K3025-20C

Integrated Entrance
Objectives

 Develop a proper entrance to MTR mall, reference


should be made to the successful experience in
Maritime Square 1
 Construct a new integrated entrance with
– Mini concourse
– Structural modifications for new vertical links including internal lift, staircase and 
escalator

 Comply with relevant guidelines, codes of practice and


statutory regulations (i.e. MTR’s New Works Design
Standards Manual, Barrier Free Access, etc.)
 Station shall remain fully operational throughout the
implementation stages

MTR Corporation 2022/5/28 Page 6


Overview

 Mezzanine Level

MTR Corporation 2022/5/28 Page 7


Overview

 Platform Level

MTR Corporation 2022/5/28 Page 8


Overview

 Concourse Level

MTR Corporation 2022/5/28 Page 9


Scope of works

Platform Level (Existing Layout)

Platform Level (Proposed Layout)


MTR Corporation 2022/5/28 Page 10
Scope of Works

Mezzanine Level (Existing Layout)

Mezzanine Level (Proposed Layout)


MTR Corporation 2022/5/28 Page 11
Scope of Works – Civil and Structural

Ramp Lobby
Cladding modification
New escalators pit modification modification
New staircase New lift pit

BoH room
modification
works

PLATFORM LEVEL

MTR Corporation 2022/5/28 Page 12


Scope of Works – Civil and Structural

New floor area New staircase New lift


New escalators
• Add new • Demolish and modify • Demolition of
• Modify of
reinforcement existing beam. existing slab and
existing beam.
concrete slabs • Add new support for beam.
• Add new escalator pit.
and steel beams. staircase. • Add new lift shaft.

MEZZANINE LEVEL

MTR Corporation 2022/5/28 Page 13


Scope of Works – ABWF
 For Reference Only

MTR Corporation 2022/5/28 Page 14


Scope of Works – ABWF
 For Reference Only

MTR Corporation 2022/5/28 Page 15


Scope of Works – ABWF
 For Reference Only

MTR Corporation 2022/5/28 Page 16


Scope of Works – ABWF
 For Reference Only

MTR Corporation 2022/5/28 Page 17


Scope of Works – ABWF
 For Reference Only

MTR Corporation 2022/5/28 Page 18


Scope of Works – ECS

 New provision of AHU


systems for Mezzanine
Level Concourse for
MVAC
– Air handling units (Within new  MEZZANINE LEVEL
AHU room)
– Fresh air ductwork (Green , 
louvers at platform level)
– Return Air Ductwork (Red , high 
level bell mouths at high level)
– Supply Air Ductwork and 
associated grilles (Blue, louvers at 
platform level)
– Install dampers (MODs, VCDs,, 
FDs etc)

PLATFORM LEVEL

MTR Corporation 2022/5/28 Page 19


Scope of Works – ECS

 New provision of Fans and Fan Coil Units for MVAC


– Fan Coil units (Blue): Serving new areas (staff meeting room, TIM room, New MCC 
room, Audit Room, General Equipment Room 4 …etc.)
– Fresh Air Fans (Green):  Serving new areas (staff meeting room, Audit Room, Mess 
room… etc.) 
– Return Air Fans (Red): Serving the new AHU room, MCC room (Back‐up), General 
Equipment room 4 (Back‐up), FS Equipment room … etc.
– Install dampers (MODs, VCDs,, FDs, MSFDs etc)

MEZZANINE LEVEL
MTR Corporation 2022/5/28 Page 20
Scope of Works – ECS

 New provision of Fans and Fan Coil Units for MVAC


– Air curtains (Purple)
– Orbital fans (Purple)

MEZZANINE LEVEL
MTR Corporation 2022/5/28 Page 21
Scope of Works – ECS

 New provision of Fans and Fan Coil Units for MVAC


– Fan Coil units (Blue): Serving the new Female Staff Locker Room
– Return Air Fan (Red): Serving the new Escalator Control Cabinet
– Air curtains (Purple)
– Install dampers (MODs, VCDs,, FDs etc)

