heat Shrinkable jointing kit
15 suitable for 11kV XLPE 3x300
Sq.mm. cable size
i) Outdoor termination kit Sets 4 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Sets 4 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
16 suitable for 11kV XLPE 3x185 0.00 0.00
Sq.mm. cable size
i) Outdoor termination kit Set 6 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Set 6 0.00 0.00 0.00 0.00 0.00 0.00
24 Volt battery and battery
17 Set 1 0.00 0.00 0.00 0.00 0.00 0.00
charger with cabinet complete
18 Control Cable 0.00 0.00
i) 4x2.5 mm sq. M 200 0.00 0.00 0.00 0.00 0.00 0.00
ii) 2x2.5 mm sq. M 200 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of substation complete as
19 0.00 0.00
per specification
i) Indoor earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
ii) Outdoor switchyard earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
Chemical Pipe earthing as per
iii) No. 10 0.00 0.00 0.00 0.00 0.00 0.00
specification as additional earthing
11kV Feeder Double Pole structure
20 on 11kV STP alongwith fitting (as No. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
per Annex-15)
FRP fencing with gate switchyard
21 Job 1 0.00 0.00 0.00 0.00 0.00 0.00
(as per Specification)

22 Outdoor switchyard lighting Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
63KVA 11/0.433 KV 3 Ph sub-
station T/F complete with double
pole & accessories with TPMO
23 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Switch, Fuse Set, Fixing clamps
and Earthing etc. complete (as per
Annex-14)
24 Painting of Structures Job 1 0.00 0.00 0.00 0.00 0.00 0.00
Lighting of S/S building induding
25 supply & fixing of fitings (As per Job 1 0.00 0.00 0.00 0.00 0.00 0.00
Specification)

T & P of Sub-Station &


26 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Switchgears (As per Specification)

Fire Fighting equipments for


27 switchyard & Control room (As 0.00 0.00
per Specification)
4.5 Kg. CO2 fire extinguisher,
(i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
portable type
5 kg. Dry chemical powder fire
(ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
extinguisher, portable type
Fire buckets (4 nos.) with stand filled
(iii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
with dry sand
Rubber matting 20 sq. mm. thick
28 No. 2 0.00 0.00 0.00 0.00 0.00 0.00
size (1 X 2 mtr.)

29 S/S name board (SMC) with stand No. 1 0.00 0.00 0.00 0.00 0.00 0.00
30 Protection Board complete No. 1 0.00 0.00 0.00 0.00 0.00 0.00

Control Room Building, Boundry,


31 Development of site, Water Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sanitation etc. (as per Annex-16)

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Additional 5 MVA Transfomer Sub-Stations
A-3-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Extension of Main bus bar
1 Nos. 1
complete with structure
2 33KV Isolator
i) 33KV Bus Isolator Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Structure for above with Plinth &
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
foundation
3 33KV Post Insulator 0.00 0.00 0.00 0.00 0.00 0.00
i) 33KV Post Insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Post Insulator (3
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
nos.) with Plinth & foundation
4 33KV Lightning Arrestor 0.00 0.00 0.00 0.00 0.00 0.00
i) 33KV Lightning Arrestor Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Lightning
ii) Arrester (3 nos.) with Plinth & Set 1 0.00 0.00 0.00 0.00 0.00 0.00
foundation
5 33/11KV Power Transformer 0.00 0.00 0.00 0.00 0.00 0.00
i) 5 MVA Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
90 lbs Rail pieces for transformer
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
44.64 Kg/M, 6.92 Mtr. long
Power Transformer Plinth of size
3.46x4.46 Mtr. having 0.5 Mtr.
iii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
below ground level and 0.4 Mtr.
above ground level.
6 33 KV VCB 0.00 0.00 0.00 0.00 0.00 0.00
i) 33 kV VCB Set 1 0.00 0.00 0.00 0.00 0.00 0.00
Structure of VCB with Plinth &
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
foundation
7 33kV Single Ph CT 0.00 0.00 0.00 0.00 0.00 0.00
i) 33 kV 1 Ph CT 200/100/1 Amp. Set 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure 33 kV Single Phase CT (3
ii) No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
8 33kV 1 Ph PT 0.00 0.00 0.00 0.00 0.00 0.00
i) 33kV 1 Ph PT 33kV/110 V No. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Single PT (3
ii) Set 1 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
9 33kV Control Panel 0.00 0.00 0.00 0.00 0.00 0.00
Cost of Additional 5 MVA Transfomer Sub-Stations
A-3-a
33kV Control panel for single T/F
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
without differential relay
10 11 KV VCB Switchgears with 0.00 0.00 0.00 0.00 0.00 0.00
Incoming CTR 800/400/5A,
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
350MVA
Outgoing CTR 400/200/5A 350
ii) Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
MVA
iii) Bus Coupler 350 MVA Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
11 KV 3 Core Al. XLPE Insulated
11 0.00 0.00 0.00 0.00 0.00 0.00
Cable
i) 3x300mm sq. XLPE M 60 0.00 0.00 0.00 0.00 0.00 0.00
ii) 3x185mm sq. XLPE M 240 0.00 0.00 0.00 0.00 0.00 0.00
Laying of 11 KV cable includnig cost
iii) M 300 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
of sand and bricks
Heat Shrinkable jointing kit
12 suitable for 11kV XLPE 3x300 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm. cable size
i) Outdoor termination kit Sets 2 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Sets 2 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
13 suitable for 11kV XLPE 3x185 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm. cable size
i) Outdoor termination kit Set 3 0.00 0.00 0.00 0.00 0.00 0.00
ii)Indoor termination kit Set 3 0.00 0.00 0.00 0.00 0.00 0.00
14 Control Cable 0.00 0.00 0.00 0.00 0.00 0.00
i) 4x2.5 mm sq. M 100 0.00 0.00 0.00 0.00 0.00 0.00
ii)2x2.5 mm sq. M 100 0.00 0.00 0.00 0.00 0.00 0.00
24 Volt battery and battery charger
15 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
with cabinet
Earthing of substation (extension)
16 0.00 0.00 0.00 0.00 0.00 0.00
as per specification
i) Indoor earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
ii)Outdoor switchyard earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
Chemical Pipe earthing as per
ii) No. 5 0.00 0.00 0.00 0.00 0.00 0.00
specification as additional earthing
17 Painting of Structures Job 1 0.00 0.00 0.00 0.00 0.00 0.00
18 Protection Board complete No. 1 0.00 0.00 0.00 0.00 0.00 0.00

11kV Feeder Double Pole structure


19 on 11kV STP alongwith fitting (as Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
per Annex-15)

Rubber matting 20 sq. mm. thick


20 No. 2 0.00 0.00 0.00 0.00 0.00 0.00
size (1 X 2 mtr.)
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
Cost of Additional 5 MVA Transfomer Sub-Stations
A-3-a
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Additional 10 MVA Transfomer Sub-Stations
A-3-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item.
Items Unit Qty. be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
No.
specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Extension of Main bus bar
1 Nos. 1
complete with structure
2 33KV Isolator
i) 33KV Bus Isolator Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Structure for above with Plinth &
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
foundation
3 33KV Post Insulator 0.00 0.00 0.00 0.00 0.00 0.00
i) 33KV Post Insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Post Insulator (3
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
nos.) with Plinth & foundation
4 33KV Lightning Arrestor 0.00 0.00 0.00 0.00 0.00 0.00
i) 33KV Lightning Arrestor Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Lightning
ii) Arrester (3 nos.) with Plinth & Set 1 0.00 0.00 0.00 0.00 0.00 0.00
foundation
5 33/11KV Transformer 0.00 0.00 0.00 0.00 0.00 0.00
i) 10 MVA Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
90 lbs Rail pieces for transformer
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
44.64 Kg/M, 6.92 Mtr. long
Power Transformer Plinth of size
3.46x4.46 Mtr. having 0.5 Mtr.
iii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
below ground level and 0.4 Mtr.
above ground level.
6 33 KV VCB 0.00 0.00 0.00 0.00 0.00 0.00
i) 33 KV VCB Set 1 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV VCB with Plinth
ii) Set 1 0.00 0.00 0.00 0.00 0.00 0.00
and foundation
7 33kV Single Ph CT 0.00 0.00 0.00 0.00 0.00 0.00
i) 33 kV 1 Ph CT 200/100/1 Amp. Set 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure 33 kV Single Phase CT (3
ii) No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
8 33kV 1 Ph PT 0.00 0.00 0.00 0.00 0.00 0.00
i) 33kV 1 Ph PT 33kV/110 V No. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Single PT (3
ii) Set 1 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
9 33kV Control Panel 0.00 0.00 0.00 0.00 0.00 0.00
33kV Control panel for single T/F
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
with differential relay
10 11 KV VCB Switchgears with 0.00 0.00 0.00 0.00 0.00 0.00
Incoming CTR 800/400/5A,
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
350MVA
Outgoing CTR 400/200/5A 350
ii) Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
MVA
iii) Bus Coupler 350 MVA Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
11 11 KV 3 Core XLPE Cable 0.00 0.00 0.00 0.00 0.00 0.00
i) 3x300mm sq. XLPE M 90 0.00 0.00 0.00 0.00 0.00 0.00
ii) 3x185mm sq. XLPE M 240 0.00 0.00 0.00 0.00 0.00 0.00
Laying of 11 KV cable includnig cost
iii) M 330 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
of sand and bricks
Heat Shrinkable jointing kit
12 suitable for 11kV XLPE 3x300
Sq.mm. cable size
i) Outdoor termination kit Sets 3 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Sets 3 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
13 suitable for 11kV XLPE 3x185 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm. cable size
i) Outdoor termination kit Set 3 0.00 0.00 0.00 0.00 0.00 0.00
ii)Indoor termination kit Set 3 0.00 0.00 0.00 0.00 0.00 0.00
14 Control Cable 0.00 0.00 0.00 0.00 0.00 0.00
i) 4x2.5 mm sq. M 100 0.00 0.00 0.00 0.00 0.00 0.00
ii)2x2.5 mm sq. M 100 0.00 0.00 0.00 0.00 0.00 0.00
24 Volt battery and battery
15 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
charger with cabinet
Earthing of substation (extension)
16 0.00 0.00 0.00 0.00 0.00 0.00
as per specification
i) Indoor earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
ii)Outdoor switchyard earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
Chemical Pipe earthing as per
ii) No. 5 0.00 0.00 0.00 0.00 0.00 0.00
specification as additional earthing
17 Painting of Structures job 1 0.00 0.00 0.00 0.00 0.00 0.00
18 Protection Board complete No. 1 0.00 0.00 0.00 0.00 0.00 0.00
11kV Feeder Double Pole structure
19 on 11kV STP alongwith fitting (as Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
per Annex-15)
Rubber matting 20 sq. mm. thick
20 No. 2 0.00 0.00 0.00 0.00 0.00 0.00
size (1 X 2 mtr.)
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Additional 5 MVA (Released) Transfomer Sub-Stations
A-3-c
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Unit) Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Extension of Main bus bar
1 Nos. 1
complete with structure
2 33KV Isolator
i) 33KV Bus Isolator Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Structure for above with Plinth &
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
foundation
3 33KV Post Insulator 0.00 0.00 0.00 0.00 0.00 0.00
i) 33KV Post Insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Post Insulator (3
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
nos.) with Plinth & foundation
4 33KV Lightning Arrestor 0.00 0.00 0.00 0.00 0.00 0.00
i) 33KV Lightning Arrestor Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Lightning
ii) Arrester (3 nos.) with Plinth & Set 1 0.00 0.00 0.00 0.00 0.00 0.00
foundation
5 33/11KV Power Transformer 0.00 0.00 0.00 0.00 0.00 0.00
i) 5 MVA (Old) Nos. 1 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
90 lbs Rail pieces for transformer
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
44.64 Kg/M, 6.92 Mtr. long
Power Transformer Plinth of size
3.46x4.46 Mtr. having 0.5 Mtr.
iii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
below ground level and 0.4 Mtr.
above ground level.
6 33 KV VCB 0.00 0.00 0.00 0.00 0.00 0.00
i) 33 kV VCB Set 1 0.00 0.00 0.00 0.00 0.00 0.00
Structure of VCB with Plinth &
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
foundation
7 33kV Single Ph CT 0.00 0.00 0.00 0.00 0.00 0.00
i) 33 kV 1 Ph CT 200/100/1 Amp. Set 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure 33 kV Single Phase CT (3
ii) No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
Cost of Additional 5 MVA (Released) Transfomer Sub-Stations
A-3-c
8 33kV 1 Ph PT 0.00 0.00 0.00 0.00 0.00 0.00
i) 33kV 1 Ph PT 33kV/110 V No. 3 0.00 0.00 0.00 0.00 0.00 0.00
Structure for 33 kV Single PT (3
ii) Set 1 0.00 0.00 0.00 0.00 0.00 0.00
Nos.) with Plinth & foundation
9 33kV Control Panel 0.00 0.00 0.00 0.00 0.00 0.00
33kV Control panel for single T/F
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
without differential relay
10 11 KV VCB Switchgears with 0.00 0.00 0.00 0.00 0.00 0.00
Incoming CTR 800/400/5A,
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
350MVA
Outgoing CTR 400/200/5A 350
ii) Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
MVA
iii) Bus Coupler 350 MVA Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
11 11 KV 3 Core XLPE Cable 0.00 0.00 0.00 0.00 0.00 0.00
i) 3x300mm sq. XLPE M 60 0.00 0.00 0.00 0.00 0.00 0.00
ii) 3x185mm sq. XLPE M 240 0.00 0.00 0.00 0.00 0.00 0.00
Laying of 11 KV cable includnig cost
iii) M 300 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
of sand and bricks
Heat Shrinkable jointing kit
12 suitable for 11kV XLPE 3x300
Sq.mm. cable size
i)Outdoor termination kit Sets 2 0.00 0.00 0.00 0.00 0.00 0.00
ii)
Indoor termination kit Sets 2 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
13 suitable for 11kV XLPE 3x185 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm. cable size
i) Outdoor termination kit Set 3 0.00 0.00 0.00 0.00 0.00 0.00
ii)Indoor termination kit Set 3 0.00 0.00 0.00 0.00 0.00 0.00
14 Control Cable 0.00 0.00 0.00 0.00 0.00 0.00
i) 4x2.5 mm sq. M 100 0.00 0.00 0.00 0.00 0.00 0.00
ii)2x2.5 mm sq. M 100 0.00 0.00 0.00 0.00 0.00 0.00
24 Volt battery and battery charger
15 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
with cabinet
Earthing of substation (extension)
16 0.00 0.00 0.00 0.00 0.00 0.00
as per specification
i) Indoor earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
ii)Outdoor switchyard earthing Set 1 0.00 0.00 0.00 0.00 0.00 0.00
Chemical Pipe earthing as per
ii) No. 5 0.00 0.00 0.00 0.00 0.00 0.00
specification as additional earthing
17 Painting of Structures Job 1 0.00 0.00 0.00 0.00 0.00 0.00
18 Protection Board complete No. 1 0.00 0.00 0.00 0.00 0.00 0.00
11kV Feeder Double Pole structure
19 on 11kV STP alongwith fitting (as Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
per Annex-15)
Rubber matting 20 sq. mm. thick
20 No. 2 0.00 0.00 0.00 0.00 0.00 0.00
size (1 X 2 mtr.)
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
Cost of Additional 5 MVA (Released) Transfomer Sub-Stations
A-3-c
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
COST OF CAPACITY ENHANCEMENT FROM 5/8 MVA to 10 MVA T/F SUB-STATIONS
A-4-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & I Total Unit Total value of Unit Service Unit Total Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & charges FOR Dest. supply Erection Tax Erection value of prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ Unit) (Rs./Unit) service tax service tax all taxes
Clearly) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 33/11KV Transformer
i) 10 MVA Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Strenghthening/Reconditioning of
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
tranformer plinth
2 33kV Control Panel 0.00 0.00
33kV Control panel for single T/F
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
with differential relay.
3 11 KV VCB Switchgears with 0.00 0.00 0.00 0.00 0.00 0.00
Incoming CTR 800/400/5A,
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
350MVA
Outgoing CTR 400/200/5A 350
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
MVA
4 11 KV 3 Core XLPE Cable 0.00 0.00 0.00 0.00 0.00 0.00
i) 3x300mm sq. XLPE M 90 0.00 0.00 0.00 0.00 0.00 0.00
ii) 3x185mm sq. XLPE M 160 0.00 0.00 0.00 0.00 0.00 0.00
Laying of 11 KV cable includnig cost
iii) M 250 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
of sand and bricks
Heat Shrinkable jointing kit
5 suitable for 11kV XLPE 3x300
Sq.mm. cable size
i) Outdoor termination kit Sets 3 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Sets 3 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
6 suitable for 11kV XLPE 3x185 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm. cable size
i) Outdoor termination kit Set 2 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Set 2 0.00 0.00 0.00 0.00 0.00 0.00
7 Control Cable 0.00 0.00 0.00 0.00 0.00 0.00
i) 4x2.5 mm sq. M 50 0.00 0.00 0.00 0.00 0.00 0.00
ii) 2x2.5 mm sq. M 50 0.00 0.00 0.00 0.00 0.00 0.00
24 Volt battery and battery
8 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
charger with cabinet

11kV Feeder Double Pole structure


9 on 11kV STP alongwith fitting (as Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
per Annex-15)

Dismantaling of 5/8 MVA


10 Transformer and cartage it to Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
nearest store.
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Transformer Capacity Enhancement from 3 MVA to 5 MVA Tranformer
A-4-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 33/11KV Transformer
i) 5MVA Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Strengthning/Reconditioning of TF
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
plinth
2 33kV Control Panel 0.00 0.00
33kV Control panel for single T/F
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
without differential relay.
3 11 KV VCB Switchgears with 0.00 0.00 0.00 0.00 0.00 0.00
Incoming CTR 800/400/5A,
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
350MVA
Outgoing CTR 400/200/5A 350
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
MVA
iii) Bus Coupler 350 MVA Nos. 0 0.00 0.00 0.00 0.00 0.00 0.00
4 11 KV 3 Core XLPE Cable 0.00 0.00 0.00 0.00 0.00 0.00
i) 3x300mm sq. XLPE M 60 0.00 0.00 0.00 0.00 0.00 0.00
ii) 3x185mm sq. XLPE M 160 0.00 0.00 0.00 0.00 0.00 0.00
Laying of 11 KV cable includnig cost
iii) M 220 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
of sand and bricks
Heat Shrinkable jointing kit
5 suitable for 11kV XLPE 3x300
Sq.mm. cable size
i) Outdoor termination kit Sets 2 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Sets 2 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
6 suitable for 11kV XLPE 3x185 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm. cable size
i) Outdoor termination kit Set 2 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Set 2 0.00 0.00 0.00 0.00 0.00 0.00
24 Volt battery and battery
7 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
charger with cabinet
8 Control Cable 0.00 0.00 0.00 0.00 0.00 0.00
i) 4x2.5 mm sq. M 50 0.00 0.00 0.00 0.00 0.00 0.00
ii) 2x2.5 mm sq. M 50 0.00 0.00 0.00 0.00 0.00 0.00
9 Painting of Structures L.S. 1 0.00 0.00 0.00 0.00 0.00 0.00
Dismantaling of 3 MVA
10 Transformer and cartage it to Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
nearest store.
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
COST OF CAPACITY ENHANCEMENT FROM 5 MVA to 8 MVA T/F SUB-STATIONS
A-4-c
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 33/11KV Transformer
i) 8 MVA Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Strenghthening/Reconditioning of
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
tranformer plinth
2 33kV Control Panel 0.00 0.00
33kV Control panel for single T/F
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
with differential relay.
3 11 KV VCB Switchgears with 0.00 0.00 0.00 0.00 0.00 0.00
Incoming CTR 800/400/5A,
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
350MVA
Outgoing CTR 400/200/5A 350
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
MVA
4 11 KV 3 Core XLPE Cable 0.00 0.00 0.00 0.00 0.00 0.00
i) 3x300mm sq. XLPE M 90 0.00 0.00 0.00 0.00 0.00 0.00
ii) 3x185mm sq. XLPE M 160 0.00 0.00 0.00 0.00 0.00 0.00
Laying of 11 KV cable includnig cost
iii) M 250 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
of sand and bricks
Heat Shrinkable jointing kit
5 suitable for 11kV XLPE 3x300
Sq.mm. cable size
i) Outdoor termination kit Sets 3 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Sets 3 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
6 suitable for 11kV XLPE 3x185 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm. cable size
i) Outdoor termination kit Set 2 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Set 2 0.00 0.00 0.00 0.00 0.00 0.00
7 Control Cable 0.00 0.00 0.00 0.00 0.00 0.00
i) 4x2.5 mm sq. M 50 0.00 0.00 0.00 0.00 0.00 0.00
ii) 2x2.5 mm sq. M 50 0.00 0.00 0.00 0.00 0.00 0.00
24 Volt battery and battery
8 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
charger with cabinet

11kV Feeder Double Pole structure


9 on 11kV STP alongwith fitting (as Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
per Annex-15)

Dismantaling of 5 MVA
10 Transformer and cartage it to Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
nearest store.
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Transformer Capacity Enhancement from 3 MVA to 5 MVA (Released) Tranformer
A-4-d
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 33/11KV Transformer 0.00 0.00 0.00 0.00
i) 5 MVA (Old) Nos. 1 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Strengthning/Reconditioning of TF
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
plinth
2 33kV Control Panel 0.00 0.00
33kV Control panel for single T/F
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
without differential relay.
3 11 KV VCB Switchgears with 0.00 0.00 0.00 0.00 0.00 0.00
Incoming CTR 800/400/5A,
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
350MVA
Outgoing CTR 400/200/5A 350
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
MVA
iii) Bus Coupler 350 MVA Nos. 0 0.00 0.00 0.00 0.00 0.00 0.00
4 11 KV 3 Core XLPE Cable 0.00 0.00 0.00 0.00 0.00 0.00
i) 3x300mm sq. XLPE M 60 0.00 0.00 0.00 0.00 0.00 0.00
ii) 3x185mm sq. XLPE M 160 0.00 0.00 0.00 0.00 0.00 0.00
Laying of 11 KV cable includnig cost
iii) M 220 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
of sand and bricks
Heat Shrinkable jointing kit
5 suitable for 11kV XLPE 3x300
Sq.mm. cable size
i) Outdoor termination kit Sets 2 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Sets 2 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
6 suitable for 11kV XLPE 3x185 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm. cable size
i) Outdoor termination kit Set 2 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Set 2 0.00 0.00 0.00 0.00 0.00 0.00
24 Volt battery and battery
7 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
charger with cabinet
8 Control Cable 0.00 0.00 0.00 0.00 0.00 0.00
i) 4x2.5 mm sq. M 50 0.00 0.00 0.00 0.00 0.00 0.00
ii) 2x2.5 mm sq. M 50 0.00 0.00 0.00 0.00 0.00 0.00
9 Painting of Structures L.S. 1 0.00 0.00 0.00 0.00 0.00 0.00
Dismantaling of 3 MVA
10 Transformer and cartage it to Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
nearest store.
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
COST OF CAPACITY ENHANCEMENT FROM 5 MVA to 8 (Released) MVA T/F SUB-STATIONS
A-4-e
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value of Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 33/11KV Transformer
i) 8 MVA (Old) Nos. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Strenghthening/Reconditioning of
ii) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
tranformer plinth
2 33kV Control Panel 0.00 0.00
33kV Control panel for single T/F
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
with differential relay.
3 11 KV VCB Switchgears with 0.00 0.00 0.00 0.00 0.00 0.00
Incoming CTR 800/400/5A,
i) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
350MVA
Outgoing CTR 400/200/5A 350
ii) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
MVA
4 11 KV 3 Core XLPE Cable 0.00 0.00 0.00 0.00 0.00 0.00
i) 3x300mm sq. XLPE M 90 0.00 0.00 0.00 0.00 0.00 0.00
ii) 3x185mm sq. XLPE M 160 0.00 0.00 0.00 0.00 0.00 0.00
Laying of 11 KV cable includnig cost
iii) M 250 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
of sand and bricks
Heat Shrinkable jointing kit
5 suitable for 11kV XLPE 3x300
Sq.mm. cable size
i) Outdoor termination kit Sets 3 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Sets 3 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
6 suitable for 11kV XLPE 3x185 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm. cable size
i) Outdoor termination kit Set 2 0.00 0.00 0.00 0.00 0.00 0.00
ii) Indoor termination kit Set 2 0.00 0.00 0.00 0.00 0.00 0.00
7 Control Cable 0.00 0.00 0.00 0.00 0.00 0.00
i) 4x2.5 mm sq. M 50 0.00 0.00 0.00 0.00 0.00 0.00
ii) 2x2.5 mm sq. M 50 0.00 0.00 0.00 0.00 0.00 0.00
24 Volt battery and battery
8 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
charger with cabinet

11kV Feeder Double Pole structure


9 on 11kV STP alongwith fitting (as Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
per Annex-15)

Dismantaling of 5 MVA
10 Transformer and cartage it to Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
nearest store.
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost Schedule of equipments/material required for Renovation and Modernization of 33/11kV S/S
A-5
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
33 KV VCB SCADA Compatible
1 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
with Structure.
2 Differential Relays for 33kv VCB No. 1 0.00 0.00 0.00 0.00 0.00 0.00
3 O/C & E/F Relays for 33kv VCB No. 1 0.00 0.00 0.00 0.00 0.00 0.00
OTI & WTI meters (SCADA
4 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Compitable)
Control panel 33 kV for double
5 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
transformer

6 Control panel 33 kV for single feeder No. 1 0.00 0.00 0.00 0.00 0.00 0.00

7 33 Kv Bus Coupler. No. 1 0.00 0.00 0.00 0.00 0.00 0.00


11 kV VCB Switchgear with CTR
8 800/400/5 A for I/C( SCADA No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Compatible )
11 kV VCB Switchgear with CTR
9 400/200/5 A for O/G( SCADA No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Compatible )
11 KV retrofitted motor for spring
10 charging in exisitng 11 KV VCB No. 1 0.00 0.00 0.00 0.00 0.00 0.00
panel

11 Differential Relays for 11KV VCB No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Panels

12 O/C & E/F Relays for 11 kv VCB No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Panels
13 11 kV Bus coupler No. 1 0.00 0.00 0.00 0.00 0.00 0.00
11 Kv Auto Reclosure (SCADA
14 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Compatible)complete in all respect
11kV sectionalizer (SCADA
15 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Compatible) complete in all respect.
16 33 kV LA No. 1 0.00 0.00 0.00 0.00 0.00 0.00
17 33 kV Line isolator No. 1 0.00 0.00 0.00 0.00 0.00 0.00
18 33 kv Bus isolator No. 1 0.00 0.00 0.00 0.00 0.00 0.00
19 33 kV CT (200/100/1 A) No. 1 0.00 0.00 0.00 0.00 0.00 0.00
20 33 kV PT(Line & Bus) No. 1 0.00 0.00 0.00 0.00 0.00 0.00
21 11 kV XLPE cable 300 sq. mm. mtr 1 0.00 0.00 0.00 0.00 0.00 0.00
22 11 kV XLPE cable 185 sq. mm. mtr 1 0.00 0.00 0.00 0.00 0.00 0.00
23 Trans. Protn.& Oil leakage LS 1 0.00 0.00 0.00 0.00 0.00 0.00
24 Temp. indicator for Wdg. & Oil LS 1 0.00 0.00 0.00 0.00 0.00 0.00
25 ONAN/ONAF; Cooling/Exaust Fan LS 1 0.00 0.00 0.00 0.00 0.00 0.00
26 Battery Set No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Civil Works Repairing of C/Room &
27 LS 1 0.00 0.00 0.00 0.00 0.00 0.00
S/Yard
28 Earthing Works No. 1 0.00 0.00 0.00 0.00 0.00 0.00
29 Lightening post at switch yard No. 1 0.00 0.00 0.00 0.00 0.00 0.00
30 Strengthning of earth mat No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bus extension complete with
31 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
structure
Reconditioning of power transformer
32 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
plinth
33 33 kV Post Insulator No. 1 0.00 0.00 0.00 0.00 0.00 0.00
34 S/S FRP Fencing Job 1 0.00 0.00 0.00 0.00 0.00 0.00
35 Transformer Oil Ltr. 1 0.00 0.00 0.00 0.00 0.00 0.00
36 Cable Fault Locator No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Chemical Pipe earthing as per
37 Job 1 0.00 0.00 0.00 0.00 0.00 0.00
specification as additional earthing
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1Km. 11KV Line on 11 Mtr. Steel Tubular Pole with ACSR Dog
B-1-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Single support on 11 Mtr. STP Pole
1 Nos. 16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-17)
Section double pole on 11 Mtr. STP
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-19)
Section Single pole on 11 Mtr. STP
3 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-18)

4 Extra Tee-off pole (as per Annex-20) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Extra stay at small angle locations


5 Nos. 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-27)
6 ACSR Dog Conductor Km. 3.09 0.00 0.00 0.00 0.00 0.00 0.00
7 Alluminium jointing sleeves Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

Extra guarding for Road crossing/


Communication Lines /11kv line
8 Nos. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
crossing on 13 Mtr. STP (as per
Annex-31)

Guarding of 11 kV Line on 13 Mtr.


