I. GENERAL REQUIREMENTS
Bonds & Certificates
a. Performance Bonds 1.00 lot
b. CARI 1.00 lot
c. Guarantee Bonds 1.00 lot
d. Surety Bond 1.00 lot
Temporary Facilities
a. Electrical Consumption 1.00 lot
b. Water Consumption 1.00 lot
c. Security 1.00 lot
d. Office/Warehouse/Quarter 1.00 lot
Mobilization / Demobilization 1.00 lot
As-Built Plans 1.00 lot
Permits
Mechanical Permit 1.00 lot
PTO Permit 1.00 lot
Road Usage Permit 1.00 lot
Miscellaneous:
a. Testing and Commissioning 1.00 lot
b. Storage /Safekeeping /Housekeeping 1.00 lot
c. Health Protocol 1.00 lot
d. Off-Site Barracks 1.00 lot
Other item/s (pls. specify)
1 Delivery Cost 1.00 lot
2 Hauling of Equipment/Materials 1.00 lot
3 Chipping & Concreting Works 1.00 lot
II Ductworks
2.0 Dampers
Volume Dampers
650x150 16.00 pc/s
600x200 1.00 pc/s
500x150 112.00 pc/s
450x250 7.00 pc/s
450x200 4.00 pc/s
350x200 87.00 pc/s
300x200 8.00 pc/s
200x150 3.00 pc/s
150x150 209.00 pc/s
V. OTHERS
1
TOTAL AMOUNT ( I to V )
COMPANY NAME
COMPANY ADDRESS
AUTHORIZED REPRESENTATIVE
DESIGNATION
SIGNATURE
BID VALIDITY
TERMS OF PAYMENT
WARRANTY
DELIVERY
Material Cost Labor Cost
Item No. PARTICULAR QTY. UNIT TOTAL AMOUNT
Unit Cost Total Cost Unit Cost Total Cost
INSTALLATION