1 1' 2 3 4 5 6 7 7' 8

2650 5050 6450 5100 4700 1800 5100 5315 2655


N
WALK WAY FOR MEZZANINE FLOOR
PROPOSED
BOUNDARY WALL

1200
GAS BANK
UP

615
A DISABLED
PARKING
DISABLED
PARKING
1300

1 2
07 1100 1100
12 13 14
04 05 1750
06 DN. LIFT
A'
2830

1950
UP
01 02 03 LIFT
SECURITY
POINT

B' PASSENGER
850

LIFT

DRIVE WAY DRIVE WAY


6500

DRIVE WAY

ENTRY +150 +150 +150


FFL FFL FFL

C'
TRANSFORMER
800

ROOM
C
CAR LIFT
20 21 22 23 24 25
3800

26
17
D' 18
1055

DRIVE WAY

D +150
FFL
UTILITY ROOM +150
2030

FFL DISABLED
DISABLED
GARBAGE
TOILET
TOILET

E
27

28

30

GROUND FLOOR PLAN 31


A Scale: 1:100 @ A2

32
Project
THE 88TH

Drawing Title
GROUND FLOOR PLAN
AIR CONDITIONING & VENTILATION LAYOUT
Scale Status Checked By
1 : 100 @ A2 ISSUED FOR TENDER NR
Job Number Drawing Number Revision
GNA-15050-AC-01 R4
1 1' 2 3 4 5 6 7 7' 8
2650 5050 6450 5100 4700 1800 5100 5315 2655

1200
615
A 6150 4800 1750
1300

1100 1100
1750

2710
LIFT
A'
2830

1950
4800
area- 32.5 sq.m.
volume- 65.0 cu.m. 33 34 35 36 LIFT

SUMP

5450
B' PASSENGER
UP
850

LIFT

37
6500

-2850

6280
FFL
DRIVE WAY
4800

area- 17.4 sq.m.

C' PUMP 42
38

ROOM
800

C 7400

2850
METER
ROOM 41 40 39
4120

814
3800

D' 6260

6260
1055

CAR LIFT

D 11300
2030

17750

GROUND FLOOR PLAN


A Scale: 1:100 @ A2

Project
THE 88TH

Drawing Title
BASEMENT FLOOR PLAN
AIR CONDITIONING & VENTILATION LAYOUT
Scale Status Checked By
1 : 100 @ A2 ISSUED FOR TENDER NR
Job Number Drawing Number Revision
GNA-15050-AC-01-1 R1
1 1' 2 3 4 5 6 7 7' 8
2650 5050 6450 5100 4700 1800 5100 5315 2655
N

COMMON

1200
TOILET
DOWN

615
A MEP ROOM
+3450 1750
SECURITY
ROOM JANITORIAL
1300

FFL
STORE RM.
GENERATOR 1100
1100
ROOM 1750

2710
LIFT
A' MANAGEMENT
2830

1950
+3450 ROOM
LIFT +3450
FFL
+3450 +3450
FFL
B' DWN UP
FFL FFL
850

BRIDGE

BRIDGE
B STEEL HANDRAIL

STEEL HANDRAIL PASSENGER


LIFT

DRIVE WAY
6500

BELOW DRIVE WAY DRIVE WAY DRIVE WAY


BELOW BRIDGE BELOW BELOW

GAS METER
GAS METER UP ROOM
ROOM

C' BRIDGE
BRIDGE
800

C
KITCHEN / KITCHEN / KITCHEN /
PANTRY PANTRY PANTRY
UNIT - A
3800

LIVING / DINNING/BED +3450 +3450


+3450
+3450
D' FFL
FFL
LIVING /
FFL
LIVING /
FFL
LIVING /
STUDIO
1055

APARTMENT DINNING/BED DINNING/BED DINNING/BED


UNIT - C UNIT - D
D STUDIO
UNIT - B
STUDIO
APARTMENT APARTMENT STUDIO
BALCONY
2030

APARTMENT

E
BALCONY
BALCONY

(UNIT A & UNIT B)


TO BE CONSTRUCTED
WITHOUT APPROVAL

MEZZANINE FLOOR PLAN-1


A Scale: 1:100 @ A2

Project
THE 88TH

Drawing Title
MEZZANINE FLOOR PLAN-1
AIR CONDITIONING & VENTILATION LAYOUT
Scale Status Checked By
1 : 100 @ A2 ISSUED FOR TENDER NR
Job Number Drawing Number Revision
GNA-15050-AC-02 R3
1 1' 2 3 4 5 6 7 7' 8
N