PLATFORM LEVEL
MTR Corporation 2022/5/28 Page 22
Scope of Works – ECS

 Duct Demolition
and Rerouting for
MVAC
– FAF‐M&03 and FAF‐
M&04 (Blue). 
Associated SFDs are to 
be demolished as well
– SAF‐P1&02 and SAF‐
P2&02 (Green) to be 
demolished and 
rerouted as indicated 
– PAU‐STAC3&01 (Blue) 
and PAU‐C&01 (Red) 
existing ductwork to be 
demolished and 
rerouted as indicated  MEZZANINE LEVEL (EXISTING)

MTR Corporation 2022/5/28 Page 23


Scope of Works – ECS

 Duct Demolition and


Rerouting for MVAC
– PAU‐STAC3&01 (Blue) and PAU‐
C&01 (Red) dropping from 
Mezzanine Level
– Fresh air (Green) to be rerouted 
from the STA AHU to the BOH 
AHU PLATFORM LEVEL (EXISTING)
– FCU‐P&006 and FCU‐P&007 and 
their associated pipework and 
controls shall be demolished

PLATFORM LEVEL (NEW)


MTR Corporation 2022/5/28 Page 24
Scope of Works – ECS

 Existing pipework
demolition for MVAC –
Water side
– FCU‐M&009, FCU‐M&010 and FCU‐
M&011 from the existing MCC room 
on the mezzanine floor shall be 
demolished. Associated pipework 
shall be demolished as well
MEZZANINE LEVEL (EXISTING)
 New Provisions for MVAC
– Water side
– New FCUs (Blue) shall be installed
– New AHUs (Green) shall be installed
– New CHW and CDP pipework 
(Purple) shall be installed
– Existing CHW pipe insulation within 
the FOH areas (Yellow) to be  MEZZANINE LEVEL (NEW)
replaced

MTR Corporation 2022/5/28 Page 25


Scope of Works – ECS

 New Provisions for


MVAC – Water side
– FCU‐P&006, FCU‐P&006 and 
FCU‐P&007 and their 
associated pipework and 
controls shall be demolished
– New FCU (Blue) shall be 
installed within the new 
Female Staff Locker Room  PLATFORM LEVEL (EXISTING)
complete with new 
CHWS&R pipes and CDP 
(Purple)

PLATFORM LEVEL (NEW)

MTR Corporation 2022/5/28 Page 26


Scope of Works – ECS

 Demolition for MVAC


– Controls
– FCU‐M&009, FCU‐M&010 
and FCU‐M&011 (Blue) from 
the existing MCC room and 
associated control cabling 
(Purple) shall be 
demolished. 

 New Provisions for MEZZANINE LEVEL (EXISTING)

MVAC – Controls
– New MVAC provisions shall 
be connected to either 
MCC‐04E or TAW‐ECS‐MCC‐
04N0 (Blue) depending on 
the type of power required
– Damper control units 
(Purple) shall be installed as 
well
MEZZANINE LEVEL (NEW)
MTR Corporation 2022/5/28 Page 27
Scope of Works – ECS

 Demolition for MVAC


– Controls
– FCU‐P&006, FCU‐P&006 and 
FCU‐P&007 (Blue) controls 
cabling shall be demolished
– LCP‐65 (Green) shall be 
demolished and relocated.

 New Provisions for PLATFORM LEVEL (EXISTING)


MVAC – Controls
– LCP‐65 (Green) shall be 
relocated to the adjacent 
existing store room
– Damper control unit 
(Purple) shall be installed 
within the Escalator Control 
Cabinet

PLATFORM LEVEL (NEW)


MTR Corporation 2022/5/28 Page 28
Scope of Works – ECS

 New Provisions of
Smoke Extraction
System
– Connect to new louvre;
– Build new SED;
– Install new SEFs;
– Install dampers (SFDs, VCDs, 
etc); MEZZANINE LEVEL
– Modify existing smoke 
control panel; and
– All associated works

