elektrik Budget Outline Level Notes
Rp 66,810,000.00 99%
26-Nov-21 Rp 4,500,000.00 11% Spek Standar
25-Nov-21 Rp 4,500,000.00 11% Tiang KWH Sebelah kanan
27-Nov-21 Rp 4,500,000.00 11% Spek Standar
27-Nov-21 Rp 4,500,000.00 11% Spek Standar
27-Nov-21 Rp 4,500,000.00 11% non tiang (KWH On the Wall)
26-Nov-21 Rp 4,500,000.00 11% Tiang KWH Sebelah kanan maju ke depan 1 meter
Rp 4,500,000.00 11% Tiang KWH Sebelah kanan
13-Dec-21 Rp 4,500,000.00 11% Tiang kwh sebelah kiri belakang bak kontrol
28-Nov-21 Rp 4,500,000.00 11%
Rp 40,500,000.00
Rp 26,310,000.00
Rp 13,505,000.00
Rp 12,805,000.00
Rp 213,812,500.00
Shelter Jateng
Rp 160,000,000.00 Invoice Sukron Tower
Rp 129,000,000.00 Pembayaran Berjalan
Rp 31,000,000.00 Pembayaran Tunggu
Rp 38,385,654.00
Rp 24,000,000.00
Rp 9,000,000.00
Rp 9,000,000.00
Rp 7,000,000.00
Rp 87,385,654.00
ID Name Duration Start Finish
A Progress Civil Pembangunan JABAR 18 5-Oct-21 10-Nov-21
1 ODC 3 Pintu PLN UP3 Sumedang 2 5-Oct-21 6-Oct-21
2 ODC 3 Pintu PLN UP3 Bandung 2 7-Oct-21 8-Oct-21
3 ODC 3 Pintu PLN ULP Rajapolah 2 12-Oct-21 16-Oct-21
4 ODC 3 Pintu PLN UP3 Tasikmalaya 2 12-Oct-21 15-Oct-21
5 ODC 3 Pintu PLN ULP Singaparna 2 12-Oct-21 15-Oct-21
6 ODC 3 Pintu PLN ULP Majalengka 2 20-Oct-21 21-Oct-21
7 ODC 3 Pintu PLN UP3 Indramayu Kota 2 26-Oct-21 27-Oct-21
8 ODC 3 Pintu PLN ULP Cibadak 2 28-Oct-21 30-Oct-21
9 ODC 3 Pintu Area Warga Margahayu 2 9-Nov-21 10-Nov-21
Total
Sisa
Ops Team
Saldo
Total
Sisa
Ops Team
Saldo
Rek
elektrik Budget Outline Level Notes
Rp 66,810,000.00 99%
26-Nov-21 Rp 4,500,000.00 11% Spek Standar
25-Nov-21 Rp 4,500,000.00 11% Tiang KWH Sebelah kanan
27-Nov-21 Rp 4,500,000.00 11% Spek Standar
27-Nov-21 Rp 4,500,000.00 11% Spek Standar
27-Nov-21 Rp 4,500,000.00 11% non tiang (KWH On the Wall)
26-Nov-21 Rp 4,500,000.00 11% Tiang KWH Sebelah kanan maju ke depan 1 meter
Rp 4,500,000.00 11% Tiang KWH Sebelah kanan
13-Dec-21 Rp 4,500,000.00 11% Tiang kwh sebelah kiri belakang bak kontrol
28-Nov-21 Rp 4,500,000.00 11%
Rp 40,500,000.00
Rp 26,310,000.00
Rp 13,505,000.00
Rp 12,805,000.00
Rp 49,652,500.00
INVOICE
Shelter UP3 Tegal add On Bongkar pasang canopy Baru Rp 15,000,000
Operasional Re Survey UID, Tegal, Binangun, Maos Rp 4,709,900
Shelter UID JTY add on Penebangan pohon dan buang Rp 3,500,000
Shelter UID JTY add on Pembuatan Canopy Carbonate Rp 17,750,000
ODC 3 Pintu PLN Boyolali add on Holow Partisi Rp 2,500,000
Rapid test team jateng Rp 699,000
Re Survey Garut Rp 227,000
Ekpedisi ODC Margahayu Rp 350,000
AK 3 Ainu Rp 2,500,000
ops 5 site GI Rp 1,475,000
AK3 Anton R Rp 1,500,000
ops 3 site GI Rp 2,000,000
AK3 Abdulloh Taufik Rp 2,500,000
ops 4 Site GI Rp 2,000,000
AK3 Maulfi Madjid Rp 2,500,000
ops 3 Site GI Rp 1,500,000
swab Cikumpay Rp 500,000
Swab Lembursitu Rp 500,000
Swab Teluk Jambe Rp 500,000
