QUALITY CONTROL OBSERVATIONS

Report No. 8 02/06/2023 & 05/06/2023


S.No Observations Photographs
.
1. Hostel 1: 1st floor
right wing, outside
Room 4 wall is
damaged

Report No. 8 Page 1 of 69


Report No. 8 Page 2 of 69
2. Hostel 1, 1st floor:
Room 1 screws
incomplete on door
tower bolts

Report No. 8 Page 3 of 69


3. Hostel 1, 1st floor:
Crack on the corridor
walls

Report No. 8 Page 4 of 69


4. Hostel 1, 1st floor:
Improper door fitting
and poor carpentry
works , latch hole
bigger (room 9)

Report No. 8 Page 5 of 69


5. Hostel 1, 1st floor:
Drainage hole and
outlet pipe is of
varying dimensions on
the gallery balcony

Report No. 8 Page 6 of 69


6. Hostel 1, 1st floor:
Staircase side railing
missing on one side of
the stairs

Report No. 8 Page 7 of 69


7. Hostel 1 – 2ND Floor,
left wing (room 3)

Report No. 8 Page 8 of 69


8. Hostel 1 – 2nd Floor,
Door stopper broken
(room 4)

Report No. 8 Page 9 of 69


9. Hostel 1 – 2nd Floor,
Improper cupboard
fitting (room 4)

Report No. 8 Page 10 of 69


10. Hostel 1 – 2nd Floor,
Improper window
panel fitting, the frame
is bent (room 6)

Report No. 8 Page 11 of 69


11. Hostel 1 – 2ND Floor,
Door is improperly
fitted (room 7)

Report No. 8 Page 12 of 69


12. Hostel 1 – 2ND Floor,
Poor door finishing
(room 7)

Report No. 8 Page 13 of 69


13. Hostel 1 – 2ND Floor,
Damaged door frame
(room 10)

Report No. 8 Page 14 of 69


14. Hostel 1 – 2ND Floor,
AC not installed with
proper alignment
( room 10)

Report No. 8 Page 15 of 69


15. Hostel 1 – 2ND Floor,
Washroom door
fixtures damaged

Report No. 8 Page 16 of 69


16. Outside the hostel the
side pathway is not
levelled properly

Report No. 8 Page 17 of 69


17. Academic block-the
wiring is lying outside
the false ceiling , in
front of the library
corridor

Report No. 8 Page 18 of 69


18. Assistant Professor
Residence 1st floor-
uneven tiling work on
kitchen wall

Report No. 8 Page 19 of 69


QUALITY CONTROL OBSERVATIONS

05/06/2023
S.No Observations Photographs
.

