Professional Documents
Culture Documents
QP Decision Science
QP Decision Science
QP Decision Science
of Questions : 5]
72
SEAT No. :
ic-
P8034 [Total No. of Pages : 3
tat
[5860]-302
-s
nq
M.B.A. - II
6p
302-GC-12 : DECISION SCIENCE
2 0 61
5:4
(2019 Pattern) (Semester - III)
8
8:4
9/2 11
0
Time : 2½ Hours] 02 [Max. Marks : 50
2 1 MP
-72
1.6 IM
tic
3) Use of non-scientific calculator is allowed.
ta
9.7
q-s
pn
Q1) Solve any five: [5×2=10]
.12
:46
1
3
a) Define Probability.
22 86
10
:45
11
08
72
IM
19
ic-
e) Enumerate any two quantitative techniques for optimal decision in business.
.72
tat
q-s
.69
:45
P.T.O.
10
72
Q3) Solve any one of the following: [1×10=10]
ic-
a) A small bank is allocating maximum 0%. Rs. 21,00,000/- for personal &
tat
car loans. The interest rates per annum are 11% for car loan & 13% for
-s
personal loans. The loans are repaid at the end of one year period. The
nq
amount of personal car cannot exceed 40% of the car loans. Past
6p
2 0 61
experience has shown that bad debts to 1.2% of all personal loans.
5:4
Formulate & solve the above problem to find the optimum loan
8
8:4
allocations.
9/2 11
b) Following is the distribution of defective pieces in a manufacturing process
0
02
2 1 MP
of a MNC in Pune.
No. of defective items 0 10 20 30 40 50
9/0
-72
1.6 IM
tic
ta
9.7
q-s
38, 58, 19, 51, 66, 15, 24, 78, 42, 08
pn
.12
:46
1
Using this sequence, simulate the number of defective items for next
3
22 86
10
10 days.
:45
11
08
P0
a) In a group of 1000 customers, there are 650 who uses Jio connection,
/09
72
400 uses Airtel connection and 150 uses both connections, Jio & Airtel.
IM
19
ic-
If a customer is selected at random, what is the probability that he uses :
.72
:46
:45
Two repairman Mr. X & Mr. Y have been interviewed for this purpose
IM
Mr. X charged Rs. 100 per hour. and he services breakdown machines
19
at rate of 8 per hour. Mr. Y demand Rs. 140 per hour and he services at
.72
[5860]-302 2
10
Q5) Solve any one of the following: [1×10=10]
72
ic-
a) Given the following:
tat
-s
Activity 1-2 2-3 2-4 2-5 3-7 4-5 4-7 5-6 6-7
nq
6p
Duration 3 4 4 5 4 2 2 3 2
2 0 61
5:4
(in days)
8
8:4
9/2 11
Construct the project network. Calculate project duration & determine
0
critical path. 02
2 1 MP
b) Determine the optimal strategies for A & B in the following game. Obtain
9/0
-72
1.6 IM
value of game.
tic
ta
B’s Strategy
9.7
q-s
B1 B2 B3
pn
.12
:46
1
3
A1 9 8 –7
22 86
10
:45
11
A’s A2 3 –6 4
08
P0
Strategy A3 6 7 7
/20
M
/09
72
IM
19
ic-
.72
tat
q-s
.69
pn
21
3.1
:46
1
86
10
:45
11
08
22
P0
/20
M
/09
IM
19
.72
.69
21
3.1
[5860]-302 3
10