Project Name GAS ENGINER POWER PLANT BIAK 15 MW

PT PLN (PERSERO) Contract No 0177.PJ/DAN.02.01/DIR/2017 Tanggal 18 Mei 2017


EPC Contractor PT. PP (Persero) Tbk. - KSO WIKA & WRK
UNIT INDUK PEMBANGUNAN MALUKU DAN PAPUA
Cliect PT. PLN (Persero)
PLTMG BIAK 15 MW Contract Price IDR 296.261.251.904,72
Contract Price DOLLAR IDR/$ 13.047

Document No.
MONTHLY PROGRESS REPORT Period Jan-23
Date 26 Dec 22 - 25 Jan 23
PLTMG BIAK 15 MW Total Sheet 10
May-22
DESCRIPTION PREV MONTH THIS MONTH UP TO THIS MONTH
ITEM NO Level UNIT QTY WF %
Level 1 Level 3 Level 4 Level 5 Level 6 Level 7 PROGRESS WF PROGRESS WF PROGRESS WF
2

II PROCUREMENT 73,893% 99,609% 73,604% 0,391% 0,289% 100,000% 73,893%


II.1 FOB 32,251% 100,000% 32,251% 0,000% 0,000% 100,000% 32,251%
A MECHANICAL WORKS 31,977% 100,000% 31,977% 0,000% 0,000% 100,000% 31,977%
1 Power Generation Package 31,141%
1.1 Gas Engine and Auxiliary Lot 2 31,141% 100,000% 31,141% 0,000% 0,000% 100,000% 31,141%

2 Lube Oil Supply and Drain System 0,478%


2.1 Package System Lot 1 0,478% 100,000% 0,478% 0,000% 0,000% 100,000% 0,478%

3 Equipment Cooling Water Make-up System 0,358%


3.1 Package System Lot 1 0,358% 100,000% 0,358% 0,000% 0,000% 100,000% 0,358%

B ELECTRICAL WORK 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%

C CONTROL & INSTRUMENTATION 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%

D O & M , FINAL ACCEPTANCE 0,274% 100,000% 0,274% 0,000% 0,000% 100,000% 0,274%
1 Initial Spare Parts 0,274% 100,000% 0,274% 0,000% 0,000% 100,000% 0,274%

II.2 EX-WORK 35,758% 99,245% 35,488% 0,755% 0,270% 100,000% 35,758%


A MECHANICAL WORK 21,180% 98,725% 20,910% 1,275% 0,270% 100,000% 21,180%
1 Power Generation Unit 4,741% 100,000% 4,741% 0,000% 0,000% 100,000% 4,741%
1 1.1 Cooling System Lot 1 0,133% 100,000% 0,133% 0,000% 0,000% 100,000% 0,133%
2 1.2 Lubrication and Hydraulic System Lot 1 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%
3 1.3 Charge Air Intake Lot 1 1,140% 100,000% 1,140% 0,000% 0,000% 100,000% 1,140%
4 1.4 Exhaust System Lot 1 2,811% 100,000% 2,811% 0,000% 0,000% 100,000% 2,811%
All necessary pipe works, flange and coupling for interconnecting pipe, valves, tanks, duct,
5 1.5 Lot 1 0,657% 100,000% 0,657% 0,000% 0,000% 100,000% 0,657%
insulation, corrosion protection, safety devices and stairs
6
7 2 Lube Oil Supply and Drain System 2,233% 100,000% 2,233% 0,000% 0,000% 100,000% 2,233%

Lube oil supply and drain system including hoses, pumps, filters, flow meter, tanks, and all
8 2.1 Lot 1 2,233% 100,000% 2,233% 0,000% 0,000% 100,000% 2,233%
necessary material, piping, electrical and I&C for complete installation and operational.

9
10 3 Fuel Supply System 3,453% 100,000% 3,453% 0,000% 0,000% 100,000% 3,453%
11 3.1 Fuel Oil System 2,282% 100,000% 2,282% 0,000% 0,000% 100,000% 2,282%
12 3.1.1 Package System 1,529% 100,000% 1,529% 0,000% 0,000% 100,000% 1,529%
13 3.1.1.1 Fuel Oil Unloading System Set 1 0,321% 100,000% 0,321% 0,000% 0,000% 100,000% 0,321%
14 3.1.1.2 One fuel oil- air water separator Set 1 0,501% 100,000% 0,501% 0,000% 0,000% 100,000% 0,501%

