DETAILED ESTIMATE
STATE :- JHARKHAND
DISTRICT :- HAZARIBAGH
BLOCK :- DARU
EXECUTIVE ENGINEER
RURAL DEVELOPMENT SPECIAL DIVISION, HAZARIBAGH
Check List of D.P.R.
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER
1 Name of High Level Bridge - CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA
OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE
HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU
YOJANA.
0 0 0 0.00
8 Contents
Construction cost
Sl No. DESCRIPTION
INR Rs.
PCC M-15 Grade Levelling Course below Approach Slab complete as per
10 14.10 Case i drawing and Technical specification PCC Grade M15 using batching cum 7.88 3405.64 26836.420
plant & Concrete pump
Plain/Reinforced cement concrete in Foundation complete as per
11 12.08 E drawing and technical specification, (RCC Grade M25 using batching cum 10.46 4378.30 45797.020
plant,transit mixer & Concrete pump)
Plain /Reinforced Cement Concrete in Sub-Structure complete as per
12 13.05 F (p) Case I drawing and technical specifications (PCC Grade M25 using batching
plant, transit mixer & concrete pump)
(p) Height Upto 5m cum 192.20 4630.90 890058.980
Providing weep holes in Brick masonry/ Plain/ Reinforced concrete
abutment, wing wall/ return wall with 100 mm dia AC pipe, extending
13 13.08 through the full width of the structure with slope of 1V:20H towards Each 172.00 110.50 19006.000
drawing face. Complete as per drawing and technical specification.
Furnishing and placing Reinforcement/ Prestressed cement concrete in
14 14.01C (ii)q Super-Structure a per drawing and Technical specification, RCC Grade cum 212.00 5495.90 1165130.800
M 30 RCC T-Beam & Slab (Height between 5m to 10m)
Reinforced cement concrete approach slab including reinforcement and
15 14.11 formwork complete as per drawing and Technical specification cum 15.75 8747.60 137774.700
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF
DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
BILLS OF QUANTITIES
SL. NH Sch. Item
DESCRIPTION UNIT QTY RATE AMOUNT
No. No.
Providing and laying of a strip seal expansion joint catering to maximum
horizontal movement upto 70 mm, complete as per approved drawings
16 14.21 and standard specifications to be installed by the manufacturer/supplier Per m 42.25 10290.00 434752.500
or their authorised representative ensuring compliance to the
manufacturer's instructions for installation.
Supplying, fitting and fixing in position true to line and level Elastomeric
bearing confirming to IRC:83 (Part-II) section IX and clause 2005 of
17 13.16 MORTH Specifications complete including all accessories as per drawing CC 202910.40 0.81 164357.420
and technical specification.
Providing drainage spout complete as per drawing and technical
18 14.09 specification Each 32.00 817.90 26172.800
Providing and laying Pitching on slopes laid over prepared filter media
25 16.04A including boulder apron laid dry in front of toe of embankment complete cum 41.26 1158.40 47795.580
as per drawing and technical specifications. (Stone / Boulder )
2 PCC M-15 Grade Concrete (1:2:4) cum 39.78 0.450 17.900 0.275 10.940 0.900 35.800
3 PCC M-20 Grade Concrete (1:1.5:3) cum 0.450 0.000 0.230 0.000 0.900 0.000
13 PCC garde M 20 ) For Coping cum 4.50 0.450 2.03 0.344 1.550 0.900 4.050
4 RCC M-25 Grade Concrete cum 764.31 0.450 343.940 0.403 308.140 0.900 687.880
5 RCC M-30 Grade Concrete cum 223.51 0.450 100.580 0.407 90.890 0.900 201.150
6 RCC M-35 Grade Concrete cum 349.71 0.450 157.370 0.422 147.580 0.900 314.740
7 Stone Masonary cum 87.90 1.050 92.300 0.510 44.830 1.100 96.690
8 Random Rubble Masonry cum 141.30 1.050 148.370 0.510 72.060 1.000 141.300
1 Sand cum Barkagaon 1155.71 55.0 2.00 0.00 1.60 9.30 10.60 21.30 115.00 967.32 1117941.40
2 Cement MT Bokaro 721.690 135.0 2.00 0.00 1.00 9.30 10.60 21.30 409.60 1686.30 1216985.85
Ichak/Tatijah
3 Boulder cum 287.500 35.0 2.00 0.00 1.67 9.30 10.60 21.30 279.30 858.29 246758.38
riya
Ichak/Tatijah
4 Aggregate cum 1976.110 35.0 2.00 0.00 1.60 9.30 10.60 21.30 115.00 669.72 1323440.39
riya
5 Steel MT Bokaro 174.700 135.0 2.00 0.00 1.00 9.30 10.60 21.30 409.60 1686.30 294596.61
6 Bitumen MT Bokaro 2.520 135.0 2.00 0.00 1.00 9.30 10.60 21.30 409.60 1686.30 4249.48
7 Bitumen Emulsion MT Bokaro 1.070 135.0 2.00 0.00 1.00 9.30 10.60 21.30 409.60 1686.30 1804.34
Total : 4205776.45
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU
BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
QUANTITY CALCULATION (Abutment) & (Pier)
NH Sch. Item
SL. No. Items Unit No. Length Breadth Height QTY Remarks
No.
