Document Title : Lifting & Hoisting Procedure Company Job No. :
Status
Serial No. Page No. / Section Rev. Company Comment Contractor Response Resolution
(Open /Close)
Add Incorporated/Added.
4 Page-26/Sec-8.9.2 2 The centre of gravity of the load must always be within the forks of a fork lift closed
truck forks of a fork lift truck.
Add: Incorporated/Added.
Other qualifications and experience assessed and approved by the Managing
5 Page-28/Sec-9.1 2 closed
Contractor’s L & H SME
Page 1 of 2
MAJNOON SOUR GAS TREATMENT FACILITY
PROJECT
COMMENTS RESPONSE SHEET (CRS)
Document Title : Lifting & Hoisting Procedure Company Job No. :
Status
Serial No. Page No. / Section Rev. Company Comment Contractor Response Resolution
(Open /Close)
Add: Incorporated/Added.
General Requirements for the Inspection of Equipment
• Anti-two-blocking devices shall be installed, inspected and maintained on main
blocks and auxiliary whip lines and shall be of the type that stops the lifting
function and winch of the crane affected by the device.
• Boom Hi-Angle limit (Boom Kick-out) devices shall be installed, inspected and
maintained on all lattice boom type cranes and be of the type that stops the
6 Page-31/Sec-10.5.10 2 function of the crane. closed
• The main hoist load block and auxiliary hoist headache ball shall be painted
with a highly visible paint for maximum visibility.
• All cranes with a maximum rated load capacity of 3 tons or more shall be fitted
with a weight indicator. Weight indicators shall be maintained in operational
condition at all times of use.