Page 1 of 10
DESCRIPTION PREV MONTH THIS MONTH UP TO THIS MONTH
ITEM NO Level UNIT QTY WF %
Level 1 Level 3 Level 4 Level 5 Level 6 Level 7 PROGRESS WF PROGRESS WF PROGRESS WF
2
15 3.1.1.3 Flow meter Unloding Line Set 1 0,017% 100,000% 0,017% 0,000% 0,000% 100,000% 0,017%
16 3.1.1.4 Suction strainer Set 1 0,012% 100,000% 0,012% 0,000% 0,000% 100,000% 0,012%
17 3.1.1.5 100% Fuel Oil Transfer Pump Set 1 0,017% 100,000% 0,017% 0,000% 0,000% 100,000% 0,017%
18 3.1.1.6 Duplex strainer Set 1 0,012% 100,000% 0,012% 0,000% 0,000% 100,000% 0,012%
19 3.1.1.7 100% Fuel Oil Forwarding Pump Set 2 0,094% 100,000% 0,094% 0,000% 0,000% 100,000% 0,094%
20 3.1.1.8 Emergency Shut Off valve Set 1 0,021% 100,000% 0,021% 0,000% 0,000% 100,000% 0,021%
21 3.1.1.9 Fuel oil accumulator Set 1 0,066% 100,000% 0,066% 0,000% 0,000% 100,000% 0,066%
22 3.1.1.10 All necessary items required for complete and fuctional system Lot 1 0,468% 100,000% 0,468% 0,000% 0,000% 100,000% 0,468%
23
24 3.1.2 HSD Tank 0,753% 100,000% 0,753% 0,000% 0,000% 100,000% 0,753%
25 3.1.2.1 Main storage tank Set 1 0,560% 100,000% 0,560% 0,000% 0,000% 100,000% 0,560%
26 3.1.2.2 Daily storage tank Set 1 0,194% 100,000% 0,194% 0,000% 0,000% 100,000% 0,194%
27
28 3.2 Fuel Gas System 1,171% 100,000% 1,171% 0,000% 0,000% 100,000% 1,171%
29 3.2.1 Package System Lot 1 1,171% 100,000% 1,171% 0,000% 0,000% 100,000% 1,171%
30 3.2.1.1 Metering and analyzer Skid Set 1 0,235% 100,000% 0,235% 0,000% 0,000% 100,000% 0,235%
31 3.2.1.2 Pressure regulating valve Set 2 0,274% 100,000% 0,274% 0,000% 0,000% 100,000% 0,274%
32 3.2.1.3 Coalescing Filters Set 2 0,392% 100,000% 0,392% 0,000% 0,000% 100,000% 0,392%
33 3.2.1.4 Emergency Shut Off valve Set 1 0,118% 100,000% 0,118% 0,000% 0,000% 100,000% 0,118%
34 3.2.1.5 All necessary items required for complete and fuctional system Lot 1 0,151% 100,000% 0,151% 0,000% 0,000% 100,000% 0,151%
35
36 4 Compressed Air System 0,448% 100,000% 0,448% 0,000% 0,000% 100,000% 0,448%
37 4.1 Package System 0,448% 100,000% 0,448% 0,000% 0,000% 100,000% 0,448%
38 4.1.1 100% capacity air compressor including oil/water filter Set 2 0,166% 100,000% 0,166% 0,000% 0,000% 100,000% 0,166%
39 4.1.2 100% capacity air dryer unit Set 2 0,142% 100,000% 0,142% 0,000% 0,000% 100,000% 0,142%
40 4.1.3 Service air receiver Set 1 0,102% 100,000% 0,102% 0,000% 0,000% 100,000% 0,102%
41 4.1.4 Control air receiver Set 1 0,014% 100,000% 0,014% 0,000% 0,000% 100,000% 0,014%
42 4.1.5 All necessary items required for complete and fuctional system Lot 1 0,024% 100,000% 0,024% 0,000% 0,000% 100,000% 0,024%
43
44 5 Wastewater Collection and Treatment System 0,126% 100,000% 0,126% 0,000% 0,000% 100,000% 0,126%
45 5.1 Package Waswater System 0,119% 100,000% 0,119% 0,000% 0,000% 100,000% 0,119%
46 5.1.1 100% Sludge pump Set 2 0,018% 100,000% 0,018% 0,000% 0,000% 100,000% 0,018%
47 5.1.2 100% Transfer pump Set 2 0,017% 100,000% 0,017% 0,000% 0,000% 100,000% 0,017%
48 5.1.3 100% Air Blower Set 2 0,002% 100,000% 0,002% 0,000% 0,000% 100,000% 0,002%
49 5.1.4 100% Discharge Pump Set 2 0,017% 100,000% 0,017% 0,000% 0,000% 100,000% 0,017%
50 5.1.5 Acid/caustic measuring tank Set 1 0,026% 100,000% 0,026% 0,000% 0,000% 100,000% 0,026%
51 5.1.6 Oil Separator including oil skimmer Set 1 0,038% 100,000% 0,038% 0,000% 0,000% 100,000% 0,038%
52
53 5.2 All necessary items required for complete and fuctional system Lot 1 0,007% 100,000% 0,007% 0,000% 0,000% 100,000% 0,007%
54
55 6 Water Supply and Treatment System 1,638% 100,000% 1,638% 0,000% 0,000% 100,000% 1,638%
56 6.1 Package System 1,335% 100,000% 1,335% 0,000% 0,000% 100,000% 1,335%
57 6.1.1 100% - Lifting Deep well pumps . Set 2 0,102% 100,000% 0,102% 0,000% 0,000% 100,000% 0,102%
58 6.1.2 100% - Pressure filters feed pumps Set 2 0,032% 100,000% 0,032% 0,000% 0,000% 100,000% 0,032%
59 6.1.3 Filtered water tank Set 1 0,151% 100,000% 0,151% 0,000% 0,000% 100,000% 0,151%
60 6.1.4 100% Reverse Osmosis RO Set 2 0,564% 100,000% 0,564% 0,000% 0,000% 100,000% 0,564%
61 6.1.5 100% - Service water pumps. Set 2 0,030% 100,000% 0,030% 0,000% 0,000% 100,000% 0,030%
62 6.1.6 Fresh water tank Set 1 0,151% 100,000% 0,151% 0,000% 0,000% 100,000% 0,151%
63 6.1.7 100% - Fresh water pumps with common accumulator. Set 2 0,151% 100,000% 0,151% 0,000% 0,000% 100,000% 0,151%
64 6.1.8 Chemical cleaning skid for both RO trains Set 1 0,074% 100,000% 0,074% 0,000% 0,000% 100,000% 0,074%
65 6.1.9 Backwash system Set 1 0,048% 100,000% 0,048% 0,000% 0,000% 100,000% 0,048%

Page 2 of 10
DESCRIPTION PREV MONTH THIS MONTH UP TO THIS MONTH
ITEM NO Level UNIT QTY WF %
Level 1 Level 3 Level 4 Level 5 Level 6 Level 7 PROGRESS WF PROGRESS WF PROGRESS WF
2
66 6.1.10 All necessary items required for complete and fuctional system Lot 1 0,032% 100,000% 0,032% 0,000% 0,000% 100,000% 0,032%
67
68 6.2 Water Tank 0,303% 100,000% 0,303% 0,000% 0,000% 100,000% 0,303%
69 6.2.1 Combined service water tank and fire water tank Set 1 0,303% 100,000% 0,303% 0,000% 0,000% 100,000% 0,303%
70
71 7 Equipment Cooling Water Make-up System 2,890% 100,000% 2,890% 0,000% 0,000% 100,000% 2,890%

Equipment cooling water make-up system including make-up pump, expansion/make-up water
72 7.1 tank complete with corrosion inhibitor injection devices, and all necessary material, piping, 2,890% 100,000% 2,890% 0,000% 0,000% 100,000% 2,890%
electrical and I&C for complete installation and operational

