ALDI CAP Electrical
ALDI CAP Electrical
The facilty concerned electrical team has worked on the mentioned issue and Md. Rasheduzzaman Khan
4 MCCBs are not adjusted according to load demand. 10-Jan-23 Done
now all MCCBs have been adjusted with the load demand accordingly Mangar(Electrical)
The facility concerned electrical team is working on the mentioned issue and all
Md. Rasheduzzaman Khan
5 Power cables are bent excessively. the power cables are being connected accordingly so that these are not bent 30-Jan-23
Mangar(Electrical)
excessively. It will take a minimum ime.
Panel permanent identification marking missing in several panel Md. Rasheduzzaman Khan
6 Electrical Panel Identification marking is going on so its need time to completion. 30-Jan-23
board. Mangar(Electrical)
Md. Rasheduzzaman Khan
7 Burning Sign observe inside the panel. The mentioned issue has been remediated accordingly 10-Jan-23 Done
Mangar(Electrical)
In Production floor, multi load (machines) connected in circuit It has been remediated accordingly . There is no multi load connected in a cercuit Md. Rasheduzzaman Khan
8 15-Jan-23 Done
breaker. breaker Mangar(Electrical)
Md. Rasheduzzaman Khan
9 Flammable items are hanging with the cable tray. All the flammable items are now removed from the cable tray 10-Jan-23 Done
Mangar(Electrical)
Most of the MDBs are connected with busbar with individual earthing from Md. Rasheduzzaman Khan
10 Comb-bus bar arrangement aren’t maintain as per standard. 30-Jan-23
individual pit. Reamaining work is going on. Mangar(Electrical)
The facility is working on this issue. Some are done and remaining work is going Md. Rasheduzzaman Khan
11 Proper 1m clearance aren’t available in front of panel board. 30-Jan-23
on. It will take minimum time to recover. Mangar(Electrical)
The responsible electrical team is working to re-arrange the panel board in Md. Rasheduzzaman Khan
12 Some panel board need to install/ re-arrange in compliance location. 30-Jan-23
compliance loaction. Mangar(Electrical)
Electrical power cable and florescent light must be covered by non- The facility is working to cover all the powercables and florescent light in store Md. Rasheduzzaman Khan
13 30-Jan-23
flammable materials in store area. area. Mangar(Electrical)
The facility responsible team has worked on them and now all light load amchine Md. Rasheduzzaman Khan
14 Light load and machine load are connected in same circuit breaker. 10-Jan-23 Done
sare not connected in same circuit breaker. Mangar(Electrical)