Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

EHAB ELSAYED

Mobile 050/8987572

EHAB_IBRAHIM2001@yahoo.com http://ehab09.webs.com/

Civil Engineer with a diversified background over the past 11 years,Additional experience includes technical, Reporting and production management. Familiar with site supervision,able to coordinate multiple projects and Teams Simultaneously and consistent record of completing projects On time and within budget.Recognized for expert Analytical and qualitative abilities.

Production Manager where i can combine my extensive technical,organization and communications skills in
. The PM. Can add and contribute values as part of a team effort

Planning and Schedules Programs:Primavera P3, P5,Ms Projects,Pertmaster and Navis work 4D Reporting Programs: Ms Excel ,Ms word , Ms Front page andSmartDraw Technical Programs:Auto CAD ,Revit and Sketch up 3D

Manage the production within the contract condition and limited to approved budget and planned schedule Supervise the production and evaluate the result of each phase Monitor and control the materials & adequate resources available for the work in accordance to planned schedule Adhere with the production management techniques,methodology and tools. Control and manage the whole production process by dividing the main deliverables to smaller manageable process by using Work Breakdown Structure " WBS" Execute and track the production process with maintain the performance to suit costumer satisfaction "One of the ways is Critical Path Method CPM" Communicate with the crew vertically and horizontally to ease the work. Coordinate with upper management and liner management to obtain approval to accomplish. Prepare the required sketches to shown the vision of the production by using sketch up 3D Manage the production status shown the schedule,budget index factor and analyses to rectify the problems in ahead by using "Risk Management" Follow the company's procedure or create one for organize the production"Organization Skills" Create technical specification and method statement for all the stuff apply on the production Familiar with the following materials (ARG fiber(Roving,chopped),E glass fiber,Polymer( BR,PVA),Concrete additives S (Type A,B,C,D,E,F),Gel Coat,Resin,Peroxide,Cobalt,Silica sand,Pigment,Silicone rubber,Crystal gypsum

Project Management Professional "PMP"(studies) Bs.c in Civil Engineering from Alexandria University,Egypt(1991-1996)

EHAB ELSAYED
Mobile 050/8987572

EHAB_IBRAHIM2001@yahoo.com http://ehab09.webs.com/

Division Manager

AL ROSTAMANI PEGEL L.L.C

Dubai,2008-Present

Al Rostamani pegel L.L.C one of construction Filed Company,Part of Al Rostamani group Monitor and control the precast works to compelet the project within time and budget Assist the P.M to make a decision in time through evaluation of the precast work (Time,Cost and Resource) Some of Potential Projects:

Project Manager

GIBCA GROUP-Arbian Profile

Sharjah,2005-2008

Arabian Profile Ltd.,One of Construction Field Company,its core business is the manufacture of aluminum,steel and panel cladding (GRC,GRP) for roofs and facades. GRC Division part of theGibca Group is simply a manufacture of cladding for the construction Industry also provides total design solution and is often sought out by contractor facing unexpected architectural designs. Supervise preparing and coordination of shop drawings and details. Assist with 3d sketches for undercut andfixing detailes Assist and participate in production and through technical advise (Mould types and qty,design mix,skilledlabour evaluation,...etc) Preparing master plan for the production related to available time ,cost and resource -items wise and based on estimation sheet Proactively managed projects by preparing and presenting,witting statement of works and building client relationships Reviewed project reports and schedule status at the completion of each phase,proficient in handling simultaneous projects and meeting deadlines effectively. Analyzed problems and anticipated project needs Estimate projects (production by kg with direct and indirect cost,installation,...) all based on historic data Accelerate the progress based on production experience and related to cost controlled Maintain proper cash flow scheme in parallel to the progress payments Some of Potential Projects:

EHAB ELSAYED
Mobile 050/8987572

EHAB_IBRAHIM2001@yahoo.com http://ehab09.webs.com/

GRC Division Manager

SEIF FOR CONSTRUCTION L.L.C

EGYPT,2001-2005

Seif for construction one of construction Filed Company,Part ofSEIF group Overall division's activity management,Estimation,Control mould design with regard to cost and time Ensure proper design Mix,Cost control & Develop new products (Poly stone,Dry Cast) Some of Potential Projects:

All the above project sprayed by PS9000A,POWER SPRAY CO.U.K

Executive Manager of manufacture Process

MEAN FOR ENGINEERING

EGYPT,1998-2001

Assist the setting up for the factory,Select and evaluate the qualified crow Monitor and check the requirements for the production (Raw materials,Resource,....) Develop and produce modified GRG Mean Roman Building-GRC cladding panels 4,500m2 full cladding Sprayed by GGAP,SPRAY TEC CO.USA

Project Engineer

French Arabic CO.

EGYPT,1996-1998

Coordinate between factory and site to ensure to get materials and panels on time Record daily activity such as manpower,machinery and tools Ensure that all previous activities are approved &signed off by consultant before proceeding further SHERATON ABU SUMA -HURGADA GRG &GRC

Date of Birth : Aug-1973 Material Status :Married Nationality :Egyption Language :Fluent in spoken and written Arabic and English Driving licence:U.A.E Valid to 2011 Visa Status :Employment Visa Others : 3d animation , 4d cinema

You might also like