73
74 8 Fire Protection System 2,199% 100,000% 2,199% 0,000% 0,000% 100,000% 2,199%
75 8.1 Package System 2,199% 100,000% 2,199% 0,000% 0,000% 100,000% 2,199%
76 8.1.1 Diesel fire pump fuel tank. Set 1 0,170% 100,000% 0,170% 0,000% 0,000% 100,000% 0,170%
77 8.1.2 Electric motor driven fire water pump. Set 1 0,206% 100,000% 0,206% 0,000% 0,000% 100,000% 0,206%
78 8.1.3 Diesel driven fire water pump. Set 1 0,170% 100,000% 0,170% 0,000% 0,000% 100,000% 0,170%
79 8.1.4 Motor driven site fire water pressure maintenance/ Jockey pump. Set 1 0,142% 100,000% 0,142% 0,000% 0,000% 100,000% 0,142%
80 8.1.5 Recirculation line with flowmeter Set 1 0,078% 100,000% 0,078% 0,000% 0,000% 100,000% 0,078%
81 8.1.6 Fire suppression equipment Lot 1 0,133% 100,000% 0,133% 0,000% 0,000% 100,000% 0,133%
82 8.1.7 Fire water loop, hydrants and hydrant boxes Lot 1 0,149% 100,000% 0,149% 0,000% 0,000% 100,000% 0,149%
83 8.1.8 Fire main segmenting valves Lot 1 0,040% 100,000% 0,040% 0,000% 0,000% 100,000% 0,040%
84 8.1.9 Local fire panels and a main Fire Alarm Annunciator Panel (FAAP) Lot 1 0,128% 100,000% 0,128% 0,000% 0,000% 100,000% 0,128%
85 8.1.10 Fire alarm & detection system Lot 1 0,355% 100,000% 0,355% 0,000% 0,000% 100,000% 0,355%
86 8.1.11 Foam system Lot 1 0,213% 100,000% 0,213% 0,000% 0,000% 100,000% 0,213%
87 8.1.12 CO2 extinguisher Lot 1 0,033% 100,000% 0,033% 0,000% 0,000% 100,000% 0,033%
88 8.1.13 Dry Chemical extinguisher Lot 1 0,028% 100,000% 0,028% 0,000% 0,000% 100,000% 0,028%
89 8.1.14 Portable fire protection equipment Lot 1 0,057% 100,000% 0,057% 0,000% 0,000% 100,000% 0,057%
90 8.1.15 All necessary items required for complete and fuctional system Lot 1 0,298% 100,000% 0,298% 0,000% 0,000% 100,000% 0,298%
91
92 9 Laboratory and Instruments 1,829% 85,240% 1,559% 14,760% 0,270% 100,000% 1,829%
93 9.1 Package System 1,829% 85,240% 1,559% 14,760% 0,270% 100,000% 1,829%
94 9.1.1 Thermometer gun Set 1 0,003% 100,000% 0,003% 0,000% 0,000% 100,000% 0,003%
95
96 9.1.2 Water Analysis Equipment 0,017% 100,000% 0,017% 0,000% 0,000% 100,000% 0,017%
97 9.1.2.1 Pocket pH Meter Set 1 0,006% 100,000% 0,006% 0,000% 0,000% 100,000% 0,006%
98 9.1.2.2 Pocket Thermometer Set 1 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%
99 9.1.2.3 Pocket Conducting meter Set 1 0,010% 100,000% 0,010% 0,000% 0,000% 100,000% 0,010%
100
101 9.1.3 Fuel Oil Analysis Equipment 0,703% 100,000% 0,703% 0,000% 0,000% 100,000% 0,703%
102 9.1.3.1 Stop Watch Set 1 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%
103 9.1.3.2 Specific gravity hydrometer Set 1 0,041% 100,000% 0,041% 0,000% 0,000% 100,000% 0,041%
104 9.1.3.3 Viscosity apparatus Set 1 0,099% 100,000% 0,099% 0,000% 0,000% 100,000% 0,099%
105 9.1.3.4 Water contents measuring apparatus Set 1 0,104% 100,000% 0,104% 0,000% 0,000% 100,000% 0,104%
106 9.1.3.5 General purpose drying oven Set 1 0,022% 100,000% 0,022% 0,000% 0,000% 100,000% 0,022%
107 9.1.3.6 Sulfur content equipment Set 1 0,436% 100,000% 0,436% 0,000% 0,000% 100,000% 0,436%
108
109 9.1.4 Analytical Instrument 1,057% 76,900% 0,813% 23,100% 0,244% 100,000% 1,057%
110 9.1.4.1 Calorimeter Set 1 0,094% 100,000% 0,094% 0,000% 0,000% 100,000% 0,094%
111 9.1.4.2 Elementry analyzer Set 1 0,287% 15,000% 0,043% 85,000% 0,244% 100,000% 0,287%
112 9.1.4.3 Gas/liquid chromatografic apparatus Set 1 0,646% 100,000% 0,646% 0,000% 0,000% 100,000% 0,646%
113 9.1.4.4 Orsat apparatus Set 1 0,030% 100,000% 0,030% 0,000% 0,000% 100,000% 0,030%

