PRE-CONSTRUCTION SURVEY REPORT
1. Site Information:
Site Name PE TMN SRI GADONG NO 2
PMU PPU SSU PE y
Site Type (check one)
LV Pole Others, Please specify type of site
s
GW EB Collector
Device Type (check one)
Others Please specify type of device
2|Page
PRE-CONSTRUCTION SURVEY REPORT
POE Enclosure N/A
Location of POE Enclosure (check
Indoor Outdoor
one)
Distance from POE Enclosure to
N/A Meters
Power Source
Distance from POE Enclosure to
N/A Meters
Pole foundation
Battery N/A
Battery Backup Available (check
Yes No
one)
POP Details for Gateway This section is applicable only for Gateway
Type of POP Location Fiber based MPLS Network Fiber based SDH Network
MPLS/SDH Port Type RJ 45 SFP
MPLS/SDH Port Number
N/A
(If available)
MPLS/SDH Device Make N/A Model N/A
Distance from MPLS/SDH port to
N/A Meters
POE LAN port
5.7 Remarks (if any)
3|Page
PRE-CONSTRUCTION SURVEY REPORT
2. Site Location
4|Page
PRE-CONSTRUCTION SURVEY REPORT
3. Site View Location
1. PE Signboard Photo
5|Page
PRE-CONSTRUCTION SURVEY REPORT
4. Propose Structure Location
1. Propose structure location with pole and equipment, cable routing & grounding illustration.
EXTENDER
BRIDGE
PROPOSED
LIGHTNING
ARRESTOR
PROPOSED
NAN
ANTENNA
PROPOSED 20m
HEIGHT POLE
PROPOSED
LANTERN ARM
PROPOSED GROUNDING
CHAMBER FOR LIGHTNING
ARESTOR & EQUIPMENTS
PROPOSED CABLE
6|Page
PRE-CONSTRUCTION SURVEY REPORT
PROPOSED
JUNCTION BOX
PROPOSED TO HACK
WALL FOR CABLE
ROUTING
PROPOSED CABLE
7|Page
PRE-CONSTRUCTION SURVEY REPORT
5. Propose Indoor Equipment Location
1. For Extender Bridge.
a. Propose PSU & RF DB enclosure location with illustration.
b. Propose AC power tapping location at existing MCB’s DB panel and cable routing to RF DB.
c. Propose PSU & RF DB enclosure at existing building busbar location with routing and measurement
(leakage and grounding).
RF DB RF PSU
8|Page
PRE-CONSTRUCTION SURVEY REPORT
POWER TAPPED AT
EXISTING POWER
SOURCE
9|Page
PRE-CONSTRUCTION SURVEY REPORT
6. Propose Cable Routing Location
1. Propose structure location with pole and equipment, cable routing & grounding illustration.
a. 40mm HDPE & 50mm GI Pipe.
b. Trenching.
c. Hacking.
d. Cable marker
10 | P a g e
PRE-CONSTRUCTION SURVEY REPORT
11 | P a g e
PRE-CONSTRUCTION SURVEY REPORT
POWER TAPPED AT
EXISTING POWER
SOURCE
12 | P a g e
PRE-CONSTRUCTION SURVEY REPORT
2. Propose Grounding Location
1. Propose chamber location for equipment and lighting arrestor location.
2. Propose existing chamber location for grounding tapping with leakage measurement (clamp meter).
3. Propose earthing cable routing from new chamber location at structure to proposed existing chamber
location for grounding tapping.
PROPOSED GROUNDING
CHAMBER FOR LIGHTNING
ARESTOR & EQUIPMENTS
PROPOSED GROUNDING
ROUTING
13 | P a g e
PRE-CONSTRUCTION SURVEY REPORT
3. Others Photo
UNDERGROUND MAPPING
14 | P a g e
PRE-CONSTRUCTION SURVEY REPORT
LAND SURVEY
15 | P a g e