PROJECT 

: WAS REMAINING WORKS ( CONCRETE BUILDINGS)
LOCATION : TURAIF, K.S.A.
REMAINING MAJOR DELIVERABLE COMMODITIES

2,255
2,500 18,000
16,000
1,848
1,706

2,000 14,000
1,508

1,394
1,381
12,000
1,500
10,000

1,022

1,011

882
8,000
1,000

662
629

608
6,000

412
341
339

336
4,000

281

262
500

232
2,000

28

0
0 0
07/27/19

08/03/19

08/10/19

08/17/19

08/24/19

08/31/19

09/07/19

09/14/19

09/21/19

09/28/19

10/05/19

10/12/19

10/19/19

10/26/19

11/02/19

11/09/19

11/16/19

11/23/19

11/30/19

12/07/19

12/14/19

12/21/19

12/28/19

01/04/20

01/11/20

01/18/20

01/25/20

02/01/20

02/08/20

02/15/20
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

SUM UP TOTAL MAJOR COMMODITIES CUMULATIVE TOTAL MAJOR COMMODITIES

108 
107 
 8  25  120  500

 450
 7
 100
 20  400
 6

78 
 350
 80
 5
 15  300


 4  60  250

47 
46 

45 

 10  200
 3
 40
 150
 2
 5  100

11 
 20
 1
 50












































 ‐  ‐  ‐  ‐
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

COMMODITY CODE: CONC  CONCRETE WORKS CUMULATIVE CONCRETE WORKS COMMODITY CODE: BLOC  BLOCKWORKS CUMULATIVE BLOCKWORKS

819 
813 

 300  1,200  900  5,000


264 

 800  4,500

 250  1,000
215 

 4,000
 700
183 

 3,500
 200  800  600

498 
 3,000
 500
358 

 150  600  2,500


346 
114 
111 

 400
291 

 2,000
220 

 100  400  300


 1,500
168 
154 
151 
127 

123 
46 

111 

 200
 1,000
90 

 50  200
23 

 100
18 
15 

 500































 ‐  ‐  ‐  ‐
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

COMMODITY CODE: PLAS  PLASTERING CUMULATIVE PLASTERING COMMODITY CODE: PAIN  PAINTING WORKS COMMODITY CODE: PAIN  PAINTING WORKS

 45  180
41 

 90  350
77 

 80  40  160


 300
32 

 70  35  140

 250
 60  30  120
24 
44 

 200  25  100


 50
20 
38 
35 

 20  80
33 

 40  150
26 

12 

 15  60
 30
19 

 100

 10  40

 20
11 




 50

 5  20
 10
































 ‐  ‐
 ‐  ‐
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

COMMODITY CODE: DORW  DOOR WORKS & HARDWARES CUMULATIVE DOOR& HARDWARES COMMODITY CODE: WINW  WINDOW WORKS CUMULATIVE WINDOW WORKS

 120  350  250  800


105 

209 
100 

 700
 300
 100
 200
161 

 600
 250
 80
 500
 150
 200
116 
52 

 60  400
44 

 150
86 

86 

82 

 100
 300
 40
 100
 200
 50
 20
17 

 50
 100














































 ‐  ‐  ‐  ‐
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

COMMODITY CODE: RFL  RAISED FLOOR CUMULATIVE RAISE FLOOR COMMODITY CODE: RWP  ROOF WATER PROOFING CUMULATIVE ROOF WATER PROOFING

PREPARED : NPD‐ASC  1 OF 2 D:\NPD OTHER FILE\TURAIF UPDATES\WAS UPDATES\DD27072019 UPDATES\WAS UPDATES DD27072019


PROJECT : WAS REMAINING WORKS ( CONCRETE BUILDINGS)
LOCATION : TURAIF, K.S.A.
REMAINING MAJOR DELIVERABLE COMMODITIES

 14  35  10  25


13 


 9

 12  30
 8  20

 10  25  7

 6  15
 8  20

 5

 6  15
 4  10


 3
 4  10



 2  5



 2  5

 1










































 ‐  ‐  ‐  ‐
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

COMMODITY CODE: DSPO  DOWNSPOUT CUMULATIVE DOWNSPOUTS COMMODITY CODE: ENHA  ENTRANCE HANDRAILS CUMULATIVE ENTRANCE HANDRAILS


569 

1,072 
 600  5,000  1,200  4,500
503 

 4,500
 4,000
482 

 500  1,000
 4,000
429 
428 

 3,500

 3,500
 400  800  3,000

 3,000
 2,500

 300  2,500  600


247 

244 

482 
226 
226 

 2,000

418 
389 

 2,000
184 

178 

357 

 200
304 
 400  1,500
133 

 1,500
266 
121 

243 
218 
105 
91 

 1,000

148 
 1,000
80 
75 

63 

 100  200
97 
39 

64 
 500  500
10 

25 

20 























 ‐  ‐  ‐  ‐
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

COMMODITY CODE: TILE  TILE WORKS CUMULATIVE TILE WORKS COMMODITY CODE: CEIL  CEILING WORKS CUMULATIVE CEILING WORKS

 500  1,400  8  14


442 

 450
 7
 1,200  12

 400
359 

 6
 10
 1,000
 350

 5

 300  8
 800
 4
 250

 6
 600  3
 200
148 
147 

143 

 4
 150  2
 400

 100  2
 1

 200

























 50
 ‐  ‐

22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51























 ‐  ‐
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 COMMODITY CODE: RWCP  RAIN WATER COLLECTION PIT
COMMODITY CODE: ALUFL  ALUMINUM FLASHING WORKS CUMULATIVE ALUMINUM FLASHING CUMULATIVE RAINWATER COLLECTION PIT
13 

 14  25  12  12


10 

 12
 10  10
 20

 10
 8  8

 15
 8

 6  6

 6
 10

 4  4
 4

 5
 2  2
 2






















































 ‐  ‐  ‐  ‐
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

COMMODITY CODE: PART  PARTITION WORKS CUMULATIVE PARTITION WORKS COMMODITY CODE: TFIX  TOILET FIXTURES CUMULATIVE TOILET FIXTURES

PREPARED : NPD  2 OF 2 D:\NPD OTHER FILE\TURAIF UPDATES\WAS UPDATES\DD27072019 UPDATES\WAS UPDATES DD27072019