Excavation for structures in ordinary soil (Earth work in excavation of foundation
of structures as per drawing and technical specification, including setting out,
1 12.1 (I) B construction of shoring and bracing, removal of stumps and other deleterious
matter, dressing of sides and bottom and bockfilling with approved material)
Mechanical means
Abutment Shaft (above Ground level) cum 1 1.200 8.700 2.104 21.970
Return Wall cum 2 3.500 0.400 4.654 13.030
NH Sch. Item
SL. No. Items Unit No. Length Breadth Height QTY Remarks
No.
Return Wall Cantilever cum 2 2.000 0.400 1.633 2.610
Rectangular part of Abutment cap cum 1 1.325 8.700 0.600 6.920
Dirt wall cum 1 0.300 8.700 1.275 3.330
Approach Slab (M30 Grade) including reinforcement and formwork complete as per
4 14.11 drawing and Technical specification. cum 2 3.5 7.5 0.30 15.75
Strip Seal Expansion Joint ( providing and laying of a strip seal expansion joint catering
to maximum horizontal movement upto 70mm, complete as per approved drawings and
5 14.22 standard specifications to be installed by the manufacturer/supplier or their authorised Per m 5 8.45 42.250
representative ensuring complaince to the manufacturer's instructions for installation.
Supplying, fitting and fixing in position true to line and level Elastomeric bearing
6 13.14 confirming to IRC:83 (Part-II) section IX and clause 2005 of MORTH Specifications CC 24 63 22 6.10 202910.40
complete including all accessories as per drawing and technical specification.
7 14.9 Providing drainage spout complete as per drawing and technical specification Each 4 8 32.00
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
WRD sl. 47
item PM 29 Dewatering for Foundation diesel pump 10 HP 10 PER
16 1 512 512.00
and corr pg- (2 x 8 hours x 8 days) = 128 x 12( A1 + A2 + 4 Pier ) HP/HR.
28 sl-47
Sub Total
B APPROACH ROAD PART
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity
including cutting and loading in tippers, trimming bottom and side slopes, in accordance
1 3.6 with requirements of lines, grades and cross sections, and transporting to the
embankment location within all lifts and lead upto 1000m (including Royalty @ Rs. 30.00
per Cum but excluding watering, rolling & compaction)
TOTAL cum 0.00
Construction of embankment with approved materials deposited at site from roadway
2 3.17 (i) cutting and excavation from drain and foundation of other structures graded and cum 1 0.00
compacted to meet requirement of table 300-2.
4545.67
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
3.19 Case II Compacting original ground supporting embankment ( Rolling with vibratory roller)
4 cum 1 30.00 7.50 0.15 33.75
(i)
Granular Sub- Base with coarse graded material (Table 400-2) (Construction of granular
sub-base by providing coarse graded material, spreading in uniform layers with motor
5 4.2 grader on prepared sruface, mixing by mix in place method with rotavatory at OMC, and
compactiing with vibratory roller to achieve the desire density, complete as per clause
401)
(i) for Grading - I Material (first 2x15m both side) cum 1 30.00 5.63 0.150 25.31
for Grading - I Material cum 1 270.00 4.050 0.150 164.03
Wet Mix Macadam (Plant Mix Method) 189.34
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the Material with water at OMC in mechanical mix plant
6 4.14 carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base /
base course on well prepared surface and compacting with vibratory roller to achieve the desired
density.