9 Km. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Long STP SP-72 (as per annex-28)

10 Tree cutting compensation Km. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1Km. 11KV Line on 11 Mtr. Steel Tubular Pole with ACSR Raccoon
B-1-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Single support on 11 Mtr. STP Pole
1 Nos. 16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-17)
Section double pole on 11 Mtr.
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
STP(as per Annex-19)
Section Single pole on 11 Mtr. STP
3 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-18)

4 Extra Tee-off pole (as per Annex-20) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Extra stay at small angle locations


5 Nos. 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-27)
6 ACSR Racoon Conductor Km. 3.09 0.00 0.00 0.00 0.00 0.00 0.00
7 Alluminium jointing sleeves Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Extra guarding for Road crossing/
Communication Lines /11kv line
8 Nos. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
crossing on 13 Mtr. STP (as per
Annex-31)
Guarding of 11 kV Line on STP SP-
9 Km. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
72 (as per annex-28)
10 Tree cutting compensation Km. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1Km. 11KV Line on 9 Mtr. PCC Pole with ACSR Dog
B-1-c
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Single support on 9 Mtr. PCC Pole
1 Nos. 16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-21)
Section double pole on 9 Mtr. PCC
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-23)
Section Single pole on 9 Mtr. PCC
3 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-22)

4 Extra Tee-off pole (as per Annex-20) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Extra stay at small angle locations


5 Nos. 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-27)
6 ACSR Dog Conductor Km. 3.09 0.00 0.00 0.00 0.00 0.00 0.00
7 Alluminium jointing sleeves Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

Extra guarding for


Road/Communication Lines /11kv
8 Nos. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
line/ 33 kV line crossing on 11 Mtr.
STP SP-55 (as per Annex-32)

Guarding of 11 kV Line on STP SP-


9 Km. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
55 (as per annex-28)
10 Tree cutting compensation Km. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1Km. 11KV Line on 9 Mtr. PCC Pole with ACSR Raccoon
B-1-d
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Single support on 9 Mtr. PCC Pole
1 Nos. 16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-21)
Section double pole on 9 Mtr. PCC
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-23)
Section Single pole on 9 Mtr. PCC
3 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-22)
Extra Tee-off pole (as per Annex-
4 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
20)
Extra stay at small angle locations
5 Nos. 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-27)
6 ACSR Raccoon Conductor Km. 3.09 0.00 0.00 0.00 0.00 0.00 0.00
7 Alluminium jointing sleeves Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

Extra guarding for


Road/Communication Lines /11kv
8 Nos. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
line/ 33 kV line crossing on 11 Mtr.
STP SP-55 (as per Annex-32)

Guarding of 11 kV Line on STP SP-


9 Km. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
55 (as per annex-28)
10 Tree cutting compensation Km. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1Km. 11KV Line on 11 Mtr. Steel Tubular Pole with ACSR Rabbit
B-1-e
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Single support on 11 Mtr. STP Pole
1 Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-17)
Section double pole on 11 Mtr.
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
STP(as per Annex-19)
Section Single pole on 11 Mtr. STP
3 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-18)

4 Extra Tee-off pole (as per Annex-20) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Extra stay at small angle locations (as


5 Nos. 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
per Annex-27)
6 ACSR Rabbit Conductor Km. 3.09 0.00 0.00 0.00 0.00 0.00 0.00
7 Alluminium jointing sleeves Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Extra guarding for Road crossing/
Communication Lines /11kv line
8 Nos. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
crossing on 13 Mtr. STP (as per
Annex-31)
Guarding of 11 kV Line on STP SP-
9 Km. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
72 (as per annex-28)
10 Tree cutting compensation Km. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1Km. 11KV Line on 9 Mtr. PCC Pole with ACSR Rabbit
B-1-f
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Single support on 9 Mtr. PCC Pole
1 Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-21)
Section double pole on 9 Mtr. PCC
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-23)
Section Single pole on 9 Mtr. PCC
3 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-22)
Extra Tee-off pole (as per Annex-
4 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
20)
Extra stay at small angle locations
5 Nos. 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-27)
6 ACSR Rabbit Conductor Km. 3.09 0.00 0.00 0.00 0.00 0.00 0.00
7 Alluminium jointing sleeves Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Extra guarding for
Road/Communication Lines /11kv
8 Nos. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
line/ 33 kV line crossing on 11 Mtr.
STP SP-55 (as per Annex-32)
Guarding of 11 kV Line on STP SP-
9 Km. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
55 (as per annex-28)
10 Tree cutting compensation Km. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1Km. 11KV line on Steel Tubular Pole with 3x95 Sq.mm. ABC
B-2-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value of Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Single support on STP Pole on 11
1 Nos. 25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mtr. STP (as per Annex-24)
Section double pole on 11 Mtr. STP
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-25)
Extra stay at small angle locations
3 Nos. 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-27)
4 11 kV 3x95 Sq. mm. ABC Km. 1.05 0.00 0.00 0.00 0.00 0.00 0.00

11KV heat Shrinkable cable


termination kit suitable for 3x95
5 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm. 11 KV ABC complete with
mounting arrangement

Cable jointing kit straight through


6 suitable for 3x95 sq.mm. 11 KV Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
ABC

7 Tree cutting compensation Km. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1Km. 11KV line on Steel Tubular Pole with 3x50 Sq.mm. ABC
B-2-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Single support on 11 Mtr. STP (as
1 Nos. 25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
per Annex-24)
Section double pole on 11 Mtr. STP
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-25)
Extra stay at small angle locations
3 Nos. 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(as per Annex-27)
4 11 kV XLPE 3x50 Sq. mm. ABC Km. 1.05 0.00 0.00 0.00 0.00 0.00 0.00

11KV heat Shrinkable cable


termination kit suitable for 3x50
5 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm. 11 KV ABC complete with
mounting arrangement

Cable jointing kit straight through


6 suitable for 3x50 sq.mm. 11 KV Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
ABC
7 Tree cutting compensation Km. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 km 11 kV Underground line on 3x300 Sq. mm. XLPE Cable double ckt.
B-2-c
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total value Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection of Erection prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges incl. service Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) Unit) incl. tax Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax (Rs.) all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 11kV 3x300 mm XLPE cable
2
km 2.2 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
2 outdoor for 11 kV 3x300 Sq. mm. Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
XLPE Cable
Cable jointing kit straight through
3 for 11 KV 3x300 Sq. mm. XLPE Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
Cable

11 kV double pole structure on 11


4 No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mtr long STP (as per Annex-26)

5 GI Pipe 6" Dia Mtrs. 12 0.00 0.00 0.00 0.00 0.00 0.00
Road Restoration Chages for
6 km 0.2 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Kucchha Road Crossing
Road Restoration Chages for
7 km 0.8 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Kucchha Road Crossing
Pipe (Hume/HDPE) for Cable
8 Laying (pipe to be laid by HDD Mtrs. 50 0.00 0.00 0.00 0.00 0.00 0.00
method)
Cable laying charges including
9 km 1 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
cost of Bricks, sand,clamps etc.
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 km 11 kV Underground line on 3x185 Sq. mm. XLPE Cable double ckt.
B-2-d
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value of Unit Service Unit Total value Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. supply Erection Tax Erection of Erection prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Unit) Charges incl. service Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. tax Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax (Rs.) all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 11kV 3x185 mm XLPE cable
2
km 2.2 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
2 outdoor for 11 kV 3x185 Sq. mm. Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
XLPE Cable
Cable jointing kit straight through
3 for 11 KV 3x185 Sq. mm. XLPE Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
Cable

11 kV double pole structure on 11


4 No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mtr long STP (as per Annex-26)

5 GI Pipe 6" Dia Mtrs. 12 0.00 0.00 0.00 0.00 0.00 0.00
Road Restoration Chages for
6 km 0.2 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Pucca Road Crossing
Road Restoration Chages for
7 km 0.8 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Kucchha Road Crossing
Pipe (Hume/HDPE) for Cable
8 Laying (Pipe to be laid by HDD Mtrs. 50 0.00 0.00 0.00 0.00 0.00 0.00
Method)
Cable laying charges including
9 km 1 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
cost of Bricks, sand,clamps etc.
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 km 11 kV Underground line on 3x120 Sq. mm. XLPE Cable double ckt.
B-2-e
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value of Unit Service Unit Total value Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. supply Erection Tax Erection of Erection prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges incl. service Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) Unit) incl. tax Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax (Rs.) all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 11kV 3x120 mm2 XLPE cable km 2.2 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
2 outdoor for 11 kV 3x120 Sq. mm. Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
XLPE Cable
Cable jointing kit straight through
3 for 11 KV 3x120 Sq. mm. XLPE Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
Cable

11 kV double pole structure on 11


4 No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mtr long STP (as per Annex-26)

5 GI Pipe 6" Dia Mtrs. 12 0.00 0.00 0.00 0.00 0.00 0.00
Road Restoration Chages for
6 km 0.2 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Pucca Road Crossing
Road Restoration Chages for
7 km 0.8 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Kucchha Road Crossing
Pipe (Hume/HDPE) for cable
8 laying (Pipe to be laid by HDD Mtrs. 50 0.00 0.00 0.00 0.00 0.00 0.00
Method)
Cable laying charges including
9 km 1 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
cost of Bricks, sand,clamps etc.
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 No. 11kV Railway Crossing with 2x(3x300) sq.mm XLPE
B-2-f
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value of Unit Service Unit Total value of Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. supply Erection Tax Erection Erection incl. prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges service tax Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) incl. (Rs.) Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax (4x15) all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11 kV XLPE Cable 3x300 Sq.
1 Mtr. 300 0.00 0.00 0.00 0.00 0.00 0.00
mm.
Heat Shrinkable Jointing kit
2 Outdoor for 11 kV 3x300 Sq. mm. Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
XLPE Cable
Pipe (Hume/HDPE) for cable
3 laying (Pipe to be laid by HDD Mtr. 80 0.00 0.00 0.00 0.00 0.00 0.00
Method)
Cable laying including cost of
4 material eg. , Bricks, Sand, clamps Mtr. 200 0.00 0.00 0.00 0.00 0.00 0.00
etc.
5 G.I. Pipe 6" dia Mtr. 12 0.00 0.00 0.00 0.00 0.00 0.00

11 kV double pole structure on 11


6 No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mtr long STP (as per Annex-26)

Railway crossing documentation


7 Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
and approval fee etc.

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1Km. 11KV line on existing Pole with 3x95 Sq.mm. ABC
B-2-g
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax Prices with (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ all taxes Unit) service tax service tax all taxes
Clearly) Unit) (Rs./Unit) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (6+7+8+9+10 (13+14) (4x15) (11+15)
)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 11 kV 3x95 Sq. mm. ABC Km. 1.05 0.00 0.00 0.00 0.00 0.00 0.00

11KV heat Shrinkable cable


termination kit suitable for 3x95
2 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm. 11 KV ABC complete with
mounting arrangement

Cable jointing kit straight through


3 suitable for 3x95 sq.mm. 11 KV Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
ABC
Pole clamp with hanging
4 Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
arrangement for 11KV ABC
5 Danger board with clamps Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00

6 GI barbed wire Kg. 30 0.00 0.00 0.00 0.00 0.00 0.00


TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1Km. 11KV line on existing Pole with 3x50 Sq.mm. ABC
B-2-h
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax Prices with (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ all taxes Unit) service tax service tax all taxes
Clearly) Unit) (Rs./Unit) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (6+7+8+9+10 (13+14) (4x15) (11+15)
)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 11 kV 3x50 Sq. mm. ABC Km. 1.05 0.00 0.00 0.00 0.00 0.00 0.00

11KV heat Shrinkable cable


termination kit suitable for 3x50
2 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm. 11 KV ABC complete with
mounting arrangement

Cable jointing kit straight through


3 suitable for 3x50 sq.mm. 11 KV Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
ABC
Pole clamp with hanging
4 Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
arrangement for 11KV ABC
5 Danger board with clamps Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00

6 GI barbed wire Kg. 30 0.00 0.00 0.00 0.00 0.00 0.00


TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 km 11 kV Underground line on 3x50 Sq. mm. XLPE Cable double ckt.
B-2-e
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value of Unit Service Unit Total value Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. supply Erection Tax Erection of Erection prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges incl. service Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) Unit) incl. tax Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax (Rs.) all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 11kV 3x50 mm2 XLPE cable km 1.1 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
2 outdoor for 11 kV 3x50 Sq. mm. Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
XLPE Cable
Cable jointing kit straight through
3 for 11 KV 3x50 Sq. mm. XLPE Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
Cable

11 kV double pole structure on 11


4 No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mtr long STP (as per Annex-26)
5 GI Pipe 6" Dia Mtrs. 12 0.00 0.00 0.00 0.00 0.00 0.00
Road Restoration Chages for
6 km 0.2 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Pucca Road Crossing
Road Restoration Chages for
7 km 0.8 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Kucchha Road Crossing
Pipe (Hume/HDPE) for cable
8 laying (Pipe to be laid by HDD Mtrs. 50 0.00 0.00 0.00 0.00 0.00 0.00
Method)
Cable laying charges including
9 km 1 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
cost of Bricks, sand,clamps etc.
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost for Reconductoring of 1 Km. of 11 KV Line with ACSR Dog
B-3-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 ACSR Dog Conductor Km. 3.09 0.00 0.00 0.00 0.00 0.00 0.00
Replacement of following
2
damaged/wornout accessories
V-Type X-Arm Channel 100x50
i mm. with Packing piece, clamp Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
and bolts & nuts
11 kV Disc Insulators B&S type
ii Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
70 KN
11 kV Disc. Fittings B&S type 70
iii Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
KN
iv 11 kV Pin Insulator Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00

v 11 kV Pin with nuts Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00

vi Armour Rod with Ferrule for Dog Sets 48 0.00 0.00 0.00 0.00 0.00 0.00

vii F- clamp for 11 kV Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
viii E-bracket for 11 kV Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
ix P.G. clamps for ACSR Dog Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

x STP (IS 410 SP 55) 11 Mtr. Long Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

xi STP (IS 410 SP 33) 9 Mtr. Long Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

Concreting of support (0.44 cu.m


x Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
each)
3 Alluminium Binding wire Kg. 16 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
4 rod of 20x2500 mm. and 6 SWG No. 2 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
11 kV Stay Complete (as per
5 No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-27)
Dismentaling of old conductor and
6 Km. 3 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
cartage to nearest Store
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost for Reconductoring of 1 km 11 KV Line with ACSR Raccoon
B-3-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 ACSR Raccoon Conductor Km. 3.09 0.00 0.00 0.00 0.00 0.00 0.00
Replacement of following
2 0.00 0.00 0.00 0.00 0.00 0.00
damaged/wornout accessories
V-Type X-Arm Channel 100x50
i mm. with Packing piece, clamp Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
and bolts & nuts
11 kV Disc Insulators B&S type
ii Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
70 KN
11 kV Disc. Fittings B&S type 70
iii Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
KN
iv 11 kV Pin Insulator Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00
v 11 KV Pin with nuts Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00
Armour Rod with Ferrule for
vi Nos. 48 0.00 0.00 0.00 0.00 0.00 0.00
Raccoon
vii F- clamp for 11 kV Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
viii E-bracket for 11 kV Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
ix P.G. clamps for ACSR Raccoon Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

x STP (IS 410 SP 55) 11 Mtr. Long Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

xi STP (IS 410 SP 33) 9 Mtr. Long Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Concreting of support (0.44 cu.m.
x Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
each)
3 Alluminium Binding wire Kg. 16 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
4 rod of 20x2500 mm. and 6 SWG No. 3 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
11 kV Stay Complete (as per
5 No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-27)
Dismentaling of old conductor and
6 Km. 3 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
cartage to nearest Store
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost for Reconductoring of 11 KV feeders by ABC of size 3x120mm2
B-3-c
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 11 kV 3x120 Sq. mm. ABC Km. 1.05 0.00 0.00 0.00 0.00 0.00 0.00

11KV heat Shrinkable cable


termination kit suitable for 3x120
2 Nos. 5 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm. 11 KV ABC complete
with mounting arrangement

Cable jointing kit straight through


3 Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
for 3x120 sq.mm. 11 KV ABC.

Pole clamp with hanging


4 Nos. 25 0.00 0.00 0.00 0.00 0.00 0.00
arrangement for 11KV ABC
Dismentaling of old conductor and
5 Km. 3 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
cartage to nearest Store
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost for Reconductoring of 1 km 11 KV Line with ACSR Rabbit
B-3-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 ACSR Rabbit Conductor Km. 3.09 0.00 0.00 0.00 0.00 0.00 0.00
Replacement of following
2 0.00 0.00 0.00 0.00 0.00 0.00
damaged/wornout accessories
V-Type X-Arm Channel 100x50
i mm. with Packing piece, clamp Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
and bolts & nuts
11 kV Disc Insulators B&S type
ii Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
70 KN
11 kV Disc. Fittings B&S type 70
iii Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
KN
iv 11 kV Pin Insulator Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00
v 11 KV Pin with nuts Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00
Armour Rod with Ferrule for
vi Nos. 48 0.00 0.00 0.00 0.00 0.00 0.00
Raccoon
vii F- clamp for 11 kV Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
viii E-bracket for 11 kV Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
ix P.G. clamps for ACSR Raccoon Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

x STP (IS 410 SP 55) 11 Mtr. Long Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

xi STP (IS 410 SP 33) 9 Mtr. Long Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Concreting of support (0.44 cu.m.
x Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
each)
3 Alluminium Binding wire Kg. 16 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
4 rod of 20x2500 mm. and 6 SWG No. 3 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
11 kV Stay Complete (as per
5 No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-27)
Dismentaling of old conductor and
6 Km. 3 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
cartage to nearest Store
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 11KV Bay Extension For New Feeder
B-4-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11KV VCB Switchgear with
1 Outgoing CTR 400/200/5A, No. 1 0.00 0.00 0.00 0.00 0.00 0.00
350MVA

2 11KV XLPE Cable 3X185 mm sq Mtr. 80 0.00 0.00 0.00 0.00 0.00 0.00
3 Cable Laying Charges Mtr. 80 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Heat Shrinkable jointing kit
4 suitable for 11 kV XLPE 3x185
sq.mm. Cable
(a) Outdoor Termination Kit No. 1 0.00 0.00 0.00 0.00 0.00 0.00
(b) Indoor Termination Kit No. 1 0.00 0.00 0.00 0.00 0.00 0.00
11 kV Feeder double pole structure
5 on STP (IS 410 SP 55) along with No. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
fittings (as per Annex-15)
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 400 KVA, 11/0.4 kV Plinth mounted distribution Sub Station
C-1-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total value Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection of Erection prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges incl. service Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) incl. tax Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax (Rs.) all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.44 kV 400KVA Transformer
1 (BEE standard Three Star Self No. 1 0.00 0.00 0.00 0.00 0.00 0.00
protected copper wound type)
2 STP (IS 410 SP-55) 11 Mtr. Long No 2 0.00 0.00 0.00 0.00 0.00 0.00
3 Stone Pad (300x300x75 mm) No 2 0.00 0.00 0.00 0.00 0.00 0.00
4 Concreting of pole (0.44 Cub. M.) No 2 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Top channel 125x65x6 mm,
5 2240 mm long
No 1 0.00 0.00 0.00 0.00 0.00 0.00

Copper L-Piece of size 400x50x6


6 mm for LT bushing rod of No 4 0.00 0.00 0.00 0.00 0.00 0.00
transformer
LT Aluminium Unarmoured
7 XLPE/PVC Cable 1x400 Sq.mm.
Mtr. 80 0.00 0.00 0.00 0.00 0.00 0.00

LT Aluminium Unarmoured
8 XLPE/PVC Cable 1x50 Sq.mm. for Mtr. 30 0.00 0.00 0.00 0.00 0.00 0.00
HT Jumpering
LT Aluminium Unarmoured
9 XLPE/PVC Cable 1x240 Sq.mm.
Mtr. 240 0.00 0.00 0.00 0.00 0.00 0.00

10 11 kV TPMO (as per Specification) No 1 0.00 0.00 0.00 0.00 0.00 0.00
11 11 kV Fuse Set No 1 0.00 0.00 0.00 0.00 0.00 0.00
12 11 kV Lightening Arrestor No 3 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Channel 100x50x6, 2028 mm
13 (For TPMO & Fuse set) No 2 0.00 0.00 0.00 0.00 0.00 0.00

Holding clamps for top channel,


14 TPMO & Fuse set etc. with bolts & No 8 0.00 0.00 0.00 0.00 0.00 0.00
nuts
Plinth of T/F with RCC Top of size
15 2x4x1.6 Mtr. Incl. 2 nos. MS No 1 0.00 0.00 0.00 0.00 0.00 0.00
Channel
11KV Disc Insulator T&C type 45
16 KN Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Cost of 400 KVA, 11/0.4 kV Plinth mounted distribution Sub Station
C-1-a
17 11 kV Disc Fittings T&C type 45 KN Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

18 11 KV Pin insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00


19 11 kV Pin with nuts Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
20 G.I. Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00

21 11 kV SMC Danger board with N&B Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

22 Stay Complete (as per Annex-27) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing rod
23 of 20x2500 mm. and 6 SWG earthing Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
wire etc.

SMC L.T. Distribution Pillar box


with one incomer and 3 sets of 300
24 Amps Kit Kat rewireable type fuse No. 1 0.00 0.00 0.00 0.00 0.00 0.00
unit for outgoing circuits complete,
connected on 800A bus bar.
25 a Al. crimping lugs 400 sq.mm. No. 16 0.00 0.00 0.00 0.00 0.00 0.00
b Al. crimping lugs 240 sq.mm. No. 24 0.00 0.00 0.00 0.00 0.00 0.00
c Al. crimping lugs 50 sq.mm. No. 3 0.00 0.00 0.00 0.00 0.00 0.00
26 Aluminium Paint Ltr 2 0.00 0.00 0.00 0.00 0.00 0.00
27 Red Oxide Paint Ltr 4 0.00 0.00 0.00 0.00 0.00 0.00
FRP fencing with gate as per
28 specification No. 1 0.00 0.00 0.00 0.00 0.00 0.00

Transformer Earthing (Chemical


29 Pipe Earthing) No. 2 0.00 0.00 0.00 0.00 0.00 0.00

11 kV LA Earthing (Chemical Pipe


30 Earthing) No. 1 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 250 KVA, 11/0.4 kV Plinth mounted distribution Sub Station
C-1-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.44 kV 250KVA Transformer
(BEE standard Three Star Self
1 protected copper wound type)
No. 1 0.00 0.00 0.00 0.00 0.00 0.00

2 STP (IS 410 SP-55) 11 Mtr. Long No 2 0.00 0.00 0.00 0.00 0.00 0.00
3 Stone Pad 300x300x75 mm No 2 0.00 0.00 0.00 0.00 0.00 0.00
4 Concreting of pole (0.44 Cub.M.) No. 2 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Top channel 125x65x6, 2240
5 mm long
No 1 0.00 0.00 0.00 0.00 0.00 0.00

Copper L-Piece of size 400x50x6


6 mm for LT rod of transformer
No 4 0.00 0.00 0.00 0.00 0.00 0.00

LT Aluminium unarmoured
7 XLPE/PVC Cable 1X400 Sq.mm for Mtr. 40 0.00 0.00 0.00 0.00 0.00 0.00
I/C
LT Aluminium unarmoured
8 XLPE/PVC Cable 1X50 Sq.mm for Mtr. 30 0.00 0.00 0.00 0.00 0.00 0.00
HT Jumpering
LT Aluminium unarmoured
9 XLPE/PVC Cable 1X120 Sq.mm for Mtr. 240 0.00 0.00 0.00 0.00 0.00 0.00
O/G

10 11KV TPMO (as per Specification) No 1 0.00 0.00 0.00 0.00 0.00 0.00
11 11KV Fuse Set No 1 0.00 0.00 0.00 0.00 0.00 0.00
12 11 kV Lightening Arrestor No 3 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Channel 100x50x6, 2028 mm
13 (For TPMO & Fuse set) No 2 0.00 0.00 0.00 0.00 0.00 0.00

Holding clamps for top channel,


14 TPMO & Fuse set etc. with bolts & No 8 0.00 0.00 0.00 0.00 0.00 0.00
nuts
Plinth of T/F with RCC Top of size
15 2x4x1.6 Mtr. Incl. 2 nos. MS No 1 0.00 0.00 0.00 0.00 0.00 0.00
Channel
11KV Disc Insulator T&C type 45
16 KN Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

17 11 kV Disc Fittings T&C type 45 KN Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

18 11 KV Pin insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00


19 11 kV Pin with nut Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
20 G.I. Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00

21 11 kV SMC Danger board with N&B Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

22 Stay Complete (as per Annex-27) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing rod
23 of 20x2500 mm. and 6 SWG earthing Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
wire etc.

SMC L.T. Distribution Pillar box


with one incomer and 3 sets of 300
24 Amps Kit Kat rewireable type fuse No. 1 0.00 0.00 0.00 0.00 0.00 0.00
unit for outgoing circuits complete,
connected on 800A bus bar.

25a Al. crimping lugs 400 sq.mm. No. 8 0.00 0.00 0.00 0.00 0.00 0.00
b Al. crimping lugs 120 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
c Al. crimping lugs 50 sq.mm. No. 3 0.00 0.00 0.00 0.00 0.00 0.00
26 Aluminium Paint Ltr 2 0.00 0.00 0.00 0.00 0.00 0.00
27 Red Oxide Paint Ltr 4 0.00 0.00 0.00 0.00 0.00 0.00
FRP fencing with gate as per
28 specification No. 1 0.00 0.00 0.00 0.00 0.00 0.00

Transformer Earthing (Chemical


29 Pipe Earthing) No. 2 0.00 0.00 0.00 0.00 0.00 0.00

11 kV LA Earthing (Chemical Pipe


30 Earthing) No. 1 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 160 KVA, 11/0.4 kV Pole mounted distribution Sub Station
C-1-c
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.44 kV 160 KVA Transformer
(BEE standard Three Star Self
1 protected copper wound type)
Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

2 ST Pole 11 Mtr. SP-55 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
3 Stone Pad (300 x 300x75mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Top Channel MS
4 (125x65x2240 mm.)
Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

MS Channel 100X50x2028 mm (for


5 TPMO & fuse set)
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

Holding clamps for top channel,


6 TPMO & fuse set etc. with bolts & Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00
nuts
MS Angle 75x75x6, 2028 mm with
7 clamp for T/F base
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

8 MS Channel 125x65 mm (Tee-off) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

Clamps for LT Tee-off with bolts &


9 nuts
Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

10 11 KV Pin insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00


11 11 kV Pin with nuts Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
11KV Disc Insulator T&C type 45
12 KN Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

13 11 kV Disc Fittings T&C type 45 KN Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

14 11 KV TPMO Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00


15 11 KV Fuse Set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
16 11 KV Lightning arrestor Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
17 G.I. Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00

18 11 kV SMC Danger board with N&B Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Cost of 160 KVA, 11/0.4 kV Pole mounted distribution Sub Station
C-1-c

SMC L.T. Distribution Pillar box


with one incomer and 2 sets of 200
19 Amps Kit Kat rewireable fuse unit Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
for outgoing circuits complete,
connected on 500A bus bar.

11 kV Stay Complete (as per Annex-


20 27) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Transformer Earthing (Chemical


21 Pipe Earthing) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

XLPE insulated unarmoured 1x240


22 Sq. mm. Cable Mtr. 40 0.00 0.00 0.00 0.00 0.00 0.00

XLPE insulated unarmoured 1x120


23 Sq. mm. Cable Mtr. 160 0.00 0.00 0.00 0.00 0.00 0.00

ACSR Weasel conductor for


24 jumpering Mtr. 25 0.00 0.00 0.00 0.00 0.00 0.00

Extra for Al. tape , binding wire,


25 jointing sleeves, PG clamps etc. L.S. 1 0.00 0.00 0.00 0.00 0.00 0.00

Earthing of pole by MS earthing rod


26 of 20x2500 mm. and 6 SWG earthing Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
wire etc.
Concreting of supports with plinth
27 (0.44 Cu.m. each) No. 2 0.00 0.00 0.00 0.00 0.00 0.00

28-a Al. crimping lugs 240 sq.mm. No. 8 0.00 0.00 0.00 0.00 0.00 0.00
b Al. crimping lugs 120 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
29 Aluminium Paint Ltr 2 0.00 0.00 0.00 0.00 0.00 0.00
30 Red Oxide Paint Ltr 4 0.00 0.00 0.00 0.00 0.00 0.00
11 kV LA Earthing (Chemical Pipe
31 Earthing) No. 1 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
250000

13708
88

1492

960

158

676

848

137

32
98

218

143

9605
4550
3000
84

240
20000

8000

137

100

18.5

500

437

950

120
70
200
100

8000
Cost of 100 KVA, 11/0.4 kV Pole mounted distribution Sub Station
C-1-d
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.44 kV 100 KVA Transformer
(BEE standard Three Star Self
1
protected aluminium wound type)
Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

2 ST Pole (IS 410 SP-55) 11 Mtr. Long Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

3 Stone Pad (300 x 300x75mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Top Channel (125x65x2240
4
mm.)
Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

MS Channel 100X50x2028 mm (for


5
TPMO & fuse set)
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

Holding clamps for top channel,


6 TPMO & fuse set etc. with bolts & Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00
nuts
MS Angle 75x75x6 mm, 2028 mm
7
long with clamp for T/F base
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

8 MS Channel 125x65 mm (Tee-off) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

Clamps for LT Tee-off with bolts &


9
nuts
Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

10 11 KV Pin insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00


11 11 kV Pin with nuts Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
11 kV Disc Insulator T&C type 45
12
KN
Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

11 kV Disc Fittimgs T&C type 45


13
KN
Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

14 11 kV TPMO (as per Specification) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

15 11 kV Fuse Set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00


16 11 kV Lightning arrestor Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
17 G.I. Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00
C-1-d
18 11 kV SMC Danger board with N&B Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

SMC L.T. Distribution Pillar box


with one incomer and 2 sets of 200
19 Amps Kit Kat rewireable fuse unit Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
for outgoing circuits complete,
connected on 500A bus bar.

11 kV Stay Complete (as per Annex-


20
27)
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Transformer Earthing (Chemical


21
Pipe Earthing)
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

LT XLPE insulated unarmoured


22
1x120 Sq. mm. Cable
Mtr. 40 0.00 0.00 0.00 0.00 0.00 0.00

LT XLPE insulated unarmoured


23
1x70 Sq. mm. Cable
Mtr. 160 0.00 0.00 0.00 0.00 0.00 0.00

ACSR Weasel conductor for


24
jumpering
Mtr. 25 0.00 0.00 0.00 0.00 0.00 0.00

Extra for Al. tape , binding wire,


25
jointing sleeves, PG clamps etc.
L.S. 1 0.00 0.00 0.00 0.00 0.00 0.00

Earthing of pole by MS earthing rod


26 of 20x2500 mm. and 6 SWG earthing Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
wire etc.
Concreting of supports with plinth
27
(0.44 Cu.m. each)
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

28-a Al. crimping lugs 120 sq.mm. No. 8 0.00 0.00 0.00 0.00 0.00 0.00
b Al. crimping lugs 70 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
29 Aluminium Paint Ltr 2 0.00 0.00 0.00 0.00 0.00 0.00
30 Red Oxide Paint Ltr 4 0.00 0.00 0.00 0.00 0.00 0.00
11 kV LA Earthing (Chemical Pipe
31
Earthing)
No. 1 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 63 KVA, 11/0.4 kV Pole mounted distribution Sub Station
C-1-e
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Unit) Charges Erection Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.44 kV 63 KVA Transformer
(BEE standard Three Star Self
1 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
protected aluminium wound type)

ST Pole (IS 410 SP-55), 11 Mtr.


2 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Long
3 Stone Pad (300 x 300x75mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Top Channel (125x65x2240
4 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
mm.)
MS Channel 100X50x2028 mm (for
5 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
TPMO & fuse set)
Holding clamps for top channel,
6 TPMO & fuse set etc. with bolts & Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00
nuts
MS Angle 75x75x6 mm, 2028 mm
7 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
long with clamp for T/F base

8 MS Channel 125x65 mm (Tee-off) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

Clamps for LT Tee-off with bolts &


9 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
nuts
10 11 KV Pin insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
11 11 kV Pin with nuts Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
11KV Disc Insulator T&C type 45
12 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
KN

13 11 kV Disc Fittings T&C type 45 KN Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

14 11 KV TPMO Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00


15 11 KV Fuse Set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
16 11 KV Lightning arrestor Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
17 G.I. Barbed wire Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
18 11 kV SMC Danger board Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Cost of 63 KVA, 11/0.4 kV Pole mounted distribution Sub Station
C-1-e
SMC L.T. Distribution Pillar box
with one incomer and 2 sets of 100
19 Amps Kit Kat rewireable type fuse Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
unit for outgoing circuits complete,
connected on 300A bus bar.

20 Stay Complete (as per Annex-27) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Transformer Earthing (Chemical
21 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Pipe Earthing)
LT XLPE insulated unarmoured
22 Mtr. 200 0.00 0.00 0.00 0.00 0.00 0.00
1x70 Sq. mm. Cable
ACSR Weasel conductor for
23 Mtr. 25 0.00 0.00 0.00 0.00 0.00 0.00
jumpering
Extra for Al. tape , binding wire,
24 L.S. 1 0.00 0.00 0.00 0.00 0.00 0.00
jointing sleeves, PG clamps etc.
Earthing of pole by MS earthing rod
25 of 20x2500 mm. and 6 SWG earthing Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
wire etc.
Concreting of supports with plinth
26 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
(0.44 Cu.m. each)
27 Al. crimping lugs 70 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
28 Aluminium Paint Ltr 2 0.00 0.00 0.00 0.00 0.00 0.00
29 Red Oxide Paint Ltr 4 0.00 0.00 0.00 0.00 0.00 0.00
11 kV LA Earthing (Chemical Pipe
30 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Earthing)
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 25 KVA, 11/0.4 kV Pole mounted distribution Sub Station
C-1-f
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.44 kV 25 KVA Transformer
(BEE standard Three Star Self
1 Nos. 1
protected aluminium wound type)

ST Pole (IS 410 SP-55), 11 Mtr.


2 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Long
3 Stone Pad (300 x 300x75mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Top Channel (125x65x2240
4 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
mm.)
MS Channel 100X50x2028 mm (for
5 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
TPMO & fuse set)
Holding clamps for top channel,
6 TPMO & fuse set etc. with bolts & Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00
nuts
MS Angle 75x75x6 mm, 2028 mm
7 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
long with clamp for T/F base

8 MS Channel 125x65 mm (Tee-off) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

Clamps for LT Tee-off with bolts &


9 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
nuts
10 11 KV Pin insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
11 11 kV Pin with nuts Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
11 kV Disc Insulator T&C type 45
12 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
KN

13 11 kV Disc Fittings T&C type 45 KN Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

14 11 KV TPMO Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00


15 11 KV Fuse Set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
16 11 KV Lightning arrestor Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
17 G.I. Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00
18 11 kV SMC Danger board Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Cost of 25 KVA, 11/0.4 kV Pole mounted distribution Sub Station
C-1-f
11 kV Stay Complete (as per Annex-
19 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
27)
Transformer Earthing (Chemical
20 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Pipe Earthing)
XLPE insulated unarmoured 1x35
21 Mtr. 40 0.00 0.00 0.00 0.00 0.00 0.00
Sq. mm. Cable
ACSR Weasel conductor for
22 Mtr. 25 0.00 0.00 0.00 0.00 0.00 0.00
jumpering
Extra for Al. tape , binding wire,
23 L.S. 1 0.00 0.00 0.00 0.00 0.00 0.00
jointing sleeves, PG clamps etc.
Earthing of pole by MS earthing rod
24 of 20x2500 mm. and 6 SWG earthing Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
wire etc.
Concreting of supports with plinth
25 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
(0.44 Cu.m. each)
26 Al. crimping lugs 35 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
27 Aluminium Paint Ltr 2 0.00 0.00 0.00 0.00 0.00 0.00
28 Red Oxide Paint Ltr 4 0.00 0.00 0.00 0.00 0.00 0.00
11 kV LA Earthing (Chemical Pipe
29 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Earthing)
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 400 kVA Compact Sub Station

Specify, For Supply For Erection Total


direct or Unit Ex- E.D. S.T. Other Unit F & I Total Unit Total value Unit Service Unit Total value Total Unit
bought Work Price (Rs./ (Rs./ Taxes & charges FOR Dest. of supply Erection Tax Erection of Erection prices incl.
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Unit) Charges incl. service Supply, F&I,
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) incl. tax Erection &
Items Unit Qty.
No. specified (Rs./ Unit) (Rs./Unit) service tax (Rs.) all taxes
Clearly) (6+7+8+9+10) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Supply, Installation, Testing &


Commissioning of 11kV/415V 400
1
KVA Outdoor type Package type
substation with the following:

11kV, 630A, 21kA/3Sec SF6


Insulated 3 Way Ring Main Unit
with Stainless Steel Gas tank and
integral earth switch interlocked to
1(a) individual cable covers, capacitive No. 1 0.00 0.00 0.00 0.00 0.00
voltage indicators, manometer for
SF6 gas pressure indication,
Padlocking facility and having
following configuration:

2 Nos. 630A Cable Isolators with


integral earth switch of making
(I) No. 1 0.00 0.00 0.00 0.00 0.00
capacity of the system, Fault passage
indicator for cable-in & cable out.