PLATFORM LEVEL
MTR Corporation 2022/5/28 Page 29
Scope of Works – ECS

 Demolition of SED
serving Atrium
– Demolish the existing SED 
and SEG
– Extend the existing SED
– Install new VCD and SEG
– Fan tuning and Air‐balancing

MEZZANINE LEVEL (DEMOLITION)

MEZZANINE LEVEL (DEMOLITION)


MTR Corporation 2022/5/28 Page 30
Scope of Works – ECS

 Demolition of existing
SED serving Platform
– Demolish the existing SED 
and SEG
– Re‐provision of SED and SEG
– Fan tuning and Air‐balancing

PLATFORM LEVEL (DEMOLITION)

PLATFORM LEVEL (DEMOLITION)


MTR Corporation 2022/5/28 Page 31
Scope of Works – ECS

 Demolition of existing SED serving Room 431 and 431


(STA-P2)
– Demolish the existing SED, SFD and SEG

MEZZANINE LEVEL (DEMOLITION) PLATFORM LEVEL (DEMOLITION)

MTR Corporation 2022/5/28 Page 32


Scope of Works – ECS

 Modification of Existing MCC


– Utilise spare compartment to provide motor starter and damper power circuit; and
– All associated works

MEZZANINE LEVEL

MTR Corporation 2022/5/28 Page 33


Scope of Works – FS

 Modification of existing
sprinkler system
– Demolish sprinkler heads in 
public areas in Mezzanine Level
– Re‐provision of sprinkler system 
to non‐public areas and the new 
fire shutter in Mezzanine level

MEZZANINE LEVEL

MEZZANINE LEVEL

MTR Corporation 2022/5/28 Page 34


Scope of Works – FS

 Modification of
existing fire hydrant
and hose reel system
– Relocate fire hydrant and 
hose reel cabinet to suit the 
new layout

PLATFORM LEVEL

MEZZANINE LEVEL

MTR Corporation 2022/5/28 Page 35


Scope of Works – FS

 Interfacing works between


FS and other disciplines to
carry out the below actions
in the event of fire
– Lift homing
– Receiving building fire alarm signal 
from property development /  MEZZANINE LEVEL
transmitting station building fire 
alarm signal to property development
– Dropping down the fire shutter (Only 
triggered when either one of the 
smoke detector on both sides of the 
fire shutter activated)
– Dropping down the smoke curtains in 
the incident smoke zone
– Stopping the escalators

PLATFORM LEVEL

MTR Corporation 2022/5/28 Page 36


Scope of Works – FS

 Interfacing works
between FS and other
disciplines to carry out
the below actions in the
event of fire
– Activating smoke extraction  CONCOURSE LEVEL
system in the incident 
smoke zone
– Tripping the VAC

 Demolish and re-


provision of smoke
detection system
throughout the
Mezzanine Level MEZZANINE LEVEL

MTR Corporation 2022/5/28 Page 37


Scope of Works – PD

 New provision of Fresh water


supply system
– Provide fresh water tank, booster pump set 
& pressure vessel & plumbing pipework for 
new shower & sink
– Provide shower in Maintenance Staff 
Locker Room
– Provide sink in Mess Room
– Provide instantaneous type electric water 
heater for new shower & sink

 New provision of Cleansing


water supply system
– Install cleansing water taps & cleansing 
water pipework for AHU Room & ESC Fan 
Room (5)

Layout of ECS fan room (5)

MTR Corporation 2022/5/28 Page 38


Scope of Works – PD

 Demolish the basins in existing


Room 431 & 432, & associated
piping, fitments & fittings

Plugged outside
water meter room

PLATFORM LEVEL
CONCOURSE LEVEL

MTR Corporation 2022/5/28 Page 39


Scope of Works – PD

 New provision of Drainage


– Provide floor drains and drainage pipework for Mess Room, TIM Room, Fan Room, 
AHU Room & Maintenance Staff Locker Room, E&M riser & public area (Grid F‐M22, 
D to E‐M20 on Mezzanine Level), hose reel (Grid E‐M21 on Platform Level)
– Provide U‐channel and drainage pipework for AHU Room (G.L. E‐M18 on 
Mezzanine Level)
– Provide drainage pipework for new shower and sink