Page 3 of 10
DESCRIPTION PREV MONTH THIS MONTH UP TO THIS MONTH
ITEM NO Level UNIT QTY WF %
Level 1 Level 3 Level 4 Level 5 Level 6 Level 7 PROGRESS WF PROGRESS WF PROGRESS WF
2
114
115 9.1.5 Flue gas Analyzer Equipment 0,050% 48,603% 0,024% 51,397% 0,026% 100,000% 0,050%
116 9.1.5.1 NOx SOx O2 analyzer Set 1 0,030% 15,000% 0,005% 85,000% 0,026% 100,000% 0,030%
117 9.1.5.2 Dust measuring equipment Set 1 0,013% 100,000% 0,013% 0,000% 0,000% 100,000% 0,013%
118 9.1.5.3 Flow velocity measuring equipment Set 1 0,007% 100,000% 0,007% 0,000% 0,000% 100,000% 0,007%
119
120 10 Workshop and Machinery Equipment 0,225% 100,000% 0,225% 0,000% 0,000% 100,000% 0,225%
121 10.1 Package System 0,225% 100,000% 0,225% 0,000% 0,000% 100,000% 0,225%
122 10.1.1 Welding Machine Set 2 0,041% 100,000% 0,041% 0,000% 0,000% 100,000% 0,041%
123 10.1.2 Lathe Set 1 0,110% 100,000% 0,110% 0,000% 0,000% 100,000% 0,110%
124 10.1.3 Grinder Set 2 0,006% 100,000% 0,006% 0,000% 0,000% 100,000% 0,006%
125 10.1.4 Drilling Machine Set 1 0,006% 100,000% 0,006% 0,000% 0,000% 100,000% 0,006%
126 10.1.5 Vises Set 2 0,006% 100,000% 0,006% 0,000% 0,000% 100,000% 0,006%
127 10.1.6 Hand Tools Set consist of 3 sets Set 3 0,025% 100,000% 0,025% 0,000% 0,000% 100,000% 0,025%
128 10.1.7 Workbench Set 2 0,003% 100,000% 0,003% 0,000% 0,000% 100,000% 0,003%
129 10.1.8 All Associated Instrumentation and Control Lot 1 0,017% 100,000% 0,017% 0,000% 0,000% 100,000% 0,017%
All other items specified in the specification and scope of works and other
130 10.1.9 Lot 1 0,010% 100,000% 0,010% 0,000% 0,000% 100,000% 0,010%
accessories required for sytem operation.
131
132 11 Air Conditioning and Ventilation 0,132% 100,000% 0,132% 0,000% 0,000% 100,000% 0,132%
133 11.1.1 Administration Building VAC Lot 1 0,020% 100,000% 0,020% 0,000% 0,000% 100,000% 0,020%
134 11.1.2 Ventilation System of Ware House Lot 1 0,010% 100,000% 0,010% 0,000% 0,000% 100,000% 0,010%
Ventilation System of Work Shop and Air Condition System for workshop office &
135 11.1.3 Lot 1 0,027% 100,000% 0,027% 0,000% 0,000% 100,000% 0,027%
laboratory
136 11.1.4 VAC for Switchyard Control Building Lot 1 0,012% 100,000% 0,012% 0,000% 0,000% 100,000% 0,012%
137 11.1.5 All Associated Instrumentation and Control (*) Lot 1 0,007% 100,000% 0,007% 0,000% 0,000% 100,000% 0,007%
Other items specified in the specification and scope of work and other accessories
138 11.1.6 Lot 1 0,056% 100,000% 0,056% 0,000% 0,000% 100,000% 0,056%
required for system operation
139
140 12 Hoist Cranes, Forklift 1,266% 100,000% 1,266% 0,000% 0,000% 100,000% 1,266%
141 12.1 Power House Overhead Traveling Crane Set 1 0,718% 100,000% 0,718% 0,000% 0,000% 100,000% 0,718%
142 12.2 Workshop Overhead Traveling Crane Set 1 0,155% 100,000% 0,155% 0,000% 0,000% 100,000% 0,155%
143 12.3 Forklift Set 1 0,393% 100,000% 0,393% 0,000% 0,000% 100,000% 0,393%
144
145 B ELECTRICAL WORK 9,790% 100,000% 9,790% 0,000% 0,000% 100,000% 9,790%
146 1 Complete Generator and Main Output System 0,166% 100,000% 0,166% 0,000% 0,000% 100,000% 0,166%
147 1.1 Main Output Connection 0,166% 100,000% 0,166% 0,000% 0,000% 100,000% 0,166%
148
149 2 Complete Plant Electrical Equipment 7,035% 100,000% 7,035% 0,000% 0,000% 100,000% 7,035%
Medium Voltage switchgears complete with necessary control metering and protection and
150 2.1 LS 1 0,827% 100,000% 0,827% 0,000% 0,000% 100,000% 0,827%
instrumentation system

Low Voltage switchgears complete with necessary control metering and protection and
151 2.2 LS 1 0,415% 100,000% 0,415% 0,000% 0,000% 100,000% 0,415%
instrumentation system

Low voltage motor control centers complete with necessary control, metering and protection
152 2.3 LS 1 1,231% 100,000% 1,231% 0,000% 0,000% 100,000% 1,231%
and instrumentation system

Uninterruptible AC power supply complete with necessary control, metering and protection and
153 2.4 LS 1 0,380% 100,000% 0,380% 0,000% 0,000% 100,000% 0,380%
instrumentation system

Black Start/Emergency Diesel Generator (EDG) complete with necessary control, metering and
154 2.5 LS 1 0,764% 100,000% 0,764% 0,000% 0,000% 100,000% 0,764%
protection and instrumentation system

Batteries, battery chargers and DC distribution panels complete with necessary control,
155 2.6 LS 1 0,447% 100,000% 0,447% 0,000% 0,000% 100,000% 0,447%
metering and protection and instrumentation system

Page 4 of 10
DESCRIPTION PREV MONTH THIS MONTH UP TO THIS MONTH
ITEM NO Level UNIT QTY WF %
Level 1 Level 3 Level 4 Level 5 Level 6 Level 7 PROGRESS WF PROGRESS WF PROGRESS WF
2
156 2.7 Cabling and wiring complete cable trays, conduits and fittings and underground ducts LS 1 2,042% 100,000% 2,042% 0,000% 0,000% 100,000% 2,042%

157 2.8 Grounding and lightning protection system complete LS 1 0,356% 100,000% 0,356% 0,000% 0,000% 100,000% 0,356%
158 2.9 Lighting and small power installation complete LS 1 0,284% 100,000% 0,284% 0,000% 0,000% 100,000% 0,284%
159 2.10 Communication systems complete LS 1 0,159% 100,000% 0,159% 0,000% 0,000% 100,000% 0,159%
160 2.11 Closed circuit TV system equipment complete LS 1 0,130% 100,000% 0,130% 0,000% 0,000% 100,000% 0,130%
161
162 3 Complete Power Transformers 1,781% 100,000% 1,781% 0,000% 0,000% 100,000% 1,781%
163 3.1 Generator transformer complete with surge arresters, current transformers, etc Lot 2 1,639% 100,000% 1,639% 0,000% 0,000% 100,000% 1,639%
164 3.2 Unit/Station Transformer complete with surge arrester, current transformers etc Lot 2 0,142% 100,000% 0,142% 0,000% 0,000% 100,000% 0,142%
165
166 4 Complete 20 kV Substation Equipment 0,807% 100,000% 0,807% 0,000% 0,000% 100,000% 0,807%
MV switchgear complete with circuit breakers, earthing switches, surge arresters, instrument
167 4.1 LS 1 0,653% 100,000% 0,653% 0,000% 0,000% 100,000% 0,653%
transformers