1 No. 200A Vacuum Circuit


Breaker/SF6 Circuit Breaker with
Microprocessor/ Static based over
(II) No. 1 0.00 0.00 0.00 0.00 0.00
current & Earth Fault protection
relay and dedicated CTs for
Transformer feeder.

11kV/415V, 400kVA Oil Cooled


1(b) Transformer with off load tap No. 1 0.00 0.00 0.00 0.00 0.00
changer.

415V, 3P, 630A, Air Circuit Breaker


1(c) as Incomer and 4 Nos. 3 P, 250A, No. 1 0.00 0.00 0.00 0.00 0.00
MCCBs as Outgoing feeders
Automatic Power Factor correction
panel of 125kVAR Capacitor banks,
1(d) No. 1 0.00 0.00 0.00 0.00 0.00
contactors and intelligent power
factor correction relay.

Enclosure housing all the above with


3 compartments and 3 doors with
padlocking facility for HT,
1(e) No. 1 0.00 0.00 0.00 0.00 0.00
Transformer & LT made of GI sheet
and painted with Polyurethane paint
for outdoor installtion.

Supply & Erection of water level


earthing 40 mm dia 15 M. long
G.I.Pipe vertically for earthing
having 12mm dia holes spaced 75
2 mm apart drilled up to 2M from the No. 2 0.00 0.00 0.00 0.00 0.00
bottom all complete as per
specification mentioned in PWD
SOR No. 701. (For Transformer
neutral & RMU)

Supply & Erection of 600x600x6mm


G.I. plate vertically for earthing with
its top least 3M below ground level
complete with 40 mm dia G.I.Pipe
and funnel of one no. 8 to 10 SWG
3 No. 4 0.00 0.00 0.00 0.00 0.00
G.I. wire in 15 mm dia G.I.Pipe,
coke and salt at least of 150 mm
thick all round, complete in all
respects. (For RMU, Transformer
body & LT Panel)

Construction of Transformer plinth


of size as per requirement of package
S/S including all material labour
4 No. 1 0.00 0.00 0.00 0.00 0.00
T&P etc. All complete including
supply of material as per direction by
the Engineer Incharge.
Supply & Erection of G.I. Pipe
Earthing with its top least 3M below
ground level complete with 40 mm
dia G.I.Pipe and funnel of one no. 8
5 to 10 SWG G.I. wire in 15mm dia No. 2 0.00 0.00 0.00 0.00 0.00
G.I.Pipe, coke and salt at least of 150
mm thick all round, complete in all
respects. (For Package Substation &
Distribution Pillar Boxes)

Supply & Erection of following 'Al'


conductor XLPE insulated armoured
400 sq. mm single core sheathed
6 cable, 1000 volts grade of following Rmt. 200 0.00 0.00 0.00 0.00 0.00
sizes in HDPE Pipe laid trenchless at
a depth of 1000 mm below ground
level.

Supply & Erection of 160 mm. dia.


HDPE Pipe (PN-6) trenchless by
7 Rmt. 200 0.00 0.00 0.00 0.00 0.00
horizontal drilling method at a depth
of 1000 mm below ground level.

S/F & Grouting of external mounting


type SMC Distribution Pillar Boxes
for power distribution, in weather
proof enclosure (IP-54), fixed on
floor over masonary pedastal or MS
angle iron frame as required and as
per the direction of Engg - in -
charge, made of SMC as per IS
13410, 415 V electrolitic Aluminium
8 No. 4 0.00 0.00 0.00 0.00 0.00
Bus Bar, removable gland plates,
cable glands, including connection
with outgoing feeders complete in
all respect. The pillar box shall
include - INCOMER: 250 AMP FP
MCCB (35 KA), BUS BAR: 300
AMP TPN Aluminium, OUT
GOINGS: 6 nos. 63 AMP TP MCCB
(25 KA).

Total 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
VA Compact Sub Station
C-1-g
Total
Total Value
of Item
(Rs.)
(4x17)

18

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00
Cost of 250 KVA (Released) , 11/0.4 kV Plinth mounted distribution Sub Station
C-1-h
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. Value of
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, Item
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) Unit) incl. incl. Erection & (Rs.)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax service tax all taxes (4x17)
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.44 kV 250KVA Old
1 No. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Transformer

2 STP (IS 410 SP-55) 11 Mtr. Long No 2 0.00 0.00 0.00 0.00 0.00 0.00

3 Stone Pad 300x300x75 mm No 2 0.00 0.00 0.00 0.00 0.00 0.00

4 Concreting of pole (0.44 Cub.M.) No. 2 0.00 0.00 0.00 0.00 0.00 0.00

M.S. Top channel 125x65x6, 2240


5 No 1 0.00 0.00 0.00 0.00 0.00 0.00
mm long

Copper L-Piece of size 400x50x6


6 No 4 0.00 0.00 0.00 0.00 0.00 0.00
mm for LT rod of transformer

LT Aluminium unarmoured
7 XLPE/PVC Cable 1X400 Sq.mm Mtr. 40 0.00 0.00 0.00 0.00 0.00 0.00
for I/C
LT Aluminium unarmoured
8 XLPE/PVC Cable 1X50 Sq.mm Mtr. 30 0.00 0.00 0.00 0.00 0.00 0.00
for HT Jumpering
LT Aluminium unarmoured
9 XLPE/PVC Cable 1X120 Sq.mm for Mtr. 240 0.00 0.00 0.00 0.00 0.00 0.00
O/G
11KV TPMO (as per
10 No 1 0.00 0.00 0.00 0.00 0.00 0.00
Specification)
11 11KV Fuse Set No 1 0.00 0.00 0.00 0.00 0.00 0.00
12 11 kV Lightening Arrestor No 3 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Channel 100x50x6, 2028
13 No 2 0.00 0.00 0.00 0.00 0.00 0.00
mm (For TPMO & Fuse set)
Holding clamps for top channel,
14 TPMO & Fuse set etc. with bolts No 8 0.00 0.00 0.00 0.00 0.00 0.00
& nuts
Plinth of T/F with RCC Top of
15 size 2x4x1.6 Mtr. Incl. 2 nos. MS No 1 0.00 0.00 0.00 0.00 0.00 0.00
Channel
11KV Disc Insulator T&C type 45
16 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
KN
11 kV Disc Fittings T&C type 45
17 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
KN
18 11 KV Pin insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
19 11 kV Pin with nut Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
20 G.I. Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00
11 kV SMC Danger board with
21 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
N&B

22 Stay Complete (as per Annex-27) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
23 rod of 20x2500 mm. and 6 SWG Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
SMC L.T. Distribution Pillar box
with one incomer and 3 sets of 300
24 Amps Kit Kat rewireable type fuse No. 1 0.00 0.00 0.00 0.00 0.00 0.00
unit for outgoing circuits complete,
connected on 800A bus bar.

25aAl. crimping lugs 400 sq.mm. No. 8 0.00 0.00 0.00 0.00 0.00 0.00
b Al. crimping lugs 120 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
c Al. crimping lugs 50 sq.mm. No. 3 0.00 0.00 0.00 0.00 0.00 0.00
26 Aluminium Paint Ltr 2 0.00 0.00 0.00 0.00 0.00 0.00
27 Red Oxide Paint Ltr 4 0.00 0.00 0.00 0.00 0.00 0.00
FRP fencing with gate as per
28 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
specification
Transformer Earthing (Chemical
29 Pipe Earthing) No. 2 0.00 0.00 0.00 0.00 0.00 0.00

11 kV LA Earthing (Chemical Pipe


30 Earthing) No. 1 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 160 KVA (Released), 11/0.4 kV Pole mounted distribution Sub Station
C-1-i
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.44 kV 160 KVA Old
1 Nos. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Transformer
2 ST Pole 11 Mtr. SP-55 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
3 Stone Pad (300 x 300x75mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Top Channel MS
4 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
(125x65x2240 mm.)
MS Channel 100X50x2028 mm
5 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
(for TPMO & fuse set)
Holding clamps for top channel,
6 TPMO & fuse set etc. with bolts Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00
& nuts
MS Angle 75x75x6, 2028 mm
7 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
with clamp for T/F base
MS Channel 125x65 mm (Tee-
8 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
off)
Clamps for LT Tee-off with bolts
9 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
& nuts
10 11 KV Pin insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
11 11 kV Pin with nuts Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
11KV Disc Insulator T&C type 45
12 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
KN
11 kV Disc Fittings T&C type 45
13 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
KN
14 11 KV TPMO Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
15 11 KV Fuse Set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
16 11 KV Lightning arrestor Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
17 G.I. Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00
11 Kv SMC Danger board with
18 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
N&B
Cost of 160 KVA (Released), 11/0.4 kV Pole mounted distribution Sub Station
C-1-i

SMC L.T. Distribution Pillar box


with one incomer and 3 sets of 300
19 Amps Kit Kat rewireable type fuse Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
unit for outgoing circuits complete,
connected on 800A bus bar.

11 kV Stay Complete (as per


20 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-27)
Transformer Earthing (Chemical
21 Pipe Earthing) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

XLPE insulated unarmoured


22 Mtr. 40 0.00 0.00 0.00 0.00 0.00 0.00
1x240 Sq. mm. Cable
XLPE insulated unarmoured
23 Mtr. 160 0.00 0.00 0.00 0.00 0.00 0.00
1x120 Sq. mm. Cable
ACSR Weasel conductor for
24 Mtr. 25 0.00 0.00 0.00 0.00 0.00 0.00
jumpering
Extra for Al. tape , binding wire,
25 L.S. 1 0.00 0.00 0.00 0.00 0.00 0.00
jointing sleeves, PG clamps etc.
Earthing of pole by MS earthing
26 rod of 20x2500 mm. and 6 SWG Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
27 No. 2 0.00 0.00 0.00 0.00 0.00 0.00
(0.44 Cu.m. each)
28-a Al. crimping lugs 240 sq.mm. No. 8 0.00 0.00 0.00 0.00 0.00 0.00
b Al. crimping lugs 120 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
29 Aluminium Paint Ltr 2 0.00 0.00 0.00 0.00 0.00 0.00
30 Red Oxide Paint Ltr 4 0.00 0.00 0.00 0.00 0.00 0.00
11 kV LA Earthing (Chemical Pipe
31 Earthing) No. 1 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 100 KVA (Released), 11/0.4 kV Pole mounted distribution Sub Station
C-1-j
For Supply For Erection Total
Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
Specify, Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
direct or Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty. bought
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
out
item. Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.44 kV 100 KVA Old
1 Nos. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Transformer
ST Pole (IS 410 SP-55) 11 Mtr.
2 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Long
3 Stone Pad (300 x 300x75mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Top Channel (125x65x2240
4 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
mm.)
MS Channel 100X50x2028 mm
5 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
(for TPMO & fuse set)
Holding clamps for top channel,
6 TPMO & fuse set etc. with bolts Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00
& nuts
MS Angle 75x75x6 mm, 2028
7 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
mm long with clamp for T/F base
MS Channel 125x65 mm (Tee-
8 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
off)
Clamps for LT Tee-off with bolts
9 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
& nuts

10 11 KV Pin insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

11 11 kV Pin with nuts Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

11 kV Disc Insulator T&C type 45


12 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
KN
11 kV Disc Fittimgs T&C type 45
13 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
KN
11 kV TPMO (as per
14 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Specification)

15 11 kV Fuse Set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00


C-1-j

16 11 kV Lightning arrestor Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

17 G.I. Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00
11 kV SMC Danger board with
18 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
N&B

SMC L.T. Distribution Pillar box


with one incomer and 2 sets of 200
19 Amps Kit Kat rewireable fuse unit Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
for outgoing circuits complete,
connected on 500A bus bar.

11 kV Stay Complete (as per


20 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-27)
Transformer Earthing (Chemical
21 Pipe Earthing) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

LT XLPE insulated unarmoured


22 Mtr. 40 0.00 0.00 0.00 0.00 0.00 0.00
1x120 Sq. mm. Cable
LT XLPE insulated unarmoured
23 Mtr. 160 0.00 0.00 0.00 0.00 0.00 0.00
1x70 Sq. mm. Cable
ACSR Weasel conductor for
24 Mtr. 25 0.00 0.00 0.00 0.00 0.00 0.00
jumpering
Extra for Al. tape , binding wire,
25 L.S. 1 0.00 0.00 0.00 0.00 0.00 0.00
jointing sleeves, PG clamps etc.
Earthing of pole by MS earthing
26 rod of 20x2500 mm. and 6 SWG Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
27 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
(0.44 Cu.m. each)
28-a Al. crimping lugs 120 sq.mm. No. 8 0.00 0.00 0.00 0.00 0.00 0.00
b Al. crimping lugs 70 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
29 Aluminium Paint Ltr 2 0.00 0.00 0.00 0.00 0.00 0.00
30 Red Oxide Paint Ltr 4 0.00 0.00 0.00 0.00 0.00 0.00
11 kV LA Earthing (Chemical Pipe
31 Earthing) No. 1 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 63 KVA (Released), 11/0.4 kV Pole mounted distribution Sub Station
C-1-k
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.44 kV 63 KVA Old
1 Nos. 1 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Transformer
ST Pole (IS 410 SP-55), 11 Mtr.
2 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Long
3 Stone Pad (300 x 300x75mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Top Channel (125x65x2240
4 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
mm.)
MS Channel 100X50x2028 mm (for
5 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
TPMO & fuse set)
Holding clamps for top channel,
6 TPMO & fuse set etc. with bolts & Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00
nuts
MS Angle 75x75x6 mm, 2028 mm
7 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
long with clamp for T/F base

8 MS Channel 125x65 mm (Tee-off) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

Clamps for LT Tee-off with bolts &


9 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
nuts
10 11 KV Pin insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
11 11 kV Pin with nuts Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
11KV Disc Insulator T&C type 45
12 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
KN

13 11 kV Disc Fittings T&C type 45 KN Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00

14 11 KV TPMO Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00


15 11 KV Fuse Set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
16 11 KV Lightning arrestor Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
17 G.I. Barbed wire Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
18 11 kV SMC Danger board Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Cost of 63 KVA (Released), 11/0.4 kV Pole mounted distribution Sub Station
C-1-k

SMC L.T. Distribution Pillar box


with one incomer and 2 sets of 100
19 Amps Kit Kat rewireable type fuse Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
unit for outgoing circuits complete,
connected on 300A bus bar.

20 Stay Complete (as per Annex-27) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Transformer Earthing (Chemical
21 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Pipe Earthing)
LT XLPE insulated unarmoured
22 Mtr. 200 0.00 0.00 0.00 0.00 0.00 0.00
1x70 Sq. mm. Cable
ACSR Weasel conductor for
23 Mtr. 25 0.00 0.00 0.00 0.00 0.00 0.00
jumpering
Extra for Al. tape , binding wire,
24 L.S. 1 0.00 0.00 0.00 0.00 0.00 0.00
jointing sleeves, PG clamps etc.
Earthing of pole by MS earthing rod
25 of 20x2500 mm. and 6 SWG earthing Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
wire etc.
Concreting of supports with plinth
26 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
(0.44 Cu.m. each)
27 Al. crimping lugs 70 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
28 Aluminium Paint Ltr 2 0.00 0.00 0.00 0.00 0.00 0.00
29 Red Oxide Paint Ltr 4 0.00 0.00 0.00 0.00 0.00 0.00
11 kV LA Earthing (Chemical Pipe
30 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Earthing)
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 16 KVA 1 Ph. 11/0.25 kV Pole mounted distribution Sub Station
C-1-l
Specif For Supply For Erection Total
y, Unit Ex- E.D. S.T. Other Taxes Unit F & I Total Unit Total value Unit Service Unit Total Total Unit Total Value
direct Work (Rs./ (Rs./ & duties (to charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
or Price (Rs./ Unit) Unit) be specified incl. any Supply (Rs.) Charges (Rs./ Charges Erection Supply, (Rs.)
bough Unit) Clearly) tax Prices with (4x11) (Rs./ Unit) Unit) incl. incl. F&I, (4x17)
t out (Rs./ Unit) (Rs./ Unit) all taxes service service Erection &
S. No Description of Items Unit Qty. item. (Rs./Unit) tax tax all taxes
(6+7+8+9+ (Rs.) (Rs.) (Rs./Unit)
10) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
16 KVA, 11KV/250 V, 1 Ph Transformer
1 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
as BEE standard.
LT Distribution Box with MCCB for
protection of 16 KVA T/F and Bus Bar
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
for 10 No. outgoing consumer
connections.
3 Clamps for D.B. (40x6 mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Clamps for T/F (75x8 mm) MS flat as per
4 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
drawing
2-phase D.O. fuse set complete with
5 Set 1 0.00 0.00 0.00 0.00 0.00 0.00
chanel and clamps
6 11 KV Ligntening Arrestor Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
7 ACSR Weasel for Jumpering Mt. 10 0.00 0.00 0.00 0.00 0.00 0.00
8 11KV Pin Insulators with pin. Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
9 Eye Bolts for service cable Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
LT XLPE unarmoured cable 16 Sq. mm
10 Mtr. 5 0.00 0.00 0.00 0.00 0.00 0.00
Single Core
Transformer Earthing (Chemical Pipe
11 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Earthing)
11 kV LA Earthing (Chemical Pipe
12 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Earthing)
13 Stay Complete (as per Annex-27) No. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL = 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 10 KVA 1 Ph. 11/0.25 kV Pole mounted distribution Sub Station
C-1-m
Specif For Supply For Erection Total
y, Unit Ex- E.D. S.T. Other Taxes Unit F & I Total Unit Total value Unit Service Unit Total Total Unit Total
direct Work (Rs./ (Rs./ & duties (to charges FOR Dest. of supply Erection Tax Erection value of prices incl. Value of
or Price (Rs./ Unit) Unit) be specified incl. any Supply (Rs.) Charges (Rs./ Charges Erection Supply, Item
bough Unit) Clearly) tax Prices with (4x11) (Rs./ Unit) incl. incl. F&I, (Rs.)
t out (Rs./ Unit) (Rs./ Unit) all taxes Unit) service service Erection & (4x17)
S. No Description of Items Unit Qty. item. (Rs./Unit) tax tax all taxes
(6+7+8+9+1 (Rs.) (Rs.) (Rs./Unit)
0) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
10 KVA, 11KV/250 V, 1 Ph
1 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Transformer as BEE standard.
LT Distribution Box with MCCB for
protection of 10 KVA T/F and Bus Bar
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
for 10 No. outgoing consumer
connections.
3 Clamps for D.B. (40x6 mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Clamps for T/F (75x8 mm) MS flat as
4 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
per drawing
2-phase D.O. fuse set complete with
5 Set 1 0.00 0.00 0.00 0.00 0.00 0.00
chanel and clamps
6 11 KV Ligntening Arrestor Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
7 ACSR Weasel for Jumpering Mt. 10 0.00 0.00 0.00 0.00 0.00 0.00
8 11KV Pin Insulators with pin. Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
9 Eye Bolts for service cable Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
LT XLPE unarmoured cable 16 Sq. mm
10 Mtr. 5 0.00 0.00 0.00 0.00 0.00 0.00
Single Core
Transformer Earthing (Chemical Pipe
11 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Earthing)
11 kV LA Earthing (Chemical Pipe
12 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Earthing)
13 Stay Complete (as per Annex-27) No. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL = 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Dismentalling of Existing Distribution Transformer
C-1-n
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value of
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Dismentalling of Distribution
Transformer of following sizes
1
inclusive of safe transportaion to the
store centre.
i) 1000 KVA No. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
ii) 750 KVA No. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
iv) 630 KVA No. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
v) 500 KVA No. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
vi) 400 KVA No. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
iv) 160 KVA No. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 3169.84 391.79 3561.63 3561.63 3561.63 3561.63
Cost of Capacity enhancement from 10/16/25 KVA TO 63 KVA distribution Sub Station
C-2-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.433KV T/F 63 KVA (BEE
1 standard Three Star Self protected Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
alluminium wound type)
2 11 KV TPMO Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
3 11 KV Fuse Set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
4 11 KV Lightning arrestor Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
5 G.I. Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00
6 11 kV SMC Danger board Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
SMC L.T. Distribution Pillar box
with one incomer and 2 sets of 100
7 Amps Kit Kat rewireable type fuse Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
unit for outgoing circuits complete,
connected on 300A bus bar.

Transformer Earthing (Chemical


8 Pipe Earthing)
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

11 kV LA Earthing (Chemical Pipe


9 Earthing)
No. 1 0.00 0.00 0.00 0.00 0.00 0.00

XLPE insulated unarmoured 1x70


10 Mtr. 200 0.00 0.00 0.00 0.00 0.00 0.00
Sq. mm. Cable
ACSR Weasel conductor for
11 Mtr. 25 0.00 0.00 0.00 0.00 0.00 0.00
jumpering
Extra for Al. tape , binding wire,
12 L.S. 1 0.00 0.00 0.00 0.00 0.00 0.00
jointing sleeves, PG clamps etc.
Earthing of pole by MS earthing
13 rod of 20x2500 mm. and 6 SWG Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
14 Al. crimping lugs 70 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
Dismentaling of old 10/16/25
15 KVA transformer and cartage to Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
nearest store
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Capacity enhancement from 25/63 KVA TO 100 KVA distribution Sub Station
C-2-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.433KV T/F 100 KVA (BEE
1 standard Three Star Self protected Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
alluminium wound type)
2 11 KV TPMO Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
3 11 KV Fuse Set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
4 11 KV Lightning arrestor Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
5 G.I. Barbed wire Kg 2 0.00 0.00 0.00 0.00 0.00 0.00
6 11 kV SMC Danger board Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

SMC L.T. Distribution Pillar box


with one incomer and 2 sets of 200
7 Amps Kit Kat rewireable fuse unit Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
for outgoing circuits complete,
connected on 500A bus bar.

Transformer Earthing (Chemical


8 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Pipe Earthing)
11 kV LA Earthing (Chemical Pipe
9 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Earthing)
XLPE insulated unarmoured 1x120
10 Mtr. 40 0.00 0.00 0.00 0.00 0.00 0.00
Sq. mm. Cable
XLPE insulated unarmoured 1x70
11 Mtr. 160 0.00 0.00 0.00 0.00 0.00 0.00
Sq. mm. Cable
ACSR Weasel conductor for
12 Mtr. 25 0.00 0.00 0.00 0.00 0.00 0.00
jumpering
Extra for Al. tape , binding wire,
13 L.S. 1 0.00 0.00 0.00 0.00 0.00 0.00
jointing sleeves, PG clamps etc.
Earthing of pole by MS earthing rod
14 of 20x2500 mm. and 6 SWG earthing Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
wire etc.
15-a Al. crimping lugs 120 sq.mm. No. 8 0.00 0.00 0.00 0.00 0.00 0.00
b Al. crimping lugs 70 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
Cost of Capacity enhancement from 25/63 KVA TO 100 KVA distribution Sub Station
C-2-b
Dismentaling of old 25/63 KVA
16 transformer and cartage to nearest Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
store
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of capacity enhancement from 63/100 KVA to 160 KVA distribution Sub Station
C-2-c
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

11/0.433KV T/F 160 kVA (BEE


1 standard Three Star Self protected Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
aluminium wound type)

2 11 KV TPMO Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00


3 11 KV Fuse Set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
4 11 KV Lightning arrestor Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
5 G.I. Barbed wire Kg 2 0.00 0.00 0.00 0.00 0.00 0.00
6 11 kV SMC Danger board Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

SMC L.T. Distribution Pillar box


with one incomer and 2 sets of 200
7 Amps Kit Kat rewireable fuse unit Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
for outgoing circuits complete,
connected on 500A bus bar.

Transformer Earthing (Chemical


8 Pipe Earthing)
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

11 kV LA Earthing (Chemical Pipe


9 Earthing)
No. 1 0.00 0.00 0.00 0.00 0.00 0.00

LT XLPE insulated unarmoured


10 Mtr. 40 0.00 0.00 0.00 0.00 0.00 0.00
1x240 Sq. mm. Cable
LT XLPE insulated unarmoured
11 Mtr. 160 0.00 0.00 0.00 0.00 0.00 0.00
1x120 Sq. mm. Cable
ACSR Weasel conductor for
12 Mtr. 25 0.00 0.00 0.00 0.00 0.00 0.00
jumpering
Extra for Al. tape , binding wire,
13 L.S. 1 0.00 0.00 0.00 0.00 0.00 0.00
jointing sleeves, PG clamps etc.
Earthing of pole by MS earthing
14 rod of 20x2500 mm. and 6 SWG Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Cost of capacity enhancement from 63/100 KVA to 160 KVA distribution Sub Station
C-2-c
15-a Al. crimping lugs 240 sq.mm. No. 8 0.00 0.00 0.00 0.00 0.00 0.00
b Al. crimping lugs 120 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
Dismentaling of old 63/100 KVA
16 transformer and cartage to nearest Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
store
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of capacity enhancement from 63/100/160 KVA to 250 KVA distribution Sub Station
C-2-d
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total value Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection of Erection prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges incl. service Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. tax Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax (Rs.) all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.433KV T/F 250 KVA (BEE
1 standard Three Star Self protected No 1 0.00 0.00 0.00 0.00 0.00 0.00
copper wound type)

Copper L-Piece of size 400x50x6


2 No 4 0.00 0.00 0.00 0.00 0.00 0.00
mm for LT rod of transformer

LT Aluminium unarmoured
3 Mtr. 40 0.00 0.00 0.00 0.00 0.00 0.00
XLPE/PVC Cable 1X400 Sq.mm.

LT Aluminium unarmoured
4 XLPE/PVC Cable 1X50 Sq.mm Mtr. 30 0.00 0.00 0.00 0.00 0.00 0.00
for HT Jumpering

LT Aluminium unarmoured
5 Mtr. 240 0.00 0.00 0.00 0.00 0.00 0.00
XLPE/PVC Cable 1X120 Sq.mm.

11KV TPMO (As per


6 No 1 0.00 0.00 0.00 0.00 0.00 0.00
Specification)
7 11KV Fuse Set No 1 0.00 0.00 0.00 0.00 0.00 0.00
8 11 kV Lightening Arrestor No 3 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Channel 100x50x6, 2028
9 No 2 0.00 0.00 0.00 0.00 0.00 0.00
mm (For TPMO & Fuse set)
Holding clamps for top channel,
10 TPMO & Fuse set etc. with bolts No 8 0.00 0.00 0.00 0.00 0.00 0.00
& nuts
Plinth of T/F with RCC Top of
11 size 2x4x1.6 Mtr. Incl. 2 nos. MS No 1 0.00 0.00 0.00 0.00 0.00 0.00
Channel
Cost of capacity enhancement from 63/100/160 KVA to 250 KVA distribution Sub Station
C-2-d
SMC L.T. Distribution Pillar box
with one incomer and 3 sets of 300
12 Amps Kit Kat rewireable type fuse No. 1 0.00 0.00 0.00 0.00 0.00 0.00
unit for outgoing circuits complete,
connected on 800A bus bar.
13a Al. crimping lugs 400 sq.mm. No. 8 0.00 0.00 0.00 0.00 0.00 0.00
b Al. crimping lugs 120 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
c Al. crimping lugs 50 sq.mm. No. 3 0.00 0.00 0.00 0.00 0.00 0.00
14 Painting of Double Pole Job 1 0.00 0.00 0.00 0.00 0.00 0.00

15 FRP fencing as per specification No. 1 0.00 0.00 0.00 0.00 0.00 0.00

Transformer Earthing (Chemical


16 Pipe Earthing) No. 2 0.00 0.00 0.00 0.00 0.00 0.00

11 kV LA Earthing (Chemical Pipe


17 Earthing) No. 1 0.00 0.00 0.00 0.00 0.00 0.00

18 G.I. Barbed wire Kg 2 0.00 0.00 0.00 0.00 0.00 0.00


19 11 kV SMC Danger board Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Dismentaling/dragging of old
20 Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
transformer and cartage to Stores
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of capacity enhancement from 100/160 KVA to 400 KVA distribution Sub Station
C-2-e
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total value Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection of Erection prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges incl. service Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. tax Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax (Rs.) all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.433KV T/F 400 KVA (Self
1 No 1 0.00 0.00 0.00 0.00 0.00 0.00
protected Three Star rating)

Copper L-Piece of size 400x50x6


2 No 4 0.00 0.00 0.00 0.00 0.00 0.00
mm for LT rod of transformer

LT Aluminium XLPE/PVC Cable


3 Mtr. 80 0.00 0.00 0.00 0.00 0.00 0.00
2x(1X400) Sq.mm.

LT Aluminium XLPE/PVC Cable


4 Mtr. 30 0.00 0.00 0.00 0.00 0.00 0.00
1X50 Sq.mm for HT Jumpering

LT Aluminium XLPE/PVC Cable


5 Mtr. 200 0.00 0.00 0.00 0.00 0.00 0.00
1X240 Sq.mm.
11KV TPMO (As per
6 No 1 0.00 0.00 0.00 0.00 0.00 0.00
Specification)
7 11KV Fuse Set No 1 0.00 0.00 0.00 0.00 0.00 0.00
8 11 kV Lightening Arrestor No 3 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Channel 100x50x6, 2028
9 No 2 0.00 0.00 0.00 0.00 0.00 0.00
mm (For TPMO & Fuse set)
Holding clamps for top channel,
10 TPMO & Fuse set etc. with bolts No 8 0.00 0.00 0.00 0.00 0.00 0.00
& nuts
Plinth of T/F with RCC Top of
11 size 2x4x1.6 Mtr. Incl. 2 nos. MS No 1 0.00 0.00 0.00 0.00 0.00 0.00
Channel

SMC L.T. Distribution Pillar box


with one incomer and 3 sets of 300
12 Amps Kit Kat rewireable type fuse No. 1 0.00 0.00 0.00 0.00 0.00 0.00
unit for outgoing circuits complete,
connected on 800A bus bar.
Cost of capacity enhancement from 100/160 KVA to 400 KVA distribution Sub Station
C-2-e
13a Al. crimping lugs 400 sq.mm. No. 16 0.00 0.00 0.00 0.00 0.00 0.00
b Al. crimping lugs 240 sq.mm. No. 24 0.00 0.00 0.00 0.00 0.00 0.00
c Al. crimping lugs 50 sq.mm. No. 3 0.00 0.00 0.00 0.00 0.00 0.00
14 Painting of DP & Fencing Job 1 0.00 0.00 0.00 0.00 0.00 0.00

15 FRP fencing as per specification No. 1 0.00 0.00 0.00 0.00 0.00 0.00

Transformer Earthing (Chemical


16 Pipe Earthing) No. 2 0.00 0.00 0.00 0.00 0.00 0.00

11 kV LA Earthing (Chemical Pipe


17 Earthing) No. 1 0.00 0.00 0.00 0.00 0.00 0.00

18 G.I. Barbed wire Kg 2 0.00 0.00 0.00 0.00 0.00 0.00


19 11 kV SMC Danger board Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

Dismentaling/dragging of old
20 Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
transformer and cartage to Stores

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of capacity enhancement from 250 KVA to 400 KVA distribution Sub Station
C-2-f
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total value Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection of Erection prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges incl. Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. service tax Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax (Rs.) all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

11/0.4 KV Transformer 400 KVA No


1 1 0.00 0.00 0.00 0.00 0.00 0.00
(Self protected Three Star rating)

Copper L-Piece of size 400x50x6 No


2 4 0.00 0.00 0.00 0.00 0.00 0.00
mm for LT rod of transformer

LT Aluminium XLPE/PVC Cable


3 Mtr. 80 0.00 0.00 0.00 0.00 0.00 0.00
2x(1X400) Sq.mm.

LT Aluminium XLPE/PVC Cable


4 Mtr. 30 0.00 0.00 0.00 0.00 0.00 0.00
1X50 Sq.mm for HT Jumpering

LT Aluminium XLPE/PVC Cable


5 Mtr. 200 0.00 0.00 0.00 0.00 0.00 0.00
1X240 Sq.mm.
11KV TPMO (As per
6 No 1 0.00 0.00 0.00 0.00 0.00 0.00
Specification)
7 11KV Fuse Set No 1 0.00 0.00 0.00 0.00 0.00 0.00
8 11 kV Lightening Arrestor No 3 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Channel 100x50x6, 2028
9 No 3 0.00 0.00 0.00 0.00 0.00 0.00
mm (For TPMO & Fuse set)
Holding clamps for top channel,
10 TPMO & Fuse set etc. with bolts No 8 0.00 0.00 0.00 0.00 0.00 0.00
& nuts
11 Repairing of transformer plinth No 1 0.00 0.00 0.00 0.00 0.00 0.00

SMC L.T. Distribution Pillar box


with one incomer and 3 sets of 300
12 Amps Kit Kat rewireable type fuse No. 1 0.00 0.00 0.00 0.00 0.00 0.00
unit for outgoing circuits complete,
connected on 800A bus bar.