Layout of maintenance staff locker room & AHU room

MTR Corporation 2022/5/28 Page 40


Scope of Works – PD

 Demolition of Drainage
– Demolish the basins in Room 431 & 432, & associated drainage piping, fitments & 
fittings
– Demolish the floor drain near Grid E‐M21 at platform level

PLATFORM LEVEL

CONCOURSE LEVEL

MTR Corporation 2022/5/28 Page 41


Scope of Works – EL

 Power source for the new provision

Normal power supply from MSB Essential power supply from MCCB board (By
no.1 in room 206 K2588) in room 207

MTR Corporation 2022/5/28 Page 42


Scope of Works – EL
 Diversion of cable containment in platform level
– Diversion of the cable containment and associated cables should be carried out 
before the new escalator's installation. In order to maintain continuous operation, 
the new cable containment and associated cables should be ready before 
decommissioning the existing cable containment and associated cables, then the 
change‐over can be carried out during non‐traffic hour.

MTR Corporation 2022/5/28 Page 43


Scope of Works – EL

 Relocation of MCC room in Mezzanine Level


– New MCC room with new MCC panel shall be installed before decommission of 
existing MCC room

Existing MCC Room New MCC room location

MTR Corporation 2022/5/28 Page 44


Scope of Works – EL

 Lighting for new concourse in Mezzanine Level


– LED light fitting is adopted for the new concourse

MEZZANINE LEVEL

MTR Corporation 2022/5/28 Page 45


Scope of Works – EL

 Power provision and cable containments for lift &


escalator
– The power supply shall be fed from the existing distribution boards (MB‐ES1 and 
MB‐LF1) from LV switchboard (MSB No. 1) at LV Switch Room No. 1 (206) at 
concourse level.
– The cable containment for interfacing system (e.g MCS, BMS) shall provide by the EL 
contractor

MTR Corporation 2022/5/28 Page 46


Scope of Works – EL

 Power provision and cable containments for ECS


– The power supply of MCC shall be fed from the new MCCB board (MB‐NC) from LV 
switchboard (MSB No. 1) at LV Switch Room No. 1 (206) at concourse level.
– The cable containment for interfacing system (e.g MCS, BMS) shall provide by the EL 
contractor

MTR Corporation 2022/5/28 Page 47


Scope of Works – EL

 Power provision and cable containments for Signages


• The Contractor shall provide new power supply for new station signage as shown on 
the Drawings to suit the station signage requirement. The works shall include power 
& control cables, cable junction boxes, fuse spur units, MCB boards, MCBs, cable 
terminals, control panels, relay boxes, cable containment and all necessary 
accessories for each signage.

 Power provision and cable containments for AFC


equipment
– The Contractor shall co‐ordinate with AFC contractor to provide new power supply 
to new AFC equipment including MCBs, switched fuse connection units, cable 
containments, and all necessary accessories for completion of the Works.

MTR Corporation 2022/5/28 Page 48


Scope of Works – EL

 Power provision and cable containments for C&C


equipment and SAMs Door
– The Contractor shall provide new power supply to new Control and Communication 
(C&C) equipment & SAMS Door including MCBs, switched fuse connection units, 
cable containments, and all necessary accessories for completion of the Works as 
shown on the Drawings.

 Power provision and cable containments for


BMS/MCS/CBMS Equipment
• The Contractor shall provide new power supply to new BMS/MCS/CBMS equipment 
including MCBs, switched fuse connection units, cable containments, and all 
necessary accessories for completion of the Works as shown on the Drawings.