(ii) a cum 1 30.00 5.63 0.150 25.31
cum 1 270.00 3.75 0.150 151.88
177.19
Prime Coat (Providing and applying Primer Coat with bitumen emulsion on prepared
7 5.1 surface of Granular Base including clearing of road surface and spraying primer at the sqm 1 30.00 5.63 (Area) 168.75
rate of 0.60 kg/sqm using mechanical means)
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
Turibar Side
4.5 m Height Retaining Wall cum 2 20.80 5.10 1.65 350.06
Rachanga Side
4.5 m Height Retaining Wall cum 2 15.80 5.10 1.65 265.91
Total 615.97
Plain/Reinfoced Cement concrete in open foundation complete as per
2 12.8 A drwaing and technical specifications. PCC Grade M10 using batching
plant & Concrete pump
Turibar Side
4.5 m Height Retaining Wall cum 2 20.20 4.50 0.15 27.27
Rachanga Side
4.5 m Height Retaining Wall cum 2 15.20 4.50 0.15 20.52
Total 47.79
Plain/Reinforced cement concrete in Foundation complete as per
drawing and technical specification, RCC Grade M25 using batching
3 12.8 E
plant,transit mixer & Concrete pump
Turibar Side
4.5 m Height Retaining Wall
Foundation Straight cum 2 20.00 4.300 0.300 51.60
Foundation Tapered toe cum 2 20.00 2.500 0.150 15.00
Foundation Tapered heel cum 2 20.00 1.200 0.150 7.20
Shaft cum 2 20.00 0.450 1.200 21.60
Rachanga Side
4.5 m Height Retaining Wall
Foundation Straight cum 2 15.00 4.300 0.300 38.70
Foundation Tapered toe cum 2 15.00 2.500 0.150 11.25
Foundation Tapered heel cum 2 15.00 1.200 0.150 5.40
Shaft cum 2 15.00 0.450 1.200 16.20
Total 166.95
Plain/Reinforced cement concrete in sub-strucutre complete as per
13.5 F (p)
4 drawing and Technical specifications RCC Grade M25 using batching
Case I
plant, transit mixer & concrete pump
Turibar Side
4.5 m Height Retaining Wall cum 2 20.00 0.45 3.00 54.00
Rachanga Side
4.5 m Height Retaining Wall cum 2 15.00 0.450 3.00 40.50
Total 94.50
Supplying , fitting and placing un-coated HYSD bar reinforcement in
5 12.40 tonne Foundation 12.43
foundation complete as per drawing and technical specifications
Supplying , fitting and placing HYSD bar reinforcement in sub-
6 13.6 tonne Substructure 15.70
structure complete as per drawing and technical specifications
Providing and laying of Filter media with granular materials/stone
crushed aggregates satisfying the requirements laid down in clause
2504.2.2. of MoRT&H specifications to a thickness of not less than
600 mm with smaller size towards the soil and bigger size towards the
7 15.5 wall and provided over the entire surface behind abutment, wing wall
and return wall to the full height compacted to a firm condition
complete as per drawing and Technical Specification.
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI
TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU
YOJANA.
QUANTITY CALCULATION (RETAINING WALL)
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height QTY
No. Item No.
Turibar Side
4.5 m Height Retaining Wall cum 2 20.00 0.60 3.00 72.00
Rachanga Side
4.5 m Height Retaining Wall cum 2 15.00 0.60 3.00 54.00
Total cum 126.00
Providing weep hole in Brick, masonary/Plain/Reinforced Cement
Concrete abutment, wing wall/returnwall with 100mm dia AC pipe,
8 13.8 extending through the full widt of the structure with slope of 1V:20H Each 274.00
towards drawing foce. Complete as per drawing and Technical
specification.
Sub Total A:
TYPICAL CROSS SECTION
Average RL 97.167 m
4.1m
7.5m
1
Average RL 92.550 m
1.5
1 Earth work in embankement (Turibar Side) 1 150.00 9.000 1.847 2,493.45 2,493.45
2 Earth work in embankement (Rachanga Side) 1 150.00 8.000 1.710 2,052.22 2,052.22
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE
MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU
BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
0.5
Road Fill
G.L. G.L.