BALCONY BALCONY
A
A
A KITCHEN /
PANTRY STUDIO
LIFT APARTMENT
A' UNIT - E KITCHEN /
PANTRY
+6750
LIFT
+6750
BALCONY

+6750 FFL FFL


BALCONY
FFL BED ROOM LIVING/DINNING/BED
B' LIVING / DINNING
UP
UNIT - F

B BRIDGE

STEEL GAS METER


HANDRAIL ROOM

VOID
BRIDGE

GAS METER
DRIVE WAY DWN ROOM
BELOW

C'
BRIDGE
BRIDGE

C SPACE FOR RAIN


WATER HARVESTING
KITCHEN / TANKS
KITCHEN /
PANTRY PANTRY KITCHEN /
UNIT - A PANTRY
+6750
LIVING / DINNING/BED +6750 +6750
FFL
D' +6750 FFL
LIVING / LIVING /
FFL
LIVING /
FFL
STUDIO DINNING/BED DINNING/BED DINNING/BED
APARTMENT
UNIT - C UNIT - D
D UNIT - B
STUDIO STUDIO STUDIO
APARTMENT APARTMENT APARTMENT
BALCONY

E
BALCONY BALCONY
NOTE : (UNIT A & UNIT B)
TO BE CONSTRUCTED
WITHOUT APPROVAL

MEZZANINE FLOOR PLAN-2


A Scale: 1:100 @ A2

Project
THE 88TH

Drawing Title
MEZZANINE FLOOR PLAN-2
AIR CONDITIONING & VENTILATION LAYOUT
Scale Status Checked By
1 : 100 @ A2 ISSUED FOR TENDER NR
Job Number Drawing Number Revision
GNA-15050-AC-03 R1
1 1' 2 3 4 5 6 7 7' 8
2650 5050 6450 5100 4700 1800 5100 5315 2655
N

1200
A A

615
A FG
1750
COMMON
TOILET ATTACHED
1300

TOILET
BALCONY
UNIT - G 1100 1100 STUDIO APARTMENT
1750

2710
LIVING / DINNING LIVING / DINNING/BED
MASTER
LIFT
A'
2830

BED BED ROOM

1950
KITCHEN ROOM 01 BALCONY
/ PANTRY LIFT
UNIT - M
B'
850

WM FG
BED COMMON
ROOM 02 TOILET
ATTACHED
TOILET
BED

B MASTER
BED ROOM
S.R LOBBY KITCHEN
/ PANTRY
ROOM 01

ATTACHED
TOILET UTILITY
S.T

S.T
COMMON STORE
RM.
6500

TOILET KITCHEN
S.R / PANTRY
S.
TOILET
UNIT - L
LIVING / DINNING LIVING / DINNING
UNIT - H
BALCONY UTILITY BALCONY

C' KITCHEN
KITCHEN
/ PANTRY
UNIT - J

A
/ PANTRY / DINNING
/BED
COMMON
FG
800

BED TOILET
UNIT - K FG
ROOM 01
A
C KITCHEN
/ PANTRY
LIVING / DINNING

BED
BALCONY ROOM 01
BALCONY
ATTACHED
TOILET
3800

BED FG FG A
D' ROOM 02

BED
UNIT - I
1055

ROOM 02
STUDIO APARTMENT
LIVING / DINNING A
D BED
LIVING ROOM 01
BALCONY COMMON
2030

TOILET

E
A A
BALCONY BALCONY BALCONY BALCONY

A A

TYPICAL FLOOR PLAN (1st to 5th)


A Scale: 1:100 @ A2

Project
THE 88TH

Drawing Title
TYPICAL FLOOR PLAN (1st to 5th)
AIR CONDITIONING & VENTILATION LAYOUT
Scale Status Checked By
1 : 100 @ A2 ISSUED FOR TENDER NR
Job Number Drawing Number Revision
GNA-15050-AC-04 R3
1 1' 2 3 4 5 6 7 7' 8

1200
615
A 1750
1300

1100 1100
1750

2710
LIFT
A'
2830

1950
LIFT

B'
850

B
6500

C'
800

C
3800

D'
1055

D
2030

4 5 6
E
UP
A

1300
1100
LIFT
LIFT
A'

2830
TERRACE FLOOR PLAN
A Scale: 1:100 @ A2

B'

850
SPACE FOR WATER

B TANK

ROOF SLAB

6500
MECHINE ROOM FLOOR PLAN
A Scale: 1:100 @ A2

Project
THE 88TH

Drawing Title
TERRACE FLOOR PLAN
AIR CONDITIONING & VENTILATION LAYOUT
Scale Status Checked By
1 : 100 @ A2 ISSUED FOR TENDER NR
Job Number Drawing Number Revision
GNA-15050-AC-05 R4