PAGE No 1 of 15
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name: Festival Living Stream-02 HSE-RA 057
Index:
Form 1 Task Analysis Initiation
Form 2 Risk Assessment Process As per Risk Assessment Procedure.
Form 3 Written Safe Work Procedure Result
Compiled by the following team:
NAME DESIGNATION SIGNATURE
Project Manager
Construction Manager
Site Engineer
Safety Officer
Risk Assessment Review 1 Review 2 Review 3 Review 4
Review Date: Date : Date : Date:
AUTHORISATION
Prepared by: Approved by
Signature Date Signature Date
HSE Manager Project Manager
4. Competent supervision Failure will cause injuries to employees and H, S Competent supervisor should be appointed for every
HSE QUALITY SYSTEM DOCUMENTATION
DOC No DS/CA006P02/00022
PAGE No 3 of 15
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name: Festival Living Stream-02 HSE-RA 057
6. Using Hand & Power Tools Defective tools H,S,E All the tools must be inspected before use.
Extension cords with worn Any or all faulty tools must be removed from the services.
insulations Special tools should be certified as safe for use and also
Tripping hazards must be inspected before use.
Use of tools not intended for the job All type of power tools must be colour coded and tagged
Use of improper PPE as safe for use also must be entered in register.
Permit to work system should be in place.
PPE should be worn by all operators as per the job
nature.
Avoid any unnecessary and unwanted materials in the
workplace that can cause tripping hazard.
9. Pressuring procedure Failure to adopt the correct H, S Remove all air from the vessel and pipe line by water
procedure through vent line.
Non-observance of personnel on Pressurization is conducted gradually/slowly.
proper testing procedure
HSE QUALITY SYSTEM DOCUMENTATION
DOC No DS/CA006P02/00022
PAGE No 5 of 15
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name: Festival Living Stream-02 HSE-RA 057
Lack of monitoring Mark all leak points and repair them before proceeding
Failure of all above stated will cause injuries with the test.
to person and/or property damage Do not monitor during pressurization step directly from
the front of sight glass or level glass.
Failure to adopt the correct Start de-pressurization by opening gradually the vent
procedure valve “ Do it slowly”
Non-observance of personnel on Do not open the drain valve if the vent valve is still
proper testing procedure closed. This is to avoid vacuum condition inside the
10. De-pressurization process Lack of monitoring H, S vessel.
Failure of all above stated will cause injuries Open the lowest drain point to completely remove water
to person and/or property damage from the vessel and pipeline.
Ensure that no remaining pressure trapped inside the
pipe line or vessel.
Result Classification:
Risk Rating
Critical = 17►15 High = 14►11 Medium = 10►7 Low = 6►0 16
6 Faulty Hand Tools and Potential Death, Major/Minor H,S,E 9 Proper hand tool & machinery PE/FM/ Before 6
Machinery Skeletal damage, cuts and bruises to and daily checking/ check list. supervisor work
all parts of the body. Competent operator and
supervision and safe working
Environmental concern Excessive Noise & Dust Noise levels to be monitored and
restricted to social able timings
where ever practicably possible.
Dust control system must be
applied.
Failure to barricade the area. Falling materials Major/minor 12 Ensure the work area has been FM Before &
injuries, potential death, property barricaded and warning sign /Supervisor during
damage. placed. work
7 H.S 4
Watchman should be posted in
necessary positions.
8 Injuries to person and / or property H, S 8 Permit to work should be Supervisor Always 2
Failure adhere procedures on damage obtained prior the work
pressure testing commences.
Test equipments should be
operated by a trained personal
only.
Unauthorized personal should
not be allowed to stay in testing
area.
Only one person should take the
2. PROCEDURE
1. Do pre-use inspection of all equipment to be used and replace or repair faulty items.
2. Use trained competent employees only.
3. Use appropriate Personal Protective Equipment i.e.:
3.1. Hardhat.
3.2. Safety boots.
3.3. Overalls.
3.4. Ear Plugs
3.5. Masks
3.6. Safety Glasses
Prior to work commencement
1. Must have PPE – safety footwear, gloves, hardhat, goggles, face musk, protective clothing etc.
2. Must have appropriate tools and equipment in good condition.
3. Must have weatherproof covers for materials and equipment, waste containers, warning tape.
4. Consider risks and hazards in work area. Refer any concerns to supervisor. Are relevant permits in place?
5. Check if it is necessary to secure area adjacent to work. Refer to supervisor if appropriate.
6. Arrange for transport of materials and equipment to site via supervisor.
7. Ensure materials and equipment are secure or removed when site unattended, eg overnight or during breaks.
HSE QUALITY SYSTEM DOCUMENTATION
DOC No DS/CA006P02/00022
PAGE No 13 of 15
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name: Festival Living Stream-02 HSE-RA 057
Hazards
1. Manual handling of materials (Lifting and shifting of materials) LITE to be considered at all times.
2. Fall from height (Working near edges and inside shafts)
3. Slips and trips and fall
4. Falling materials (eg:, Tools, equipments ,components etc)
5. Collapse of the pipes and valves due to high pressure.
6. Contact with sharp edges of materials.
7. Working at heights.
8. Adverse weather conditions. If any doubts refer to the supervisor.
Harm
Potential Death, Minor/major cuts and contusions, loss of limbs, fractures, concussion to fatality, property damage
Persons in danger
Control measures
No lone working
1. Appropriate PPE must be worn by all workers on site & special PPE should be provided for those who are directly involved in this
activity.
2. Site Induction and tool box talks should be given prior to start job.
3. Equipment to be used in transporting pipes should be inspected and must be safe for use.
4. Pipes shall be properly secured while being transported.
5. Pipes stand and shafting capable of carrying the load. Pressure capacity clearly marked on every unit.
6. Employees shall be educated in keeping out of possible crush on steel pipes turn into pieces
7. Permit to work system should be followed by all supervisors and engineers.
8. Daily, weekly and monthly inspection to be done regularly any defect found must be reported immediately.
9. Physical barricade to installed and maintained with entry and exit points.
10. Only personnel involve in pressure testing activities are allowed inside the barricaded area. Enforce the use of competent persons
only.
11. All hand and power tools must be inspected before use
12. All hand and power tools must be safe for use
13. All type of power tools must be colour coded and tagged as safe for use also must be entered in register.
14. Permit to work system should be in place.
15. PPE should be worn by all operators as per the job nature.
16. Only competent person shall operate the Hydraulic test pump
17. Maintain work area isolated with means of barricade and appropriate signage should be in place.
18. Remind personnel through toolbox talk to observe proper positioning when working
19. All the work should be done under the competent supervision.