MTR Corporation 2022/5/28 Page 49


Integrated Entrance (IE) Phasing
Integrated Entrance

• Phase 1 – Construction of Mezzanine Void Slab

• Phase 2 – Ramp Modification Works (Part 1 of 2)

• Phase 3 – Ramp Modification Works (Part 2 of 2)

• Phase 4 – Construction of lift and escalator pit

• Phase 5 – Construction of Mezzanine Void Slab


& Statutory Inspection

MTR Corporation 2022/5/28 Page 50


IE Phase 1
Phase 1 – Construction of Mezzanine Void Slab Details
1. Erection of Hoarding for the preparation of
2. Provision of the temporary TVM Access Room
temporary tactile

Affected TVM

Existing TIM/AVM
Existing TIM/AVM

Concourse Level
MTR Corporation
(Plan View) 2022/5/28 Page 51
IE Phase 1
Phase 1 – Construction of Mezzanine Void Slab Details
1. Modification of
ECS Ducts
2. Erection of Hoarding

3. Modification of
existing delivery
platform, ceiling and
finishes

4. Installation of
pre-cast slab

5. ABWF works for new temporary


staff rooms and remove hoarding
Mezzanine Level once completed
MTR Corporation
(Plan View) 2022/5/28 Page 52
IE Phase 1
Phase 1 – Construction of Mezzanine Void Slab Details

BoH Area to be modified as


Pre-cast slab to be installed
Temporary Staff Rooms

Mezzanine Level
MTR Corporation 2022/5/28 Page 53
IE Phase 2
Phase 2 – Ramp Modification Works (Part 1 of 2) Details
2. Erect hoarding for ramp modification (With
Min. 1.8m width in operation)
3. Ramp Modification

1. CSC Store to be relocated to


1. Female locker room and CSC Office to be relocated to
temporary staff room at mezz level
temporary staff room at mezz level
Concourse Level
Platform Level
(Plan View)
(Plan View)
MTR Corporation 2022/5/28 Page 54
IE Phase 2
Phase 2 – Ramp Modification Works (Part 1 of 2) Details

New Existing
Stairs Ramp

New New Lift


Escalators
Existing Ramp General View

Platform Level

MTR Corporation 2022/5/28 Page 55


IE Phase 2  
Phase 2 – Ramp Modification Works (Part 1 of 2) Details

1. CSC Store, female locker room and CSC Office


temporarily relocated from Concourse and Platform level

Mezzanine Level
(Plan View)
MTR Corporation 2022/5/28 Page 56
IE Phase 3
Phase 3 – Ramp Modification Works (Part 2 of 2) Details

- Escalator and lift pit above


concourse level to be constructed;
- Room relocation at Back of
House Concourse level is required

Concourse Level
(Plan View)
MTR Corporation 2022/5/28 Page 57
IE Phase 2‐3 Room Relocation Completion

4. Modification works to
3. Installation of reduce IT Room Area
TIM/AVM/OEM for
temporary TVM room

2. Audit/Revenue/Strong room to Room 257


MTB1

5. STA177 (HK TV 1. ARC Depot to be


MTB2 relocated to Hin Kin
Mall) to be temporarily
suspended Station

4. Temporary Breast
6. Demolition of high- feeding location
level block walls at
construction area 4. Modification works to
CSC Store relocation
reduce Staff Meal Room
completed at Phase 2

Concourse Level
(Plan View)
MTR Corporation 2022/5/28 Page 58
IE Phase 4
Phase 4 – Construction of lift and escalator pit Details

3. Release affected BoH rooms


1. Temporary propping for
and Kiosk, and relocate Station
demolition of platform slab at
Maintenance Office to Room 256
escalator and lift pit above & steel
upon completion of escalator and
members installation
lift pit
2. Escalator and lift pit
Concourse Level 4. Reinstate TVM/AVM
construction
(Plan View)
MTR Corporation 2022/5/28 Page 59
IE Phase 4
Phase 4 – Construction of lift and escalator pit Details

1. Hoarding erection

2. Demolition of platform structure


and installation of steal members
3. Construction of new lift pit and
escalator pit structure

Platform Level
(Plan View)
MTR Corporation 2022/5/28 Page 60
IE Phase 5 & Statutory Inspection
Phase 5 – Construction of Mezzanine Void Slab Details

1. Erect propping working platform and


covered walkway for Mezz Slab construction
3. Construction of BoH & ABWF works 1. Erect working
platform and covered
walkway for Mezz Slab
2. Staircase construction
construction