13 a Al. crimping lugs 400 sq.mm. No. 16 0.00 0.00 0.00 0.00 0.00 0.00
b Al. crimping lugs 240 sq.mm. No. 24 0.00 0.00 0.00 0.00 0.00 0.00
Cost of capacity enhancement from 250 KVA to 400 KVA distribution Sub Station
C-2-f
c Al. crimping lugs 50 sq.mm. No. 6 0.00 0.00 0.00 0.00 0.00 0.00
14 Painting of DP & Fencing Job 1 0.00 0.00 0.00 0.00 0.00 0.00

15 FRP fencing as per specification No. 1 0.00 0.00 0.00 0.00 0.00 0.00

Transformer Earthing (Chemical


16 Pipe Earthing) No. 2 0.00 0.00 0.00 0.00 0.00 0.00

11 kV LA Earthing (Chemical Pipe


17 Earthing) No. 1 0.00 0.00 0.00 0.00 0.00 0.00

18 G.I. Barbed wire Kg 2 0.00 0.00 0.00 0.00 0.00 0.00


19 11 kV SMC Danger board Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

Dismentaling/dragging of old
20 Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
transformer and cartage to Stores

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of capacity enhancement from 400 KVA to 630 KVA distribution Sub Station
C-2-g
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value of Unit Service Unit Total value Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. supply Erection Tax Erection of Erection prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges incl. service Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) Unit) incl. tax Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax (Rs.) all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

11/0.4 KV Transformer 630 KVA No


1 1 0.00 0.00 0.00 0.00 0.00 0.00
(Self protected Three Star rating)

Copper L-Piece of size 400x50x6 No


2 4 0.00 0.00 0.00 0.00 0.00 0.00
mm for LT rod of transformer

LT Aluminium XLPE Cable


3 Mtr. 80 0.00 0.00 0.00 0.00 0.00 0.00
2x(1X630) Sq.mm.
LT Aluminium XLPE Cable 1X50
4 Mtr. 30 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm.
LT Aluminium XLPE Cable
5 Mtr. 480 0.00 0.00 0.00 0.00 0.00 0.00
1X240 Sq.mm.
11KV TPMO (as per
6 No 1 0.00 0.00 0.00 0.00 0.00 0.00
Specification)
7 11KV Fuse Set No 1 0.00 0.00 0.00 0.00 0.00 0.00
8 11 kV Lightening Arrestor No 3 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Channel 100x50x6, 2028
9 No 3 0.00 0.00 0.00 0.00 0.00 0.00
mm (For TPMO & Fuse set)
Holding clamps for top channel,
10 TPMO & Fuse set etc. with bolts No 8 0.00 0.00 0.00 0.00 0.00 0.00
& nuts
11 Repairing of transformer plinth No 1 0.00 0.00 0.00 0.00 0.00 0.00

SMC L.T. Distribution Pillar box


with one incomer and 3 sets of 300
12 Amps Kit Kat rewireable type fuse No. 2 0.00 0.00 0.00 0.00 0.00 0.00
unit for outgoing circuits complete,
connected on 800A bus bar.

13 a Al. crimping lugs 630 sq.mm. No. 16 0.00 0.00 0.00 0.00 0.00 0.00
b Al. crimping lugs 240 sq.mm. No. 24 0.00 0.00 0.00 0.00 0.00 0.00
c Al. crimping lugs 50 sq.mm. No. 6 0.00 0.00 0.00 0.00 0.00 0.00
14 Painting of DP & Fencing Job 1 0.00 0.00 0.00 0.00 0.00 0.00

15 FRP fencing as per specification No. 1 0.00 0.00 0.00 0.00 0.00 0.00

Transformer Earthing (Chemical


16 No. 2 0.00 0.00 0.00 0.00 0.00 0.00
Pipe Earthing)
11 kV LA Earthing (Chemical Pipe
17
Earthing)
No. 1 0.00 0.00 0.00 0.00 0.00 0.00

18 G.I. Barbed wire Kg 2 0.00 0.00 0.00 0.00 0.00 0.00


19 11 Kv SMC Danger board Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

Dismentaling/dragging of old Job


20 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
transformer and cartage to Stores

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Capacity enhancement from 10/16/25 KVA TO 63 KVA (Released) distribution Sub Station
C-2-h
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.433KV T/F 63 KVA old
1 Nos. 1 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
transformer
2 11 KV TPMO Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
3 11 KV Fuse Set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
4 11 KV Lightning arrestor Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
5 G.I. Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00
6 11 kV SMC Danger board Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

SMC L.T. Distribution Pillar box


with one incomer and 2 sets of 100
7 Amps Kit Kat rewireable type fuse Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
unit for outgoing circuits complete,
connected on 300A bus bar.

Transformer Earthing (Chemical


8 Pipe Earthing)
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

11 kV LA Earthing (Chemical Pipe


9 Earthing)
No. 1 0.00 0.00 0.00 0.00 0.00 0.00

XLPE insulated unarmoured 1x70


10 Mtr. 200 0.00 0.00 0.00 0.00 0.00 0.00
Sq. mm. Cable
ACSR Weasel conductor for
11 Mtr. 25 0.00 0.00 0.00 0.00 0.00 0.00
jumpering
Extra for Al. tape , binding wire,
12 L.S. 1 0.00 0.00 0.00 0.00 0.00 0.00
jointing sleeves, PG clamps etc.
Earthing of pole by MS earthing
13 rod of 20x2500 mm. and 6 SWG Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
14 Al. crimping lugs 70 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
Dismentaling of old 10/16/25
15 KVA transformer and cartage to Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
nearest store
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Capacity enhancement from 25/63 KVA TO 100 KVA (Released) distribution Sub Station
C-2-i
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.433KV T/F 100 KVA old
1 Nos. 1 NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
transformer
2 11 KV TPMO Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
3 11 KV Fuse Set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
4 11 KV Lightning arrestor Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
5 G.I. Barbed wire Kg 2 0.00 0.00 0.00 0.00 0.00 0.00
6 11 kV SMC Danger board Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
SMC L.T. Distribution Pillar box
with one incomer and 2 sets of 200
7 Amps Kit Kat rewireable fuse unit Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
for outgoing circuits complete,
connected on 500A bus bar.
Transformer Earthing (Chemical
8 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Pipe Earthing)
11 kV LA Earthing (Chemical Pipe
9 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Earthing)
XLPE insulated unarmoured 1x120
10 Mtr. 40 0.00 0.00 0.00 0.00 0.00 0.00
Sq. mm. Cable
XLPE insulated unarmoured 1x70
11 Mtr. 160 0.00 0.00 0.00 0.00 0.00 0.00
Sq. mm. Cable
ACSR Weasel conductor for
12 Mtr. 25 0.00 0.00 0.00 0.00 0.00 0.00
jumpering
Extra for Al. tape , binding wire,
13 L.S. 1 0.00 0.00 0.00 0.00 0.00 0.00
jointing sleeves, PG clamps etc.
Earthing of pole by MS earthing rod
14 of 20x2500 mm. and 6 SWG earthing Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
wire etc.
15-a Al. crimping lugs 120 sq.mm. No. 8 0.00 0.00 0.00 0.00 0.00 0.00
b Al. crimping lugs 70 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
Dismentaling of old 25/63 KVA
16 transformer and cartage to nearest Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
store
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of capacity enhancement from 63/100 KVA to 160 KVA (Released) distribution Sub Station
C-2-j
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.433KV T/F 160 kVA old
1 Nos. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
transformer
2 11 KV TPMO Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
3 11 KV Fuse Set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
4 11 KV Lightning arrestor Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
5 G.I. Barbed wire Kg 2 0.00 0.00 0.00 0.00 0.00 0.00
6 11 kV SMC Danger board Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

SMC L.T. Distribution Pillar box


with one incomer and 2 sets of 200
7 Amps Kit Kat rewireable fuse unit Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
for outgoing circuits complete,
connected on 500A bus bar.

Transformer Earthing (Chemical


8 Pipe Earthing)
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

11 kV LA Earthing (Chemical Pipe


9 Earthing)
No. 1 0.00 0.00 0.00 0.00 0.00 0.00

LT XLPE insulated unarmoured


10 Mtr. 40 0.00 0.00 0.00 0.00 0.00 0.00
1x240 Sq. mm. Cable
LT XLPE insulated unarmoured
11 Mtr. 160 0.00 0.00 0.00 0.00 0.00 0.00
1x120 Sq. mm. Cable
ACSR Weasel conductor for
12 Mtr. 25 0.00 0.00 0.00 0.00 0.00 0.00
jumpering
Extra for Al. tape , binding wire,
13 L.S. 1 0.00 0.00 0.00 0.00 0.00 0.00
jointing sleeves, PG clamps etc.
Earthing of pole by MS earthing
14 rod of 20x2500 mm. and 6 SWG Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
15-a Al. crimping lugs 240 sq.mm. No. 8 0.00 0.00 0.00 0.00 0.00 0.00
b Al. crimping lugs 120 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
Cost of capacity enhancement from 63/100 KVA to 160 KVA (Released) distribution Sub Station
C-2-j
Dismentaling of old 63/100 KVA
16 transformer and cartage to nearest Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
store
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of capacity enhancement from 63/100/160 KVA to 250 KVA (Released) distribution Sub Station
C-2-k
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11/0.433KV T/F 250 KVA Old
1 No 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
transformer

Copper L-Piece of size 400x50x6


2 No 4 0.00 0.00 0.00 0.00 0.00 0.00
mm for LT rod of transformer

LT Aluminium unarmoured
3 Mtr. 40 0.00 0.00 0.00 0.00 0.00 0.00
XLPE/PVC Cable 1X400 Sq.mm.

LT Aluminium unarmoured
4 XLPE/PVC Cable 1X50 Sq.mm Mtr. 30 0.00 0.00 0.00 0.00 0.00 0.00
for HT Jumpering
LT Aluminium unarmoured
5 Mtr. 240 0.00 0.00 0.00 0.00 0.00 0.00
XLPE/PVC Cable 1X120 Sq.mm.
11KV TPMO (As per
6 No 1 0.00 0.00 0.00 0.00 0.00 0.00
Specification)
7 11KV Fuse Set No 1 0.00 0.00 0.00 0.00 0.00 0.00
8 11 kV Lightening Arrestor No 3 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Channel 100x50x6, 2028
9 No 2 0.00 0.00 0.00 0.00 0.00 0.00
mm (For TPMO & Fuse set)
Holding clamps for top channel,
10 TPMO & Fuse set etc. with bolts No 8 0.00 0.00 0.00 0.00 0.00 0.00
& nuts
Plinth of T/F with RCC Top of
11 size 2x4x1.6 Mtr. Incl. 2 nos. MS No 1 0.00 0.00 0.00 0.00 0.00 0.00
Channel
SMC L.T. Distribution Pillar box
with one incomer and 3 sets of 300
12 Amps Kit Kat rewireable type fuse No. 1 0.00 0.00 0.00 0.00 0.00 0.00
unit for outgoing circuits complete,
connected on 800A bus bar.
Cost of capacity enhancement from 63/100/160 KVA to 250 KVA (Released) distribution Sub Station
C-2-k
13a Al. crimping lugs 400 sq.mm. No. 8 0.00 0.00 0.00 0.00 0.00 0.00
c Al. crimping lugs 120 sq.mm. No. 12 0.00 0.00 0.00 0.00 0.00 0.00
d Al. crimping lugs 50 sq.mm. No. 6 0.00 0.00 0.00 0.00 0.00 0.00
14 Painting of Double Pole Job 1 0.00 0.00 0.00 0.00 0.00 0.00

15 FRP fencing as per specification No. 1 0.00 0.00 0.00 0.00 0.00 0.00

Transformer Earthing (Chemical


16 Pipe Earthing) No. 2 0.00 0.00 0.00 0.00 0.00 0.00

11 kV LA Earthing (Chemical Pipe


17 Earthing) No. 1 0.00 0.00 0.00 0.00 0.00 0.00

18 G.I. Barbed wire Kg 2 0.00 0.00 0.00 0.00 0.00 0.00


19 11 kV SMC Danger board Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

Dismentaling/dragging of old
20 Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
transformer and cartage to Stores

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 km of 3 Ph 4 Wire LT Line on ACSR Raccoon Conductor
D-1-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Single support on 9 Mtr. Long
1 Nos. 25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
STP (as per Annex-29)
2 ACSR Raccoon km 4.12 0.00 0.00 0.00 0.00 0.00 0.00
3 Alluminium Jointing sleeves Kg. 4 0.00 0.00 0.00 0.00 0.00 0.00
4 Aluminium binding wire Kg. 4 0.00 0.00 0.00 0.00 0.00 0.00
5 Spacer LT FRP Nos. 72 0.00 0.00 0.00 0.00 0.00 0.00
6 Earth wire clamp Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
7 Earthing complete Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
Extra cost for Stay at angle (As
8 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
per Annex-30)
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Reconductoring 1 km of 3 Ph 4 Wire LT Line on Raccoon
D-1-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Single support on 9 Mtr. Long
1 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
STP (as per Annex-29)
2 Phase wire ACSR Raccoon km 4.12 0.00 0.00 0.00 0.00 0.00 0.00
3 Alluminium Jointing sleeves Kg. 3 0.00 0.00 0.00 0.00 0.00 0.00
4 Aluminium binding wire Kg. 3 0.00 0.00 0.00 0.00 0.00 0.00
5 LT Shackle Insulator Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
LT clamp for LT Shackle
6 Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
Insulator
7 LT Shackle strap 10" Pair 8 0.00 0.00 0.00 0.00 0.00 0.00
8 Spacer LT FRP Nos. 24 0.00 0.00 0.00 0.00 0.00 0.00
9 Earth wire clamp Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Extra cost for Stay at angle (As
10 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
per Annex-30)
Dismanteling of Old LT wires and
11 Km 4 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
cartage it to nearest store
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 Km. LT Line with Aerial Bunched Conductor (ABC) of (3x150+1x16+1x120) sq.mm.
D-2-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Supply & Erection of STP 9 M
(A)
Long

The excavation of foundation pit


in mix soil/normal soil/soft & hard
rack and its back filling and
leveling etc. The size of the pit
will be 450x450 mm and having a
depth of 1/6 of the full length of
1
the support, erection of supports,
including grouting (in Ratio 1:4:8
in Cement, sand and Brick
Ballast) including fixing of all
clamp fitting and other accessories
as per relevant drawings.

Single pole support on 9 Mtr. long


(i)  Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
STP
(ii) Stone pad (300x300x75 mm) Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
Concreting of support ( 0.285
(iii) Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
Cum each)
Excavation of earth and driving of
M.S. Earthing Rod 20x2500 mm
(with 40 mm. taper extra)
2 Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
connecting it with support by
means of G.I. Wire No.6 S.W.G.
with bolt & Nuts etc.
3 Stay Complete (As per Annex-30) Nos. 15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supply & Erection of L.T.


(B) XLPE Aerial Bunched cable
and its accessories
Supply and Fixing of following
1
clamps
Dead End clamps with I-Hook
a Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
(Insulated)
Suspension clamps with I-Hook
b Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
(Insulated)

95/50 sq.mm. - 70/35 sq.mm. PG


c Clamps (For line to line jumpering Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
& energiizing DB neutral)

Pole clamps suitable for STP SP-


d Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
33 and PCC Poles
Supply and Fixing of following
2 0.00 0.00
Connectors
L.T. Insulation Piercing Connectors
of 120-50 sq.mm. - 50-35 sq.mm.
a size for energizing distribution
Nos. 60 0.00 0.00 0.00 0.00 0.00 0.00
kiosk/box
L.T. Insulation Piercing
Connectors (16 sq.mm. - 16
b Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm.) suitable for street light
connection
Mid span jointing sleeves
c Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
(150Sq.mm.)
Supply & Fixing of LT
distribution boxes/kiosk of
following types on the LT poles
3
including all clamps & material
required for mounting,
connections & sealing.
i) SMC type. Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00

20 SWG CRCA MS Sheet by


ii) deep drawn method with Powder Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
coating.
Insulated ABC of
4 km 1.05 0.00 0.00 0.00 0.00 0.00 0.00
3x150+1x120+1x16 Sq.mm.
Supply & fixing of ON/OFF
5 Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
switch for street light connections
1x35 mm2 XLPE/PVC insulated
6 Al. cable for energising the Mtr 200 0.00 0.00 0.00 0.00 0.00 0.00
distribution boxes/ kiosks.
1x16 mm2 XLPE insulated Al.
7 cable for energising the Street Mtr 30 0.00 0.00 0.00 0.00 0.00 0.00
light
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 Km. LT Line with Aerial Bunched Conductor (ABC) of (3x120+1x16+1x95) sq.mm.
D-2-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & I Total Unit Total value Unit Service Unit Total Total Unit Total
bought Work (Rs./ (Rs./ Taxes & charges FOR Dest. of supply Erection Tax Erection value of prices incl. Value of
out Price Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Unit) Charges Erection Supply, Item
Sl. item. (Rs./ be tax with all taxes (4x11) (Rs./ Unit) incl. incl. F&I, (Rs.)
Items Unit Qty.
No. Unit) specified (Rs./ Unit) (Rs./Unit) service tax service tax Erection & (4x17)
Clearly) (6+7+8+9+10) (Rs.) (Rs.) all taxes
(Rs./ Unit) (13+14) (4x15) (Rs./Unit)
(11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Supply & Erection of STP 9 M
(A)
Long

The excavation of foundation pit


in mix soil/normal soil/soft & hard
rack and its back filling and
leveling etc. The size of the pit
will be 450x450 mm and having a
depth of 1/6 of the full length of
1
the support, erection of supports,
including grouting (in Ratio 1:4:8
in Cement, sand and Brick
Ballast) including fixing of all
clamp fitting and other accessories
as per relevant drawings.

Single pole support on 9 Mtr. long


(i)  Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
STP
(ii) Stone pad (300x300x75 mm) Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
Concreting of support ( 0.285
(iii) Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
Cum each)

Excavation of earth and driving of


M.S. Earthing Rod 20x2500 mm.
(with 40 mm. taper extra)
2 Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
connecting it with support by
means of G.I. Wire No.6 S.W.G.
with bolt & Nuts etc.

3 Stay Complete (As per Annex-30) Nos. 15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Erection of L.T.
(B) XLPE Aerial Bunched cable
and its accessories
Supply and Fixing of following
1
clamps
Dead End clamps with I-Hook
a Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
(Insulated)
Suspension clamps with I-Hook
b Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
(Insulated)

95/50 sq.mm. - 70/35 sq.mm. PG


c Clamps (For line to line jumpering Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
& energiizing DB neutral)
Pole clamps suitable for STP SP-
d Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
33 and PCC Poles
Supply and Fixing of following
2 0.00 0.00
Connectors
L.T. Insulation Piercing Connectors
of 120-50 sq.mm. - 50-35 sq.mm.
a size for energizing distribution
Nos. 60 0.00 0.00 0.00 0.00 0.00 0.00
kiosk/box

L.T. Insulation Piercing


Connectors (16 sq.mm. - 16
b Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm.) suitable for street light
connection
Mid span jointing sleeves
c Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
(120Sq.mm.)
Supply & Fixing of LT
distribution boxes/kiosk on the LT
3 poles including all clamps &
material required for mounting,
connections & sealing.
i) SMC type.. Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
20 SWG CRCA MS Sheet by
ii) deep drawn method with Powder Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
coating Box.
Insulated ABC of
4 km 1.05 0.00 0.00 0.00 0.00 0.00 0.00
3x120+1x95+1x16 Sq.mm.
Supply & fixing of ON/OFF
5 Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
switch for street light connections
1x35 mm2 XLPE/PVC insulated
6 Al. cable for energising the Mtr 200 0.00 0.00 0.00 0.00 0.00 0.00
distribution boxes/ kiosks.
1x16 mm2 XLPE insulated Al.
7 cable for energising the Street Mtr 30 0.00 0.00 0.00 0.00 0.00 0.00
light
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 Km. LT Line with Aerial Bunched Conductor (ABC) of (3x95+1x16+1x70) sq.mm.
D-2-c
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Supply & Erection of STP 9 M
(A)
Long

The excavation of foundation pit


in mix soil/normal soil/soft & hard
rack and its back filling and
leveling etc. The size of the pit
will be 450x450 mm and having a
depth of 1/6 of the full length of
1
the support, erection of supports,
including grouting (in Ratio 1:4:8
in Cement, sand and Brick
Ballast) including fixing of all
clamp fitting and other accessories
as per relevant drawings.

Single pole support on 9 Mtr. long


(i)  Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
STP
(ii) Stone pad (300x300x75 mm) Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
Concreting of support ( 0.285
(iii) Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
Cum each)

Excavation of earth and driving of


M.S. Earthing Rod 20x2500 mm.
(with 40 mm. taper extra)
2 Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
connecting it with support by
means of G.I. Wire No.6 S.W.G.
with bolt & Nuts etc.

3 Stay Complete (As per Annex-30) Nos. 15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Erection of L.T.
(B) XLPE Aerial Bunched cable
and its accessories
Supply and Fixing of following
1
clamps
Dead End clamps with I-Hook
a Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
(Insulated)
Suspension clamps with I-Hook
b Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
(Insulated)

95/50 sq.mm. - 70/35 sq.mm. PG


c Clamps (For line to line jumpering Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
& energiizing DB neutral)

Pole clamps suitable for STP SP-


d Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
33 or PCC Poles
Supply and Fixing of following
2 0.00 0.00
Connectors
L.T. Insulation Piercing Connectors
of 120-50 sq.mm. - 50-35 sq.mm.
a size for energizing distribution
Nos. 60 0.00 0.00 0.00 0.00 0.00 0.00
kiosk/box

L.T. Insulation Piercing


Connectors (16 sq.mm. - 16
b Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm.) suitable for street light
connection
Mid span jointing sleeves
c Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
(120/95/50 Sq.mm.)
Supply & Fixing of LT
distribution boxes/kiosk on the LT
3 poles including all clamps &
material required for mounting,
connections & sealing.
i) SMC type.. Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
20 SWG CRCA MS Sheet by
ii) deep drawn method with Powder Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
coating Box.
Insulated ABC of
4 km 1.05 0.00 0.00 0.00 0.00 0.00 0.00
3x95+1x70+1x16 Sq.mm.
Supply & fixing of ON/OFF
5 Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
switch for street light connections
1x35 mm2 XLPE/PVC insulated
6 Al. cable for energising the Mtr 200 0.00 0.00 0.00 0.00 0.00 0.00
distribution boxes/ kiosks.
1x16 mm2 XLPE insulated Al.
7 cable for energising the Street Mtr 30 0.00 0.00 0.00 0.00 0.00 0.00
light
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 Km. LT Line with Aerial Bunched Conductor (ABC) of (3x70+1x16+1x50) sq.mm.
D-2-d
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Unit) Charges Erection Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Supply & Erection of STP 9 M
(A)
Long

The excavation of foundation pit


in mix soil/normal soil/soft & hard
rack and its back filling and
leveling etc. The size of the pit
will be 450x450 mm and having a
depth of 1/6 of the full length of
1
the support, erection of supports,
including grouting (in Ratio 1:4:8
in Cement, sand and Brick
Ballast) including fixing of all
clamp fitting and other accessories
as per relevant drawings.

Single pole support on 9 Mtr. long


(i)  Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
STP
(ii) Stone pad (300x300x75 mm) Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
Concreting of support ( 0.285
(iii) Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
Cum each)

Excavation of earth and driving of


M.S. Earthing Rod 20x2500 mm.
(with 40 mm. taper extra)
2 Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
connecting it with support by
means of G.I. Wire No.6 S.W.G.
with bolt & Nuts etc.

3 Stay Complete (As per Annex-30) Nos. 15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Erection of L.T.
(B) XLPE Aerial Bunched cable 0.00 0.00
and its accessories
Supply and Fixing of following
1 0.00 0.00
clamps
Dead End clamps with I-Hook
a Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
(Insulated)
Suspension clamps with I-Hook
b Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
(Insulated)

95/50 sq.mm. - 70/35 sq.mm. PG


c Clamps (For line to line jumpering Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
& energiizing DB neutral)

Pole clamps suitable for STP SP-


d Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
33 and PCC Poles
Supply and Fixing of following
2 0.00 0.00
Connectors
L.T. Insulation Piercing Connectors
of 120-50 sq.mm. - 50-35 sq.mm.
a size for energizing distribution
Nos. 60 0.00 0.00 0.00 0.00 0.00 0.00
kiosk/box

L.T. Insulation Piercing


Connectors (16 sq.mm. - 16
b Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm.) suitable for street light
connection
Mid span jointing sleeves (70
c Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm.)

Supply & Fixing of LT


distribution boxes/kiosk on the LT
3 poles including all clamps &
material required for mounting,
connections & sealing.

i) SMC type.. Nos. 10


20 SWG CRCA MS Sheet by
ii) deep drawn method with Powder Nos. 10
coating Box.
Insulated ABC of
4 km 1.05 0.00 0.00 0.00 0.00 0.00 0.00
3x70+1x50+1x16 Sq.mm.
Supply & fixing of ON/OFF
5 Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
switch for street light connections
1x35 mm2 XLPE/PVC insulated
6 Al. cable for energising the Mtr 200 0.00 0.00 0.00 0.00 0.00 0.00
distribution boxes/ kiosks.
1x16 mm2 XLPE insulated Al.
7 cable for energising the Street Mtr 30 0.00 0.00 0.00 0.00 0.00 0.00
light
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 Km. LT Line with Aerial Bunched Conductor (ABC) of (3x50+1x16+1x35) sq.mm.
D-2-e
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Supply & Erection of STP 9 M
(A)
Long

The excavation of foundation pit


in mix soil/normal soil/soft & hard
rack and its back filling and
leveling etc. The size of the pit
will be 450x450 mm and having a
depth of 1/6 of the full length of
1
the support, erection of supports,
including grouting (in Ratio 1:4:8
in Cement, sand and Brick
Ballast) including fixing of all
clamp fitting and other accessories
as per relevant drawings.

Single pole support on 9 Mtr. long


(i)  Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
STP
(ii) Stone pad (300x300x75 mm) Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
Concreting of support ( 0.285
(iii) Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
Cum each)

Excavation of earth and driving of


M.S. Earthing Rod 20x2500 mm.
(with 40 mm. taper extra)
2 Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
connecting it with support by
means of G.I. Wire No.6 S.W.G.
with bolt & Nuts etc.

3 Stay Complete (As per Annex-30) Nos. 15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply & Erection of L.T.
(B) XLPE Aerial Bunched cable
and its accessories
Supply and Fixing of following
1
clamps
Dead End clamps with I-Hook
a Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
(Insulated)
Suspension clamps with I-Hook
b Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
(Insulated)

95/50 sq.mm. - 70/35 sq.mm. PG


c Clamps (For line to line jumpering Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
& energiizing DB neutral)
Pole clamps suitable for STP SP-
d Nos. 30 0.00 0.00 0.00 0.00 0.00 0.00
33 and PCC Poles
Supply and Fixing of following
2 0.00 0.00
Connectors
L.T. Insulation Piercing Connectors
of 120-50 sq.mm. - 50-35 sq.mm.
a size for energizing distribution
Nos. 60 0.00 0.00 0.00 0.00 0.00 0.00
kiosk/box
L.T. Insulation Piercing
Connectors (16 sq.mm. - 16
b Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm.) suitable for street light
Mid span jointing sleeves (50
connection
c Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm.)
Supply & Fixing of LT
distribution boxes/kiosk on the LT
3 poles including all clamps &
material required for mounting,
connections & sealing.

i) SMC type. Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00


20 SWG CRCA MS Sheet by
ii) deep drawn method with Powder Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
coating Box.
Insulated ABC of
4 km 1.05 0.00 0.00 0.00 0.00 0.00 0.00
3x50+1x35+1x16 Sq.mm.
Supply & fixing of ON/OFF
5 Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
switch for street light connections
1x35 mm2 XLPE/PVC insulated
6 Al. cable for energising the Mtr 200 0.00 0.00 0.00 0.00 0.00 0.00
distribution boxes/ kiosks.
1x16 mm2 XLPE insulated Al.
7 cable for energising the Street Mtr 30 0.00 0.00 0.00 0.00 0.00 0.00
light
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Replacement of 1 Km of bare conductor L.T. line by Aerial Bunched Conductor 3x150+1x120+1x16 Sq.mm.
D-3-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
(A) Supply & Erection of STP 9 M long & PCC Poles of 8.5 M Long
The excavation of foundation pit in
mix soil/normal soil/soft & hard rack
and its back filling and leveling etc.
The size of the pit will be 450x450
mm and having a depth of 1/6 of the
1
full length of the support, erection of
supports, including grouting (in Ratio
1:4:8 in Cement, sand and Brick
Ballast) including fixing of all clamp
fitting and other accessories.

Single pole support on 9 Mtr. long


(i)
S.T.P. SP-33
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

Single support on 8.5 Mtr. long PCC


(ii)
Poles
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

(iii) Stone pad (300x300x75 mm) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
Concreting of support ( 0.285
(iv) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
Cum each)

Excavation of earth and driving of


M.S. Earthing Rod 20x2500 mm.
2 (with 40 mm. taper extra) connecting Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
it with support by means of G.I. with
No.6 S.W.G. with bolt & Nuts etc.

3 Stay Complete (As per Annex-30) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Repairing of repairable
damaged/rusted poles at site by
welding 4 Nos. M.S. Angle iron
50x50x6 mm. long pieces to
strengthen the bottom of rotten poles,
4 after digging 500mm deep around the Nos. 5 0.00 0.00 0.00 0.00 0.00 0.00
pole and holding the pole vertically
upright and then filling soil, grouting
and making plinth 300mm above
ground level in cc ratio 1:4:8
including muffing and coping.
Cost of Replacement of 1 Km of bare conductor L.T. line by Aerial Bunched Conductor 3x150+1x120+1x16 Sq.mm.
D-3-a
Supply & Erection of L.T. XLPE
(B) Aerial Bunched cable and its
accessories
Supply and Fixing of following
1
clamps
Dead End clamps with I-Hook
a
(Insulated)
No. 10 0.00 0.00 0.00 0.00 0.00 0.00

Suspension clamps with I-Hook


b
(Insulated)
No. 20 0.00 0.00 0.00 0.00 0.00 0.00

95/50 sq.mm. - 70/35 sq.mm. (For


c line to line jumpering & energiizing No. 10 0.00 0.00 0.00 0.00 0.00 0.00
DB neutral) PG Clamps

Pole clamps suitable for STP SP-33


d
or PCC Poles
No. 30 0.00 0.00 0.00 0.00 0.00 0.00

Supply and Fixing of following


2 0.00 0.00
Connectors

L.T. Insulation Piercing Connectors


of 120-50 sq.mm. - 50-35 sq.mm.
a
size for energizing distribution
No. 60 0.00 0.00 0.00 0.00 0.00 0.00
kiosk/box

L.T. Insulation Piercing Connectors


b (16 sq.mm. - 16 sq.mm.) suitable for No. 20 0.00 0.00 0.00 0.00 0.00 0.00
street light connection

Mid span jointing sleeves (150


c
Sq.mm.)
No. 4 0.00 0.00 0.00 0.00 0.00 0.00

Supply & Fixing of LT distribution


boxes/kiosk on the LT poles
3 including all clamps & material
required for mounting, connections
& sealing.

i) SMC type. Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00

20 SWG CRCA MS Sheet by


ii) deep drawn method with Powder Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
coating Box.