Metering and protection system, control and monitoring system and associated equipment
168 4.2 LS 1 0,154% 100,000% 0,154% 0,000% 0,000% 100,000% 0,154%
complete
169
170 C INSTRUMENTATION & CONTROL 4,631% 100,000% 4,631% 0,000% 0,000% 100,000% 4,631%
171 1 Distributed digital control system and PLC control system LS 1 3,510% 100,000% 3,510% 0,000% 0,000% 100,000% 3,510%
172 1.1 Necessary hardware
173 1.2 Software for power plant
174 1.3 TFT - LCD
175 1.4 Cable, etc.
176
177 2 Power Plant Operation Control Desks LS 1 0,050% 100,000% 0,050% 0,000% 0,000% 100,000% 0,050%
178 2.1 Operator Desk
179 2.2 Printer Desk
180 2.3 Terminal Cabinet
181 2.4 Power Cabinet
182
183 3 Instrument valve LS 1 0,155% 100,000% 0,155% 0,000% 0,000% 100,000% 0,155%
184 3.1 Control Valve
185 3.2 Control Valve Cryogenic
186 3.3 Relief Valve
187 3.4 Relief Valve Cryogenic
188 3.5 On-Off Valve
189 3.6 On-Off Valve Cryogenic
190
191 4 Field Instruments LS 1 0,679% 100,000% 0,679% 0,000% 0,000% 100,000% 0,679%
192 4.1 Pressure Transmitters
193 4.2 Differential Pressure Transmitters
194 4.3 Temperature Transmitters and Well
195 4.4 Level Transmitter
196 4.5 Pressure Gauge
197 4.6 Differential Pressure Gauge
198 4.7 Temperature Gauge and Well
199 4.8 Level Gauge
200 4.9 Flow Meter
201
202 5 Instrument Cable, Cable tray, Junction Box, Gland and accessories LS 1 0,231% 100,000% 0,231% 0,000% 0,000% 100,000% 0,231%
203 6 Instrument installation bulk material and accessories LS 1 0,006% 100,000% 0,006% 0,000% 0,000% 100,000% 0,006%

Page 5 of 10
DESCRIPTION PREV MONTH THIS MONTH UP TO THIS MONTH
ITEM NO Level UNIT QTY WF %
Level 1 Level 3 Level 4 Level 5 Level 6 Level 7 PROGRESS WF PROGRESS WF PROGRESS WF
2
204
205 D O&M, FINAL ACCEPTANCE 0,158% 100,000% 0,158% 0,000% 0,000% 100,000% 0,158%
206 1 Initial Consumables 0,158% 100,000% 0,158% 0,000% 0,000% 100,000% 0,158%
207
208 II.3 MARINE FREIGHT 2,725% 100,000% 2,725% 0,000% 0,000% 100,000% 2,725%
209 A MECHNICAL
210 1 Power Generation Unit 2,367% 100,000% 2,367% 0,000% 0,000% 100,000% 2,367%
211 2 Lube Oil Supply and Drain System 0,191% 100,000% 0,191% 0,000% 0,000% 100,000% 0,191%
212 3 Equipment Cooling Water Make-up System 0,167% 100,000% 0,167% 0,000% 0,000% 100,000% 0,167%
213
214 II.4 INLAND TRANSPORT 3,159% 99,391% 3,140% 0,609% 0,019% 100,000% 3,159%
215 A MECHNICAL 2,036% 99,055% 2,017% 0,945% 0,019% 100,000% 2,036%
216 1 Power Generation Unit 1,205% 100,000% 1,205% 0,000% 0,000% 100,000% 1,205%
217 1.1 Gas Engine and Auxiliary 0,808% 100,000% 0,808% 0,000% 0,000% 100,000% 0,808%
218 1.2 Cooling System 0,008% 100,000% 0,008% 0,000% 0,000% 100,000% 0,008%
219 1.3 Charge Air Intake 0,069% 100,000% 0,069% 0,000% 0,000% 100,000% 0,069%
220 1.4 Exhaust System 0,281% 100,000% 0,281% 0,000% 0,000% 100,000% 0,281%
221 1.5 All Piping Works Interconnecting System 0,040% 100,000% 0,040% 0,000% 0,000% 100,000% 0,040%
222
223 2 Lube Oil Supply and Drain System 0,135% 100,000% 0,135% 0,000% 0,000% 100,000% 0,135%
224 2.1 Package System 0,054% 100,000% 0,054% 0,000% 0,000% 100,000% 0,054%
225 2.2 Storage and Drain Tank 0,081% 100,000% 0,081% 0,000% 0,000% 100,000% 0,081%
226
227 3 Fuel Supply System 0,188% 100,000% 0,188% 0,000% 0,000% 100,000% 0,188%
228 3.1 Fuel Oil System 0,117% 100,000% 0,117% 0,000% 0,000% 100,000% 0,117%
229 3.1.1 Packacge System 0,071% 100,000% 0,071% 0,000% 0,000% 100,000% 0,071%
Fuel oil unloading system including 4 unloading bays, pump and bypass
230 3.1.1.1 Set 1 0,018% 100,000% 0,018% 0,000% 0,000% 100,000% 0,018%
line
231 3.1.1.2 One fuel oil- air water separator Set 1 0,030% 100,000% 0,030% 0,000% 0,000% 100,000% 0,030%
232 3.1.1.3 Flow meter Unloding Line Set 1 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
233 3.1.1.4 Suction strainer Set 1 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
234 3.1.1.5 100% Fuel Oil Transfer Pump Set 1 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
235 3.1.1.6 Duplex strainer Set 1 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
236 3.1.1.7 100% Fuel Oil Forwarding Pump Set 2 0,006% 100,000% 0,006% 0,000% 0,000% 100,000% 0,006%
237 3.1.1.8 Emergency Shut Off valve Set 1 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
238 3.1.1.9 Fuel oil accumulator Set 1 0,004% 100,000% 0,004% 0,000% 0,000% 100,000% 0,004%

239 3.1.1.10 All necessary items required for complete and fuctional system Lot 1 0,009% 100,000% 0,009% 0,000% 0,000% 100,000% 0,009%