0.3
b2 b1
0.4
0.4 0.4
B1
0.4
B2
STEEL CALCULATION
Superstucture
Per Span 8332.381 kg
SL Foundation Sub-Structure Excluding 5%
Structure Foundation Type (in Kg)
No. (in Kg) (in Kg)
a
Main bar b
Pile 2 25 - 500 17900 650 18890 150 2833500 3.851 10912.96
(Full length)
c
b
Pile 3A Ring 12 150 3484 3484 372 1296097 0.887 1150.11
b
Pile 3 Ring 12 100 3484 3484 438 1526050 0.887 1354.16
b
Pile 4 Spacer Bar 20 2000 3506 3506 36 126223 2.465 311.13
Top Bar
Pile Cap 202 (Along Transverse 25 125 a b c 1565 4950 1565 8080 69 557520 3.851 2147.24
Direction )
Pile Cap 203 Main bar Bottom 20 125 a b c 1565 8550 1565 11680 41 478880 2.465 1180.39
Pile Cap 204 Distributor (Bottom ) 20 125 a b c 1565 4950 1565 8080 69 557520 2.465 1374.23
Pile Cap 105 Chair bar 16 250 1565 700 300 5034 21 105714 1.578 166.77
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A1
No. of Structures: 1
Sideface
Pile Cap 206a reinforcement along 16 - a b c 500 4918 500 5918 20 118360 1.578 186.72
longitudinal direction
Sideface
Pile Cap 206 reinforcement along 16 - a b c 500 8550 500 9550 20 191000 1.578 301.31
transverse direction
a
Abutment Main bar (Earth b
110 25 150 700 4092 500 5292 65 343980 3.851 1324.81
Shaft face)
c
a
Abutment
110a Main bar (Side face) 25 150 b 700 4092 500 5292 16 84672 3.851 326.11
Shaft c
Abutment a
111 Distributor 12 150 b 1100 8350 1100 10550 24 253200 0.887 224.68
Shaft c
Abutment a
112 Link 10 - 1090 1350 108 145800 0.616 89.85
Shaft
Abutment
114 Top Bar 16 - a b a 500 8350 500 9350 16 149600 1.578 236.00
Cap
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A1
No. of Structures: 1
Abutment a
114 Bottom Bar 16 - b c 500 8350 500 9350 16 149600 1.578 236.00
Cap
Sideface
Abutment reinforcement along a c
114 16 - b 1100 8350 1100 10550 4 42200 1.578 66.57
Cap Longitudinal
direction
a
Abutment
113 6L Stirrup 16 150 b 251 500 5658 57 322506 1.578 508.76
Cap
a
Dirt Wall
Main bar (Opposite a
and 117 12 150 b 288 2628.5 863 3780 57 215432 0.887 191.17
to Eath face) c
Bracket
Dirt Wall a
Main bar
and 115 16 150 b 288 2628.5 675 3592 57 204716 1.578 322.95
(Eath face) c
Bracket
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A1
No. of Structures: 1
Dirt Wall a
Distributor (earth b
and 116 12 150 c 300 8350 300 8950 15 134250 0.887 119.13
face)
Bracket
a b c
Dirt Wall
and 120 Bracket haunch bar 12 125 350 600 500 922 500 2872 68 195293 0.887 173.30
d e
Bracket
Dirt Wall
Bracket stirrup b
and 118 10 250 a 580 230 1820 102 185640 0.616 114.40
(in 3 layers)
Bracket
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A1
No. of Structures: 1
Dirt Wall a
Dirt wall top
and 119 12 - 8350 8350 2 16700 0.887 14.82
longitudinal bar
Bracket
Dirt Wall
Bracket top a
and 121 12 - 8350 8350 5 41750 0.887 37.05
longitudinal bar
Bracket
a b
Return Main bar (Eath face
126 16 140 c 4630 1000 300 5930 34 201618 1.578 318.06
Wall-I up to abutment cap)
a
Return b
124 Vertical bar 16 125 c 250 4167 500 4917 224 1101408 1.578 1737.51
Wall-I
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A1
No. of Structures: 1
Return a
Main bar (Opposite
Wall-I 125a 12 140 b c 250 1540 1790 14 25571 0.887 22.69
to Eath face )
Cantiliver
Return
Wall-I 125b 20 300 2380 2000 4680 4 18720 2.465 46.14
Cantiliver
Return a
Main bar Eath face
Wall-I 126a 16 140 b c 250 1540 1790 14 25571 1.578 40.34
)
Cantiliver
Total weight of the reinforcement for Foundation (HYSD bar) (Ton) : 20253.89
Total weight of the reinforcement required for Substructure: (HYSD Bar) (Ton) 7696.83