Dismantling of LT line 3/4/5 wire


including rolling back its conductor,
wire, clamps, insulator etc. including km.
4
stacking and transportation of wire
4 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
material to the discom stores within
the same town.

Insulated ABC of
5
3x150+1x120+1x16 Sq.mm.
km 1.05 0.00 0.00 0.00 0.00 0.00 0.00
Cost of Replacement of 1 Km of bare conductor L.T. line by Aerial Bunched Conductor 3x150+1x120+1x16 Sq.mm.
D-3-a

Disconnecting of LT service line of


following category of consumers
before dismantling of old LT line and
the reconnections through
6
distribution boxes/kiosk, supply &
fixing of Clamp/Connectors etc for
Consumer Service Cables after
commissioning of ABC line.

a) Single Phase No. 135 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
b) Three Phase No. 15 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Cost of Replacement of 1 Km of bare conductor L.T. line by Aerial Bunched Conductor 3x150+1x120+1x16 Sq.mm.
D-3-a
ON/OFF switch for street light
7 Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
connections
Disconnecting of Street light cable
and reconnecting it on new line
8 Nos. 20 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
through ON/OFF switch as per
specification.
1x35 mm2 XLPE/PVC insulated Al.
9 cable for energising the distribution Mt. 200 0.00 0.00 0.00 0.00 0.00 0.00
boxes/ kiosks.
1x16 mm2 XLPE insulated Al. cable
10 Mt. 30 0.00 0.00 0.00 0.00 0.00 0.00
for energising the Street light
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Replacement of 1 Km of bare conductor L.T. line by Aerial Bunched Conductor 3x120+1x95+1x16 Sq.mm.
D-3-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
(A) Supply & Erection of STP 9 M long & PCC Poles of 8.5 M Long

The excavation of foundation pit in


mix soil/normal soil/soft & hard rack
and its back filling and leveling etc.
The size of the pit will be 450x450
mm and having a depth of 1/6 of the
1
full length of the support, erection of
supports, including grouting (in Ratio
1:4:8 in Cement, sand and Brick
Ballast) including fixing of all clamp
fitting and other accessories.

Single pole support on 9 Mtr. long


(i)
S.T.P. SP-33
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

Single support on 8.5 Mtr. long PCC


(ii)
Poles
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

(iii) Stone pad (300x300x75 mm) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
Concreting of support ( 0.285
(iv) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
Cum each)

Excavation of earth and driving of


M.S. Earthing Rod 20x2500 mm.
2 (with 40 mm. taper extra) connecting Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
it with support by means of G.I. with
No.6 S.W.G. with bolt & Nuts etc.

3 Stay Complete (As per Annex-30) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Repairing of repairable
damaged/rusted poles at site by
welding 4 Nos. M.S. Angle iron
50x50x6 mm. long pieces to
strengthen the bottom of rotten poles,
4 after digging 500mm deep around the Nos. 5 0.00 0.00 0.00 0.00 0.00 0.00
pole and holding the pole vertically
upright and then filling soil, grouting
and making plinth 300mm above
ground level in cc ratio 1:4:8
including muffing and coping.

Supply & Erection of L.T. XLPE


(B) Aerial Bunched cable and its
accessories
Supply and Fixing of following
1
clamps
Dead End clamps with I-Hook
a
(Insulated)
No. 10 0.00 0.00 0.00 0.00 0.00 0.00

Suspension clamps with I-Hook


b
(Insulated)
No. 20 0.00 0.00 0.00 0.00 0.00 0.00

95/50 sq.mm. - 70/35 sq.mm. (For


c line to line jumpering & energiizing No. 10 0.00 0.00 0.00 0.00 0.00 0.00
DB neutral) PG Clamps

Pole clamps suitable for STP SP-33


d
or PCC Poles
No. 30 0.00 0.00 0.00 0.00 0.00 0.00

Supply and Fixing of following


2 0.00 0.00
Connectors
L.T. Insulation Piercing Connectors
of 120-50 sq.mm. - 50-35 sq.mm.
a
size for energizing distribution
No. 60 0.00 0.00 0.00 0.00 0.00 0.00
kiosk/box

L.T. Insulation Piercing Connectors


b (16 sq.mm. - 16 sq.mm.) suitable for No. 20 0.00 0.00 0.00 0.00 0.00 0.00
street light connection

Mid span jointing sleeves (120


c
Sq.mm.)
No. 4 0.00 0.00 0.00 0.00 0.00 0.00

Supply & Fixing of LT distribution


boxes/kiosk on the LT poles
3 including all clamps & material
required for mounting, connections
& sealing.

i) SMC type. Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00


20 SWG CRCA MS Sheet by
ii) deep drawn method with Powder Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
coating Box.

Dismantling of LT line 3/4/5 wire


including rolling back its conductor,
wire, clamps, insulator etc. including km.
4
stacking and transportation of wire
4 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
material to the discom stores within
the same town.

Insulated ABC of 3x120+1x95+1x16


5
Sq.mm.
km 1.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Disconnecting of LT service line of


following category of consumers
before dismantling of old LT line and
the reconnections through
6
distribution boxes/kiosk, supply &
fixing of Clamp/Connectors etc for
Consumer Service Cables after
commissioning of ABC line.

a) Single Phase No. 135 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
b) Three Phase No. 15 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
ON/OFF switch for street light
7 Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
connections
Disconnecting of Street light cable
and reconnecting it on new line
8 Nos. 20 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
through ON/OFF switch as per
specification.
1x35 mm2 XLPE/PVC insulated Al.
9 cable for energising the distribution Mt. 200 0.00 0.00 0.00 0.00 0.00 0.00
boxes/ kiosks.

1x16 mm2 XLPE insulated Al. cable


10 Mt. 30 0.00 0.00 0.00 0.00 0.00 0.00
for energising the Street light

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Replacement of 1 Km of bare conductor L.T. line by Aerial Bunched Conductor 3x95+1x70+1x16 Sq.mm.
D-3-c
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
(A) Supply & Erection of STP 9 M long & PCC Poles of 8.5 M Long

The excavation of foundation pit in


mix soil/normal soil/soft & hard rack
and its back filling and leveling etc.
The size of the pit will be 450x450
mm and having a depth of 1/6 of the
1
full length of the support, erection of
supports, including grouting (in Ratio
1:4:8 in Cement, sand and Brick
Ballast) including fixing of all clamp
fitting and other accessories.

Single pole support on 9 Mtr. long


(i)
S.T.P. SP-33
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

Single support on 8.5 Mtr. long PCC


(ii)
Poles
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

(iii) Stone pad (300x300x75 mm) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
Concreting of support ( 0.285
(iv) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
Cum each)

Excavation of earth and driving of


M.S. Earthing Rod 20x2500 mm.
2 (with 40 mm. taper extra) connecting Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
it with support by means of G.I. with
No.6 S.W.G. with bolt & Nuts etc.

3 Stay Complete (As per Annex-30) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Repairing of repairable
damaged/rusted poles at site by
welding 4 Nos. M.S. Angle iron
50x50x6 mm. long pieces to
strengthen the bottom of rotten poles,
4 after digging 500mm deep around the Nos. 5 0.00 0.00 0.00 0.00 0.00 0.00
pole and holding the pole vertically
upright and then filling soil, grouting
and making plinth 300mm above
ground level in cc ratio 1:4:8
including muffing and coping.

Supply & Erection of L.T. XLPE


(B) Aerial Bunched cable and its
accessories
Supply and Fixing of following
1
clamps
Dead End clamps with I-Hook
a
(Insulated)
No. 10 0.00 0.00 0.00 0.00 0.00 0.00

Suspension clamps with I-Hook


b
(Insulated)
No. 20 0.00 0.00 0.00 0.00 0.00 0.00

95/50 sq.mm. - 70/35 sq.mm. (For


c line to line jumpering & energiizing No. 10 0.00 0.00 0.00 0.00 0.00 0.00
DB neutral) PG Clamps

Pole clamps suitable for STP SP-33


d
or PCC Poles
No. 30 0.00 0.00 0.00 0.00 0.00 0.00

Supply and Fixing of following


2 0.00 0.00
Connectors
L.T. Insulation Piercing Connectors
of 120-50 sq.mm. - 50-35 sq.mm.
a
size for energizing distribution
No. 60 0.00 0.00 0.00 0.00 0.00 0.00
kiosk/box

L.T. Insulation Piercing Connectors


b (16 sq.mm. - 16 sq.mm.) suitable for No. 20 0.00 0.00 0.00 0.00 0.00 0.00
street light connection

Mid span jointing sleeves (95


c
Sq.mm.)
No. 4 0.00 0.00 0.00 0.00 0.00 0.00

Supply & Fixing of LT distribution


boxes/kiosk on the LT poles
3 including all clamps & material
required for mounting, connections
& sealing.
i) SMC type. Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
20 SWG CRCA MS Sheet by
ii) deep drawn method with Powder Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
coating Box.

Dismantling of LT line 3/4/5 wire


including rolling back its conductor,
wire, clamps, insulator etc. including km.
4
stacking and transportation of wire
4 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
material to the discom stores within
the same town.

Insulated ABC of 3x95+1x70+1x16


5
Sq.mm.
km 1.05 0.00 0.00 0.00 0.00 0.00 0.00

Disconnecting of LT service line of


following category of consumers
before dismantling of old LT line and
the reconnections through
6 0.00 0.00 0.00 0.00 0.00 0.00
distribution boxes/kiosk, supply &
fixing of Clamp/Connectors etc for
Consumer Service Cables after
commissioning of ABC line.

a) Single Phase No. 135 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
b) Three Phase No. 15 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
ON/OFF switch for street light
7 Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
connections
Disconnecting of Street light cable
and reconnecting it on new line
8 Nos. 20 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
through ON/OFF switch as per
specification.
1x35 mm2 XLPE/PVC insulated Al.
9 cable for energising the distribution Mt. 200 0.00 0.00 0.00 0.00 0.00 0.00
boxes/ kiosks.

1x16 mm2 XLPE insulated Al. cable


10 Mt. 30 0.00 0.00 0.00 0.00 0.00 0.00
for energising the Street light

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Replacement of 1 Km of bare conductor L.T. line by Aerial Bunched Conductor 3x50+1x135+1x16 Sq.mm.
D-3-d
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
(A) Supply & Erection of STP 9 M long & PCC Poles of 8.5 M Long

The excavation of foundation pit in


mix soil/normal soil/soft & hard rack
and its back filling and leveling etc.
The size of the pit will be 450x450
mm and having a depth of 1/6 of the
1
full length of the support, erection of
supports, including grouting (in Ratio
1:4:8 in Cement, sand and Brick
Ballast) including fixing of all clamp
fitting and other accessories.

Single pole support on 9 Mtr. long


(i)
S.T.P. SP-33
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

Single support on 8.5 Mtr. long PCC


(ii)
Poles
Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

(iii) Stone pad (300x300x75 mm) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
Concreting of support ( 0.285
(iv) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
Cum each)

Excavation of earth and driving of


M.S. Earthing Rod 20x2500 mm.
2 (with 40 mm. taper extra) connecting Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
it with support by means of G.I. with
No.6 S.W.G. with bolt & Nuts etc.

3 Stay Complete (As per Annex-30) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Repairing of repairable
damaged/rusted poles at site by
welding 4 Nos. M.S. Angle iron
50x50x6 mm. long pieces to
strengthen the bottom of rotten poles,
4 after digging 500mm deep around the Nos. 5 0.00 0.00 0.00 0.00 0.00 0.00
pole and holding the pole vertically
upright and then filling soil, grouting
and making plinth 300mm above
ground level in cc ratio 1:4:8
including muffing and coping.

Supply & Erection of L.T. XLPE


(B) Aerial Bunched cable and its
accessories
Supply and Fixing of following
1
clamps
Dead End clamps with I-Hook
a
(Insulated)
No. 10 0.00 0.00 0.00 0.00 0.00 0.00

Suspension clamps with I-Hook


b
(Insulated)
No. 20 0.00 0.00 0.00 0.00 0.00 0.00

95/50 sq.mm. - 70/35 sq.mm. (For


c line to line jumpering & energiizing No. 10 0.00 0.00 0.00 0.00 0.00 0.00
DB neutral) PG Clamps

Pole clamps suitable for STP SP-33


d
or PCC Poles
No. 30 0.00 0.00 0.00 0.00 0.00 0.00

Supply and Fixing of following


2
Connectors
L.T. Insulation Piercing Connectors
of 120-50 sq.mm. - 50-35 sq.mm.
a
size for energizing distribution
No. 60 0.00 0.00 0.00 0.00 0.00 0.00
kiosk/box

L.T. Insulation Piercing Connectors


b (16 sq.mm. - 16 sq.mm.) suitable for No. 20 0.00 0.00 0.00 0.00 0.00 0.00
street light connection

Mid span jointing sleeves (50


c
Sq.mm.)
No. 4 0.00 0.00 0.00 0.00 0.00 0.00

Supply & Fixing of LT distribution


boxes/kiosk on the LT poles
3 including all clamps & material
required for mounting, connections
& sealing.
i) SMC type. Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
20 SWG CRCA MS Sheet by
ii) deep drawn method with Powder Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00
coating Box.

Dismantling of LT line 3/4/5 wire


including rolling back its conductor,
wire, clamps, insulator etc. including km.
4
stacking and transportation of wire
4 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
material to the discom stores within
the same town.

Insulated ABC of 3x50+1x135+1x16


5
Sq.mm.
km 1.05 0.00 0.00 0.00 0.00 0.00 0.00

Disconnecting of LT service line of


following category of consumers
before dismantling of old LT line and
the reconnections through
6
distribution boxes/kiosk, supply &
fixing of Clamp/Connectors etc for
Consumer Service Cables after
commissioning of ABC line.

a) Single Phase No. 135 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
b) Three Phase No. 15 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
ON/OFF switch for street light
7 Nos. 20 0.00 0.00 0.00 0.00 0.00 0.00
connections
Disconnecting of Street light cable
and reconnecting it on new line
8 Nos. 20 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
through ON/OFF switch as per
specification.
1x35 mm2 XLPE/PVC insulated Al.
9 cable for energising the distribution Mt. 200 0.00 0.00 0.00 0.00 0.00 0.00
boxes/ kiosks.
1x16 mm2 XLPE insulated Al. cable
10 Mt. 30 0.00 0.00 0.00 0.00 0.00 0.00
for energising the Street light
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Conversion of L.T. Overhead Lines into Underground Lines by 3.5x400 Sqmm. Cable
D-4-a
Specify, For Supply For Erection Total
direct or
bought Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
out Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
Sl. item. Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Items Unit Qty. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Supply and laying of 1100 V
Grade, PVC sheathed steel strip
1 armoured, aluminum conductor Km. 1 0.00 0.00 0.00 0.00 0.00 0.00
LT XLPE insulated cable of size
3.5x400 sqmm..

Cable end termination using total


double compression brass glands
2 Nos. 80 0.00 0.00 0.00 0.00 0.00 0.00
and crimping type Cu. Thimbles
for 3.5x400 Sqmm. LT Cable.
Laying, testing & commissioning
of 3.5Cx400 sq.mm size LT
3 Km. 0.9 0.00 0.00 0.00 0.00 0.00 0.00
XLPE insulated cable
underground in trenches.
Laying, testing & commissioning
of 3.5Cx400 sq.mm size LT
4 Km. 0.1 0.00 0.00 0.00 0.00 0.00 0.00
XLPE insulated cable
underground in HDPE pipe.

Digging of Trench by excavation


of earth, laying of bricks to cover
the cable and filling of sand &
earth ramming and dressing
5 properly with complete job for Km. 0.75 0.00 0.00 0.00 0.00 0.00 0.00
laying of 1100 V Grade, PVC
sheathed steel strip armoured,
aluminum conductor LT XLPE
insulated cables.

Back fillng & restoring the road to


6 make it as original including Km. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
supply of all material.
Supply & laying of HDPE pipe of
160 mm dia. by Horizontal
drilling for underground piping
7 Km. 0.1 0.00 0.00 0.00 0.00 0.00 0.00
(trenchless) for above cable at
road crossings. Min Depth of pipe
shall be 1.2 M below surface.

Supply & laying of 7x20 SWG


8 GSS wire for earthing along Kg. 400 0.00 0.00 0.00 0.00 0.00 0.00
cables.
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Conversion of L.T. Overhead Lines into Underground Lines by 3.5x240 Sqmm. Cable
D-4-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Supply and laying of 1100 V Grade,
PVC sheathed steel strip armoured,
1 aluminum conductor LT XLPE Km. 1 0.00 0.00 0.00 0.00 0.00 0.00
insulated cable of size 3.5x240
sqmm..

Cable end termination using total


double compression brass glands and
2 Nos. 80 0.00 0.00 0.00 0.00 0.00 0.00
crimping type Cu. Thimbles for
3.5x240 Sqmm. LT Cable.

Laying, testing & commissioning of


3.5Cx240 sq.mm size LT XLPE
3 Km. 0.90 0.00 0.00 0.00 0.00 0.00 0.00
insulated cable underground in
trenches.

Laying, testing & commissioning of


3.5Cx240 sq.mm size LT XLPE
4 Km. 0.10 0.00 0.00 0.00 0.00 0.00 0.00
insulated cable underground in
HDPE pipe.

Digging of Trench by excavation of


earth, laying of bricks to cover the
cable and filling of sand & earth
ramming and dressing properly with
5 Km. 0.75 0.00 0.00 0.00 0.00 0.00 0.00
complete job for laying of 1100 V
Grade, PVC sheathed steel strip
armoured, aluminum conductor LT
XLPE insulated cables.

Back fillng & restoring the road to


6 make it as original including supply Km. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
of all material.
Supply & laying of HDPE pipe of
160 mm dia. by Horizontal drilling
for underground piping (trenchless)
7 Km. 0.10 0.00 0.00 0.00 0.00 0.00 0.00
for above cable at road crossings.
Min Depth of pipe shall be 1.2 M
below surface.

Supply , installation and testing of


8 7x20 SWG GSS wire for earthing Kg. 400 0.00 0.00 0.00 0.00 0.00 0.00
along cables.
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Conversion of L.T. Overhead Lines into Underground Lines by 3.5x120 Sqmm. Cable
D-4-c
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Supply and laying of 1100 V
Grade, PVC sheathed steel strip
1 armoured, aluminum conductor Km. 1 0.00 0.00 0.00 0.00 0.00 0.00
LT XLPE insulated cable of size
3.5x120 sqmm..

Cable end termination using total


double compression brass glands
2 Nos. 80 0.00 0.00 0.00 0.00 0.00 0.00
and crimping type Cu. Thimbles
for 3.5x120 Sqmm. LT Cable.
Laying, testing & commissioning
of 3.5Cx120 sq.mm size LT
3 Km. 0.9 0.00 0.00 0.00 0.00 0.00 0.00
XLPE insulated cable
underground in trenches.
Laying, testing & commissioning
of 3.5Cx120 sq.mm size LT
4 Km. 0.10 0.00 0.00 0.00 0.00 0.00 0.00
XLPE insulated cable
underground in HDPE pipe.

Digging of Trench by excavation


of earth, laying of bricks to cover
the cable and filling of sand &
earth ramming and dressing
5 properly with complete job for Km. 0.75 0.00 0.00 0.00 0.00 0.00 0.00
laying of 1100 V Grade, PVC
sheathed steel strip armoured,
aluminum conductor LT XLPE
insulated cables.

Back fillng & restoring the road to


6 make it as original including Km. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
supply of all material.
Supply & laying of HDPE pipe of
110 mm dia. by Horizontal
drilling for underground piping
7 Km. 0.10 0.00 0.00 0.00 0.00 0.00 0.00
(trenchless) for above cable at
road crossings. Min Depth of pipe
shall be 1.2 M below surface.

Supply , installation and testing of


8 7x20 SWG GSS wire for earthing Kg. 400 0.00 0.00 0.00 0.00 0.00 0.00
along cables.
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Conversion of L.T. Overhead Lines into Underground Lines by 3.5x50 Sqmm. Cable
D-4-d
Specify, For Supply For Erection Total
direct or
bought Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
out Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
Sl. item. Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Items Unit Qty. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
No.
specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Supply and laying of 1100 V
Grade, PVC sheathed steel strip
1 armoured, aluminum conductor Km. 1 0.00 0.00 0.00 0.00 0.00 0.00
LT XLPE insulated cable of size
4x50 sqmm..

Cable end termination using total


double compression brass glands
2 Nos. 80 0.00 0.00 0.00 0.00 0.00 0.00
and crimping type Cu. Thimbles
for 4x50 Sqmm. LT Cable.
Laying, testing & commissioning
of 4x50 sq.mm size LT XLPE
3 Km. 0.9 0.00 0.00 0.00 0.00 0.00 0.00
insulated cable underground in
trenches.
Laying, testing & commissioning
of 4x50 sq.mm size LT XLPE
4 Km. 0.10 0.00 0.00 0.00 0.00 0.00 0.00
insulated cable underground in
HDPE pipe.

Digging of Trench by excavation


of earth, laying of bricks to cover
the cable and filling of sand &
earth ramming and dressing
5 properly with complete job for Km. 0.75 0.00 0.00 0.00 0.00 0.00 0.00
laying of 1100 V Grade, PVC
sheathed steel strip armoured,
aluminum conductor LT XLPE
insulated cables.

Back fillng & restoring the road to


6 make it as original including Km. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
supply of all material.
Supply & laying of HDPE pipe of
50 mm dia. by Horizontal drilling
for underground piping
7 Km. 0.10 0.00 0.00 0.00 0.00 0.00 0.00
(trenchless) for above cable at
road crossings. Min Depth of pipe
shall be 1.2 M below surface.

Supply , installation and testing of


8 7x20 SWG GSS wire for earthing Kg. 400 0.00 0.00 0.00 0.00 0.00 0.00
along cables.
Supply and laying of following
pipes for samll service cable to
9 0.00 0.00 0.00 0.00 0.00 0.00
houses (Supply of service cable is
not included under this schedule)
Gl Pipe of 50 mm dia (external
a) Mtr. 50 0.00 0.00 0.00 0.00 0.00 0.00
area)
Gl Pipe of 40 mm dia (external
b) Mtr. 80 0.00 0.00 0.00 0.00 0.00 0.00
area)
PVC pipe heavy gauge 50 mm dia
c) Mtr. 50 0.00 0.00 0.00 0.00 0.00 0.00
(underground area)
PVC pipe heavy gauge 40 mm dia
d) Mtr. 80 0.00 0.00 0.00 0.00 0.00 0.00
(underground area)
Supply and laying of 8 SWG
10 Mtr. 300 0.00 0.00 0.00 0.00 0.00 0.00
earthing GI wire
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Price Schedule for Installation of LT Distribution Boards for LT underground system (Type-A, B & C)
D-4-e
Specify, For Supply For Erection Total
direct or
Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought
Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
Supply of LT Disribution Boards out
Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. with a rupturing caoacity of 50KA item.
Items Unit Qty. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
No. at 415V or as called for individual specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
items, openable in front and back Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
suitable for 3 plase, 4 wire, 50Hz (Rs./ Unit) (13+14) (4x15) (11+15)
AC supply and an ambient
temperature of 45 deg. C. The
1 Cubicle should be 2 weather proof, 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
dust proof, vermin Proof and
enclosure protection shall be IP-54
Supply
as per ISof2147-1962
LT Disribution
and IS:Boards
8623.
with a rupturing caoacity
The panels/switches boards of 50KA
shall
1 at
be 415V or as called
fabricated out for
of individual
14-SWG Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
items,
CRCA openable
sheet steelin front
and and back
provided
suitable for 3 plase,
with 16 SWG hinged doors 4 wire, 50Hz
AC supplysuitable
including and anfoundation.
ambient
temperature
MAIN LT of 45 deg.ATC. SUB
PANEL The
Cubicle should be
STATION- 1000 & 630 KVA weather proof,
dust
(Type proof,
Supply of LT vermin
A-1) Proof
Disribution and
Boards
enclosure
with protection
a rupturing
Incomer-1250 shall
caoacity
Amp. be50KA
TPof IP-54
MDO
as
at per 1ISNo.
415V
ACB- or2147-1962 andindividual
as called for IS: 8623.
2 The
items,panels/switches
Outgoing-250 Amp. TP and
openable in boards
front MCCB shall
back- Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
be fabricated
suitable
6 Nos. &for
1003 Amp.out TP
plase, 4ofwire,
14-SWG
MCCB 50Hz
-2
CRCA
AC sheet steel
Nos. supply and andan provided
ambient
with 16 SWG
temperature of 45 hinged
deg. C.doorsThe
includingshould
Cubicle suitable foundation.
be weather proof,
MAINproof,
dust LT PANEL
vermin ProofAT SUB and
Supply
STATION- of LT 400Disribution
KVAshall
(Type Boards
enclosure protection be A-2)
IP-54
with a rupturing
Incomer-800 caoacity
Amp. TP of 50KA1
as per IS 2147-1962 andMCCB-
IS: 8623.
at 415V or as called for individual
No. panels/switches boards shall
The
3 items, openable in front
Outgoing-250 and back- Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
be fabricated Amp. out TPof MCCB
14-SWG
suitable for
5 Nos. &sheet 3 plase,
100 Amp. 4 wire, 50Hz
CRCA steel TP
andMCCB -2
provided
AC supply and
Nos. 16 SWG hinged doors an ambient
with
temperature of 45 deg. C. The
including suitable foundation.
Cubicle should be weather proof,
MAIN LT PANEL AT SUB
dust proof, vermin Proof and
STATION- 250 & 160 KVA
enclosure protection shall be IP-54
(Type A-3)
as per IS 2147-1962 and IS: 8623.
Incomer-600 Amp. TP MCCB- 1
The panels/switches boards shall
4 No. Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
be fabricated out of 14-SWG
Outgoing-250 Amp. TP MCCB -
CRCA sheet steel and provided
4 Nos. & 100 Amp. TP MCCB - 2
with 16 SWG hinged doors
Nos.
including suitable foundation.
MAIN LT PANEL AT SUB
STATION- 160 & 100 KVA
(Type A-4)
Incomer-250 Amp. TP MCCB- 1
items, openable in front and back
suitable for 3 plase, 4 wire, 50Hz
AC supply and an ambient
temperature of 45 deg. C. The
Cubicle should be weather proof,
dust proof, vermin Proof and
enclosure protection shall be IP-54
as per IS 2147-1962 and IS: 8623.
5 The panels/switches boards shall Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
be fabricated out of 14-SWG
CRCA sheet steel and provided
with 16 SWG hinged doors
including suitable foundation.
MAIN LT PANEL AT SUB
Supply
STATION- , installation,
63 & 25 KVA testing &
(Type
commissioning
A-5) of outdoor type
feeder pillar panel
Incomer-160 Amp.toTPbe MCCB-
made of 21
mm
No. CRCA sheet and covers will
be 1.6mm63 CRCA
Outgoing- Amp. TPsheet
MCCBduly -4
6 powder
Nos. coated paint with 400 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
amps Al. busbar. (Type-B1)
Incomer - 250 Amp. TP MCCB -
1 No.
Outgoing - 63 Amp. TP MCCB -
6 Nos.

Supply , installation, testing &


commissioning of outdoor type
feeder pillar panel to be made of 2
mm CRCA sheet and covers will
be 1.6mm CRCA sheet duly
7 powder coated paint with 300 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
amps Al. busbar. (Type-B2)
Incomer - 250 Amp. TP MCCB -
1 No.
Outgoing - 63 Amp. TP MCCB -
5 Nos.

Supply , installation, testing &


commissioning of outdoor type
feeder pillar panel to be made of 2
mm CRCA sheet and covers will
be 1.6mm CRCA sheet duly
8 powder coated paint with 300 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
amps Al. busbar. (Type-B3)
Incomer - 100 Amp. TP MCCB -
1 No.
Outgoing - 63 Amp. TP MCCB -
4 Nos.
Supply , installation, testing &
commissioning of Lockable
distribution boxes of size
9 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
450X400mm with bus bar 100
Amp. TPN to feed upto 10 houses
(type C)
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 km. XLPE armoured Consumer Service Cable
XLPE LT Service armoured Cable for single phase,2x4 sq. mm. E-1-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

XLPE LT Service armoured Cable


1 Kms 1.00 0.00 0.00 0.00 0.00 0.00 0.00
for single phase,2x4 sq. mm.

TOTAL 0.00 0.00 0.00

XLPE LT Service armoured Cable for three phase, 4x6 sq. mm. E-1-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
XLPE LT Service armoured Cable
1 Kms 1.00 0.00 0.00 0.00 0.00 0.00 0.00
for three phase,4x6 sq. mm.
TOTAL 0.00 0.00 0.00
XLPE LT Service armoured Cable for three phase,4x10 sq. mm. E-1-c
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
XLPE LT Service armoured Cable
1 Kms 1.00 0.00 0.00 0.00 0.00 0.00 0.00
for three phase,4x10 sq. mm.

TOTAL 0.00 0.00 0.00

XLPE LT Service armoured Cable for three phase,4x16 sq. mm. E-1-d
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
XLPE LT Service armoured Cable
1 Kms 1.00 0.00 0.00 0.00 0.00 0.00 0.00
for three phase,4x16 sq. mm.
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
3.96 MVAr Capacitor Banks at 33/11kV 8/10 MVA Transformers
F-1-a
For Supply For Erection Total

Specify, Other Unit Total Unit


Unit F & Total Unit Total value
direct or Taxes & Erection prices incl.
Sl. I charges FOR Dest. Total value of Unit Service of Erection Total Value
Items Unit Qty. bought Unit Ex- E.D. S.T. duties (to Charges Supply, F&I,
No. incl. any Supply Prices supply Erection Tax incl. service of Item
out Work Price (Rs./ (Rs./ be incl. Erection &
tax with all taxes (Rs.) Charges (Rs./ tax (Rs.)
item. (Rs./ Unit) Unit) Unit) specified (Rs./ (Rs./Unit) (4x11) (Rs./ Unit) Unit)
service tax
(Rs.)
all taxes
(4x17)
Clearly) (Rs.) (Rs./Unit)
Unit) (6+7+8+9+10) (4x15)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

12.65 kV,3960 kVAr, 3-Phase, 50


C/s, Outdoor Type , Capacitor bank
having two variable step of 792 Kvar
& two Variable steps of 1188 kVAr.
1 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bank shall be complete with
Capacitor units of 264/396
kVAr,Aluminium busbars, Pin &
Post insulators, Expulsion fuses etc.

11 kV, Aluminium Wound, Dry


2 0.00 0.00
type Series reactors
a 0.52 kVAr for 792 kVAr step Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
b 0.79 kVAr for 1188 kVAr step Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
3 11 kV, 3-Phase Oil-Cooled RVT No. 1 0.00 0.00 0.00 0.00 0.00 0.00
12 kV 3 Phase Outdoor type metal
4 enclosed Vacuum Capacitor Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
switches.

11 kV, 400 Amp, Off Load Isolator


5 with earth switch and mounting No. 1 0.00 0.00 0.00 0.00 0.00 0.00
structure.

