Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

UMECHURUBA, CHIMEZIRIM ENYINNAYA

Home Address Port Harcourt, Nigeria.


E-Mail Address eumechuruba@gmail.com
Telephone Number +234(0)803-7076554, +234{0}8184767226
Mobile
Nationality Nigerian

Job Role Desired Well Intervention Supervisor

Profile Summary
 A highly trained and energetic well intervention supervisor, innovative, analytical and detail
oriented problem solver with focus on goal deliverables.
 Skilled in managing well intervention, downhole guages, well head operations, rig and
rigless with assurance of the production targets, asset integrity and specific project
requirements
 Expertise in managing the compliance with HSE guidelines throughout the operations to
ensure safety of the workers, safe handling of equipments and imparted required trainings
for HSE.

Education
 University of Benin 2016 - 2019
 M.Eng Production Engineering (Industrial)
 Laser Petroleum Geosciences Centre Port Harcourt 2008 -2009
 Diploma in Applied Geosciences
 University of Port Harcourt, Port Harcourt 2000-2006
 B.Eng. Electrical/Electronic Engineering. Second Class Honor, Lower Division
(2.2)
 University Demonstration Secondary School, Port Harcourt 1994-2000
 West African School Certificate
 University Primary Secondary School, Port Harcourt 1989-1994
First School Leaving Certificate
Relevant Experience
From To Company Job Title

March 1st 2019 Till Date ALPHARETTA OIL & GAS Well Intervention
SERVICESWORLDWIDE Supervisor
LIMITED, Lagos

 Provide specialized technical Support to Project well assets as required regarding


Coiled Tubing,Slick line, E-line etc services.
 Liaise with other entities for studies, engineering input and details required for preparation
of wellintervention program, plans and contingencies
 Prepare Call for Tenders for Intervention Activities
 Actively participate in improvements concerning intervention methods
and toolsmaintain well file and update upon changes
 Advise clients on products and services that best suits their needs in terms of cost
and servicequality delivery.

From To Compan Job


y Title
September February 30th Laser Engineering and Asst Slickline Operator
2014 2019 Resources Consultants
Limited Port Harcourt
-
 Ensure all Slickline Operations are carried at safety as per standard Slickline Operations
Procedures
 Ensure that detailed daily reports are submitted to the senior Slickline sup with a clear description
of downhole status and any other relevant information.
 Ensure that Operators are fully aware of the Operations requirements and preparation prior
to anytask commence.
 Comply with applicable company and regulatory authority policies, regarding personnel,
QualitySystem, HSE standards and procedures.
 Proficiency in deep water
 Using slick line to install and retrieve safety valves, plugs and pressure regulators.
 Removing sand and paraffin out of the wellbore
 Running instruments to record bottom-hole pressure and temperature and installing and retrieving
gas lift valves.
From To Company Job Title
October September Laser Engineering and GaugeEngineer/Slickline
2012 2014 Resources Consultants Asst Operator
Limited, Port Harcourt

Duties, Responsibilities:
 Assist with providing Well services service at well site
 Running various Well intervention services on wells such as; Tagging TD, gauge run, Bottom
Hole Samplers,bailing sand, shifting sleeves, bottom hole temperature and pressure surveys,
Installing / Pulling of plugs, Installing/ pulling gas lift valves, paraffin cutting, Ceramic breaking etc
 Interface with asset teams, production and well services team during intervention operation.
 Ensure the safety of team during well interventions work on assigned fields.
 Contribute to well Interventions projects and activities.
 Assist in the assembly and preparation of equipments for well servicing
From To Com Job Title
pany
October September Laser Engineering and Gauge /Field Service
2010 2012 Resources Consultants Engineer Trainee
Limited, Port Harcourt

 Program gauges and prepare data acquisition report


 Carry inventory before and after field operations
 Clean and oil tools after field operations
 Learn various down hole tools and functions
 Scrape and paint Pressure control equipments
 Study field programs/well schematic on the job scope