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A2
No. of Structures: 1
a
Main bar b
Pile 2 25 - 500 18400 650 19390 150 2908500 3.851 11201.82
(Full length)
c
b
Pile 3A Ring 12 150 3484 3484 390 1358812 0.887 1205.76
b
Pile 3 Ring 12 100 3484 3484 438 1526050 0.887 1354.16
b
Pile 4 Spacer Bar 20 2000 3506 3506 36 126223 2.465 311.13
Top Bar
Pile Cap 202 (Along Transverse 25 125 a b c 1565 4950 1565 8080 69 557520 3.851 2147.24
Direction )
Pile Cap 203 Main bar Bottom 20 125 a b c 1565 8550 1565 11680 41 478880 2.465 1180.39
Pile Cap 204 Distributor (Bottom ) 20 125 a b c 1565 4950 1565 8080 69 557520 2.465 1374.23
Pile Cap 105 Chair bar 16 250 1565 700 300 5034 21 105714 1.578 166.77
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A2
No. of Structures: 1
Sideface
reinforcement along
Pile Cap 206a 16 - b c 500 4918 500 5918 16 94688 1.578 149.37
longitudinal a
direction
Sideface
Pile Cap 206 reinforcement along 16 - a b c 500 8550 500 9550 16 152800 1.578 241.05
transverse direction
a
Abutment Main bar (Earth b
110 25 150 700 4192 500 5392 65 350480 3.851 1349.84
Shaft face)
c
a
Abutment
110a Main bar (Side face) 25 150 b 700 4192 500 5392 16 86272 3.851 332.27
Shaft c
Abutment a
111 Distributor 12 150 b 1100 8350 1100 10550 26 274300 0.887 243.40
Shaft c
Abutment a
112 Link 10 - 1090 1350 108 145800 0.616 89.85
Shaft
Abutment
114 Top Bar 16 - a b a 500 8350 500 9350 16 149600 1.578 236.00
Cap
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A2
No. of Structures: 1
Abutment a
114 Bottom Bar 16 - b c 500 8350 500 9350 16 149600 1.578 236.00
Cap
Sideface
Abutment reinforcement along a c
114 16 - b 1100 8350 1100 10550 4 42200 1.578 66.57
Cap Longitudinal
direction
a
Abutment
113 6L Stirrup 16 150 b 251 500 5658 57 322506 1.578 508.76
Cap
a
Dirt Wall
Main bar (Opposite a
and 117 12 150 b 288 2628.5 863 3780 57 215432 0.887 191.17
to Eath face) c
Bracket
Dirt Wall a
Main bar
and 115 16 150 b 288 2628.5 675 3592 57 204716 1.578 322.95
(Eath face) c
Bracket
Dirt Wall a
Distributor (earth b
and 116 12 150 c 300 8350 300 8950 15 134250 0.887 119.13
face)
Bracket
a b c
Dirt Wall
and 120 Bracket haunch bar 12 125 350 600 500 922 500 2872 68 195293 0.887 173.30
Bracket d e
Dirt Wall
Bracket stirrup b
and 118 10 250 a 580 230 1820 102 185640 0.616 114.40
(in 3 layers)
Bracket
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A2
No. of Structures: 1
Dirt Wall a
Dirt wall top
and 119 12 - 8350 8350 2 16700 0.887 14.82
longitudinal bar
Bracket
Dirt Wall
Bracket top a
and 121 12 - 8350 8350 5 41750 0.887 37.05
longitudinal bar
Bracket
a b
Return Main bar (Eath face
126 16 140 c 4630 1000 300 5930 36 213478 1.578 336.77
Wall-I up to abutment cap)
Return a
124 Vertical bar 16 125 b 250 4267 500 5017 224 1123808 1.578 1772.85
Wall-I c
Return a
Main bar (Opposite
Wall-I 125a 12 140 b c 250 1540 1790 14 25571 0.887 22.69
to Eath face )
Cantiliver
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A2
No. of Structures: 1
Return
Wall-I 125b 20 300 2380 2000 4680 4 18720 2.465 46.14
Cantiliver
Return a
Main bar Eath face
Wall-I 126a 16 140 b c 250 1540 1790 14 25571 1.578 40.34
)
Cantiliver
Total weight of the reinforcement for Foundation (HYSD bar) (Ton) : 20500.79
Total weight of the reinforcement required for Substructure: (HYSD Bar) (Ton) 7810.79
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
559
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
Structure Name: Pier PIER-01
No. of Structure: 1
Bar Total
Bar Spacing Length Uni Wt.
