Name of Substation: NAJRAN HOUSING 132/13.8 kV S/S Contract No. : 15SN1029
Page 1 of 2
CAPAITOR BANK TEST
INSULATION
TIME
R-G
1 Minute 43.4
(1.)
Measured
Factory value in REMARKS
Unit Sr No. Inductance in
mH
mH
160636 1636.4 1642.64 OK
Date: 4/03/2023 Tested by: Al Sharif Group Witnessed by: SEC SOA-CSD
ENG NAME: Khubaib – ASG-024
SIGNATURE:
SITE TEST REPORT Date : 4-3-2023
CONTRACTOR:
Customer:
SEC-SOA
Name of Substation: NAJRAN HOUSING 132/13.8 kV S/S Contract No. : 15SN1029
Page 2 of 2
CAPAITOR BANK TEST
Factory
Measured
Voltage Current Impedence Impedence
Unit Sr No.
V A
Ω Ω
624.0 619.342
160636 223 0.373
Impedence : Z : V/I
FAT. FAT.
Meas. Meas.
value in value in % Error
Unit Sr No. value in value in Ω
Ω@ mΩ @
Ω 20ºC @ 75 ºC
20ºC 75 ºC
7.798 9.320 -0.97
160636 7.590 9.230
Sl. Calibration
Description Make Equipment Sl .No
No Due Date
1. TOM Multi-Amp 35340115 17/9/2021
2. Megger Megger 1003701111113636 5/11/2021
3. MultiMeter Fluke 4374425 9/9/2021
Date: 4/03/2023 Tested by: Al Sharif Group Witnessed by: SEC SOA-CSD
ENG NAME: Khubaib – ASG-024
SIGNATURE: