TNB Electrical Meter Target Dates (Contractor - Voon Electrical)

No Form Ref. No. Description Original Target Duration Action Remarks


1 PIAT Handover TNB room for Precommissioning Inspection and Testing (PIAT) Q3 2021 1 month PPC/LiZ PIAT defects/comments rectification

2 Contribution Obtain contribution charges amount and pay


charges
3 Equipment Mobilization of equipment and installation 6-18 months LiZ/PPD
delivery
4 Bulk meter Obtain the bulk meter deposit amount and pay
deposit
5 Energization Energization and installation of bulk meter Q1 2023 At least 1 month before Bomba for
T&C
6 Unit meter Obtain the unit meter deposit amount and pay PPD
deposit
7 Unit meter Installation of unit meter PPD At least 1 week (depends on meter
installation delivery)
8

TIME Target Dates (Contractor - Voon Electrical)

No Form Ref. No. Description Original Target Duration Action Remarks


1 Testing & Q1 2023
inspection
2 Handover MDF Q2 2023
room

Street Lighting Target Dates (Contractor - Voon Electrical)

No Form Ref. No. Description Original Target Duration Action Remarks


1 Testing & Q1 2023 After energization of TNB
inspection
2