Manual Title : Standard Operation Procedure Manual MANUAL NUMBER:

Procedure Name : Well Control Procedures for Non-


ISSUE DATE:
Shearables Oct 03, 2014
Procedure No. : KSDR-03-DXXXX REV. DATE:

SERIES No: ISSUED BY: APPROVED BY:


Page 1 of 3
Level 3 RS RM

Well Control Procedures for Non-Shearables


Purpose and Objective
The primary purpose of this Standard Operating Procedure (SOP) is to serve as a contingency plan reference
for the Drill Site Managers (DSM’s) for all non-shearable tubular operation during well control.

Scope
This document applies to all Chevron Pacific Indonesia (CPI) drilling rigs operating in all SMO area. These
procedures are limited to non shearable operations that are commonly executed in CPI area.

PROCEDURE

Well Control Procedure for Stabilizer


1. Stab in FOSV.
2. Space out to avoid non sealing tubular/stabilizer across BOP stack.
3. Shut in well with annular BOP.
4. If pipe light issue becomes a potential problem, drop the tubular/stabilizer and shut in well with blind
ram/blind shear.

Well Control Procedure for drill collars


1. Stab in FOSV.
2. Shut in well with annular BOP
3. If could not seal or pipe light issue becomes a potential problem, drop drill collars and shut in well with
blind ram/blind shear.

Well Control Procedure for Casing


1. Prior to run casing, reduce annular closing pressure as per guidance.
2. Shut in well with annular BOP
3. If pipe light issue becomes a potential problem, drop drill casing and shut in well with blind ram/blind
shear.
4. Install casing swadge equipped with ball valve/low torque valve.

Well Control Procedure for directional equipment


1. Stab in FOSV.
2. Space out to avoid non sealing tubular across BOP stack.
3. Shut in well with annular BOP.
4. If pipe light issue becomes a potential problem, drop the tubular and shut in well with blind ram/blind
shear.

Uncontrolled when printed KSDR-03-DXXXX Page 1 of 3


Manual Title : Standard Operation Procedure Manual MANUAL NUMBER:
Procedure Name : Well Control Procedures for Non-
ISSUE DATE:
Shearables Oct 03, 2014
Procedure No. : KSDR-03-DXXXX REV. DATE:

SERIES No: ISSUED BY: APPROVED BY:


Page 2 of 3
Level 3 RS RM

RESOURCES, ROLES AND RESPONSIBILITIES

The following table outlines the roles and responsibilities associated with this procedure.
Roles and Responsibilities
Role Responsibilities
 Understand all non shearable equipment that is being run
periodically in rig operation
Drilling Site  Understand contingency plan for shut in well for all non shearable
Manager equipment
 Accountable for securing well using contingency plan if non
shearable equipment are failed to seal
 Understand contingency plan for shut in well for all non shearable
Drilling equipment
Superintendent  Support & guide DSM should the operation require deviation to this
SOP
Drilling  Understand contingency plan for shut in well for all non shearable
Engineer equipment
 Understand all non shearable equipment that is being run
periodically in rig operation
Tool Pusher &
 Secure the well using annular if any flow occurs
Tour Pusher
 Report any flow to DSM immediately if annular fail to seal the well
for contingency plan

JHA – JOB HAZARD ANALYSIS


JHA DATE: ……… Revision: -
Describe Work to be Done:
Well Control Procedures for Non-Shearables
PTW / Specialized and Work Permit Required? Yes No
 Permit to Work
 -
 -
Dlakukan Oleh: Sign:
1. ____________________
2. ____________________
3. ____________________

Ditinjau Oleh: Sign:

Disetujui Oleh: Sign:

Potential Accidents/Hazards Recommended SAFE Job


No Sequence of Basic Job Steps (PPE; Body Position; Procedure; Procedure PIC
Environmental; Tools/Equip or Controls
1

2
3

Uncontrolled when printed KSDR-03-DXXXX Page 2 of 3


Manual Title : Standard Operation Procedure Manual MANUAL NUMBER:
Procedure Name : Well Control Procedures for Non-
ISSUE DATE:
Shearables Oct 03, 2014
Procedure No. : KSDR-03-DXXXX REV. DATE:

SERIES No: ISSUED BY: APPROVED BY:


Page 3 of 3
Level 3 RS RM

10

Additional JHA

 Communication
_______________________________________________________________
 Personnel
_______________________________________________________________
 Equipment
_______________________________________________________________

Personnel Involved:

Name Position Company Signature

Line Supervisor Rig Superintendent


________________ ________________

Uncontrolled when printed KSDR-03-DXXXX Page 3 of 3