Location Bar Description Dia. Shape a b c d e f Nos. Length Weight (Kg)
Mark (mm) (mm) (Kg/m)
(mm) (mm)
a
b
Pile 2 Main bar ( Full length) 25 - 500 17400 650 18350 100 3.851 1835000 7067.33
c
b
Pile 3 Ring 12 150 3484 3484 232 0.887 808319 717.27
b
Pile 3A Ring 12 100 3484 3484 292 0.887 1017367 902.77
b
Pile 4 Spacer Bar 20 2000 3506 3506 20 2.465 70124 172.85
Pile cap 203 Main bar Bottom 25 125 a b c 1563 4950 1563 8075 41 3.851 331075 1275.10
Pile cap 204 Distributor (Bottom ) 25 125 b c 1563 4950 1563 8075 41 3.851 331075 1275.10
a
105 Chair bar 16 250 1563 700 300 4234 21 1.578 88914 140.27
Sideface reinforcement
Pile cap 206 along longitudinal 20 - a b c 500 4910 500 5910 12 2.465 70920 174.81
direction
Sideface reinforcement
Pile cap 206a along transverse 20 - a b c 500 4900 500 5900 12 2.465 70800 174.51
direction
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
559
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
Structure Name: Pier PIER-01
No. of Structure: 1
Bar Total
Bar Spacing Length Uni Wt.
Location Bar Description Dia. Shape a b c d e f Nos. Length Weight (Kg)
Mark (mm) (mm) (Kg/m)
(mm) (mm)
Equally a
Pier Shaft 207 Main bar 25 b 500 4726 500 5576 40 3.851 223040 859.02
Spaced
c
Pier Shaft 208 Binder 12 150 a 6169 6169 11 0.887 67859 60.22
Alround bar in
Pier Cap 213 Rectangular Portion in 16 150 b 7700 2500 200 20600 8 1.578 164800 259.98
a b
Pier Cap
Pier Cap 216 4L Stirrups 12 - b 980 1988 12448 12 0.887 149376 132.55
a
Total weight of the reinforcement for Pile & Pile Cap (HYSD bar) (Ton) : 14043.94
Total weight of the reinforcement required for Pier Shaft & Cap (HYSD Bar) (Ton) : 3853.69
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
559
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
Structure Name: Pier PIER-02
No. of Structure: 1
Bar Total
Bar Spacing Length Uni Wt.
Location Bar Description Dia. Shape a b c d e f Nos. Length Weight (Kg)
Mark (mm) (mm) (Kg/m)
(mm) (mm)
a
b
Pile 2 Main bar ( Full length) 25 - 500 17600 650 18550 100 3.851 1855000 7144.36
c
b
Pile 3 Ring 12 150 3484 3484 240 0.887 836192 742.01
b
Pile 3A Ring 12 100 3484 3484 292 0.887 1017367 902.77
b
Pile 4 Spacer Bar 20 2000 3506 3506 20 2.465 70124 172.85
Pile cap 203 Main bar Bottom 25 125 a b c 1563 4950 1563 8075 41 3.851 331075 1275.10
Pile cap 204 Distributor (Bottom ) 25 125 b c 1563 4950 1563 8075 41 3.851 331075 1275.10
a
105 Chair bar 16 250 1563 700 300 4234 21 1.578 88914 140.27
Sideface reinforcement
Pile cap 206 along longitudinal 20 - a b c 500 4910 500 5910 12 2.465 70920 174.81
direction
Sideface reinforcement
Pile cap 206a along transverse 20 - a b c 500 4900 500 5900 12 2.465 70800 174.51
direction
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
559
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
Structure Name: Pier PIER-02
No. of Structure: 1
Bar Total
Bar Spacing Length Uni Wt.