9 kV, 10 kA,Station Class, Lightning


6 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Arrestors

7 Indoor Type Automatic Control Unit No. 1 0.00 0.00 0.00 0.00 0.00 0.00

Hot dip galvanised structures for


8 set 1 0.00 0.00 0.00 0.00 0.00 0.00
complete system
Control cables, lugs/thimble,
9 set 1 0.00 0.00 0.00 0.00 0.00 0.00
Junction Box etc.
11 KV XLPE insulated 3x120 mm2
10 Mtr 15 0.00 0.00 0.00 0.00 0.00 0.00
Armoured
Heat Shrinkable Jointing kit for
11 11 kV 3x185 Sq. mm. XLPE 0.00 0.00
Cable
a Indoor temination kit No. 1 0.00 0.00 0.00 0.00 0.00 0.00
b Outdoor temination kit No. 1 0.00 0.00 0.00 0.00 0.00 0.00
11 KV VCB Switchgear with
12 complete arangement for connection No. 1 0.00 0.00 0.00 0.00 0.00 0.00
with existing 11 KV bus bar.
13 Casting of Civil foundation set 1 0.00 0.00 0.00 0.00 0.00 0.00
Cable trench for laying of
14 Rmt. 5 0.00 0.00 0.00 0.00 0.00 0.00
power/control cables.
Earthing for structure and LA's by
15 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
pipe in pipe earthing
Extra for facility management
16
services for 3 yrs.
a Charges for 1st Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
b Charges for 2nd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
c Charges for 3rd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
1.98 MVAr Capacitor Banks at 33/11kV 5 MVA Transformers
F-1-b
For Supply For Erection Total

Total Unit
Specify, Other Unit Total Unit
Unit F & FOR Dest.
direct or Unit Ex- Taxes & Unit Erection Total value of prices incl.
Sl. I charges Supply Total value of Service Total Value
Items Unit Qty. bought E.D. S.T. duties (to Erection Charges Erection incl. Supply, F&I,
No. Work incl. any Prices with supply Tax of Item
out (Rs./ (Rs./ be Charges incl. service tax Erection &
Price (Rs./ tax all taxes (Rs.) (Rs./ (Rs.)
item. Unit) Unit) specified (Rs./ service tax (Rs.) all taxes
Unit) (Rs./ (Rs./Unit) (4x11) Unit) (4x17)
Clearly) Unit) (Rs.) (4x15) (Rs./Unit)
Unit) (6+7+8+9+1
(Rs./ Unit) (13+14) (11+15)
0)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

12.65 kV, 1980 kVAr, 3-Phase, 50


C/s, Outdoor Type , Capacitor bank
having two variable step of 792 Kvar
& one Variable steps of 396 kVAr.
1 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bank shall be complete with
Capacitor units of 264/132
kVAr,Aluminium busbars, Pin &
Post insulators, Expulsion fuses etc.

11 kV, Aluminium Wound, Dry


2 0.00 0.00
type Series reactors
a 0.52 kVAr for 792 kVAr step Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
b 0.25 kVAr for 396 kVAr step Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
3 11 kV, 3-Phase Oil-Cooled RVT No. 1 0.00 0.00 0.00 0.00 0.00 0.00
12 kV 3 Phase Outdoor type metal
4 enclosed Vacuum Capacitor Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
switches.
11 kV, 400 Amp, Off Load Isolator
5 with earth switch and mounting No. 1 0.00 0.00 0.00 0.00 0.00 0.00
structure.
9 kV, 10 kA,Station Class, Lightning
6 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Arrestors
7 Indoor Type Automatic Control Unit No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Hot dip galvanised structures for
8 set 1 0.00 0.00 0.00 0.00 0.00 0.00
complete system
Control cables, lugs/thimble,
9 set 1 0.00 0.00 0.00 0.00 0.00 0.00
Junction Box etc.
11 KV XLPE insulated 3x120 mm2
10 Mtr 15 0.00 0.00 0.00 0.00 0.00 0.00
Armoured
Heat Shrinkable Jointing kit for
11 11 kV 3x185 Sq. mm. XLPE 0.00 0.00
Cable
a Indoor temination kit No. 1 0.00 0.00 0.00 0.00 0.00 0.00
b Outdoor temination kit No. 1 0.00 0.00 0.00 0.00 0.00 0.00
11 KV VCB Switchgear with
12 complete arangement for connection No. 1 0.00 0.00 0.00 0.00 0.00 0.00
with existing 11 KV bus bar.
13 Casting of Civil foundation set 1 0.00 0.00 0.00 0.00 0.00 0.00
Cable trench for laying of
14 Rmt. 5 0.00 0.00 0.00 0.00 0.00 0.00
power/control cables.
Earthing for structure and LA's by
15 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
pipe in pipe earthing
Extra for facility management
16
services for 3 yrs.
a Charges for 1st Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
b Charges for 2nd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
c Charges for 3rd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 No. 4, 8, 10, 16, 25, 40, 63 & 100 KVAr Capacitor Bank
4 KVAr fixed type LT Capacitor Bank F-2-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2 KVAr fixed type LT Capacitor
1 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bank
1 KVAr fixed type LT Capacitor
2 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Bank
XLPE Unarmoured Cable 4x6
3 Mtr 20 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm.
4 Extra for facility management
services for 3 yrs.
a Charges for 1st Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
b Charges for 2nd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
c Charges for 3rd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00
8 KVAr fixed type LT Capacitor Bank F-2-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Sl.
Items Unit Qty. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
No.
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
4 KVAr fixed type LT Capacitor
1 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bank
2 KVAr fixed type LT Capacitor
2 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Bank
XLPE Unarmoured Cable 4x6
3 Mtr 20 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm.
Extra for facility management
4 services for 3 yrs.
a Charges for 1st Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
b Charges for 2nd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
c Charges for 3rd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00
12 KVAr fixed type LT Capacitor Bank F-2-c
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Sl.
Items Unit Qty. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
No.
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
5 KVAr fixed type LT Capacitor
1 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bank
2 KVAr fixed type LT Capacitor
2 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Bank
1 KVAr fixed type LT Capacitor
3 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bank
XLPE Unarmoured Cable 4x10
4 Mtr 20 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm.
Extra for facility management
5 services for 3 yrs.
a Charges for 1st Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
b Charges for 2nd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
c Charges for 3rd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00
16 KVAr fixed type LT Capacitor Bank F-2-d
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Sl.
Items Unit Qty. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
No.
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
8 KVAr fixed type LT Capacitor
1 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bank
4 KVAr fixed type LT Capacitor
2 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Bank
XLPE Unarmoured Cable 4x16
3 Mtr 20 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm.
Extra for facility management
4 services for 3 yrs.
a Charges for 1st Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
b Charges for 2nd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
c Charges for 3rd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00
30 KVAr fixed type LT Capacitor Bank F-2-e
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Sl.
Items Unit Qty. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
No.
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
12 KVAr fixed type LT Capacitor
1 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bank
4 KVAr fixed type LT Capacitor
2 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Bank
3 KVAr fixed type LT Capacitor
3 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bank
2 KVAr fixed type LT Capacitor
4 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bank
XLPE Unarmoured Cable 4x25
5 Mtr 20 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm.
Extra for facility management
6 services for 3 yrs.
a Charges for 1st Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
b Charges for 2nd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
c Charges for 3rd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00
50 KVAr fixed type LT Capacitor Bank F-2-f
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Sl.
Items Unit Qty. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
No.
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
20 KVAr fixed type LT Capacitor
1 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bank
5 KVAr fixed type LT Capacitor
2 Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00
Bank
XLPE Unarmoured Cable 4x50
3 Mtr 30 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm.
Extra for facility management
4 services for 3 yrs.
a Charges for 1st Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
b Charges for 2nd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
c Charges for 3rd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00
63 KVAr fixed type LT Capacitor Bank F-2-g
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Sl.
Items Unit Qty. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
No.
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 30 KVAr fixed type LT Capacitor Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bank
2 10 KVAr fixed type LT Capacitor Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00
Bank
3 8 KVAr fixed type LT Capacitor Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bank
4 5 KVAr fixed type LT Capacitor Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bank
5 XLPE Unarmoured Cable 3.5x70 Mtr 30 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm.
6 Extra for facility management
services for 3 yrs.
a Charges for 1st Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
b Charges for 2nd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
c Charges for 3rd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00
100 KVAr fixed type LT Capacitor Bank F-2-h
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Sl.
Items Unit Qty. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
No.
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
50 KVAr fixed type LT Capacitor
1 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bank
20 KVAr fixed type LT Capacitor
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Bank
10 KVAr fixed type LT Capacitor
3 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00
Bank
XLPE Unarmoured Cable 3.5x120
4 Mtr 30 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm.

Extra for facility management


5 services for 3 yrs.

a Charges for 1st Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
b Charges for 2nd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
c Charges for 3rd Year Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Conversion of 1 km of bare LT line to 11 kV HT Line (HVDS)
G-1-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Dismantling of existing conductor,


shackle insulators, Clamps etc. Km.
1 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
from the existing poles and its safe line
carriage to store of the town.

Providing and fixing following


2 0.00
materials
11 KV ‘V’ Type X-arm (M.S.
(i) No. 23 0.00 0.00 0.00 0.00 0.00 0.00
Angle 65x65x6 mm.)
X-Arm holding clamp with bolts
(ii) & nuts made of M.S. strip 50x6 No. 23 0.00 0.00 0.00 0.00 0.00 0.00
mm
(iii) 11 KV Pin Insulator No. 69 0.00 0.00 0.00 0.00 0.00 0.00
(iv) 11 KV Pin with N&B No. 69 0.00 0.00 0.00 0.00 0.00 0.00
(v) F-Bracket with N&B No. 23 0.00 0.00 0.00 0.00 0.00 0.00
(vi) G.I. Barbed Wire Kg. 23 0.00 0.00 0.00 0.00 0.00 0.00
SMC Danger Plate & clamps with
(vii) No. 23 0.00 0.00 0.00 0.00 0.00 0.00
N&B
Making 11 kV Single Section
3 0.00 0.00
Pole
M.S. channel 100x50x6 mm, 1500
(i) No. 2 0.00 0.00 0.00 0.00 0.00 0.00
mm long
Clamp with N&B for channel
(ii) No. 2 0.00 0.00 0.00 0.00 0.00 0.00
made of M.S. strip of 50x6 mm
(iii) G.I. Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00
SMC Danger Plate & Clamps with
(iv) No. 2 0.00 0.00 0.00 0.00 0.00 0.00
bolts & nuts
11 KV Disc insulators B & S type
(v) No. 12 0.00 0.00 0.00 0.00 0.00 0.00
(45 KN)
11 KV Disc fitting B & S type (45
(vi) No. 12 0.00 0.00 0.00 0.00 0.00 0.00
KN)
(vii) 11 KV Pin Insulator No. 6 0.00 0.00 0.00 0.00 0.00 0.00
(viii) 11 KV Pin with N&B No. 6 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
4 rod of 20x2500 mm. and 6 SWG No. 25 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.

5 Stay Complete (as per Annex 27) No. 20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Repairing of repairable damaged


poles by welding 4 nos. M.S.
Angle Iron 50x50x6 m 700 mm
6 long pieces to strengthen the Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00
bottom and making its plinth 300
mm above ground level including
plastering, muffing and coping.
Laying spreading and final
sagging of ACSR Conductor in
accordance with profile and sag
7 Km 3.09 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
chart, including, binding,
jumpering and fixing of all
accessories.
Guarding of Line (as per Annex
8 km 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
28)
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Distribution T/F & above 25 kVA Metering System
For 400 kVA DT H-1-a-v
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Resin cast ring type outdoor LT CTs


for installation on transformer with
1 requisite fixture and cable with 5 VA
burden 0.5 class accuracy with all
fittings and meter box as below:-

Set of 4 CTs of 800/5 A (for 400


a Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
kVA DT)
SMC meter box for installation of
b meter and modem (for new Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Transformers)
DLMS type meter (As per
2 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
specification)
3 AMR Modem No. 1 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00

For 250 kVA DT H-1-a-iv


Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
3 Ph 4 Wire LT CT Metering Cubicle
(SMC) for installation of CTs, Meter
1 and Modem along with set of 4 CTs Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
of 800/5 A for metering of 250 kVA
DT
Set of 4 CTs of 600/5 A (for 250
2 Set 1 0.00 0.00 0.00 0.00 0.00 0.00
kVA DT)
DLMS type meter (As per
3 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
specification)
4 AMR Modem No. 1 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
For 100/160 kVA DT H-1-a-iii
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
3 Ph 4 Wire LT CT Metering Cubicle
(SMC) for installation of CTs, Meter
1 and Modem along with set of 4 CTs Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
of 400/5 A for metering of 100 &
160 kVA DT
Set of 4 CTs of 400/5 A (for 100/160
2 Set 1 0.00 0.00 0.00 0.00 0.00 0.00
kVA DT)
DLMS type meter (As per
3 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
specification)
4 AMR Modem No. 1 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00

For 63 kVA DT H-1-a-ii


Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
3 Ph 4 Wire LT CT Metering Cubicle
(SMC) for installation of CTs, Meter
1 and Modem along with set of 4 CTs Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
of 200/5 A for metering of 63 kVA
DT
Set of 4 CTs of 200/5 A (for 63 kVA
2 Set 1 0.00 0.00 0.00 0.00 0.00 0.00
DT)
DLMS type meter (As per
3 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
specification)
4 AMR Modem No. 1 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
For 25 kVA DT H-1-a-i
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
3 Ph 4 Wire LT CT Metering Cubicle
(SMC) for installation of CTs, Meter
1 and Modem along with set of 4 CTs Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
of 100/5 A for metering of 25 kVA
DT

Set of 4 CTs of 100/5 A (for 25 kVA


2 Set 1 0.00 0.00 0.00 0.00 0.00 0.00
DT)
DLMS type meter (As per
3 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
specification)
4 AMR Modem No. 1 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
For 16 & 10 kVA 1 Ph. DT (in group of Transformer at 11 KV side) H-1-a-j
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

11 KV 3 Ph 4 Wire Combined
outdoor pole mounted CT-PT
Metering Unit with meter box
1 suitable to house energy meter with Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
modem in following CT ratio of 5/5
A for metering of 16 & 10 1 Ph. kVA
DT

Set of 4 CTs of 100/5 A (for 25 kVA


2 Set 1 0.00 0.00 0.00 0.00 0.00 0.00
DT)
DLMS type meter (As per
3 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
specification)
4 AMR Modem No. 1 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Street Light Automation and Metering System
H-1-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Automation ON/OFF Circuit
1 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Breaker Switch
Electronic Meter 1 Phase 20-80
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
amp with SMC Meter Box
3 Extra cost for cable L.S. 1 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 Phase Consumer Meter
H-1-c-i
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value of Remarks
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Electronic KWH Meter 1PX2W Nos. 1
5-20A/10-60A with Box 0.00 0.00 0.00 0.00 0.00 0.00

Total 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.

Cost of 3 Phase Consumer Meter


H-1-c-ii
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value of Remarks
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Electronic KWH Meter 3PX4W Nos. 1
CTR 3X-/5A with Box 0.00 0.00 0.00 0.00 0.00 0.00

Total 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Price Schedule for Installation of AMR 3 Phase Consumer Meter above 25 KW load
H-1-c-iii
For Supply For Erection Total

Specify, Other Unit Total Total Unit


direct or Unit F & Total Unit
Sl. Taxes & Unit Erection value of prices incl.
Items Unit Qty. bought Unit Ex- E.D. S.T. duties (to I charges FOR Dest. Total value Erection Service Charges Erection Supply, F&I, Total Value of Remarks
No. Work incl. any Supply Prices of supply Tax Item
out (Rs./ (Rs./ be Charges incl. incl. Erection &
item. Price (Rs./ Unit) Unit) specified tax with all taxes (Rs.)
(Rs./
(Rs./
service tax service tax all taxes
(Rs.)
Unit) (Rs./ (Rs./Unit) (4x11) Unit) (4x17)
Clearly) Unit) (Rs.) (Rs.) (Rs./Unit)
Unit) (6+7+8+9+10)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Electronic KWH Trivector Meter


1 Nos. 1 B.O. 0.00 0.00 0.00 0.00 0.00 0.00
3PX4W CTR -/5A with Box

LT CT Metering Cubicle wirh 4


2 Nos. 1 B.O. 0.00 0.00 0.00 0.00 0.00 0.00
CTs of suitable ratio as per load

3 Carriage and Installation Charges Nos. 1 B.O. NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 No. Mobile Service Centre
I-1-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total value Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection of Erection prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges incl. service Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) Unit) incl. tax Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) service tax (Rs.) all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (4x15) (Rs./Unit)
(Rs./ Unit) (13+14) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Mini truck with cabin
1 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
(Tata/Mazda/DCM)
Motorised ladder with mounting
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
arrangement etc.
3 Computer and printer Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

4 Hand held billing machine Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00

5 Maintenance tool kit Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

6 Safety equipment kit Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

7 Wireless phone Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

8 Battery set with charger Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 No. 400 KVA, 11/0.4 kV trolly mounted mobile Sub-Station
J-1-a
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work Price (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out (Rs./ Unit) Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Portable trolly Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

2 Transformer 400 KVA, 11/0.4 kV Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

Mounting arrangement for


3 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
transformer fuse set and isolator

4 11 kV isolator Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00

5 11 kV fuse set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00


Fixing Arrangement of T/f on
6 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
trolly
XLPE/PVC insulated 1x50 Sq. mm.
7 Al. cable
Mtr. 45 0.00 0.00 0.00 0.00 0.00 0.00

LT Aluminium unarmoured
8 Mtr. 80 0.00 0.00 0.00 0.00 0.00 0.00
XLPE/PVC Cable 1X400 Sq.mm.

Total 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 No. 250 KVA trolly mounted mobile Sub-Station
J-1-b
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Portable trolly Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
2 Transformer 250 KVA Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Mounting arrangement for
3 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
transformer fuse set and isolator
4 11kV isolator Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
5 11KV fuse set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
Fixing Arrangement of T/f on
6 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
trolly
XLPE/PVC insulated 1x50 Sq. mm.
7 Al. cable
Mtr. 45 0.00 0.00 0.00 0.00 0.00 0.00

LT Aluminium unarmoured
8 Mtr. 80 0.00 0.00 0.00 0.00 0.00 0.00
XLPE/PVC Cable 1X400 Sq.mm.
Total 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost Schedule of Meter Pillar Box
J-1-c
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Supply and installation of SMC
1 Meter Pillar Boxes (for 6 meters) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
with clamps on STP/PCC poles
Fixing of meters (old/new) in meter
2
pillar boxes
a Single Phase Nos. 5 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
b Three Phase Nos. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Dismantelling of old meters
3 including service cable from the 0.00 0.00 0.00 0.00 0.00 0.00
premises of the consumers
a Single Phase Nos. 4 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
b Three Phase Nos. 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
Supply and laying of incoming LT
4 PVC unarmoures cable 3.5x35 Mtr 5 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm. upto Meter Pillar Boxes
Supply and laying of service cable
5 (Old/New) after the meter upto the
consumer premises
Single Phase two wire LT
a unarmoured PVC cable (2x4 Mtr 75 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm.)
Single Phase two wire LT
b unarmoured PVC cable (2x6 Mtr 50 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm.)

Three Phase two wire LT


c unarmoured PVC cable (4x6 Mtr 7.5 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm.)
Three Phase two wire LT
d unarmoured PVC cable (4x10 Mtr 5 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm.)
Total 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 No. LT Protection Unit on existing Distribution Sub-station
For 400 KVA T/F J-1-d-1
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
SMC L.T. Distribution Pillar box
with one incomer and 3 sets of 300
1 Amps Kit Kat rewireable type fuse No. 1 0.00 0.00 0.00 0.00 0.00 0.00
unit for outgoing circuits complete,
connected on 800A bus bar.
Total 0.00 0.00 0.00

For 250 KVA T/F J-1-d-2


Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Sl. Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
Items Unit Qty.
No. (Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

SMC L.T. Distribution Pillar box


with one incomer and 3 sets of 300
1 Amps Kit Kat rewireable type fuse No. 1 0.00 0.00 0.00 0.00 0.00 0.00
unit for outgoing circuits complete,
connected on 800A bus bar.

Total 0.00 0.00 0.00


For 160 & 100 KVA T/F J-1-d-3
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

SMC L.T. Distribution Pillar box


with one incomer and 2 sets of 200
Amps Kit Kat rewireable fuse unit
1 for outgoing circuits complete, No. 1 0.00 0.00 0.00 0.00 0.00 0.00
connected on 500A bus bar for 100
& 160 KVA distribution transformer
on double pole

Total 0.00 0.00 0.00

For 63 KVA T/F J-1-d-4


Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

SMC L.T. Distribution Pillar box


with one incomer and 2 sets of 100
Amps Kit Kat rewireable type fuse
1 unit for outgoing circuits complete, No. 1 0.00 0.00 0.00 0.00 0.00 0.00
connected on 300A bus bar for 63
KVA distribution transformer on
double pole

Total 0.00 0.00 0.00

Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Replacement of old/used LT Lead/Cable of existing Transformer
FOR 25 KVA J-1-e-1
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
LT XLPE 1x35 Sq. mm. cable for
1 Mtr. 40 0.00 0.0 0.00 0.00 0.00 0.00
25 KVA Distribution T/F
Dismanteling of old cable &
2 Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.0 0.00 0.00 0.00 0.00
cartage it to nearest store
TOTAL 0.0 0.0 0.0

FOR 63 KVA J-1-e-2


Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Sl.
Items Unit Qty. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
No.
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
LT XLPE 1x70 Sq. mm. cable for
1 63 KVA Distribution T/F (for I/C Mtr. 200 0.00 0.0 0.00 0.00 0.00 0.00
& O/G Distributor)
Dismanteling of old cable &
2 Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.0 0.00 0.00 0.00 0.00
cartage it to nearest store
TOTAL 0.0 0.0 0.0
FOR 100 KVA J-1-e-3
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Sl.
Items Unit Qty. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
No.
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
LT XLPE 1x120 Sq. mm. cable
1 for 100 KVA Distribution T/F for Mtr. 40 0.00 0.0 0.00 0.00 0.00 0.00
I/C
LT XLPE 1x70 Sq. mm. cable for
2 100 KVA Distribution T/F for Mtr. 160 0.00 0.0 0.00 0.00 0.00 0.00
O/G
Dismanteling of old cable &
3 Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.0 0.00 0.00 0.00 0.00
cartage it to nearest store
TOTAL 0.0 0.0 0.0

FOR 160 KVA J-1-e-4


Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Sl.
Items Unit Qty. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
No.
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
LT XLPE 1X240 Sq. mm. cable
1 Mtr. 40 0.00 0.0 0.00 0.00 0.00 0.00
for I/C
LT XLPE 1X120 Sq. mm. cable
2 Mtr. 160 0.00 0.0 0.00 0.00 0.00 0.00
for O/G
Dismanteling of old cable &
3 Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.0 0.00 0.00 0.00 0.00
cartage it to nearest store
TOTAL 0.0 0.0 0.0
FOR 250 KVA J-1-e-5
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Sl. Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
Items Unit Qty.
No. (Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
LT XLPE 1X400 Sq. mm. cable
1 Mtr. 40 0.00 0.00 0.00 0.00 0.00 0.00
for I/C
LT XLPE 1X120 Sq. mm. cable
2 Mtr. 240 0.00 0.00 0.00 0.00 0.00 0.00
for O/G
Dismanteling of old cable &
3 Job 1 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
cartage it to nearest store
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of extra outgoing 11 kV XLPE cable
J-1-f
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11 kV 3x185 Sq. mm. XLPE
1 Mtr. 80 0.00 0.00 0.00 0.00 0.00 0.00
Cable
Heat Shrinkable Jointing kit for
2 11 kV 3x185 Sq. mm. XLPE
Cable
a Indoor temination kit No. 1 0.00 0.00 0.00 0.00 0.00 0.00
b Outdoor temination kit No. 1 0.00 0.00 0.00 0.00 0.00 0.00
3 Cable laying Charges Mtr. 80 NTQ NTQ NTQ NTQ NTQ NTQ 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 No. 11 kV 3 Way Ring Main Unit
J-1-g
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Cost of 3 Way RMU with One
incomer and two outgoing and one
1 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
breaker for transformer complete
in all respect.

2 11 kV XLPE 3X185 Sq mm Cable Mtr 80 0.00 0.00 0.00 0.00 0.00 0.00

Heat Shrinkable jointing kit


3 suitable for 11kV XLPE 3x185
Sq.mm. cable size Outdoor
a Outdoor Termination No. 3 0.00 0.00 0.00 0.00 0.00 0.00
b Indoor Termination No. 3 0.00 0.00 0.00 0.00 0.00 0.00
4 Fencing (As per Specification) Mtr 12 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 No. 11 kV 4 Way Ring Main Unit
J-1-g-1
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Cost of 4Way RMU with two
incomer and two outgoing and one
1 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
breaker for transformer complete
in all respect.

2 11 kV XLPE 3X185 Sq mm Cable Mtr 160 0.00 0.00 0.00 0.00 0.00 0.00

Heat Shrinkable jointing kit


3 suitable for 11kV XLPE 3x185
Sq.mm. cable size Outdoor
a Outdoor Termination No. 6 0.00 0.00 0.00 0.00 0.00 0.00
b Indoor Termination No. 6 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 No. 11 kV Fault Passage Indicator(FPI)
J_1_g (1)
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Cost of FPI No. 1 0.00 0.00 0.00 0.00 0.00 0.00

2 11 kV XLPE 3X185 Sq mm Cable Mtr 80 0.00 0.00 0.00 0.00 0.00 0.00

Heat Shrinkable jointing kit


3 suitable for 11kV XLPE 3x185
Sq.mm. cable size Outdoor
a Outdoor Termination No. 3 0.00 0.00 0.00 0.00 0.00 0.00
b Indoor Termination No. 3 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 1 No. 33 kV 3 Way Ring Main Unit
J-1-g
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Cost of 3 Way RMU with One
incomer and two outgoing and one
1 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
breaker for transformer complete
in all respect.

2 33 kV XLPE 3X300 Sq mm Cable Mtr 80 0.00 0.00 0.00 0.00 0.00 0.00

Heat Shrinkable jointing kit


3 suitable for 33kV XLPE 3x300
Sq.mm. cable size Outdoor
a Outdoor Termination No. 3 0.00 0.00 0.00 0.00 0.00 0.00
b Indoor Termination No. 3 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Strengthening of existing 11 KV feeders for 1 km
J-1-h
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Straightening of tilted Poles (PCC
1 No. 2 0.00 0.00 0.00 0.00 0.00 0.00
or STP)

Supply & Erection of 8.5 Mtr.


long PCC Poles, including fixing
pole accessories insulators, clamps
2 No. 0.5 0.00 0.00 0.00 0.00 0.00 0.00
etc. for new line as well as
replacement of old damaged
poles.

Supply & Erection of 9 Mtr. long


PCC Poles, including fixing pole
accessories insulators, clamps etc.
3 No. 0.5 0.00 0.00 0.00 0.00 0.00 0.00
for new line as well as
replacement of old damaged
poles.
Supply & Erection of 9 Mtr. long
STP, including fixing pole
accessories insulators, clamps etc.
4 No. 0.5 0.00 0.00 0.00 0.00 0.00 0.00
for new line as well as
replacement of old damaged
poles.
Supply & Erection of 11 Mtr. long
STP, including fixing pole
accessories insulators, clamps etc.
5 No. 0.5 0.00 0.00 0.00 0.00 0.00 0.00
for new line as well as
replacement of old damaged
poles.

Tightening and re-sagging of


Km.
ACSR conductors in accordance
6 (Single 1 0.00 0.00 0.00 0.00 0.00 0.00
with profile and sag chart,
Wire)
including, binding, jumpering etc.
Cost of Strengthening of existing 11 KV feeders for 1 km
J-1-h
Km.
Replacement of wornout/damaged
7 (Single 0.1 0.00 0.00 0.00 0.00 0.00 0.00
conductor.
Wire)
Stringing and sagging of G.I. Wire
Km.
6 SWG inclulding all accessories
8 (Single 0.2 0.00 0.00 0.00 0.00 0.00 0.00
where conductor is being
Wire)
replaced.

9 Stay Complete (as per Annex-27) No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Earthing of pole by MS earthing


10 rod of 20x2500 mm. and 6 SWG No. 2 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Guarding Complete (as per Annex
11 Km. 0.1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
28)
Supply and replacement of
12 wornout/damaged following
material
a ACSR Dog Km. 0.05 0.00 0.00 0.00 0.00 0.00 0.00
b ACSR Raccoon Km. 0.02 0.00 0.00 0.00 0.00 0.00 0.00
c ACSR Rabbit Km. 0.02 0.00 0.00 0.00 0.00 0.00 0.00
d ACSR Weasel Km. 0.01 0.00 0.00 0.00 0.00 0.00 0.00
11 kV Disc Insulator B&S type 70
e No. 3 0.00 0.00 0.00 0.00 0.00 0.00
KN
11 kV Disc Fittings B&S type 70
f No. 3 0.00 0.00 0.00 0.00 0.00 0.00
KN
11 kV Disc Insulator T&C type 45
g No. 3 0.00 0.00 0.00 0.00 0.00 0.00
KN
11 kV Disc Fittings T&C type 45
h No. 3 0.00 0.00 0.00 0.00 0.00 0.00
KN
Cost of Strengthening of existing 11 KV feeders for 1 km
J-1-h
i 11KV Pin Insulator No. 6 0.00 0.00 0.00 0.00 0.00 0.00
j 11 kV Pin with N&B No. 6 0.00 0.00 0.00 0.00 0.00 0.00
i `F' Bracket with nuts & bolts No. 3 0.00 0.00 0.00 0.00 0.00 0.00
j E' Bracket with nuts & bolts No. 3 0.00 0.00 0.00 0.00 0.00 0.00
11KV `V' type Cross arm 100x50
k Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00
mm, M.S. Channel (7.9 Kg./M)
l G.I Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of Material of Welding and plinthing of rusted damaged ST Poles
J-1-i
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Repairing of repairable
damaged/rusted poles at site by
welding 4 Nos. M.S. Angle iron
50x50x6 mm. long pieces to
strengthen the bottom of rotten poles,
1 after digging 500mm deep around the No. 1 0.00 0.00 0.00 0.00 0.00 0.00
pole and holding the pole vertically
upright and then filling soil, grouting
and making plinth 300mm above
ground level in cc ratio 1:4:8
including muffing and coping.