ENGINEERING PROJECTS INVOLVED IN


 BHP Survey for LEKOIL Otakipo field – December 2022 – Febuary 2023
 Workover Completions for NAOC Tibidaba – 2nd November 2021 – March 2022
 HWU Divine 102 Inspection for NAOC – 7TH August – 17th August 2021
 Fishing for Chorus Energy - Matsogo 1S – 13th April – 23th April 2021
 Drift run/Unplugging for SPDC Forcados 1st February - 25th March, 2021
 Surface Sampling for SEPLAT – Okpohuru – 26th November – 4th January 2021
 BHP Survey for Chorus Energy - Matsogo 1S – 22nd November – 28th November 2020
 BHP Survey for ADDAX – Adanga Main, North and Oron West Wells – 2nd Jan 2020 – 21stJan
2020.
 Dewaxing /Solvent soak for NEW CROSS – EKU 40T – October 4th – October 28th, 2019
 Well Cleanup for NEW CROSS – Awoba NW-2L&S – May 8th – July 5th, 2019
 Through Tubing Well Intervention for NEW CROSS - Ekulama 27L&39L – February 6th – 20th 2019
 Completions for ExxonMobil, TRIDENT-14 Rig - 12th December 2018 - 4th January 2019
 Completions for ExxonMobil, TRIDENT-14 Rig - 4th December 2018 - 9th December 2018
 Straddle pack off EROTON - Cawthonrne Channel 2 - 11th - 21st September 2018
 Bottom Hole Sampling for NEW CROSS - Ekulama 40T - 3rd September - September 6th 2018
 Fishing for EROTON – Well 47 Cawthone Channel – 8th December – 23rd December, 2017
 Bottom Hole Pressure Data Acquisition for LEKOIL – Otakikpo Field –31st
August – 2nd September. 2017
 Down Hole Sampling for FRONTIER – Uquo Field – 21st July – 24th July, 2017
 Bottom Hole Pressure Data Acquisition /MER Test Program for LEKOIL – Otakikpo Field
–1st July – 7th July. 2017
 Production Logging Tool and Zone Change for XENOIL – KE 1 Field – 27th April – 18th May, 2017
 Bottom Hole Pressure Data Acquisition for FRONTIER – Uquo Field – 23rd
February – 27th February, 2017
 Down Hole Sampling for LEKOIL – Otakikpo Field – 7th December – 25th December. 2016
 Bottom Hole pressure Data Acquisition for SEPLAT – Sapele 10L Field – 10TH
November 2016 –14th November 2016
 Gas lift Retrieval & Installation for SEPLAT – Sapele 31 Field 6th May – 4th June 2016
 Plug Installation & Retrieval (RZG Plug) – ExxonMobil – Asabo Field – 6th June – 1st July, 2015
 Bottom Hole Pressure Data Acquisition for XenOil Energy Resources KE 1 – 6th April –
24th April,2015
 Install and Retrieval of Gaslift Valves for ExxonMobil – Utue Production Platform - February 12th
– February 23rd, 2015
 Air Monitoring & Water Sampling – Sendje Berge – 17th July - 20th July 2014
 Swabbing for Britania U – Ajapa Field – 7th December 2013 – 19th December 2013
 Bottom Hole pressure Data Acquisition for SEPLAT – Oben Field – 22nd October
2013 – 19th November 2013
 Bottom Hole pressure Data Acquisition for NPDC/FHN – Ogini Field – 14th
December 2012 –April 8th 2013
 Completions for Energia Nigeria Limited - Ebendo 4 – 18 August – 29th 2012
 Nipple Test/SSD Test in Ciscon Nigeria Limited Base for Energia Nigeria Limited – June 2012
 Completions for Waltersmith Petroman Oil Limited – Well Ibegwe 7- May 2012
 Plug & SSD Test in Slumberger Base for Waltersmith Petroman Oil Limited – April 2012
 Bottom Hope Pressure Data Acquisition for SEPLAT – Oben field – 20th April 2012
2008-National Youth Service Corps (NYSC)
NIGERIAN COLLEGE OF AVIATION TECHNOLOGY
ZARIA,KADUNA STATE
AERONAUTICAL TELECOMMUNICATION ENGINEERING SCHOOL.
Communication Equipment Maintenance Department
 Electrical(Electronics) Lab Instructor (ATE 32)

2004 – WELTEK NIGERIA LIMITED - Industrial Training


Status: Control and Instrumentation
 Engineering Design and Construction
 Upgrading and building of automated panels for flow stations
 Handled the tasks of setting standards for corporate Utility Instrumentation
and boilercontrols
 Assigned the tasks of replacing systems and controlling projects
Handled the responsibilities of control system checkout, tuning and set-up responsible
for developing and designing new control systems
TRAINING/COURSES ACQUIRE
Basic Hydrogen Sulfide Date: Oct 10th - Oct9th 2020
Business Essentials for Technical Professionals Date: October 7th - 10th 2021

T-BOSIET Date: May 15th - May 18th 2018

CORELAB TULSA OKLAHOMA


AFS 300 - CORE FLOODING Date March 27th – 7th April, 2017

STANADRD ORGANIZATION OF NIGERIA


ISO 9001:2015
QMS IMPLEMENTATION/AUDIT COURSE Date Feb 21st – 24th Feb, 2017

LASER PETROLEUM GEOSCIENCES CENTRE


Date: 2016
 Surface Well Testing Operations August 22nd – 26th, 2016

 ExxonMobil - GLOBAL OPERATIONS PBP WORK MANAGEMENT SYSTEMS

MODUEL 2 – Permit Holder August, 2015


LASER PETROLEUM GEOSCIENCES CENTRE Date: 2015
 Permit to Work/Hazard Identification & Culture July 14th, 2015

OPEANS SAFTEY TRAINING CENTRE


 Safety swing rope and basket transfer training (SSR & BTT) Sept 11th 2014

PROSERV ABERDEEN
Down Hole Sampling
Date: 2014 May 12th – 21st, 2014
Positive Displacement Sampling
 Sample tool Assembly
 Preparation
 Maintenance
 Down hole Sampling Stimulation
 Sample Transfer & Cylinder Handling
Single Phase Sampling
 Sample tool Assembly
 Preparation
 Maintenance
 Down hole Sampling Stimulation
 Sample Transfer & Cylinder Handling
LASER PETROLEUM GEOSCIENCES CENTRE
 WIRELINE SAFETY
 Basic Well Completion & Production
 Project Management Software Solution
 Flow system Modeling

Referees
Available on request

You might also like