[ 0 6[Gas
6 2 generator
551700 04] Tripped due to CDVR Shutdown during inspection found Excitation voltage
and current above normal during off load running.]
[12-08-2020]
MAIN STATOR MAGGERING BEFORE WASHING (1). PHASE TO PHASE 1-Netco Main Rotor Testing report before washing: - (1.3)
3 0.3 12.20 44
Main stator After Varnish
4 0.3 12.20 49
PHASE STATUS (GΩ) TIME (sec) METER RANGE
R___ BODY 10 60 5000 VOLTS 2-Self Test Main Rotor Testing report before washing: - (1.3)
Y___ BODY 10 60 5000 VOLTS
B___ BODY 10 60 5000 VOLTS Pole Resistance Applied Voltage Amp
2 0.3 250 246 MΩ 343 MΩ 3- Self Test Main Rotor Testing report before washing: - (1.3)
4 0.3 12.76 45
(3). MAIN ROTOR :- (1.3Ω)
TIME
PHASE STATUS (sec) METER RANGE
2 0.3 12.30 37
3 0.3 12.20 44
4 0.3 12.20 49
1 0.3 12.80 46
2 0.3 12.86 47
3 0.3 12.15 46
4 0.3 12.75 47
1 0.3 12.85 45
4 0.3 12.76 45
(4)EXCITOR FIELD (STATOR) :- (4.2Ω)