TOTAL 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Renovation & Modernization of Existing DTs (as per quantities specified in DPR)
K-1
Specify, For Supply For Erection Total
direct or Unit Ex- E.D. S.T. Other Unit F & Total Unit Total value Unit Service Unit Total Total Unit Total Value
bought Work (Rs./ (Rs./ Taxes & I charges FOR Dest. of supply Erection Tax Erection value of prices incl. of Item
out Price (Rs./ Unit) Unit) duties (to incl. any Supply Prices (Rs.) Charges (Rs./ Charges Erection Supply, F&I, (Rs.)
Sl. item. Unit) be tax with all taxes (4x11) (Rs./ Unit) incl. incl. Erection & (4x17)
Items Unit Qty.
No. specified (Rs./ (Rs./Unit) Unit) service tax service tax all taxes
Clearly) Unit) (6+7+8+9+10) (Rs.) (Rs.) (Rs./Unit)
(Rs./ Unit) (13+14) (4x15) (11+15)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Reconditioning of following rating
11/0.4 KV Transformer and
1
installation of Distribution box for
LT Protection
a 1000 KVA No. 1 0.00 0.00 0.00 0.00 0.00 0.00
b 630 KVA No. 1 0.00 0.00 0.00 0.00 0.00 0.00
c 400 KVA No. 1 0.00 0.00 0.00 0.00 0.00 0.00
d 250 KVA No. 1 0.00 0.00 0.00 0.00 0.00 0.00
e 160 KVA No. 1 0.00 0.00 0.00 0.00 0.00 0.00
f 100 KVA No. 1 0.00 0.00 0.00 0.00 0.00 0.00
g 63 KVA No. 1 0.00 0.00 0.00 0.00 0.00 0.00
h 25 KVA No. 1 0.00 0.00 0.00 0.00 0.00 0.00
i 16 KVA No. 1 0.00 0.00 0.00 0.00 0.00 0.00
j 10 KVA No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Total DT
Copper L-Piece of size 400x50x6
2 mm for LT Bushing Rod of No. 1 0.00 0.00 0.00 0.00 0.00 0.00
transformer
3 11KV TPMO No. 1 0.00 0.00 0.00 0.00 0.00 0.00
4 11 KV Fuse Set No. 1 0.00 0.00 0.00 0.00 0.00 0.00
5 Lightning arrestor 11 KV No. 1 0.00 0.00 0.00 0.00 0.00 0.00
MS Channel 100X50X2028mm
6 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
(Dropper for fuse set)
Holding clamps for top channel,
7 TPMO & fuse set etc. with bolts & No. 1 0.00 0.00 0.00 0.00 0.00 0.00
nuts
Renovation & Modernization of Existing DTs (as per quantities specified in DPR)
K-1
Filling of transformer oil in DT (Av.
8 Ltrs. 1 0.00 0.00 0.00 0.00 0.00 0.00
20 Ltrs. Per DT)
Repairing of Plinth of transformer
9 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
(250 kVA and above)
10 Painting of DP structure Job 1 0.00 0.00 0.00 0.00 0.00 0.00
11 Repairing of fencing No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing rod
12 of 20x2500 mm. and 6 SWG earthing No. 1 0.00 0.00 0.00 0.00 0.00 0.00
wire etc.
Repairing of Plinth/Grounting of
13 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Poles/ Support
14 G.I. Barbed wire Kg. 1 0.00 0.00 0.00 0.00 0.00 0.00
11 kV Danger board with clamp with
15 N&B No. 1 0.00 0.00 0.00 0.00 0.00 0.00

11 kV Stay complete (As per Annex


16 No. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
27)
LT Aluminium unarmoured XLPE
17 Single Core Cable of following 1
size:-
a 1x630 Sq.mm. Mtr. 1 0.00 0.00 0.00 0.00 0.00 0.00
b 1x400 Sq.mm. Mtr. 1 0.00 0.00 0.00 0.00 0.00 0.00
c 1x240 Sq.mm. Mtr. 1 0.00 0.00 0.00 0.00 0.00 0.00
d 1x120 Sq.mm. Mtr. 1 0.00 0.00 0.00 0.00 0.00 0.00
e 1x70 Sq.mm. Mtr. 1 0.00 0.00 0.00 0.00 0.00 0.00
f 1x50 Sq.mm. Mtr. 1 0.00 0.00 0.00 0.00 0.00 0.00

LT Aluminium unarmoured XLPE


18 1 Core Cable of following size for 1
outgoing feeders:-

a 1x240 Sq.mm. Mtr. 1 0.00 0.00 0.00 0.00 0.00 0.00


b 1x120 Sq.mm. Mtr. 1 0.00 0.00 0.00 0.00 0.00 0.00
c 1x95 Sq.mm. Mtr. 1 0.00 0.00 0.00 0.00 0.00 0.00
d 1x70 Sq.mm. Mtr. 1 0.00 0.00 0.00 0.00 0.00 0.00
ACSR Weasel conductor for
19 Mtr. 1 0.00 0.00 0.00 0.00 0.00 0.00
jumpering
LS
Extra for Al. tape , binding wire,
20 (Per 1 0.00 0.00 0.00 0.00 0.00 0.00
jointing sleeves, PG clamps etc.
t/f)
Al. crimping lugs LS
21 (630/400/240/120/95/70/50/35) (Per 1 0.00 0.00 0.00 0.00 0.00 0.00
sq.mm. t/f)
Transformer Earthing (Chemical
22 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Pipe Earthing)
Renovation & Modernization of Existing DTs (as per quantities specified in DPR)
K-1
11 kV LA Earthing (Chemical Pipe
23 No. 1 0.00 0.00 0.00 0.00 0.00 0.00
Earthing)
Coversion of PILCA cable into
24 Mtr. 1 0.00 0.00 0.00 0.00 0.00 0.00
XLPE Cable.
TOTAL 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 10.
3 Bidder shall quote Unit handling, erection & commissioning charges/labour charges including road cutting charges etc if applicable in colomn 13.
Cost of 33kV Single Support on 11 Mtr. Long Steel Tubular Pole (SP 55) including fittings.
Annex-1
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl. bought (Rs.) (Rs.)
Items Unit Qty. out
No.
item. Per Unit Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
(4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 ST Pole 11 Mtr. SP-55 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
X-Arm Channel 100x50x6 mm V-
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
type
X-Arm holding Clamp (Back
3 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Clamp) with bolts & nuts
4 F bracket for 33kV Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 33KV Pin Insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 33 kV Pin with Nut No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Armour Rod with Ferrule for
7 Sets. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ACSR Dog Helical performed
8 Stone pad (300x300x75 mm) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 kV SMC Number plate with
9 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
33 kV SMC Danger board with
10 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
11 G.I. Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

12 Alluminium Binding wire-6 SWG Kg. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

13 Alluminium paint Ltrs. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 Red Oxide paint Ltrs. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
15 rod of 20x2500 mm. and 6 SWG Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
16 No. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.44 Cu.m. each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of 33KV Sectional Double Pole Structure with 11 Meter Long Steel Tubular Pole (SP 55)
Annex-2
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl.
or Clearly) (Rs.) (Rs.) all taxes
Sl.
Items Unit Qty. bought (Rs.) (Rs.)
No.
out
item. Per Unit Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
(4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 ST Pole 11 Mtr. SP-55 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Stone pad (300x300x75 mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

M.S. Angle Iron 65x65x6mm,


3 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4300 mm long bracing with clamp
M.S. Top Channel 125x65mm,
4 3200 mm (10.7kg/mt) with clamp, Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bolts, nuts and washers
11KV Disc. Insulators B&S type
5 Nos. 24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70 KN
11 kV Disc. Fittings B&S type for
6 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dog/Raccoon 70 KN
7 33 kV Pin Insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 33 kV Pin with Nut No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 P.G. Clamp for Dog Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 E Bracket for 33 KV Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 kV SMC Number plate with
11 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
33 kV SMC Danger board with
12 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
13 G.I. Barbed wire Kg. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

14 Alluminium Binding wire-6 SWG Kg. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

15 Alluminium paint Ltrs. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16 Red Oxide paints Ltrs. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 KV Stay set complete (as per
17 Nos. 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-10)
Earthing of pole by MS earthing
18 rod of 20x2500 mm. and 6 SWG Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
19 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.44 Cu.m. each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of 33KV Four Pole Structure with 11 Meter Long Steel Tubular Pole (SP 55)
Annex-3
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl. bought (Rs.) (Rs.)
Items Unit Qty. out
No.
item.
Per Unit Total (4x6) Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 ST Pole 11 Mtr. SP-55 Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Stone pad (300x300x75 mm) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Angle Iron 65x65x6mm,
3 4300 mm long bracing with 4 Nos. 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp
M.S. Top Channel 125x65mm,
4 3200 mm (10.7kg/mt) with clamp, Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bolts, nuts and washers
M.S. Top Channel 125x65mm,
5 2600 mm (10.7kg/mt) with clamp, Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bolts, nuts and washers
11KV Disc. Insulators B&S type
6 Nos. 24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70 KN
11 kV Disc. Fittings B&S type for
7 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dog/Raccoon 70 KN
8 33KV Pin Insulator Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 33 kV Pin with Nut No. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 P.G. Clamp for Dog Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 E Bracket for 33 KV Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 kV SMC Number plate with
12 Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
33 kV SMC Danger board with
13 Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
14 G.I. Barbed wire Kg. 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15 Alluminium Binding wire-6 SWG Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16 Alluminium paint Ltrs. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17 Red Oxide paints Ltrs. 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 KV Stay set complete (as per
18 Nos. 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-10)
Earthing of pole by MS earthing
19 rod of 20x2500 mm. and 6 SWG Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
20 Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.44 Cu.m. each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of 33KV Single Support on 13 Mtr. Long Steel Tubular Pole (SP 72) including fittings
Annex-4
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Charges Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes (Rs.) Supply Prices incl. all
or Clearly) (Rs.) taxes
Sl. bought (Rs.) (Rs.)
Items Unit Qty. out
No.
item.
Per Unit Total Per Total Per Total Per Total Per Unit Total Per Unit Total Per Unit Total
(4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
ST Pole 13 Mtr. Long IS 410 (SP
1 72) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

125x65 mm channel suspension


2 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
cross arm
Packaging piece and clamps for
3 125x65 mm Channel Suspension Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
with bolts and nuts
11 kV Disc Insulator B&S type 70
4 No. 9 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KN
11 kV Suspension fittings for
5 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Panther 70 KN

Armour rod with ferrules for


6 Set 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ACSR Panther Helical Performed

7 Stone pad (300x300x75 mm) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 kV SMC Number plate with
8 clamp with N&B Nos 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

33 kV SMC Danger board with


9 clamp with N&B Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

10 G.I. Barbed wire kg 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 Red Oxide paint Ltrs 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12 Aluminium Paint Ltrs 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13 Aluminium binding wire-6 SWG kg 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
14 rod of 20x2500 mm. and 6 SWG Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
15 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.64 Cu.m. each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of 33KV Sectional Double Pole Structure with 13 Mtr. Long Steel Tubular Pole (SP 72)
Annex-5
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl.
Items Unit Qty. bought (Rs.) (Rs.)
No. out
item. Per Unit Total Per Total Per Total Per Total Per Unit Total Per Unit Total Per Unit Total
(4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 STP 13 Mtr. Long IS 410 (SP 72) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Angle Iron 65x65x6 mm,
2 4300 mm long bracing with 4 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp
M.S. Top Channel 125x65mm,
3 3200 mm (10.7kg/mt) with clamp, Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bolts, nuts and washers
4 Stone pad (300x300x75 mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV disc insulators B&S type 70
5 Nos. 24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KN
6 Tension fitting for "Panther" Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 33 kV Pin insulators Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 33 kV Pin with Nut No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 PG clamps for "Panther" Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 E bracket for 33 kV Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 kV SMC Number plate with
11 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
33 kV SMC Danger board with
12 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
13 G.I. Barbed wire kg 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 Aluminium tape kg 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15 Aluminium paint Ltrs 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16 Red Oxide paint Ltrs 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Concreting of supports with plinth
17 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.64 Cu.m. each)
Earthing of pole by MS earthing
18 rod of 20x2500 mm. and 6 SWG Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
33 KV Stay set complete (as per
19 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-10)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of 33KV Four Pole Structure with 13 Mtr. Long Steel Tubular Pole (SP 72)
Annex-6
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Charges Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes (Rs.) Supply Prices incl. all
or Clearly) (Rs.) taxes
bought (Rs.) (Rs.)
Sl. out
Items Unit Qty.
No. item.

Per Unit Total Per Total Per Total Per Total Per Unit Total Per Unit Total Per Unit Total
(4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 STP 13 Mtr. Long IS 410 (SP 72) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Angle Iron 65x65x6 mm,
2 4300 mm long bracing with 4 Nos. 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp
Top Channel 125x65mm, 3200 mm
3 (10.7kg/mt) with clamp, bolts, nuts Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
and washers
Top Channel 125x65mm, 2440 mm
4 (10.7kg/mt) with clamp, bolts, nuts Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
and washers
5 Stone pad (300x300x75 mm) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV disc insulators B&S type 70
6 Nos. 24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KN
7 Tension fitting for "Panther" Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 33 kV Pin insulator Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 33 kV Pin with Nut No. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 PG clamps for "Panther" Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 E bracket for 33 kV Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 kV SMC Number plate with
12 Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
33 kV SMC Danger board with
13 Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
14 G.I. Barbed wire kg 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15 Aluminium tape kg 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16 Aluminium paint Ltrs 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17 Red Oxide paint Ltrs 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Concreting of supports with plinth
18 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.64 Cu.m. each)
Earthing of pole by MS earthing
19 rod of 20x2500 mm. and 6 SWG Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
33 kV Stay set Complete (as Per
20 Nos. 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-10)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
1382.4
Cost of 33KV Single Support on 9 Mtr. PCC Pole including fittings.
Annex-7
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
bought (Rs.) (Rs.)
Sl. out
Items Unit Qty. item.
No.
Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
12)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 PCC Pole, 9.0 Mtr. Long Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
X-arm channel 100x50x6 mm , V-
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
type
X-arm holding Clamp (Back
3 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Clamp) with bolts & nuts
F-bracket with nuts, bolts &
4 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
washers
5 33KV Pin Insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 33 kV Pin with Nut No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Armour Rod with Ferrule for
7 Sets. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ACSR Dog Helical performed
8 Stone pad (300x300x75 mm) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 kV SMC Number plate with
9 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
33 kV SMC Danger board with
10 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
11 G.I. Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12 Alluminium Binding wire Kg. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
13 rod of 20x2500 mm. and 6 SWG Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
14 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.286 Cu.m. each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of 33KV Sectional Double Pole Structure with 9 Mtr. PCC Pole
Annex-8
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl. bought (Rs.) (Rs.)
Items Unit Qty. out
No.
item.
Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 PCC Pole, 9.0 Mtr. Long Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Angle Iron 65x65x6mm,
2 4300 mm long bracing with 4 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp
Top Channel 125x65mm, 3200 mm
3 (10.7kg/mt) with clamp, bolts, nuts Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
and washers
4 Stone pad (300x300x75 mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV Disc. Insulators B&S type
5 Nos. 24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70 KN
11 kV Disc. Fittings B&S type for
6 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dog/Raccoon 70 KN
7 33KV Pin Insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 33 kV Pin with Nut No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 P.G. Clamp for Dog Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 33 kV E-Bracket Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 kV SMC Number plate with
11 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
33 kV SMC Danger board with
12 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
13 G.I. Barbed wire Kg. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 Alluminium Tape Kg. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 kV Stay set complete (as per
15 Nos. 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-10)
Earthing of pole by MS earthing
16 rod of 20x2500 mm. and 6 SWG Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports (0.286
17 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cu.m. each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of 33KV Four Pole Structure with 9 Mtr. PCC Pole
Annex-9
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl.
Items Unit Qty. bought (Rs.) (Rs.)
No. out
item. Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 PCC Pole, 9.0 Mtr. Long Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Angle Iron 65x65x6 mm,
2 4300 mm long bracing with 4 Nos. 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp
Top Channel 125x65mm, 3200 mm
3 (10.7kg/mt) with clamp, bolts, nuts Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
and washers
Top Channel 125x65mm, 2440 mm
4 (10.7kg/mt) with clamp, bolts, nuts Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
and washers
5 Stone pad (300x300x75 mm) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV Disc. Insulators B&S type
6 Nos. 24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70 KN
11 kV Disc. Fittings B&S type for
7 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dog/Raccoon 70 KN
8 33KV Pin Insulator Nos. 9 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 33 kV Pin with Nut No. 9 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 P.G. Clamp for Dog Nos. 12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 E Bracket for 33 KV Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 kV SMC Number plate with
12 Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
33 kV SMC Danger board with
13 Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
14 G.I. Barbed wire Kg. 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15 Alluminium Tape Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 kV Stay set complete (as per
17 Nos. 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-10)
Earthing of pole by MS earthing
18 rod of 20x2500 mm. and 6 SWG Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports (0.286
19 Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cu.m. each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of 33 KV Stay
Annex-10
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
bought (Rs.) (Rs.)
Sl. out
Items Unit Qty. item.
No.
Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
12)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 33 kV G.I. Stay Rod 20X1800 mm. No. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2 Stay Wire 7/8 SWG Kg. 10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Stay Clamp Set 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Bolt, Nut and Washers Kg. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 Grouting with concrete Job 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of Material for Guarding of 33KV Line for 1 km
Annex-11
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
bought (Rs.) (Rs.)
Sl. out
Items Unit Qty. item.
No.
Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
12)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Guarding angle 75x75x6 mm, 2200


1 mm long with holding clamp, No. 17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
packing piece, nut & bolts etc.

2 G.I. Wire 6 SWG along the span Kg. 330 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

G.I. Wire No. 8 SWG accross the


3 Kg. 110 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
span
4 Turn Buckle No. 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 Eye Bolt No. 28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 G.I. Wire 16 SWG for binding Kg. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of Road/ Communication Lines/ 11 kV Lines crossing on STP 13 Mtr with Cradle Guarding
Annex-12
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
bought (Rs.) (Rs.)
out
Sl.
Items Unit Qty. item.
No.
Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
12)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 Single support 13 Mtr. STP (SP-72) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

X-Arm Channel 100x50 mm V-


2 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
type
X-Arm holding Clamp (Back
3 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Clamp) with bolts & nuts
4 33 kV Pin Insulator Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 33 kV Pins with Nuts Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
M.S. guarding Angle Iron 75x75x6
6 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mm 3010 mm long
7 F Bracket Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 Turn buckle Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
G.I. Wire 6 SWG along the span
9 Kg. 42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(For 50 Mtr. line)
G.I. Wire No. 8 SWG accross the
10 Kg. 28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
span (For 50 Mtr. line)

11 G.I. Wire No. 16 SWG for binding Kg. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

33 kV Stay set complete (as per


12 Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-10)
Armour rod with ferrules for
13 ACSR Dog/Panther Helical Set 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Performed
14 Stone pad (300x300x75 mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 kV SMC Number plate with
15 Nos 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
33 kV SMC Danger board with
16 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
17 G.I. Barbed wire kg 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18 Red Oxide paint Ltrs 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19 Aluminium Paint Ltrs 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
20 Aluminium binding wire-6 SWG kg 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
21 rod of 20x2500 mm. and 6 SWG Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
22 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.64 Cu.m. each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of Road/ Communication Lines/ 11 kV Lines crossing on STP 11 Mtr with Cradle Guarding
Annex-13
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
bought (Rs.) (Rs.)
Sl. out
Items Unit Qty.
No. item.

Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 Single support 11 Mtr. STP (SP-55) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

X-Arm Channel 100x50 mm long


2 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
V-type
X-Arm holding Clamp (Back
3 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Clamp) with bolts & nuts
4 33 kV Pin Insulator Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 33 kV Pins with Nuts Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 F Bracket Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Guarding Angle Iron 75x75x6
7 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mm 3010 mm long
8 Turn buckle Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
G.I. Wire 6 SWG along the span
9 Kg. 42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(For 50 Mtr. line)
G.I. Wire No. 8 SWG accross the
10 Kg. 28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
span (For 50 Mtr. line)
11 G.I. Wire No. 16 SWG for binding Kg. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 kV Stay set complete (as per
12 Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-10)

Armour rod with ferrules for


13 Set 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ACSR Panther Helical Performed

14 Stone pad (300x300x75 mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 kV SMC Number plate with
15 Nos 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
33 kV SMC Danger board with
16 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
17 G.I. Barbed wire kg 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18 Red Oxide paint Ltrs 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19 Aluminium Paint Ltrs 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
20 Aluminium binding wire-6 SWG kg 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
21 rod of 20x2500 mm. and 6 SWG Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
22 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.44 Cu.m. each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
COST OF MATERIAL FOR 63 KVA, 11/0.4KV, 3 PHASE DISTRIBUTION TRANSFORMER FOR SUB-STATION SUPPLY ON PLINTH
Annex-14
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Charges Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes (Rs.) Supply Prices incl. all
or Clearly) (Rs.) taxes
Sl. bought (Rs.) (Rs.)
Items Unit Qty.
No. out
item.
Per Unit Total Per Total Per Total Per Total Per Unit Total Per Unit Total Per Unit Total (4x18)
(4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) (4x16) (14+16)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
11KV/0.433 KV, 3 Phase, 63 KVA
Transformer (BEE standard, 3 star
1 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
rating self protected type), Al.
wound
2 PCC Poles, 9 M Long Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Stone Pad 300x300x75 mm Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MS Top Channel (125x65x2240
4 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mm.)
MS Channel 100X50X2028mm
5 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(Dropper for fuse set)
Copper L-Piece of size 400x50x6
6 mm for LT bushing Rod of No. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
transformer
Holding clamps for top channel
7 TPMO & fuse set etc. with bolts & Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
nuts

8 Plinth with RCC Top 2x4x1.6 Mtr. Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

11KV TPMO (As per


9 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Specification)
10 11KV Fuse Set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 11 kV Lightning arrestor No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LT Aluminium XLPE insulated
12 Cable of size 1x50 Sq.mm. (for HT Mt. 30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
jumpering)
LT Aluminium XLPE insulated
13 armoured Cable of size 3.5x70 Mt. 20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
sqmm.
11 Kv SMC Danger Board
14 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
complete
Transformer Earthing Complete
15 (Chemical Pipe earthing as per No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Specification)
COST OF MATERIAL FOR 63 KVA, 11/0.4KV, 3 PHASE DISTRIBUTION TRANSFORMER FOR SUB-STATION SUPPLY ON PLINTH
Annex-14
16 G.I. Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17 Stay Complete (as per Annex 27) Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
18 rod of 20x2500 mm. and 6 SWG Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
19 Concreting of pole (0.286 cu. M.) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
20-a Al. crimping lugs 35 sq.mm. No. 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b Al. crimping lugs 50 sq mm. No. 15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
c Al. crimping lugs 70 sq.mm. No. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV Aluminium XLPE Cable
21 Mt. 50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3x35 Sq. mm.
Heat Shrinkable jointing kit
22 suitable for 11kV XLPE 3x35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sq.mm. cable size
i) Outdoor termination kit Set 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ii) indoor termination kit Set 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SMC MCCB Distribution board (1
23 No. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. I/C & 3 No. O/G)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of 11 KV Feeder Double Pole Structure with 11 Mtrs. Long STP including fitting
Annex-15
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
bought (Rs.) (Rs.)
Sl. out
Items Unit Qty. item.
No.

Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 S.T.P. IS 410 SP-55 11 Mtr. long. No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Top channel 100x50 mm 2240 mm


2 (10.70kg/M) with clamp, nuts & No. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bolts.
3 Stone Pad (300x300x75) No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV Disc insulater B&S type 70
4 No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KN
11 kV Disc fitting B&S type 70
5 No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KN
6 11 kV Pin insulater No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 11 kV Pin with Nut No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 P.G. Clamp for Dog No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 E' Bracket for 11 KV No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV SMC Number Plate for
10 No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
11 kV SMC Danger board with
11 No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
MS Channel 125x65x2028 mm
12 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
long (Dropper for fuse set)
Holding clamps for top channel
13 Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TPMO & fuse set etc. with N&B
11KV TPMO (As per
14 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Specification)
15 11KV Fuse Set Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16 11 kV Lightning Arrestor No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17 G.I. Barbed wire. Kg. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18 Alluminium binding wire - 6 SWG Kg. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19 Alluminium Paint. Ltr. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
20 Red Oxide Paint. Ltr. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21 Stay Complete (as per Annex 27) No. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22 Concreting of STP (0.44 Cu m) No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
23 rod of 20x2500 mm. and 6 SWG No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
24 G.I. pipe 50 mm dia Mt. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Page 252
MADHYANCHAL VIDYUT VITRAN NIGAM LTD., LUCKNOW
Price schedule & Bill of Quantity for construction of Switchgear Room Building & other works at 33/11 KV
S/S in LUCKNOW.
Price Schedule (BOQ) Unit Rate Annex-16
Total Amount
including all
S. No. Name of Items Unit Qty. (Rs.)
taxes
1 2 3 4 5 (4x5)
6
(Rs./Unit)
1 Excavation in foundation in ordinary soil (loam clay or sand) including lift Cum 147.50 57.60 8,496.00
upto 1.50 meter and lead upto 30 m and including filling, watering and
ramming of excavated earth into the trenches or into the space between the
building and the side of the foundation trenches or into the plinth and removal
and disposal of the surplus earth as directed by the E/I upto a distance of 30
meters from the foundation trenches (CSI No.-251).

2 Providing and injecting chemical emulsion for pre-construction anti-termite Sqm. 134.80 95.00 12,806.00
treatment by creating a chemical barrier under and all around the column pits,
wall trenches, basement, excavation, top, surface of plinth filling junction of
wall and floor along the external perimeter of building expansion joints,
surroundings of pipes and conduite etc. complete with chlorpyriphose?Lindane
E.C. 20% with 1% concentraion as per IS 6311 (Part-II) latest amendment and
direction of E/I including of chemical, labour, T&P required for proper
completion of work (NSI).

3 Concrete with 4 cm gauge Ist class brick ballast down graded coarse sand of Cum 65.20 1,996.00 130,139.20
2.5 F.M. and cement in proportion of 12:6:1 in foundation and under floors
and supply of all materials labour & T&P etc. required for proper completion
of the work. (CSI No.273).
4 First class brick work (Class-150) in 1:6 cement and approved coarse sand Cum 105.80 2,271.00 240,271.80
(FM 1.80-2.25) mortar in foundation & plinth and in Swithc Yard To-wall
including supply of all materials, labur and T&P etc. required for proper
completion of work. (CSI No.-303).
5 As item No. 4 above but in 1:4 cement and coarse snad mortar (CSI No. 305) Cum 2.80 2,414.00 6,759.20

6 As item No. 4 above but in super structure including necessary cutting & Cum 40.90 2,393.00 97,873.70
moulding of brick as required & also including honey comb brick work,
thickness of wall shall not to be less than 1.5 brick thick (345 mm) (CSI
No.303+309).
7 As item No. 4 above but in super structure including necessary cutting & Cum 101.30 2,499.00 253,148.70
moulding of brick as required & also including honey comb brick work,
thickness of wall shall not to be less than one brick thick (230 mm) (CSI
No.303+309+310).
8 As item No. 4 above but in super structure including necessary cutting & Cum 3.20 2,552.20 8,167.04
moulding of brick as required & also including honey comb brick work,
thickness of wall shall not to be less than one brick thick (115 mm) (CSI
No.303+309+310a).
9 Mild Steel or Iron work in heavy sizes such as trusses, built-up gates, door and MT 4.00 50,827.00 203,308.00
door frames, record racks etc. wrought to required form including supply of
steel, bolts, nuts, cutting and their fixing and welding in required shape and
sizerequired for proper completion of the work, including labour, T&P and
cost of steel which shall be arranged by the contractor. (CSI No. 503a)

10 Mild steel or iron in plain/ Tor work in plain work such as R C C or R.B. work MT 3.25 48,684.00 158,223.00
(when not included in over all rates) wrought to required shape as necessary
including bending as per requirement and direction of E/I for proper
completion of the work & including supply of steel, its wastage, bend, hooks
& authorised overlapping in reinforcement shall be measured. (Steel shall be
arranged by the contractor) (CSI No. 504a)
Page 253
11 P/F steel glaze window, ventilators of standard rolled 'Man' or 'Mahavir' Steel Sqm. 11.85 2,305.00 27,314.25
section confiming to IS 7452-1974 as per drawing joints metered and welded
with (100x14x3.15) mm hold fast embedded in C.C. block (15x10x10) cm size
of 1:3:6 proportion i.e. one part of cement, three part of coarse sand and six
part of graded stone (aggregated 20mm nominal size) including S/F of 4mm
thick glass panes of plain / pin headed 4 mm thick nuts, glazing clips and
special putty of approved make complete and including cost of all red oxide
paint. The fabrication should confirm to IS 1038-1975 (NSI)

12 Cement concreate with 2 cm guage approved stone ballast, approved coarse Cum 2.50 3,400.00 8,500.00
sand cement in the proportion 4:2:1 including supply of all material labour and
T&P etc. required for proper completion of the work (CSI No. 279 (a))

13 R.C.C. Work with cement approved coarse sand and 2 cm gauge approved Cum 7.90 4,432.00 35,012.80
hard stone ballast in the proportion 1:11/2:3 in the lintels of doors & windows,
bands excluding supply of reinforcement and its bending but including its
fixing and binding the same with 24 BWG G.I. binding wire and including
necessary centering and shuttering etc & cutting and also including supply of
all materials, cost of binding wire, labour & T&P etc. required for proper
completion of work. (CSI No. 283a)

14 As in item No. (13) above but for lighter beams i.e. having span upto 6 m. Cum 0.80 5,433.00 4,346.40
(CSI No. 285a)
15 As in item No. (13) above but for slabs (CSI No. 284a) Cum 23.90 5,038.00 120,408.20
16 As in item no. (13) above but for raft foundation & footing and for grouting of Cum 3.00 4,108.00 12,324.00
switch yard panels with 4 cm gauge graded approved hard stone ballast. (CSI
No. 287a)
17 As in item No. (13) above but in RCC T-beam & RCC columns. (CSI No. Cum 4.10 5,536.00 22,697.60
288a)
18 Pre Cost cement concrete door sills chaukhats boundary posts, shelves and Cum 1.50 4,458.00 6,687.00
similar small works with cement approved coarse sand (F.M. 1.80-2.50) and 2
cm guage approved hard stone ballast in the proportion 1:11/2:3 excluding
supply of reinforcement and its binding but including its fixing & binding with
24 BWG GI binding wire and including the cost of binding wire, moulds and
all other materials, labour and T&P etc. required for proper completion of the
work. (CSI No. 282a)

19 40 mm thick damp proof course with 1:2 cement and approved coarse sand Sqm. 46.00 236.10 10,860.60
mortar with water proofing materials as ordered by the E/I in the proportion as
specified by the manufacturer, including supply of all materials, labour and T
%P etc required for proper completion of the work and also inculding proper
curing and shuttering as necessary (CSI No. 362)

20 S/F hexagonal fan box with hexagonal side of approx 80 mm in length Each 5.00 94.00 470.00
fabricated from 16 SWG MS sheet incorporating 12 mm dia. M.S. round bar
duly bent for supporting fan hanger duly painted with red oxide and screwing
arrangement with wiring coundult in the R.C.C. roof before concreting along
with supply of all material, labour, T&P etc. required for proper completion of
the work. (NSI)

21 Supply & Fixing of 110 mm dia PVC pipe ( 4 KG/ Sqm.) for water supply RM 23.60 141.00 3,327.60
mains and rain water pipe of Tirupati or equivalent make with specials as Tee,
bend, socket, elbow etc including cutting of pipe and including excavation of
trenches (600x900) for laying pipe line and back filling after testing pipe line
including supply of all materials, labour and T&P etc, required for proper
completion of work,(CSI No. 26.64a)

22 12 mm thick plaster with cement mortar in proportion of 1:3 cement and Sqm. 149.10 95.00 14,164.50
coarse sand 2.5 fineness modules over brick work minimum thickness not to
be less than 10 mm. including supply of all materials labour and T&P etc.
required for proper completion of work (CSI No.583)
Page 254
23 As in above item No. 22 but with 1:4 an coarse sand mortar (CSI No. 584) Sqm. 1439.40 82.50 118,750.50

24 Providing and mixing approved quality of water proofing coumound (200mt/1 Kg. 149.10 42.20 6,292.02
kg per bag (DR. FIXIT/RECRON-3S)in cement mortar or concrete as per
direction of E/Iin proportion as recommended by the manufacturer (Based on
CSI No. 599)
25 Providing Gola 75x75 mm in C.C 1:2:4 with coarse sand and 10 mm down RM 49.00 27.00 1,323.00
grit including finishing with cement mortar 1:3 as per standard design. (CSI
No. 10.17)
26 Providing (12x15mm) section groove in plaster at the junction of ceilling & RM 800.00 4.80 3,840.00
walls including all materials, labour and T&P etc required for proper
completion of the work (CSI No. 600a)
27 Add for extra labour and material for plaster over rough face & one thick brick Sqm. 479.70 7.00 3,357.90
work (CSI No. 596)
28 S/F 6 mm white glazed tiles of size 200x300 mm of approved make in wall or Sqm. 13.70 800.00 10,960.00
in skirting of dado laid with 1.3 cememt and approved coarse sand mortar
finished with white cement slurry, jointing and polishing complete, including
supply of all materials labour and tools and planst etc required for proper
completion of the work (CSI No. 628)
29 Making drip coarse 25mm x 12mm in 1:2 cement and coarse sand including RM 77.60 7.50 582.00
all material labour and T&P etc. required for proper completion of the work.
(CSI No. 600 (b) )
30 Earth filling under floors and in Sub-station area including cost of earth. Earth Cum 549.40 135.00 74,169.00
to be obtained from out side the D.V.V.N.L. permises including its cartage and
watering, ramming, dressing in 20 cm. thick layer and dressing of area etc.
complete including cost of earth, labour and T&P with all lead and lift etc.
complete. (CSI No.260)
31 Fine sand of 1.25 F.M. filling in plingth including supply of necessary Cum 19.30 285.00 5,500.50
quantity of sand from a distance not exceeding 8 Kms. From the site of work
including watering, dressing etc. Rate to include cost of all materials, labour &
T&P required for proper completion of work (CSI No. 255)

32 S/F 8mm thick floor tiles of size 400x400 mm of approved make laid with 1:3 Sqm. 3.30 900.00 2,970.00
cement and approved coarse sand mortar finished with white cement slurry,
jointing and polishing complete, including supply of all materials labour and
tools and plants etc required for proper completion of the work. (NSI)

33 S/F of flooring with 25mm thick Kota stone slab over lease of 20 mm thick Sqm. 129.10 695.00 89,724.50
cement mortar 1:6 mix and jointed with grey cement slurry mixed with
pigment to match the shade of slab including rubbing and polishing complete
for proper completion of the work. (CSI No. 632i)
34 40 mm thick 1:2:4 plain cement concrete floor with cement approved coarse Sqm. 53.30 193.00 10,286.90
sand & 2 Cm graded approved stone ballast laid in panels, finished with 3 mm
floating cost of neat cement or cement and marble dust in ratio 5:1 as specified
and removing over lapping of mortar at the joints or panels, if any, and giving
them a uniform finish without base concrete including of all materials cement,
labour and T&P etc. required for proper completion of the work. (CSI
No.605).