240
241 3.1.2 HSD Tank 0,046% 100,000% 0,046% 0,000% 0,000% 100,000% 0,046%
242 3.1.2.1 Main storage tank Set 1 0,034% 100,000% 0,034% 0,000% 0,000% 100,000% 0,034%
243 3.1.2.2 Daily storage tank Set 1 0,012% 100,000% 0,012% 0,000% 0,000% 100,000% 0,012%
244
245 3.2 Fuel Gas System 0,071% 100,000% 0,071% 0,000% 0,000% 100,000% 0,071%
246 3.2.1 Packacge System 0,062% 100,000% 0,062% 0,000% 0,000% 100,000% 0,062%
247 3.2.1.1 Metering and analyzer Skid Set 1 0,014% 100,000% 0,014% 0,000% 0,000% 100,000% 0,014%
248 3.2.1.2 Pressure regulating valve Set 2 0,017% 100,000% 0,017% 0,000% 0,000% 100,000% 0,017%
249 3.2.1.3 Coalescing Filters Set 2 0,024% 100,000% 0,024% 0,000% 0,000% 100,000% 0,024%
250 3.2.1.4 Emergency Shut Off valve Set 1 0,007% 100,000% 0,007% 0,000% 0,000% 100,000% 0,007%
251
252 3.2.2 All necessary items required for complete and fuctional system Lot 1 0,009% 100,000% 0,009% 0,000% 0,000% 100,000% 0,009%

Page 6 of 10
DESCRIPTION PREV MONTH THIS MONTH UP TO THIS MONTH
ITEM NO Level UNIT QTY WF %
Level 1 Level 3 Level 4 Level 5 Level 6 Level 7 PROGRESS WF PROGRESS WF PROGRESS WF
2
253
254 4 Compressed Air System 0,027% 100,000% 0,027% 0,000% 0,000% 100,000% 0,027%
255 4.1 100% capacity air compressor including oil/water filter Set 2 0,010% 100,000% 0,010% 0,000% 0,000% 100,000% 0,010%
256 4.2 100% capacity air dryer unit Set 2 0,009% 100,000% 0,009% 0,000% 0,000% 100,000% 0,009%
257 4.3 Service air receiver Set 1 0,006% 100,000% 0,006% 0,000% 0,000% 100,000% 0,006%
258 4.4 Control air receiver Set 1 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
259 4.5 All necessary items required for complete and fuctional system Lot 1 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
260
261 5 Wastewater Collection and Treatment System 0,008% 100,000% 0,008% 0,000% 0,000% 100,000% 0,008%
262 5.1 Wastewater systems 0,007% 100,000% 0,007% 0,000% 0,000% 100,000% 0,007%
263 5.1.1 100% Sludge pump Set 2 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
264 5.1.2 100% Transfer pump Set 2 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
265 5.1.3 100% Air Blower Set 2 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%
266 5.1.4 100% Discharge Pump Set 2 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
267 5.1.5 Acid/caustic measuring tank Set 1 0,002% 100,000% 0,002% 0,000% 0,000% 100,000% 0,002%
268 5.1.6 Oil Separator including oil skimmer Set 1 0,002% 100,000% 0,002% 0,000% 0,000% 100,000% 0,002%
269
270 5.2 All necessary items required for complete and fuctional system Lot 1 0,0004% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%
271
272 6 Water Supply and Treatment System 0,072% 100,000% 0,072% 0,000% 0,000% 100,000% 0,072%
273 6.1 Packacge System 0,071% 100,000% 0,071% 0,000% 0,000% 100,000% 0,071%
274 6.1.1 100% - Lifting Deep well pumps . Set 2 0,006% 100,000% 0,006% 0,000% 0,000% 100,000% 0,006%
275 6.1.2 100% - Pressure filters feed pumps Set 2 0,002% 100,000% 0,002% 0,000% 0,000% 100,000% 0,002%
276 6.1.3 Filtered water tank Set 1 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%
277 6.1.4 100% Reverse Osmosis RO Set 2 0,034% 100,000% 0,034% 0,000% 0,000% 100,000% 0,034%
278 6.1.5 100% - Service water pumps. Set 2 0,002% 100,000% 0,002% 0,000% 0,000% 100,000% 0,002%
279 6.1.6 Fresh water tank Set 1 0,009% 100,000% 0,009% 0,000% 0,000% 100,000% 0,009%
280 6.1.7 100% - Fresh water pumps with common accumulator. Set 2 0,008% 100,000% 0,008% 0,000% 0,000% 100,000% 0,008%
281 6.1.8 Chemical cleaning skid for both RO trains Set 1 0,005% 100,000% 0,005% 0,000% 0,000% 100,000% 0,005%
282 6.1.9 Backwash system Set 1 0,003% 100,000% 0,003% 0,000% 0,000% 100,000% 0,003%
283 6.1.10 All necessary items required for complete and fuctional system Lot 1 0,002% 100,000% 0,002% 0,000% 0,000% 100,000% 0,002%
284
285 6.2 Water Tank 0,002% 100,000% 0,002% 0,000% 0,000% 100,000% 0,002%
286 6.2.1 Combined service water tank and fire water tank Lot 1 0,002% 100,000% 0,002% 0,000% 0,000% 100,000% 0,002%
287
288 7 Equipment Cooling Water Make-up System Lot 1 0,048% 100,000% 0,048% 0,000% 0,000% 100,000% 0,048%
289 8 Fire Protection System 0,133% 100,000% 0,133% 0,000% 0,000% 100,000% 0,133%
290 8.1 Diesel fire pump fuel tank. Set 1 0,010% 100,000% 0,010% 0,000% 0,000% 100,000% 0,010%
291 8.2 Electric motor driven fire water pump. Set 1 0,012% 100,000% 0,012% 0,000% 0,000% 100,000% 0,012%
292 8.3 Diesel driven fire water pump. Set 1 0,010% 100,000% 0,010% 0,000% 0,000% 100,000% 0,010%
293 8.4 Motor driven site fire water pressure maintenance/ Jockey pump. Set 1 0,009% 100,000% 0,009% 0,000% 0,000% 100,000% 0,009%
294 8.5 Recirculation line with flowmeter Lot 1 0,005% 100,000% 0,005% 0,000% 0,000% 100,000% 0,005%
295 8.6 Fire suppression equipment Lot 1 0,008% 100,000% 0,008% 0,000% 0,000% 100,000% 0,008%
296 8.7 Fire water loop, hydrants and hydrant boxes Lot 1 0,009% 100,000% 0,009% 0,000% 0,000% 100,000% 0,009%
297 8.8 Fire main segmenting valves Lot 1 0,002% 100,000% 0,002% 0,000% 0,000% 100,000% 0,002%
298 8.9 Local fire panels and a main Fire Alarm Annunciator Panel (FAAP) Lot 1 0,008% 100,000% 0,008% 0,000% 0,000% 100,000% 0,008%
299 8.10 Fire alarm & detection system Lot 1 0,021% 100,000% 0,021% 0,000% 0,000% 100,000% 0,021%
300 8.11 Foam system Lot 1 0,013% 100,000% 0,013% 0,000% 0,000% 100,000% 0,013%
301 8.12 CO2 extinguisher Lot 1 0,002% 100,000% 0,002% 0,000% 0,000% 100,000% 0,002%
302 8.13 Dry Chemical extinguisher Lot 1 0,002% 100,000% 0,002% 0,000% 0,000% 100,000% 0,002%
303 8.14 Portable fire protection equipment Lot 1 0,003% 100,000% 0,003% 0,000% 0,000% 100,000% 0,003%

