First Coat (Primer)

Second Coat (Filler)

Third Coat

Fourth Coat

Fifth Coat

TYPE:

TYPE:

TYPE:

TYPE:

TYPE:

Date:

Date:

Date:

Date:

Date:

Start Time:
Start Time:

Start Time:

Start Time:

Start Time:

Finish Time:

Finish Time:

Finish Time:

Finish Time:

Finish Time:

Final Acceptance

C1

All defects shall be repaired according to the touch up

DOCUMENTNO. NJP-BPE-CM-C02 0014

C2 2
The coating shall be visually Inspected for defects and shall meet the requirements of the coating
manufacturer's data sheets.

C3

C4 After completing paint application, clean spattered surfaces. Remove spattered paints by
washing, scraping, or other methods.

Final finishing surface should be smooth and free of scratch or damage

Archhitectural Techinal. SPEC. SEC. 099113, SEC 099123

Archhitectural Techinal. SPEC. SEC, 099113, SEC 099123.

Architectural Technical SPEC. SEC. 099113, SEC 099123

C5

Final colour, finish and texture meets the approved drawing requirements

Approved IFC/ shop drawing