Project Details :
Project Name : Bangabandhu Sheikh Mujibor Rahman Novo-theatre, Dhaka
Architects : Ali Imam
Location : Concourse Dr/Academy of Sciences, San Francisco, CA 94118, United States
Concept
The Planetarium dome simulates Earth and its cool blue sky. The curved ceiling represents the sky and shows
moving images of planets and stars through projection onto a large-screen dome at an angle of 120 degrees.
Site Surrounding :
2.
Novo-theatre, Dhaka
Bangladesh Military Museum
6
3. National Parliament House
4.
5.
Chandrima Udyan
Dhaka old Airport
4 5
6. The Prime Minister’s Office
7. Rags Vobon
8. Elenbari
9. Monipuripara 7
2 1
3 8
9
National Parliament House
Chandrima Udyan Bangladesh Military Museum Old Airport The Prime Minister’s Office
Road Network :
7 7
2
1
1
7 2 7 5
5
6 6
3 1 4 3
6 1 6 5
1 7 5 7
7 7
2 1 2
4 2
3
1
7
5
2 6
4
5
4
4 6
7
1 2
2
Concept:
“ Was not only to make an Academy building but a building with a feel of Nature and Life in itself”
The selection of Renzo Piano fueled the Academy’s high aspirations for the museum’s architecture and solidified its
commitment to creating a sustainable building. Piano’s design began with a living roof concept, which he described as
“[lifting] up a piece of the park and [putting] a building underneath.”9 The roof would feature a field and seven rolling hills
to mimic San Francisco’s landscape. The roof would be visible from the Music Concourse, an open-air plaza within Golden
Gate Park.
Project Objective
The Academy’s requirements were far more challenging than any leasing requirement we have witnessed in San
Francisco’s history, including the need to:
•House 25 million “things” from the Academy’s world-renowned collections;
•Address the various zoning, space and environmental requirements for the Academy’s collections, including lab
space, water supply, storage, drainage and containment, proper fire suppression systems, heavy floor loading capacity,
hazardous material containment and ambient temperature control;
•Build temporary public and private spaces, including a temporary Steinhart Aquarium;
•Accommodate 300 researchers and related staff;
•Showcase a priceless library of 12,000+ books and specimens; and
•Ensure that the lease dovetailed with the projected completion of the new facility in Golden Gate Park, allowing
the Academy to phase out of their temporary building on a floor by floor basis, as areas of their new facility were
completed.
Site Location
The California Academy of Sciences (the Academy) is a scientific and educational institution in San Francisco’s Golden Gate
Park.
mexico
Golden Park
Site Surrounding
Plan & Zoning
Floor Plan
Functional Zoning
The building
consolidates several
exhibits under one roof; Living Roof
these offerings were
formerly distributed
across multiple Green Roof
structures. Level Three
Level Two
Rainforest Interior
Office Space
Rainforest
Planetarium
African Hall Ground Level
Earthquake!
Aquarium + Swamp
Basement
Aquarium
Natural Ventilation & Lighting
Climate-control Strategy (Natural Ventilation)
Too Warm
No windows or piazza = No movement of air
No green roof = Increase heat loss from roof
Too Warm
Piazza = Vertical movement of air
No Windows = No lateral movement of air
No Green roof = Increase heat loss from roof
Too Cool
Piazza = Vertical movement of air
Windows = lateral movement of air
No Green roof = Minimize heat loss from roof
Just Right
Piazza = Vertical movement of air
Windows = lateral movement of air
No Green roof = Minimize heat loss from roof
Spheres = Manipulates movement of air to
create comfortable microclimates