We are pleased to submit our best price for the HVAC works – summary is as shown below and the
detailed BOQ with the prices are attached to this quotation.
LIST OF METERIALS
S# DESCRIPTION BRAND Material Delivery Country of Origin
6-8 WEEKS
(AHU-SPLIT
UNITS)
8-10 WEEKS
1 HVAC EQUIPMENT YORK -Johnson Controls (PACU UNITS) Manufacture in KSA
2 FAN Saudi Fans 8 WEEKS KSA
3 SHEET METAL FOR DUCT WORK AL GURAIR. AGIS 1-2 WEEKS MANUFACTURE BY UAE
4 DUCTING SILICON STAR SILICON 32-17 1-2 WEEKS MANUFACTURE BY UAE
Thermal Insulation FOR INDDOR DUCT WITH AFICO 1"24 KG ,NTEICO Manufacture By
5 2 WEEKS
TAP, ADHESIVE & YELLOW BELT STRAP FSK TAP AND STAR 81-10 KSA AND UAE
TITLE OF
NEOM FILE CODE KAUST COMPLETE CODE
DOCUMENT/DRAWINGS
A. Scope of work
1. Inclusions
2. Exclusions
Any other work mentioned above from the scope of work will be considered as variation.
All the HVAC Equipment’s suitable Platform base to be provided by the client (SCC).
Site facilities/water & electricity.
Power supply to all the HVAC Equipment’s (PACU/AHU/Split unit) to be provided by client.
380V/3PH/60Hz For all items (PACU/AHU/ACCU)
Split Units - 220-240V/1Ph/60Hz For all items
Power Supply for tools and tackles.
Prepare The ACCOMMODATION
Gate pass for our team, tools and equipment's.
Rest shelter, Smoking shelter, toilets for manpower at site.
HVAC Equipment’s, Platforms, Testing & Commissioning (package & AHU Units – As per BOQ)
TAB Works.
Third Party Inspection Works & Certifications.
Scaffolding for completion of job safely.
E. Validity: This offer is valid only for 2 weeks from above date.
F. Project Duration: 3 months from the date of PO & site readiness & mobilization.
G. Completion period
1. The entire contractual work would be completed as per mutually agreed programmed of work, subject
to receipt of payments and all drawing / data duly signed and approved by you or your company.
2. Our quote is based on your requirement; any variation other than the BOQ-Drawings/ scope of
work will be additional.
With reference to your above enquiry, we have tried to quote our best rate and delivery time possible. We
hope this quotation might fulfill all your requirements. In case of any confusion, feel free to contact us. We
will try our best possible to work for you. Your response is highly appreciated on the same.
Thanking You,
M A RASHEED
Estimation team Business Development Manager