Integrated Entrance
Objectives
Mezzanine Level
Platform Level
Concourse Level
Ramp Lobby
Cladding modification
New escalators pit modification modification
New staircase New lift pit
BoH room
modification
works
PLATFORM LEVEL
MEZZANINE LEVEL
PLATFORM LEVEL
MEZZANINE LEVEL
MTR Corporation 2022/5/28 Page 20
Scope of Works – ECS
MEZZANINE LEVEL
MTR Corporation 2022/5/28 Page 21
Scope of Works – ECS
PLATFORM LEVEL
MTR Corporation 2022/5/28 Page 22
Scope of Works – ECS
Duct Demolition
and Rerouting for
MVAC
– FAF‐M&03 and FAF‐
M&04 (Blue).
Associated SFDs are to
be demolished as well
– SAF‐P1&02 and SAF‐
P2&02 (Green) to be
demolished and
rerouted as indicated
– PAU‐STAC3&01 (Blue)
and PAU‐C&01 (Red)
existing ductwork to be
demolished and
rerouted as indicated MEZZANINE LEVEL (EXISTING)
Existing pipework
demolition for MVAC –
Water side
– FCU‐M&009, FCU‐M&010 and FCU‐
M&011 from the existing MCC room
on the mezzanine floor shall be
demolished. Associated pipework
shall be demolished as well
MEZZANINE LEVEL (EXISTING)
New Provisions for MVAC
– Water side
– New FCUs (Blue) shall be installed
– New AHUs (Green) shall be installed
– New CHW and CDP pipework
(Purple) shall be installed
– Existing CHW pipe insulation within
the FOH areas (Yellow) to be MEZZANINE LEVEL (NEW)
replaced
MVAC – Controls
– New MVAC provisions shall
be connected to either
MCC‐04E or TAW‐ECS‐MCC‐
04N0 (Blue) depending on
the type of power required
– Damper control units
(Purple) shall be installed as
well
MEZZANINE LEVEL (NEW)
MTR Corporation 2022/5/28 Page 27
Scope of Works – ECS
New Provisions of
Smoke Extraction
System
– Connect to new louvre;
– Build new SED;
– Install new SEFs;
– Install dampers (SFDs, VCDs,
etc); MEZZANINE LEVEL
– Modify existing smoke
control panel; and
– All associated works
PLATFORM LEVEL
MTR Corporation 2022/5/28 Page 29
Scope of Works – ECS
Demolition of SED
serving Atrium
– Demolish the existing SED
and SEG
– Extend the existing SED
– Install new VCD and SEG
– Fan tuning and Air‐balancing
Demolition of existing
SED serving Platform
– Demolish the existing SED
and SEG
– Re‐provision of SED and SEG
– Fan tuning and Air‐balancing
MEZZANINE LEVEL
Modification of existing
sprinkler system
– Demolish sprinkler heads in
public areas in Mezzanine Level
– Re‐provision of sprinkler system
to non‐public areas and the new
fire shutter in Mezzanine level
MEZZANINE LEVEL
MEZZANINE LEVEL
Modification of
existing fire hydrant
and hose reel system
– Relocate fire hydrant and
hose reel cabinet to suit the
new layout
PLATFORM LEVEL
MEZZANINE LEVEL
PLATFORM LEVEL
Interfacing works
between FS and other
disciplines to carry out
the below actions in the
event of fire
– Activating smoke extraction CONCOURSE LEVEL
system in the incident
smoke zone
– Tripping the VAC
Plugged outside
water meter room
PLATFORM LEVEL
CONCOURSE LEVEL
Demolition of Drainage
– Demolish the basins in Room 431 & 432, & associated drainage piping, fitments &
fittings
– Demolish the floor drain near Grid E‐M21 at platform level
PLATFORM LEVEL
CONCOURSE LEVEL
Normal power supply from MSB Essential power supply from MCCB board (By
no.1 in room 206 K2588) in room 207
MEZZANINE LEVEL
Affected TVM
Existing TIM/AVM
Existing TIM/AVM
Concourse Level
MTR Corporation
(Plan View) 2022/5/28 Page 51
IE Phase 1
Phase 1 – Construction of Mezzanine Void Slab Details
1. Modification of
ECS Ducts
2. Erection of Hoarding
3. Modification of
existing delivery
platform, ceiling and
finishes
4. Installation of
pre-cast slab
Mezzanine Level
MTR Corporation 2022/5/28 Page 53
IE Phase 2
Phase 2 – Ramp Modification Works (Part 1 of 2) Details
2. Erect hoarding for ramp modification (With
Min. 1.8m width in operation)
3. Ramp Modification
New Existing
Stairs Ramp
Platform Level
Mezzanine Level
(Plan View)
MTR Corporation 2022/5/28 Page 56
IE Phase 3
Phase 3 – Ramp Modification Works (Part 2 of 2) Details
Concourse Level
(Plan View)
MTR Corporation 2022/5/28 Page 57
IE Phase 2‐3 Room Relocation Completion
4. Modification works to
3. Installation of reduce IT Room Area
TIM/AVM/OEM for
temporary TVM room
4. Temporary Breast
6. Demolition of high- feeding location
level block walls at
construction area 4. Modification works to
CSC Store relocation
reduce Staff Meal Room
completed at Phase 2
Concourse Level
(Plan View)
MTR Corporation 2022/5/28 Page 58
IE Phase 4
Phase 4 – Construction of lift and escalator pit Details
1. Hoarding erection
Platform Level
(Plan View)
MTR Corporation 2022/5/28 Page 60
IE Phase 5 & Statutory Inspection
Phase 5 – Construction of Mezzanine Void Slab Details
Hoarding
Area
Hoarding Area
Covered Walkway
Covered Walkway
Platform Level
Platform Level
(Section View)
(Plan View)
New Existing
Stairs Ramp
Digital Advertising
Panel at TAW
platform level
MTR Corporation 2022/5/28 Page 67
Major Construction Challenges / Risks
Existing Digital Advertising Panel at Ramp Modification
area @TAW Platform Level
Hoarding
Area
Hoarding Area
Covered Walkway
Covered Walkway
Platform Level
Platform Level
(Section View)
(Plan View)
MTR Corporation 2022/5/28 Page 69
Major Construction Challenges / Risks
Public Access
to be maintained
4. Temporary Breast
6. Demolition of high- feeding location
level block walls at
construction area 4. Modification works to
CSC Store relocation
reduce Staff Meal Room
completed at Phase 2
Concourse Level
(Plan View)
MTR Corporation 2022/5/28 Page 71
IE Phase 2-3 Room Relocation
Steel beams installation
(MTB1 – 914x419x388 UB) & (MTB2 - 914x305x224 UB)
Room relocation
completed before
Protection to construction
station
equipment
during
MTB1
construction
(eg. IT room)
MTB2
Designated Contractors
– Automatic Fare Collection System (AFC) including Ticket Issue Machines (TIM), Add
Value Machines (AVM), etc.
– Escalators
– Lift
– Digital Service Kiosk (DSK)
– Control and Communication (C&C) System
– Works on Train Operator Monitor System
– Platform Emergency Plunger System
– Security Access Management System (SAMS)
– Main Control System (MCS) & Building Management System (BMS)
– Signage and Braille map
– Digital Advertising Panel
– Etc
Interfacing Parties
– Adjacent property development
– Advertisement works
– CCTV works
– TAW Station and HIK Station
– Designated contractors
– Etc
MTR Corporation 2022/5/28 Page 78
Construction Programme