Page 7 of 10
DESCRIPTION PREV MONTH THIS MONTH UP TO THIS MONTH
ITEM NO Level UNIT QTY WF %
Level 1 Level 3 Level 4 Level 5 Level 6 Level 7 PROGRESS WF PROGRESS WF PROGRESS WF
2
304 8.15 All necessary items required for complete and fuctional system Lot 1 0,018% 100,000% 0,018% 0,000% 0,000% 100,000% 0,018%
305
306 9 Laboratory and Instruments 0,111% 82,635% 0,092% 17,365% 0,019% 100,000% 0,111%
307 9.1 Thermometer gun Set 1 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%
308
309 9.2 Water Analysis Equipment 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
310 9.2.1 Pocket pH Meter Set 1 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%
311 9.2.2 Pocket Thermometer Set 1 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%
312 9.2.3 Pocket Conducting meter Set 1 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
313
314 9.3 Fuel Oil Analysis Equipment 0,043% 100,000% 0,043% 0,000% 0,000% 100,000% 0,043%
315 9.3.1 Stop Watch Set 1 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%
316 9.3.2 Specific gravity hydrometer Set 1 0,003% 100,000% 0,003% 0,000% 0,000% 100,000% 0,003%
317 9.3.3 Viscosity apparatus Set 1 0,006% 100,000% 0,006% 0,000% 0,000% 100,000% 0,006%
318 9.3.4 Water contents measuring apparatus Set 1 0,006% 100,000% 0,006% 0,000% 0,000% 100,000% 0,006%
319 9.3.5 General purpose drying oven Set 1 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
320 9.3.6 Sulfur content equipment Set 1 0,026% 100,000% 0,026% 0,000% 0,000% 100,000% 0,026%
321
322 9.4 Analytical Instrument 0,064% 72,823% 0,047% 27,177% 0,017% 100,000% 0,064%
323 9.4.1 Calorimeter Set 1 0,006% 100,000% 0,006% 0,000% 0,000% 100,000% 0,006%
324 9.4.2 Elementry analyzer Set 1 0,017% 0,000% 0,000% 100,000% 0,017% 100,000% 0,017%
325 9.4.3 Gas/liquid chromatografic apparatus Set 1 0,039% 100,000% 0,039% 0,000% 0,000% 100,000% 0,039%
326 9.4.4 Orsat apparatus Set 1 0,002% 100,000% 0,002% 0,000% 0,000% 100,000% 0,002%
327
328 9.5 Flue gas Analyzer Equipment 0,003% 39,533% 0,001% 60,467% 0,002% 100,000% 0,003%
329 9.5.1 NOx SOx O2 analyzer Set 1 0,002% 0,000% 0,000% 100,000% 0,002% 100,000% 0,002%
330 9.5.2 Dust measuring equipment Set 1 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
331 9.5.3 Flow velocity measuring equipment Set 1 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%
332
333 10 Workshop and Machinery Equipment 0,024% 100,000% 0,024% 0,000% 0,000% 100,000% 0,024%
334 10.1 Welding Machine Set 2 0,002% 100,000% 0,002% 0,000% 0,000% 100,000% 0,002%
335 10.2 Lathe Set 1 0,007% 100,000% 0,007% 0,000% 0,000% 100,000% 0,007%
336 10.3 Grinder Set 2 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%
337 10.4 Drilling Machine Set 1 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%
338 10.5 Vises Set 2 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%
339 10.6 Hand Tools Set consist of 3 sets Set 3 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
340 10.7 Workbench Set 2 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%
341 10.9 All Associated Instrumentation and Control Lot 1 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
All other items specified in the specification and scope of works and other accessories required
342 10.10 Lot 1 0,011% 100,000% 0,011% 0,000% 0,000% 100,000% 0,011%
for sytem operation.
343
344 11 Air Conditioning and Ventilation 0,008% 100,000% 0,008% 0,000% 0,000% 100,000% 0,008%
345 11.1 Administration Building VAC Lot 1 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
346 11.2 Ventilation System of Ware House Lot 1 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%

347 11.3 Ventilation System of Work Shop and Air Condition System for workshop office & laboratory Lot 1 0,002% 100,000% 0,002% 0,000% 0,000% 100,000% 0,002%

348 11.4 VAC for Switchyard Control Building Lot 1 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
349 11.5 All Associated Instrumentation and Control (*) Lot 1 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%
Other items specified in the specification and scope of work and other accessories required for
350 11.6 Lot 1 0,003% 100,000% 0,003% 0,000% 0,000% 100,000% 0,003%
system operation
351

Page 8 of 10
DESCRIPTION PREV MONTH THIS MONTH UP TO THIS MONTH
ITEM NO Level UNIT QTY WF %
Level 1 Level 3 Level 4 Level 5 Level 6 Level 7 PROGRESS WF PROGRESS WF PROGRESS WF
2
352 12 Hoist Cranes, Forklift 0,077% 100,000% 0,077% 0,000% 0,000% 100,000% 0,077%
353 12.1 Power House Overhead Traveling Crane Set 1 0,044% 100,000% 0,044% 0,000% 0,000% 100,000% 0,044%
354 12.2 Workshop Overhead Traveling Crane Set 1 0,009% 100,000% 0,009% 0,000% 0,000% 100,000% 0,009%
355 12.3 Forklift Set 1 0,024% 100,000% 0,024% 0,000% 0,000% 100,000% 0,024%
356
357 B ELECTRICAL 0,757% 100,000% 0,757% 0,000% 0,000% 100,000% 0,757%
358 1 Complete Generator and Main Output System 0,013% 100,000% 0,013% 0,000% 0,000% 100,000% 0,013%
359 2 Complete Plant Electrical Equipment 0,553% 100,000% 0,553% 0,000% 0,000% 100,000% 0,553%
Medium Voltage switchgears complete with necessary control metering and protection and
360 2.1 LS 1 0,066% 100,000% 0,066% 0,000% 0,000% 100,000% 0,066%
instrumentation system