Hoarding
Area

Hoarding Area
Covered Walkway

Covered Walkway
Platform Level
Platform Level
(Section View)
(Plan View)

MTR Corporation 2022/5/28 Page 61


IE Phase 5 & Statutory Inspection
Phase 5 – Construction of Mezzanine Void Slab Details
2. Structural Modification of
Mezz level slab
3. Staircase Construction 1. Hoarding erection

5. ABWF Works for


BoH Rooms
4. Lift and Escalator 5. ABWF Works for
Installation Mini-concourse &
new BoH plant
rooms
Mezzanine Level
(Plan View)

MTR Corporation 2022/5/28 Page 62


Major Construction Challenges / Risks

 Works at NTH and NPH


 High level working platform
 Scaffolding
 Take lead to coordinate with other parties & contractors
 Delivery Route, Concreting Route and storage to be
agreed with Operating and the Engineer
 Temporary diversion of services
 Requirements for drilling-in and through bolt installation
 Maintain Operational & Passengers Safety throughout
the construction period

MTR Corporation 2022/5/28 Page 63


Major Construction Challenges / Risks
Delivery Routing & Storage Limited access at Mezz
level (escalator
Delivery route from Concourse to
location)
Platform involves high level delivery

New Existing
Stairs Ramp

New New Lift


Escalators
General View

MTR Corporation 2022/5/28 Page 64


Major Construction Challenges / Risks
Minimize disturbance to public
Ramp level to be adjust to match the level
of public area (original BoH room)

Two phases of ramp modification to


maintain passengers flow

MTR Corporation 2022/5/28 Page 65


Major Construction Challenges / Risks
High level works above public area
ECS ducting at
ECS ducting for platform level
pre-cast slab

MTR Corporation 2022/5/28 Page 66


Major Construction Challenges / Risks
 Existing Digital Advertising Panel at Ramp Modification
area

Digital Advertising
Panel at TAW
platform level
MTR Corporation 2022/5/28 Page 67
Major Construction Challenges / Risks
 Existing Digital Advertising Panel at Ramp Modification
area @TAW Platform Level

MTR Corporation 2022/5/28 Page 68


Major Construction Challenges / Risks
 Site constraints: Concreting above covered walkway at TML platform
Phase 5 – Construction of Mezzanine Void Slab Details
1. Erect propping working platform and
covered walkway for Mezz Slab construction
3. Construction of BoH & ABWF works 1. Erect working
platform and covered
walkway for Mezz Slab
2. Staircase construction
construction

Hoarding
Area

Hoarding Area
Covered Walkway

Covered Walkway
Platform Level
Platform Level
(Section View)
(Plan View)
MTR Corporation 2022/5/28 Page 69
Major Construction Challenges / Risks

 Existing site condition (Photo to be input)

Demolition of Existing Ceilings and


Concreting at Mezz Level above

Public Access
to be maintained

MTR Corporation 2022/5/28 Page 70


IE Phase 2-3 Room Relocation
 Steel beams installation
 (MTB1 – 914x419x388 UB) & (MTB2 - 914x305x224 UB)
4. Modification works to
3. Installation of reduce IT Room Area
TIM/AVM/OEM for
temporary TVM room

2. Audit/Revenue/Strong room to Room 257


MTB1

5. STA177 (HK TV 1. ARC Depot to be


MTB2 relocated to Hin Kin
Mall) to be temporarily
suspended Station

4. Temporary Breast
6. Demolition of high- feeding location
level block walls at
construction area 4. Modification works to
CSC Store relocation
reduce Staff Meal Room
completed at Phase 2

Concourse Level
(Plan View)
MTR Corporation 2022/5/28 Page 71
IE Phase 2-3 Room Relocation
 Steel beams installation
 (MTB1 – 914x419x388 UB) & (MTB2 - 914x305x224 UB)
Room relocation
completed before
Protection to construction
station
equipment
during
MTB1
construction
(eg. IT room)
MTB2

