PROPOSED TILAL AL GHAF IN, DUBAI

RISK ASSESSMENT

Date: 17-01-2021 Document No. MS-21004

METHOD STATEMENT
FOR RISK ASSESSMENT

DOCUMENT NO. MS-21004

0 17-01-2021 FINAL FK AES

Rev No. Date Status Prepared By Checked By Approved By


PROPOSED TILAL AL GHAF, DUBAI

RISK ASSESSMENT

Date: 17-01-2021 Document No. MS-21004

TABLE OF CONTENTS
1. RISK ASSESSMENT CONTROL .................................................................................................................. 2

1.1. NUMERICAL RISK ESTIMATION TABLE ....................................................................................................2

1.2. ACTION PRIORITIZATION TABLE ..............................................................................................................2

1.3. RISK ASSESSMENT ....................................................................................................................................3

Page 1 of 6
PROPOSED TILAL AL GHAF, DUBAI

RISK ASSESSMENT

Date: 17-01-2021 Document No. MS-21004

Risk Assessment CONTROL

All work assignments (site activities) should have a Specific Risk Assessment/Method Statement which
shall include specific attention to safety. "Follow-up" monitoring is required in order to prevent accidents.
Risk assessment will be carried out in accordance with the standard risk assessment template issued that
is issued along with the method statement template and adequately covering all specific environmental,
safety and health risks associated. The template is as follows:-

1.1. NUMERICAL RISK ESTIMATION TABLE

Least Consequences Most Consequences


Severity (S)
1 2 3 4 5

1 1 2 3 4 5
Least

2 2 4 6 8 10
Likelihood (L)

3 3 6 9 12 15

4 4 8 12 16 20
Most

5 5 10 15 20 25

• S = Severity of consequences should hazard occur (1 Least Consequence – 5 Most


Consequence)
• L = Likelihood of hazard occurring (1 Least likely – 5 Most likely)
• R = Risk = S x L (A Risk Rating of 1-25)

1.2. ACTION PRIORITIZATION TABLE

Risk Level (R) Assessment

1-2 Negligible

3-7 Acceptable providing risk is managed

8 - 12 Must be avoided if reasonably practicable

13 - 25 Unacceptable risk, apply mitigation

Page 2 of 6
PROPOSED TILAL AL GHAF IN, DUBAI

RISK ASSESSMENT

Date: 17-01-2021 Document No. MS-21004

1.3. RISK ASSESSMENT

Initial Risk Rating Resultant Risk Rating


Hazard Potential HSE Effects Proposed Control Measures
S L R S L R
- Ensure that all drivers hold valid
UAE driving licenses and are
aware of all the traffic
regulations.
- Vehicle to be properly inspected
for defects before driving.
-Personnel injury
- Inspection of brakes and tires.
Traffic - Ensure periodic maintenance of
5 1 5
Accidents 5 2 10 vehicle.
- Abide by road speed limits.
-Loss of life
- Drivers and passengers to wear
seatbelts at all times.
- No use of mobile phones while
driving, with no exemption of
“hand-free” units.
- No eating reading or any form of
distraction while driving.

Page 3 of 6
PROPOSED TILAL AL GHAF IN, DUBAI

RISK ASSESSMENT

Date: 17-01-2021 Document No. MS-21004

Initial Risk Rating Resultant Risk Rating


Hazard Potential HSE Effects Proposed Control Measures
S L R S L R
- Always plan the route before
setting off.
- Advice related parties on planned
route, return time, phone
numbers, number of passengers
and of any route changes, if any.
- All vehicles to be equipped with a
GPS monitoring system with
related waypoints stored in
Driving in - Personnel vehicles lost memory.
remote areas - Personnel stranded for long - Always drive in pairs, no lone
5 3 15 5 1 5
period of time in dangerous driving
environment - Minimize off-road travels.
- Dehydration and sunstroke - Never leave vehicles when
stranded and walk into the
desert.
- Vehicles monitored through GPS
tracking system.
- Additional food and drinking
water to be stored on each
vehicle.
- Ensure that all concerned
personnel are trained in HSE.
Working with - All site employees must wear
- Physical injury to personnel
their PPE at all times. 4 1 4
drilling rigs 4 3 12
- Conduct regular Toolbox
meetings.
- Go through required PPE
checklist.

Page 4 of 6
PROPOSED TILAL AL GHAF IN, DUBAI

RISK ASSESSMENT

Date: 17-01-2021 Document No. MS-21004

Initial Risk Rating Resultant Risk Rating


Hazard Potential HSE Effects Proposed Control Measures
S L R S L R
- Ensure that no work on site
begins unless all related NOCs
are obtained.
- Damage to electrical lines
Drilling in soil - Excavate the top soil by hand to 2 1 2
- Damage to water pipes 2 3 6
expose any underground
- Physical injury to personnel
services.
- Ensure that all personnel are
wearing their PPE.
- Routinely service the rigs and
vehicles such that they are
properly maintained.
- Rig operators to check the rig
Use of - Oil Spillage before commencing with any
machinery on - Fire work. 3 1 3
3 2 6
site - Every crew must have a spill kit
present on site.
- Fire Extinguishers must always
be present on site.
- All personnel must be informed of
the procedures incase of a fire.
- Only personnel with valid U.A.E
driving licenses are to shift the
Shifting of rigs.
- Injury to personnel due to a
- Drivers are to be informed of the 5 1 5
machinery collision with other machinery 5 2 10
safest route to take by the HSE
- Toppling/falling of machinery
Manager/GE Manager.
- All personnel in vehicles to be
securely fastened with seatbelts.

Page 5 of 6
PROPOSED TILAL AL GHAF IN, DUBAI

RISK ASSESSMENT

Date: 17-01-2021 Document No. MS-21004

Initial Risk Rating Resultant Risk Rating


Hazard Potential HSE Effects Proposed Control Measures
S L R S L R
- Proper housekeeping to be
maintained on site.
Production of - Backfilling for trial pits to be
- Increased landfill material 3 2 6
waste material 3 4 12 conducted by the soil retrieved
- Increased hazardous material
from the ground.
- All waste to be properly removed
from the site.
- Routinely service the rigs and
vehicles such that they are
properly maintained.
- Rig operators to check the rig
before commencing with any
Spillage of oil work.
- Contamination of soil 4 1 4
or diesel 4 3 12 - Every crew must have a spill kit
- Contamination of groundwater
present on site.
- Dip trays will be constructed
around diesel tanks used for
storage on site.

- Identify the properties


- Keep safe distance from them
Property - Keep load distributer under the
- Damage of nearby properties 4 1 4
damage 4 2 8 jacks in a manner the load is
due to toppling of drilling rig.
evenly distributed.
- Keep the jacks in flat and smooth
ground.

Page 6 of 6