Low Voltage switchgears complete with necessary control metering and protection and
361 2.2 LS 1 0,023% 100,000% 0,023% 0,000% 0,000% 100,000% 0,023%
instrumentation system

Low voltage motor control centers complete with necessary control, metering and protection
362 2.3 LS 1 0,099% 100,000% 0,099% 0,000% 0,000% 100,000% 0,099%
and instrumentation system

Uninterruptible AC power supply complete with necessary control, metering and protection and
363 2.4 LS 1 0,030% 100,000% 0,030% 0,000% 0,000% 100,000% 0,030%
instrumentation system

Black Start/Emergency Diesel Generator (EDG) complete with necessary control, metering and
364 2.5 LS 1 0,061% 100,000% 0,061% 0,000% 0,000% 100,000% 0,061%
protection and instrumentation system

Batteries, battery chargers and DC distribution panels complete with necessary control,
365 2.6 LS 1 0,036% 100,000% 0,036% 0,000% 0,000% 100,000% 0,036%
metering and protection and instrumentation system
366 2.7 Cabling and wiring complete cable trays, conduits and fittings and underground ducts LS 1 0,164% 100,000% 0,164% 0,000% 0,000% 100,000% 0,164%
367 2.8 Grounding and lightning protection system complete LS 1 0,029% 100,000% 0,029% 0,000% 0,000% 100,000% 0,029%
368 2.9 Lighting and small power installation complete LS 1 0,023% 100,000% 0,023% 0,000% 0,000% 100,000% 0,023%
369 2.10 Communication systems complete LS 1 0,013% 100,000% 0,013% 0,000% 0,000% 100,000% 0,013%
370 2.11 Closed circuit TV system equipment complete LS 1 0,010% 100,000% 0,010% 0,000% 0,000% 100,000% 0,010%
371
372 3 Complete Power Transformers 0,126% 100,000% 0,126% 0,000% 0,000% 100,000% 0,126%
373 3.1 Generator transformer complete with surge arresters, current transformers, etc Lot 2 0,116% 100,000% 0,116% 0,000% 0,000% 100,000% 0,116%
374 3.2 Unit/Station Transformer complete with surge arrester, current transformers etc Lot 2 0,010% 100,000% 0,010% 0,000% 0,000% 100,000% 0,010%
375
376 4 Complete 20/70/150 kV Substation Equipment 0,065% 100,000% 0,065% 0,000% 0,000% 100,000% 0,065%
MV switchgear complete with circuit breakers, earthing switches, surge arresters, instrument
377 4.1 LS 1 0,052% 100,000% 0,052% 0,000% 0,000% 100,000% 0,052%
transformers

Metering and protection system, control and monitoring system and associated equipment
378 4.2 LS 1 0,012% 100,000% 0,012% 0,000% 0,000% 100,000% 0,012%
complete
379
380 C INSTRUMENT 0,366% 100,000% 0,366% 0,000% 0,000% 100,000% 0,366%
381 1 Distributed digital control system and PLC control system 0,332% 100,000% 0,332% 0,000% 0,000% 100,000% 0,332%
382 1.1 Necessary hardware LS 1
383 1.2 Software for power plant
384 1.3 TFT - LCD
385 1.4 Cable, etc.
386
387 2 Power Plant Operation Control Desks LS 1 0,004% 100,000% 0,004% 0,000% 0,000% 100,000% 0,004%
388 3.1 Operator Desk
389 3.2 Printer Desk
390 3.3 Terminal Cabinet
391 3.4 Power Cabinet
392
393 3 Diagnostic Software 0,004% 100,000% 0,004% 0,000% 0,000% 100,000% 0,004%
394 4 Supervisory and Plant management system 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%

Page 9 of 10
DESCRIPTION PREV MONTH THIS MONTH UP TO THIS MONTH
ITEM NO Level UNIT QTY WF %
Level 1 Level 3 Level 4 Level 5 Level 6 Level 7 PROGRESS WF PROGRESS WF PROGRESS WF
2
395 5 Instrument valve LS 1 0,001% 100,000% 0,001% 0,000% 0,000% 100,000% 0,001%
396 5.1 Control Valve
397 5.2 Control Valve Cryogenic
398 5.3 Relief Valve
399 5.4 Relief Valve Cryogenic
400 5.5 On-Off Valve
401 5.6 On-Off Valve Cryogenic
402
403 6 Field Instruments LS 1 0,006% 100,000% 0,006% 0,000% 0,000% 100,000% 0,006%
404 6.1 Pressure Transmitters
405 6.2 Differential Pressure Transmitters
406 6.3 Temperature Transmitters and Well
407 6.4 Level Transmitter
408 6.5 Pressure Gauge
409 6.6 Differential Pressure Gauge
410 6.7 Temperature Gauge and Well
411 6.8 Level Gauge
412 6.9 Flow Meter
413 10 Instrument Cable, Cable tray, Junction Box, Gland and accessories LS 1 0,018% 100,000% 0,018% 0,000% 0,000% 100,000% 0,018%
414 11 Instrument installation bulk material and accessories LS 1 0,000% 100,000% 0,000% 0,000% 0,000% 100,000% 0,000%

TOTAL 73,893% 73,604% 0,289% 73,893%

Dibuat:
Diperiksa: Contractor PLTMG BIAK
PLN Enjiniring Consortium PT. WIKA (Persero) - WRK

OCTAVIANUS RIBUT BUDYANTO


Supervisi Konstruksi PLTMG Biak 15 MW Disetujui: Project Manager PLTMG Biak 15 MW
PT. PLN (Persero) UPP Papua

JOHANES ARI
PIC Proyek
PLTMG BIAK 15 MW