35 P/F glass strips of 3.15 mm thickness and 40 mm depth in joints of floors and RM 52.00 14.20 738.40
skirting at the time of laying floors flushed with floor level including supply of
all materials, labour, T&P required for proper completion of work. (CSI No.
631b)
36 2 cm thick cement plaster in dado or skirting in 1:2 one part of cement and two Sqm. 12.60 135.00 1,701.00
parts of approved coarse sand laid in panels, finished with 3mm floating coat
of neat cement and marble dust in ratio 5:1 including supply of all materials
cement labour and T&P etc. required for proper completion of the work. (CSI
No.597).
Page 255
37 Concreting for 40 mm thick RCC trench cover in mild steel frame work with Sqm. 7.20 197.00 1,418.40
C.C. (1:1/5:3) in cement coarse sand, 12 cm gauge hard stone ballast with neat
cement finish on top and bottom complete with all material, labour and T&P
etc. required for proper completion of the work but excluding cost of frame
(CSI No.294 (a).
38 S/F of 32 mm thick single leaf flush door shutter (boiled warter resistance, Sqm. 12.60 975.00 12,285.00
phenol maldehide resing bonded, hot pressed factory made) commercial
quality confirming quality to IS:2202 Part-I (1983) ISI marked including
fixing of wooden cleats & stoppers and including fixing and adjustment of
hinges, including supply all labour, materials and T&P etc. required for work.
(CSI No. 500a)

39 S/F of aluminium L-Drop 16 mm dia 300 mm long with screw in doors and Nos. 12.00 86.00 1,032.00
windows etc. (NSI)
40 S/F of aluminium Tower bolt 200 mm long with screw in doors and windows Nos. 7.00 32.00 224.00
etc. (NSI)
41 S/F of aluminium Handle 150 mm long with screw in doors and windows etc. Nos. 14.00 25.00 350.00
(NSI)
42 Painting two coats with Acrylic emulsion paint of Berger/Asian?ICI of Sqm. 377.60 59.50 22,467.20
equivalent (paint and wter in the ratio 1:1 by volume or as per manufacturers
specification) over prepared and primed surface of cement concrete, cement
plaster and bricks including all labour, materials and T&P etc required for
proper completion of the work (preparation of base with Birla putty etc and
coating of primer shall be paid extra) (CSI No. 663+664)

43 Finishing of walls with three coats water proof exerior emulsion paint "ACE" Sqm. 895.10 54.10 48,424.91
Out " Out Look" or equivalent make on new work including one priming coat
(1Liter paint diluted including 0.75 liter of water) to give an even shade
complete including cost of aal materials, labour and T&P etc required for
proper completion of the work. (NSI)
44 Painting two coats with APEX or equivalent brand weather coat paint on new Sqm. 281.50 62.00 17,453.00
wall surface (well prepared with Birla Putty and one coat of pricer ICI or
equivalent which shall be paid separately) including thorough washing with
water including cost of all materials, labour, T&P etc. required for proper
completion of the work (CSI No. 13.23+13.24)

45 Painting with approved quality and shade or paint iron work or new wood Sqm. 179.80 53.80 9,673.24
work with one coat of ready mixed priming paint and two coats of approved
superior quality ready mexed paint Luxol or equiivalent brand conforming to
the ISI No. 103 (1950) including supply of all materials, labour and T&P etc
required for proper completion of the work as per (CSI No.641+642)

46 Applying POP with minimum required thickness of plaster of paris putty of Sqm. 114.70 76.00 8,717.20
approved brand on plastered surface of walls/ceilling to level and smoothing
the surface to give and even finish including cost of all labour materials T&P
etc required for proper completion of the work (NSI)
47 Applying POP same as item no. 47 above but making POP cornices in RM 100.00 55.50 5,550.00
75mmx75mm size apporved shape and design at juncton of ceilling and wall
including cost of all labour, materia, necessary centering and shuttering, T&P
etc required for proper ccompletion of the work (NSI)
48 POP fan ring/circle on ceilling of rooms as per shape and design approved by Nos. 7.00 90.00 630.00
E?I including cost of all materials, labour and T%P etc required for proper
completion of the work as per direction of E?I with necessary centering and
shuttering (NSI)
49 Applying Birla or equilavalent putty on new interior or exterior surface over Sqm. 262.90 43.00 11,304.70
one cost of water based cement primer of ICI or equivalent brand for
smoothening and leveling of the surface as per requirement and direction of
E/I including of all materials, labour, T&P etc required for proper completion
of the work. (CSI No. 13.21)
Page 256
50 Supply & laying of 80 mm thick cement concrete interlocking tiles grey Sqm. 189.00 468.30 88,508.70
coloured I shaped including supply of all materials labour and T&P etc
required for proper completion of the work (CSI No. 12.27)
Page 257
51 Ist class brick soling on edge floor laid dry joints sand filled including Sqm. 10.00 219.00 2,190.00
preparaton of base to proper slope and its ramming including supply of all
materials labour and T&P etc required for proper completion of the work (CSI
No.615)
52 S/Filling of First Class brick bats of size 80mm to 150 mm in soak pit Cum 4.40 594.00 2,613.60
including cost of brick bats, labour and T&P etc and all leads and lifts up to
soakpir as per direction of Engineer in charge (NSI)
53 Construction of 200 mm dia bore hole by casing method in soil mixed with -
kanker bajri etc. with use of special T&P handling and dismantling after
completion of the work also including all labour and T&P required for
leveling of site loading arrangement etc. complete (NSI)
(a) 0-30 mtr. BGL RM 30.00 151.50 4,545.00
(b) 31-60 mtr. BGL RM 50.00 187.60 9,380.00
54 Construction of plateform of hand pump 1500 mm dia with 50x50 mm MS flat Job 1.00 1,700.00 1,700.00
on periphary of plateform raised 75 mmm thick from floor of plateform is laid
with 40 mm thick cement concrete 1:2:4 over base of 100 mm thick CC 1:6:12
(Cement :Coarse snad:40mm stone ballast) including cost of all materials,
labour and T&P etc required for proper completion of the work (NSI)

55 Providing and lowering of 110 mm Outer dia PVC pipe of 'Prakash', 'Uniplas' RM 80.00 226.00 18,080.00
or equivalent make of 6 kg/cm2 pressure pipe (as approved sample by E/I)
conforming to ISI 498S/1988 including cost of all materials, labour and T&P
etc required for proper completion of work (NSI)
56 Providing and lowering of 32mm dia GI pipe of TT Swastik, ITC or Jindal RM 52.00 213.00 11,076.00
make including supply of all materials, labour and T&P etc required for proper
completion of work (NSI)
57 Supply of Slotted PVC 110 mm dia pipe for making tubewell assembly and RM 25.00 78.80 1,970.00
cartage to boring site, the pipes shall be of TATA/Jindal or approved make
including cost of all materials, labour and T&P etc required for proper
completion of work
58 Supply and installation of India Mark-II hand pump machine connected rod Job 1.00 6,600.00 6,600.00
and other fittings of approved quality and make over the bore as direction of
Engineer in charge including all labour and T&P etc required for extraction &
stacking of pipe etc complete (NSI)
59 Leveling and dressing of land by cutting on falling upto 150 mm depth Sqm. 1500.00 2.60 3,900.00
complete with all labour and T&P etc. required for proper completion of the
work (NSI No.4.12)
60 Providing barbed wire fencing including fixing into Post includig all labour Kg. 20.00 77.00 1,540.00
material and T&P etc required for proper completion of the work. The weight
of GI Barbed wire should not be less then 100 gm per meter (CSI no. 513a)

61 S/F of 110x110 mm outer dia PVC plain bend of heavy quality ISI marked Each 4.00 131.00 524.00
including cost of all materials, labour and T&P etc required for proper
completion of work (NSI)
62 Wiring point for light with 1sq. mm FR PVC insulated multistrand single core Each 20.00 432.00 8,640.00
copper conductor cable in heavy PVC gauge rigid PVC conduit pipe
concealed in the wall completion with 1.5 Sq. mm FR PVC insulated multi
stand copper conductor cable as earth wire drawn inside the conduit, piano
type switch, ceilling rose/angle/ btten holder on 3mm thick phenolic laminated
bakelite sheet etc complete in all respects as directed including matching
colour wash (PSI No. 131(C)).

63 Wiring point for fan/ fresh air fan (light duty exhause fan) with 1 sqm FR PVC Each 6.00 495.00 2,970.00
including multisrtand single core copper conductor cable in heavy gauge rigid
steel conduit concealed in the wall completion with 1.5 Sq. mm FR PVC
insulated multisrtand copper conductor cable as earth wire drawn inside the
conduit, piano type switch & ceilling rose holder on 3mm thick phenolic
laminated bakelite sheet etc complete in all respects as directed including
matching colour wash (PSI No. 133(C))
Page 258
64 Wiring point for plug with 1sqmm FR PVC insulated multisrtand single core Each 5.00 231.00 1,155.00
copper conductor cable in heavy gauge rigid steel conduit concealed in wall,
completion with 1.5 sq.mm FR PVC insulated multisrtand copper conductor
cable as earth wire drawn inside the conduit and piano type switch and socket
etc. complete in all respects including matching colour wash (PSI No. 134(C)).

65 Supply and wiring of submain with two number 4.0 sqmm FR PVC insulated RM 60.00 128.00 7,680.00
1100 V grade multistrand single core copper conductor cable in 20mm dia
heavy duty (2mm thick) PVC conduit with one number 2.5 sqmm FR PVC
insulated multistrand copper conductor cable as earth continuity wire
including matching colour wash etc. complete in all respects (PSI No. 216(C)).

66 S/F of batten/angle holder of approved brand as per sample complete in all Each 11.00 24.00 264.00
respect (PSI No. 1142)
67 S/F of CFL Tubes 25 watt of PHILIPS of equivalent make as approved by E/I Nos. 7.00 160.00 1,120.00
before fixing the same (NSI)
68 Supply and burying of 600mmx600mmx6.0mm GI plate vertically for Each 1.00 4,035.00 4,035.00
earthing with its top at least 3 mtrs below ground complete with 20 mm dia GI
pipe and funnel for watering and one earthing lead of 8 to 10 SWG GI wire in
15 mm dia GI pipe upto switch board (from apron to switch board the cost of
GI Pipe and GI wire will be extra) 30cm square GI frame with hinged cover
masonary housing, atternate layer of charcoal/coke and salt at least 150 mm
thick alround the earthing plate etc. as per directions of E/I complete in all
respect as per drawing (This will apply for earthing of poles also) (PSI
No.702)

69 S/F of 6/10/16/20/25/32 Amp MCB of approved make and as per sample Each 8.00 132.00 1,056.00
approved by E/I (10 KA) (PSI No. 1002)
70 S/F surface/flush mounting 4 ways SPN distribution board without MCB Each 2.00 465.00 930.00
complete in all respect and direction of E/I (PSI No.1022)
71 S/F of power plug with 15A/240V flush type switch and 5 pin 15A/250V flush Each 5.00 232.00 1,160.00
type univerhal socket in suitable M.S. Box of 175mm x 100mm x 50 mm size
with phenolic laminated backlight sheet cover 3mm thick with brass machine
screws and cup washer (PSI No. 1139)
72 S/F 1x26 W integrated street light with acrylic cover of Compact or equivalent Each 2.00 980.00 1,960.00
make including cost of lamp & 26 W CFL, other materials, labour, T&P etc
required for fixing it on lamp post but excluding the cost of lamp post (NSI)

73 S/F 63 amp. SP isolator (3KA) (Havells Make) (PSI No. 1004B) Nos. 1.00 156.00 156.00
74 S/F white glazed earthern ware W.C. "Orissa" Pan Hindustan make of size Each 1.00 1,244.00 1,244.00
(58x44cm) including supply of all materials labour and T&P etc complete
(CSI No. 27.02.b)
75 P/F first quality white glazed earthen ware wash hand basin ISI marked size Each 1.00 1,470.00 1,470.00
550mmX400mm (Hindware required design No. 20042 or equivalent make)
make with R.S. or C.I. brackets C.P. brass pillar cock 15 mm dia (weight not
less than 400 grams) ISI marked 32 mm dia C.P. brass chain with rubber plug,
32 mm dia C.P. brass waste standard pattern with check nut, PVC connection
15" dia including cutting and making good the walls and floor including cost
of all required material, labour and T&P etc., required for proper completion
of work (fittings to beused should be of superior quality as per approved
samle) (CSI No. 27.07).

76 S/F Nahani trap of heavy approved quality complete with C.P. brass grating, Each 1.00 257.00 257.00
Nahani Trap laid over base cemen concrere 1:6:12 including cost of all
materials, labour and T&P etc. required for proper completion of the work.
(CSI No. 27.70)
Page 259
77 P/F 750 mm x 20 mm size C.P. Brass towel rail of approved quality (weight Each 1.00 314.00 314.00
275 gms including brackets) with a pair of C.P. brass brackets (to fit the size
of towel rail) fixed on the wall on wooden cleats with C.P. brass screw
including supply of all materials, labour, T&P etc. required for proper
completion of the work and cutting and making good wall plaster etc. required
for work. (CSI No. 27.25).
Page 260
78 Supply and installation of Submersible pump of 1 HP out let 32 mm dia or Each 1.00 16,000.00 16,000.00
more of KSB or Kirloskar or equivalent make including cost of 30M. flat cable
& same make of electrical panel complete with one year of the warrantty of
site (NSI).
79 Supply and fixing of submersible cable size 2.5 sq. mm for upto 3 H.P. pump RM 10.00 89.00 890.00
set of 'HAVELLS' or equivalent make (CSI No. 19.151)
80 S/F Syntex or eqivalent make water storage tank including all materials, Ltr. 200.00 7.50 1,500.00
labour and T&P etc. required for proper completion of the work. (BSI No.
26.50)
81 P/F 15 mm dia B-Class (Jindal, JTC make) ISI marked G.I. Pipe complete RM 20.00 128.00 2,560.00
with G.I. special such as bends, tee, Socket, Cross, Clamp etc earth work
including fitting the trenches etc required for proper completion of the work
the rate also including concealed G.I. fitting where required cutting and
making good the wall etc and all materials labour T&P etc complete (C.S.I.
No. 26.01)

82 As in item no. above but for 20 mm dia B class GI pipe for external work (CSI RM 20.00 134.60 2,692.00
No. 26.02)
83 S/F PVC cistern Hindustan or equivalent make 10 lters. Capacity complete Each 1.00 1,430.00 1,430.00
with all accessories (Low level) including all materials labour and T&P etc.
complete (CSI 27.16)
84 S/F brass bib cock/stop cock of heavy quality 15 mm dia (400 gms) ISI mark Each 3.00 231.00 693.00
including supply all materials, labour T&P etc complete. (CSI. No. 26.51)

85 Making hole in the wall for exhaust fan and finishing properly complete in all Each 1.00 250.00 250.00
respect (PSI no. 1121)
86 P/F 1 mm thick M.S. Sheet garrage door with frame of 40x40x6 mm angle Sqm. 3.40 1,920.00 6,528.00
iron 3.15 mm thick M.S. gusset plates at the junctions and corners including
supply and fixing of necessary fitting lock rail of 15" length of oxidised iron
and including pintels hooks at the top and applying a priming coat of red lead
paint on all sides complete using MS angles 40x40x6 mm for diagonal
brancins (CSI No. 517)

87 P/F RCC hume pipe 600 mm dia NP-3 including proper leveling & alignment RM 14.00 2,038.00 28,532.00
required for proper drainage of water including materials labour and T&P etc
required for proper completion of the work (NSI)
88 Extra for making edge moulding to 25 mm thick Kota Stone counters and RM 15.00 68.00 1,020.00
steps etc in proper desired shape and size as per direction of Engineer in
charge including cutting by machine and polishing to give high gloss finish
complete etc including cost of all materials labour and T&P etc required for
proper completion of the work (NSI)
89 Supply fixing of galvanized mosquito proof heavy quality iron wire gauge Sqm. 11.85 310.00 3,673.50
over door/ window, old shisham wood beading and supply and fixing necssary
screws, nails and all materials, labour and T&P etc required for proper
completion of the work (CSI no. 20.35)
90 P/F of 110 mm dia PVC top or bottom plug/bail plug of Prakash Uniplas or Nos. 1.00 110.00 110.00
equivalent make of heavy quality including cost of all materials, labour and
T&P etc required for proper completion of the work (NSI)
Grand Total 2,107,947.76
(Rs. Twenty one lac seven thousand nine hundred forty seven and paise seventy six only.)

The tenderer is required to quote his rates as follows -


1.                 
My/our rates are.--------------------------- % ( -------------------------------------------Percent) below the rates of all
items
My/Our
2.                 of rates
work are
mentioned abovethe rates of all items of work mentioned above.
‘at par’ with
3.                 
My/Our rates are ------------------------------- % ( -------------------------------------- Percent) above the rates of all
item of work mentioned above.
Page 261
Net quoted total value for Civil Works
a Total value of Civil works on schedule rates (Rs.) 2,107,947.76
b Variation in prices quoted by the tenderer as above 0.00% -
c Net value (Rs.)

Tenderer
Signature:
Name:
Designation:
SPECIAL CONDITIONS:
1.       The tender shall not be considered if the tenderer does not quote single percentage above or below all items of
          work in case it is not quoted ‘ at par ‘
  2.       Income Tax, Trade tax (VAT) or any other statutory tax applicable at the time of payment shall be recovered
          from Contractor’s bills.
  3.       The Contractor shall be required to procure & use only good quality 53mpa cement as per I.S. specification of
          A.C.C, Laxmi, J.K., Shree, Birla, Prism, Bangur or equivalent brand only. In case of any change of the brand
   the cement has to be got approved by E/I. The consumption of the cement shall be prepared and recorded in the
M.B and only thereafter the payment shall be released for the items of work in which the cement has been used
4- Cost involved in testing of the materials required if any shall be borne by the contractor.

Tenderer
Signature:
Name:
Designation:
Cost of Material of 11KV Single Support on 11 Mtr. Long Steel Tubular Pole including fittings.
Annex-17
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
bought (Rs.) (Rs.)
Sl. out
Items Unit Qty.
No. item.

Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 ST Pole IS 410 11 Mtr. SP-55 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11KV `V' type Cross arm
2 100x50x6 mm, M.S. Channel (7.9 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kg./M)
X-Arm holding Clamp (Back
3 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Clamp) with bolts & nuts
4 F bracket for 11kV Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11KV Pin Insulator for ACSR
5 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dog/Raccoon
6 11KV Pin with nuts Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Armour Rod with Ferrule for


7 Sets. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ACSR Dog Helical performed

8 Stone pad (300x300x75 mm) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV SMC Number Plate for
9 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
11 kV SMC Danger board with
10 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
11 Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12 Alluminium Binding wire-6 SWG Kg. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13 Alluminium paint Ltrs. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 Red Oxide paints Ltrs. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
15 rod of 20x2500 mm. and 6 SWG Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
16 No. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.44 Cu.m. each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of 11KV Single Section Support on 11Meter Long Steel Tubular Pole including fittings.
Annex-18
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl.
Items Unit Qty. bought (Rs.) (Rs.)
No. out
item. Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 ST Pole 11 Mtr. IS 410 SP-55 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Top Channel 125x65x6, 1525
2 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mm long
Holding Clamp (Back Clamp) with
3 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bolts & nuts
4 F bracket for 11kV Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV Pin Insulator for ACSR
5 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dog/Raccoon
6 11 kV Pin with nuts Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV Disc Insulator B&S type 70
7 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KN
11 kV Disc Fittings B&S type 70
8 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KN
PG Clamps for ACSR
9 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dog/Raccoon
10 Stone pad (300x300x75 mm) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV SMC Number Plate for
11 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
11 kV SMC Danger board with
12 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
13 Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 Alluminium Binding wire-6 SWG Kg. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15 Alluminium paint Ltrs. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16 Red Oxide paints Ltrs. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
17 rod of 20x2500 mm. and 6 SWG Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
18 No. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.44 Cu.m. each)

19 Stay Complete (as per Annex-27) No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of Sectional Double Pole Structure with 11 Meter Long Steel Tubular Pole in 11kV Line
Annex-19
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl.
Items Unit Qty. bought (Rs.) (Rs.)
No. out
item. Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 ST Pole 11 Mtr. SP-55 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Stone pad (300x300x75 mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Angle Iron 65x65x6mm,
3 2700 mm bracing set complete Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
with clamp
Top Channel 125x65mm, 2240 mm
4 (10.7kg/mt) with clamp, bolts, nuts Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
and washers
11 kV Disc. Insulators B&S type
5 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70 KN
11 kV Disc. Fittings B&S type 70
6 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KN
11 kV Pin Insulator for ACSR
7 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dog/Raccoon
8 11 kV Pin with N&B Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P.G. Clamp for ACSR
9 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dog/Raccoon
10 E Bracket for 11 kV Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV SMC Number Plate for
11 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
11 kV SMC Danger board with
12 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
13 Barbed wire Kg. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 Alluminium Binding wire-6 SWG Kg. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15 Alluminium paint Ltrs. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16 Red Oxide paints Ltrs. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17 Stay Complete (as per Annex-27) Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
18 rod of 20x2500 mm. and 6 SWG Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
19 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.44 Cu.m. each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
Cost of Sectional Double Pole Structure with 11 Meter Long Steel Tubular Pole in 11kV Line
Annex-19
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of 11kV Tee-Off
Annex-20
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
bought (Rs.) (Rs.)
Sl. out
Items Unit Qty.
No. item.

Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
MS Channel 100x50x6 mm. 1300
1 No. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mm long
MS Channel clamp with nuts &
2 No. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bolts
11 kV Disc Insulator B&S type 70
3 No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KN
11 kV Disc fittings B&S type 70
4 No. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KN
5 PG Clamp for Dog/Raccoon No. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 Stay Complete (as per Annex-27) No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of Material for single pole 11 KV main line on 9 Mtr. PCC pole
Annex-21
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl. bought (Rs.) (Rs.)
Items Unit Qty. out
No.
item.
Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 PCC Pole 9 Mtrs. Long Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Stone Pad (300 x 300x75mm) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11KV `V' type Cross arm
3 100x50x6 mm, M.S. Channel (7.9 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kg./M)
Cross arm holding Clamp with nuts
4 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
& bolts
5 11KV Pin Insulator with pins Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 11 kV Pin with N&B Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 `F' Bracket with N&B Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SMC Danger Board with clamp,
8 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bolts & nuts
9 G.I Barbed wire Kg. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 Stay Complete (as per Annex-27) Nos. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
11 rod of 20x2500 mm. and 6 SWG Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
12 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.268 Cu.m. each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of Material for Section single pole 11 KV main line on 9 Mtr. PCC pole
Annex-22
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl.
Items Unit Qty. bought (Rs.) (Rs.)
No. out
item. Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 PCC pole 9 Mtr Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 MS Top Channel 125x65x6 mm. Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Holding Clamp (Back Clamp) with


3 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bolts & nuts
4 F bracket for 11kV Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 11 kV Pin Insulator Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 11 kV Pin with N&B Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV Disc Insulator B&S type 70
7 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KN
11 kV Disc Fittings B&S type 70
8 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KN
PG Clamps for ACSR
9 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dog/Raccoon
10 Stone pad (300x300x75 mm) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV SMC Number Plate for
11 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
11 kV SMC Danger board with
12 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
13 Barbed wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 Alluminium Binding wire-6 SWG Kg. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15 Alluminium paint Ltrs. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16 Red Oxide paints Ltrs. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
17 rod of 20x2500 mm. and 6 SWG Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
18 No. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.268 Cu.m. each)
19 Stay Complete (as per Annex-27) No. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of material for Section double pole 11KV line on 9 Mtr. PCC Pole
Annex-23
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl.
Items Unit Qty. bought (Rs.) (Rs.)
No. out
item. Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 PCC Pole 9 Mtrs. Long Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Stone Pad (300 x 300x75mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Top Channel 125x65x6 mm
3 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2240 mm long
Cross arm holding clamps with
4 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bolts and nuts
M.S. Angle Iron 65x65x6
5 mm,2700 mm long bracing with 4 Set 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp
11 kV Pin Insulator for ACSR
6 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dog/Raccoon
7 11 kV Pin with nuts Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 11 kV Disc Insulator B&S 70 KN Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV Disc Fittings B&S type 70
9 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KN
10 `E' Bracket with N&B Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PG Clamps for ACSR
11 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dog/Raccoon
11 kV SMC Danger Board with
12 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp and nut bolts
13 Barbed Wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
14 rod of 20x2500 mm. and 6 SWG Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
15 Stay Complete (as per Annex-27) Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Concreting of supports with plinth
16 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.268 Cu.m. each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of Single support in 11KV line on 11 Mtr. Steel Tubular Pole with ABC OH Cable
Annex-24
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl.
Items Unit Qty. bought (Rs.) (Rs.)
No.
out
item. Per Unit Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
(4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 STP (IS 410 SP-55), 11 Mtr. Long Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Stone Pad (300x300x75 mm.) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pole clamp with hanging
3 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
arrangement for 11KV ABC
4 Grouting of pole (0.44 Cu.m Each) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 Earthing complete Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV SMC Danger board with
6 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamps
7 G.I barbed wire Kg. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of double pole in 11KV line on 11 Mtr. Steel Tubular Pole with OH ABC Cable
Annex-25
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl.
Items Unit Qty. bought (Rs.) (Rs.)
No. out
item.
Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 ST Pole 11 Mtr. SP-55 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Stone Pad (300 x 300x75mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MS Channel Cross Arms 125x65
3 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mm (Top Channel)
Cross arm holding clamps with
4 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bolts and nuts
M.S. Angle Iron 65x65x6 mm,
5 2700 mm long bracing with 4 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp
11 kV SMC Danger Board with
6 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp
7 G.I.Barbed Wire Kg. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 Alluminium paint Ltrs. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 Red Oxide paints Ltrs. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
10 rod of 20x2500 mm. and 6 SWG Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
11 kV Stay complete (as per
11 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-27)
Concreting of supports with plinth
12 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.44 Cu.m. each)
Pole clamp with hanging
13 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
arrangement for 11 kV ABC
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of Sectional Double Pole in 11 kV line on 11 Mtr. STP for U/G Line
Annex-26
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl. bought (Rs.) (Rs.)
Items Unit Qty. out
No.
item.
Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 ST Pole 11 Mtr. SP-55 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Stone pad (300x300x75 mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Angle Iron 65x65x6 mm,
3 2700 mm long bracing complete Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
with clamp
Top Channel 125x65mm, 2240 mm
4 (10.7kg/mt) with clamp, bolts, nuts Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
and washers
11 kV Disc. Insulators B&S type
5 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
70 KN
11 kV Disc. Fittings B&S type 70
6 Nos. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KN
P.G. Clamp for ACSR
7 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dog/Raccoon
11 kV SMC Number Plate for
8 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
11 kV SMC Danger board with
9 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
10 Barbed wire Kg. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 Alluminium Binding wire-6 SWG Kg. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12 Alluminium paint Ltrs. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13 Red Oxide paints Ltrs. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV Stay Complete (as per
14 Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-27)
Earthing of pole by MS earthing
15 rod of 20x2500 mm. and 6 SWG Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
16 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.44 Cu.m. each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of Material of 11KV Stay
Annex-27
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
bought (Rs.) (Rs.)
Sl. out
Items Unit Qty.
No. item.

Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 Stay Rod 16X1800 mm. No. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Stay Wire 7/10 SWG Kg. 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Stay Clamp Set 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Bolt, Nut and Washers Kg. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 Grouting with concrete Job 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of Material for Guarding of 1 km 11KV Line
Annex-28
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
bought (Rs.) (Rs.)
Sl. out
Items Unit Qty.
No. item.

Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19

Guarding angle 75x75x6 mm,1600


1 mm long with holding clamp, No. 16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
packing piece, nut & bolts etc.

G.I. Wire No. 6 SWG along the


2 Kg. 330 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
span (For 1 Km. line)
G.I. Wire No. 8 SWG accross the
3 Kg. 110 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
span (For 1 Km. line)
4 Turn Buckle No. 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 Eye Bolt No. 24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 G.I. Wire No. 16 SWG for binding Kg. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00


Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of Single support of 3 Ph 4 Wire LT Line
Annex-29
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl. bought (Rs.) (Rs.)
Items Unit Qty. out
No.
item.
Per Total (4x6) Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 STP 9 Mtr. Long (SP-33) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Stone Pad (300x300x75 mm) Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 LT Clamp with N & B Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 LT Shakle Insulator 100x115 mm Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bolts and nuts for shackle
6 Kg. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
insulators
7 Loop Guard complete Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Concreting of support (0.285 Cum
8 Nos. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Cost of Material of LT Stay
Annex-30
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl. bought (Rs.) (Rs.)
Items Unit Qty. out
No.
item.
Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 Stay Rod 16X1800 mm. No. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Stay Wire 7/10 SWG Kg. 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Stay Clamp Set 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 LT Stay Inulator No. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 Bolt, Nut and Washers Kg. 0.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 Grouting with concrete Job 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Bill of Quantity of Road/ Communication Lines/ 33 kV Lines crossing of 11 KV Lines on STP 13 Mtr with Cradle Guarding
Annex-12
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl. bought (Rs.) (Rs.)
Items Unit Qty. out
No.
item. Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 Single support 13 Mtr. STP (SP-72) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

X-Arm Channel 100x50 mm V-


2 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
type
X-Arm holding Clamp (Back
3 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Clamp) with bolts & nuts
4 11 kV Pin Insulator Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 11 kV Pins with Nuts Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
M.S. guarding Angle Iron 75x75x6
6 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mm 3010 mm long
7 F Bracket Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 Turn buckle Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
G.I. Wire 6 SWG along the span
9 Kg. 42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(For 50 Mtr. line)
G.I. Wire No. 8 SWG accross the
10 Kg. 28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
span (For 50 Mtr. line)
11 G.I. Wire No. 16 SWG for binding Kg. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV Stay set complete (as per
12 Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-27)
Armour rod with ferrules for
13 ACSR Dog/Raccoon Helical Set 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Performed
14 Stone pad (300x300x75 mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV SMC Number plate with
15 Nos 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
11 kV SMC Danger board with
16 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
17 G.I. Barbed wire kg 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18 Red Oxide paint Ltrs 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19 Aluminium Paint Ltrs 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
20 Aluminium binding wire-6 SWG kg 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
21 rod of 20x2500 mm. and 6 SWG Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
22 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.64 Cu.m. each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.
Bill of Quantity for Road/ Communication Lines/ 33 kV Lines crossing of 11 KV Lines on STP 11 Mtr with Cradle Guarding
Annex-13
Specify, Ex-Work Price E.D. S.T. Other Taxes (to Total Unit Price with Unit F&I Total FOR Dest.
direct (Rs.) (Rs.) (Rs.) be specified all taxes Charges Supply Prices incl. all
or Clearly) (Rs.) (Rs.) taxes
Sl. bought (Rs.) (Rs.)
Items Unit Qty.
No. out
item.
Per Total Per Total Per Total Per Total Per Unit Total Per Total Per Unit Total
Unit (4x6) Unit (4x8) Unit (4x10) Unit (4x12) (6+8+10+ (4x14) Unit (4x16) (14+16) (4x18)
1 2 3 4 5 6 7 8 9 10 11 12 13 12)
14 15 16 17 18 19
1 Single support 11 Mtr. STP (SP-55) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

X-Arm Channel 100x50 mm long


2 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
V-type
X-Arm holding Clamp (Back
3 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Clamp) with bolts & nuts
4 11 kV Pin Insulator Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 11 kV Pins with Nuts Nos. 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 F Bracket Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
M.S. Guarding Angle Iron 75x75x6
7 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
mm 3010 mm long
8 Turn buckle Nos. 10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
G.I. Wire 6 SWG along the span
9 Kg. 42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(For 50 Mtr. line)
G.I. Wire No. 8 SWG accross the
10 Kg. 28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
span (For 50 Mtr. line)
11 G.I. Wire No. 16 SWG for binding Kg. 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV Stay set complete (as per
12 Nos. 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Annex-27)
Armour rod with ferrules for
13 ACSR Dog/Raccoon Helical Set 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Performed
14 Stone pad (300x300x75 mm) Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 kV SMC Number plate with
15 Nos 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
11 kV SMC Danger board with
16 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
clamp with N&B
17 G.I. Barbed wire kg 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18 Red Oxide paint Ltrs 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19 Aluminium Paint Ltrs 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
20 Aluminium binding wire-6 SWG kg 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Earthing of pole by MS earthing
21 rod of 20x2500 mm. and 6 SWG Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
earthing wire etc.
Concreting of supports with plinth
22 Nos. 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(0.44 Cu.m. each)
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Note:
1 Bidder shall include all the taxes and duties in the quoted prices in column 6 for bought out items only.
2 Bidder shall quote Unit Freight,storage & Insurance for transit & storage charges for both direct as well as bought out items in colomn 16.

You might also like