Commissioning & StartUp Directory by JGC
Commissioning & StartUp Directory by JGC
◆ Commissioning Program
Our commissioning engineers are passionate about risk in commissioning
and start-up management, and work closely with the client to create the Predictable Start up
- Commissioning Readiness Review and Audit
optimized plan taking into account lessons learned and our knowledge - Optimization and/or Automation
from our many previous projects, aiming always to deliver the best for Startup/Normal Operation
commissioning and startup service
CASTOR®
(Commissioning & Startup Transient
Operability Review)
Commissioning Safety
Our Solution
Provide consultation on the following plans/topics:
• Completion Plan
• Commissioning Execution Plan
• Design/Engineering Considerations
• Benchmark Schedule and/or manning against projects completed
• Subcontractor Strategy
• Technical Evaluation for Subcontractor
• Identifying Commissioning Risks
CASTOR® Solution
• Reveal risks during transient state operation at
commissioning and initial start-up phase
• Plan mitigation actions against risks
• Increase likelihood of successful commissioning and
plant start-up
• Minimize downtime due to trouble
• Eliminate risks of schedule delay
7
•
• Improvement of Operation Manuals, Procedures (SOP), Training
Programs and updating of procedures for existing plants Cases
[Utility Commissioning]
Introduction of hazardous material in areas Inlet Facilities Process Train1 Process Train2
✓ Chemicals
Electricity
Buildin WWT
Steam
✓ Steam
g
✓ Hydrocarbon [Gas-In]
Inlet
InletFacility
Facilities Process Train1 Process Train2
Hydrocarbo
Our Solution Utility
Utility n Construction
Construction
Flare
Chemical
Provide consultation on the following plans/topics: Storage Flare
Hydrocarbon
• Design/Engineering Considerations (Additional Isolations) Utility
Utility Hydrocarbon Construction
Construction
Electricity
Buildin
g
WWT
Steam Hydrocarbon Hydrocarbon
Optimize Area
Control of Risk
[Results]
Achievement of Safety SIMOPS
Our Experiences
• CSU planning using system definitions since early 1990s
x • SIMOPS study since early 2000s
• Continued to ensure commissioning safety in recent larger
and more complex projects.
Construction Commissioning
Successful Project Completion Petronas FLNG-2 EPCIC ENI Coral FLNG-2 EPCIC
OR&A Solution
Project Month
Recruiting Progress Tracking Business Process Progress Tracking