Report No. 8 Page 20 of 69


19. Main entrance gate of
the campus- Seepage
on the ceiling

Report No. 8 Page 21 of 69


20. Main entrance gate of
the campus- Paver
blocks uneven

Report No. 8 Page 22 of 69


21. Main entrance gate of
the campus- Kitchen
door frame damaged

Report No. 8 Page 23 of 69


22. Poor quality plastering
work

Report No. 8 Page 24 of 69


23. Academic block
entrance- Patches on
the ceiling

Report No. 8 Page 25 of 69


24. Distance uneven
between two pairs of
column (130mm b/n
one pair and 175mm
b/n the other)

Report No. 8 Page 26 of 69


25. Varying distance
between two adjacent
pairs of columns
(2650mm b/n one pair
and 2680mm b/n the
other)

Report No. 8 Page 27 of 69


26. Ground floor
Chairperson room
left wing Academic
Block- Interior and
exterior beadings on
window not on same
level

Report No. 8 Page 28 of 69


27. Hostel Block -2:-
Granite stone on lift
wall cladding is of
different colour

Report No. 8 Page 29 of 69


28. Hostel Block -2:-
Entrance wall of
uneven alignment

Report No. 8 Page 30 of 69


29. Hostel Block -2:-
Seepage on ceiling and
column joint on
entrance

Report No. 8 Page 31 of 69


30. Ground floor, Hostel
2:- Poor fitting of door
frame, gaps visible

Report No. 8 Page 32 of 69


31. Ground floor, Hostel
2:- Wirings lying
unorganised on the
floor and no trap door
present

Report No. 8 Page 33 of 69


32. Ground floor, Hostel
2:- Gaps in skirting’s

Report No. 8 Page 34 of 69


33. Ground floor, Hostel
2:-Electrical fixtures
absent

Report No. 8 Page 35 of 69


34. Ground floor, Hostel
2:- Protruding granite
slab in the washroom

Report No. 8 Page 36 of 69


35. Ground floor, Hostel
2:-Cracked wall tile
and improper finishing
on the corners in the
washroom

Report No. 8 Page 37 of 69


36. Ground floor, Hostel
2:- Slanting Granite
stone at washroom
area

Report No. 8 Page 38 of 69


37. Hostel 2, 1st floor :-
Improper fixing of
door hinges

Report No. 8 Page 39 of 69


38. Hostel 2 , 1st floor
Rooms:-
Loosely fitted door
beading on door
frames

Report No. 8 Page 40 of 69


39. Hostel 2 , 1st floor
Rooms:-
Improper door
finishing’s, gaps are
visible

Report No. 8 Page 41 of 69


40. Hostel 2, 1st floor:-
Washroom: Packing
between the wall and
the door is not
provided

Report No. 8 Page 42 of 69


41. Hostel 2 , 1st floor
Rooms:- Poor
finishing works, cracks
developing

Report No. 8 Page 43 of 69


42. Hostel 2, 1st floor
Left wing corridor:--
some installation
protruding from the
ceiling

Report No. 8 Page 44 of 69


43. Hostel 2, 1st floor
Rooms: The finishing
works were not proper

Report No. 8 Page 45 of 69


Report No. 8 Page 46 of 69
Report No. 8 Page 47 of 69
44. Behind Hostel 1 :-
Gap present between
the sidewalk and the
building

Report No. 8 Page 48 of 69


45. Outside hostel block:
Kerb stone on the
internal path not
straight and improper
levelling

Report No. 8 Page 49 of 69


46. Hostel 2:- Exterior
walls improperly
finished and cracks
visible

Report No. 8 Page 50 of 69


47. Hostel 2: Damaged
kota stone on the stairs

Report No. 8 Page 51 of 69


48. Hostel 2, 1st floor:-
Two coloured skirtings
on the column

Report No. 8 Page 52 of 69


49. Hostel 2, 2nd floor,
left wing room:-
AC is not in proper
alignment with wall

Report No. 8 Page 53 of 69


50. Hostel 2, 2nd floor, left
wing room:-
Plaster work coming
out from the wall near
curtain rod

Report No. 8 Page 54 of 69


51. Hostel 2, 2nd floor, left
wing room:-
Window sill granite
stone need moulding
and polishing, having
sharp edges

Report No. 8 Page 55 of 69


52. Hostel 2, 2nd floor, left
wing room:-
AC improperly aligned
and improper finishing
of the wall below the
AC

Report No. 8 Page 56 of 69


53. Hostel 2, 2nd floor, left
wing room:-
Unfinished beam
surface inside room,
chipping and finishing
needed

Report No. 8 Page 57 of 69


54. Hostel 2, 1st floor, left
wing room:-
Uneven surface of
floor tiles

Report No. 8 Page 58 of 69


55. Hostel 2, 2nd floor
opposite lift:-
Bent column

Report No. 8 Page 59 of 69


56. Hostel 2, 2nd floor,
Shaft door:-
No packing given
between the wall and
frame and covered
from above with
plaster

Report No. 8 Page 60 of 69


57. Hostel 2, 3rd floor,
washroom:-
Temporary packing
work between ceiling
and column

Report No. 8 Page 61 of 69


58. Hostel 2, 3rd floor:-
Bent column from
below

Report No. 8 Page 62 of 69


59. Hostel 2:- External
column is bent

Report No. 8 Page 63 of 69


60. Hostel 2:- Entrance
column having
improper finishing,

Report No. 8 Page 64 of 69


61. Paver blocks are not
properly interlocking,
size difference

Report No. 8 Page 65 of 69


62. Hostel Block internal
paths:-
Improper levelling of
side walks

Report No. 8 Page 66 of 69


63. Plastic bag found
coming out from the
transit mixer carrying
freshly made concrete
from the batching plant

Report No. 8 Page 67 of 69


64. Assistant Professor
Residence:-
Placing of tube light,
whether on wall or on
ceiling?

Report No. 8 Page 68 of 69


Thank You

Report No. 8 Page 69 of 69