Swab Pinayungan Rp 475,000
Ormas Pinayungan Rp 500,000
Ormas Up2 Bandung Rp 750,000
Ormas Cikumpay Rp 500,000
Ormas Teluk Jambe Rp 500,000
Swab Antigen 7 Orang team Jateng Rp 700,000
Solar genset Banguntapan Rp 2,100,000
Hyap Crane Banguntapan Rp 2,700,000
Forklift Kebasen Rp 1,500,000
Swab GI Teluk Jambe Install Rp 475,000
Langsiran Ormas GI Teluk Jambe Rp 500,000
Ops AK3 4 site Rp 2,000,000
Solar Kebasen Rp 2,100,000
Solar Pemalang Rp 2,100,000
Solar Teluk Jambe Rp 3,000,000
Langsiran Ormas Gi Cikumpay Rp 500,000
Crane GI Cikumpay Rp 2,800,000
Koordinasi Satpam GI Cikumpay Rp 1,000,000
Solar GI Cikumpay Rp 3,200,000
Langsiran Ormas GI Pinayungan Rp 500,000
Swab Antigen GI Pinayungan Install Rp 475,000
Koordinasi Satpam GI Pinayungan Rp 300,000
Solar GI Pekalongan Rp 2,500,000
Solar GI Pinayungan Rp 2,500,000
SLO PLN Cibadak Rp 500,000
Solar GI Lembur situ Rp 2,500,000
Solar GI Wates Rp 2,500,000
Solar GI Kebumen Rp 2,500,000
Swab GI Pangandaran Rp 475,000
Solar GI Sunyaragi dan Cangkring Rp 5,280,000
Add On Lampu taman Cangkring Rp 550,000
listrik Rajapolah Rp 154,000
Rp 110,344,900
Rp 14,500,000 Solar + Swab Jateng
Rp 27,575,000 Solar+Swab+Langsir Jabar
Rp 68,269,900
jasa+material
Belanja Umum
Belanja Umum
Belanja Umum
Belanja Umum
Belanja Umum
Belanja Umum
Belanja Umum
ID Name Initials Type Material Label Standard Rate Cost Per Use
JABAR
1 Anton Rahardjo Jabar 1 HL On Site GI 50% DP
2 Asep Taryadi Jabar 2 HL On Site ULP 50% DP
3 Asep Taryadi Jabar 3 BR Pabrikasi ULP 50% DP
4 Sobri Jabar 4 BR On Site Genset 50% DP
JATENG
1 M. Ainu Ramadhani Jateng 3 HL On Site GI 50% DP
2 M. Sukron Jateng 1 BR On Site ULP 50% DP
3 Sulistiyono Jateng 2 BR On Site ULP 50% DP
Notes
Sertifikasi AK3
K3 Umum
K3 Umum
Civil
Sertifikasi AK3
K3 Umum
K3 Umum
Task Name Resource Name % Work Complete Work % Work Complete Work
ODC 3 Pintu Pembangunan Jabar 99.00% Civil 0.00% Elektrik
Genset 10 KVA Sarpen Jabar 63.20% Civil 0.00% Elektrik
ODC 3 Pintu Pembangunan Jateng 96.30% Civil 0.00% Elektrik
Shelter Pembangunan Jateng 100.00% Civil 0.00% Elektrik
Genset 10 KVA Sarpen Jateng 98.00% Civil 0.00% Elektrik
Units Invoice DP 1 DP 2 DP 3 DP4
9 Rp 99,000,000 Rp 36,400,000 Rp 5,660,000 Rp 24,750,000 Rp -
11 Rp 247,500,000 Rp - Rp - Rp 121,000,000 Rp 22,000,000
6 Rp 81,000,000 Rp 5,000,000 Rp - Rp 13,000,000 Rp 20,250,000
5 Rp 285,000,000 Rp 35,000,000 Rp 30,000,000 Rp 100,000,000 Rp 14,250,000
7 Rp 161,000,000 Rp 15,000,000 Rp 41,250,000 Rp 22,500,000 Rp 39,375,000
Rp 873,500,000
DP5 Sisa Invoice
Rp 24,750,000 Rp 1,754,000 Rp 5,686,000
Rp 7,000,000 Rp 9,500,000 Rp 88,000,000
Rp - Rp 20,500,000 Rp 22,250,000
Rp - Rp 10,000,000 Rp 95,750,000
Rp 39,375,000 Rp - Rp 3,500,000
Rp 215,186,000
Rp 70,500,000 sukron
Rp 144,686,000
Rp 2,000,000 genset
Rp 10,000,000 tiang
Rp 132,686,000
Rp 29,000,000 add on