Large scale service


diversion for steel beam &
pit construction
Construction Concourse Level
- Delivery route &
programme for (Plan View) installation method for
vacation of HKTV Mall
steel beams
MTR Corporation 2022/5/28 Page 72
Temporary Room Relocation
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
(Mar 2021 – Sept (May 2021 – Sept (Sept 2021 – Nov (Oct 2021 – Apr (Apr 2022 – Sept
2021) 2021) 2021) 2022) 2022)
Strong Room Relocate to Room At Room 257 of At Room 257 of At Room 257 of Relocate to
257 at Concourse Concourse Level Concourse Level Concourse Level Original Location
Level
CSC Office - Relocate to At temporary room At temporary room Relocate to
temporary room at at Mezzanine Level at Mezzanine Level Platform Level
Mezzanine Level
CSC Store - Relocate to At temporary room At temporary room Relocate to
temporary room at at Mezzanine Level at Mezzanine Level Original Location
Mezzanine Level
Female Locker - Relocate to At temporary room At temporary room Relocate to Mezz
Room temporary room at at Mezzanine Level at Mezzanine Level floor room
Mezzanine Level assigned by Station
/ OWP.
Station - - - Relocate to Room At Room 256 (ARC
Maintenance Office 256 at Concourse office) at
Level. Concourse Level
Most of the
furniture can be
kept in the original
location.
ARC Depot - Relocate to Room At Room G-B08 of At Room G-B08 of At Room G-B08 of
G-B08 at Hin Keng Hin Keng Station Hin Keng Station Hin Keng Station
Station

MTR Corporation 2022/5/28 Page 73


Temporary Room Relocation (Con’t)
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
(Mar 2021 – Sept (May 2021 – Sept (Sept 2021 – Nov (Oct 2021 – Apr (Apr 2022 – Sept
2021) 2021) 2021) 2022) 2022)
TVM Access Room Construction of wall Relocate to the At temporary room At temporary room Relocate to
along Grid F to temporary room at at Concourse Level at Concourse Level Original Location
facilitate the Concourse Level
temporary
relocation of ticket
machines.
(Other contractor to
relocate the ticket
machine)
IT Room - - Room required Room with Room reinstate to
tidying and allow hoarding original status
space for hoarding
Staff Meal Room - Relocate the Room required Room with Room reinstate to
breastfeeding area tidying and allow hoarding original status;
to the corridor (no. space for hoarding Relocate the
258) breastfeeding area
to original location
STA 177 - - Store empty for Store emptied Store released for
high level works normal operation

MTR Corporation 2022/5/28 Page 74


Through bolt Preparation Works

 Carry out reinforcement scanning and related


preparation works at least 6 months prior to
commencement of the works

LOWER MEZZANINE LEVEL


MTR Corporation 2022/5/28 Page 75
Through bolt Preparation Works
 Carry out reinforcement scanning and related
preparation works at least 6 months prior to
commencement of the works

Steel Beam (by through


Damage to
bolts) at Mezz Level above
existing Beam
Reinforcement
Clash of Service / structure -> diversion of
shall not be
service & adjustment of steel beam locations
allowed
MTR Corporation 2022/5/28 Page 76
Large-scale diversion of services

MTR Corporation 2022/5/28 Page 77


Major Interfaces

 Designated Contractors
– Automatic Fare Collection System (AFC) including Ticket Issue Machines (TIM), Add 
Value Machines (AVM), etc.
– Escalators
– Lift
– Digital Service Kiosk (DSK)
– Control and Communication (C&C) System
– Works on Train Operator Monitor System
– Platform Emergency Plunger System
– Security Access Management System (SAMS)
– Main Control System (MCS) & Building Management System (BMS)
– Signage and Braille map
– Digital Advertising Panel
– Etc

 Interfacing Parties
– Adjacent property development
– Advertisement works
– CCTV works
– TAW Station and HIK Station
– Designated contractors
– Etc
MTR Corporation 2022/5/28 Page 78
Construction Programme

 Special highlight on the following Completion Obligation:

MTR Corporation 2022/5/28 Page 79