Location Bar Description Dia. Shape a b c d e f Nos. Length Weight (Kg)
Mark (mm) (mm) (Kg/m)
(mm) (mm)
Equally a
Pier Shaft 207 Main bar 25 b 500 6026 500 6876 40 3.851 275040 1059.29
Spaced
c
Pier Shaft 208 Binder 12 150 a 6169 6169 20 0.887 123381 109.48
Alround bar in
Pier Cap 213 Rectangular Portion in 16 150 b 7700 2500 200 20600 8 1.578 164800 259.98
a b
Pier Cap
Pier Cap 216 4L Stirrups 12 - b 980 1988 12448 12 0.887 149376 132.55
a
Total weight of the reinforcement for Pile & Pile Cap (HYSD bar) (Ton) : 14155.88
Total weight of the reinforcement required for Pier Shaft & Cap (HYSD Bar) (Ton) : 4128.18
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
559
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
Structure Name: Pier PIER-03
No. of Structure: 1
Bar Total
Bar Spacing Length Uni Wt.
Location Bar Description Dia. Shape a b c d e f Nos. Length Weight (Kg)
Mark (mm) (mm) (Kg/m)
(mm) (mm)
a
b
Pile 2 Main bar ( Full length) 25 - 500 16000 650 16950 100 3.851 1695000 6528.13
c
b
Pile 3 Ring 12 150 3484 3484 196 0.887 682890 605.97
b
Pile 3A Ring 12 100 3484 3484 292 0.887 1017367 902.77
b
Pile 4 Spacer Bar 20 2000 3506 3506 20 2.465 70124 172.85
Pile cap 203 Main bar Bottom 25 125 a b c 1563 4950 1563 8075 41 3.851 331075 1275.10
Pile cap 204 Distributor (Bottom ) 25 125 b c 1563 4950 1563 8075 41 3.851 331075 1275.10
a
205 Chair bar 16 250 1563 700 300 4234 21 1.578 88914 140.27
Sideface reinforcement
Pile cap 206 along longitudinal 20 - a b c 500 4910 500 5910 12 2.465 70920 174.81
direction
Sideface reinforcement
Pile cap 206a along transverse 20 - a b c 500 4900 500 5900 12 2.465 70800 174.51
direction
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
559
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
Structure Name: Pier PIER-03
No. of Structure: 1
Bar Total
Bar Spacing Length Uni Wt.
Location Bar Description Dia. Shape a b c d e f Nos. Length Weight (Kg)
Mark (mm) (mm) (Kg/m)
(mm) (mm)
Equally a
Pier Shaft 207 Main bar 25 b 500 5926 500 6776 40 3.851 271040 1043.89
Spaced
c
Pier Shaft 208 Binder 12 150 a 6169 6169 19 0.887 117211 104.01
Alround bar in
Pier Cap 213 Rectangular Portion in 16 150 b 7700 2500 200 20600 8 1.578 164800 259.98
a b
Pier Cap
Pier Cap 216 4L Stirrups 12 - b 980 1988 12448 12 0.887 149376 132.55
a
Total weight of the reinforcement for Pile & Pile Cap (HYSD bar) (Ton) : 13328.39
Total weight of the reinforcement required for Pier Shaft & Cap (HYSD Bar) (Ton) : 4105.22
559
Bar Total
Spacin Length Uni Wt.
Location Bar Mark Bar Description Dia. Shape a b c d e f Nos. Length Weight (Kg)
g(mm) (mm) (Kg/m)
(mm) (mm)
c
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI
RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA
MANTRI GRAM SETU YOJANA.
STEEL CALCULATION
Foundation Sub-Structure
Foundation a 16 120 3118 20000 75 2968 200 3.22 332 1.59 1698.720 Top Longitudinal
B
L
Foundation b 10 120 1837 20000 75 1687 200 1.94 332 0.62 398.710 Top Longitudinal
B
L
Foundation c 10 120 4300 20000 75 B 4150 200 4.55 332 0.62 936.570 Bottom Longitudinal
L
Foundation c1 16 200 4300 20000 75 B 19850 200 20.25 44 1.59 1416.690 Bottom Transverse
L
Foundation
d 10 120 2518 20000 75 L 19850 0 19.85 42 0.62 516.890 Top Transeverse
(Outside Face)
Foundation
e 10 120 1237 20000 75 L 19850 0 19.85 20 0.62 246.140 Top Transeverse
(Earth Face)
Stem h 12 180 20000 50 4400 200 4.80 224 0.89 956.930 Vertical Outside Face
L
B
Stem g 16 100 20000 50 4400 200 4.80 400 1.59 3052.800 Vertical Earth Face
L
B
Stem i 16 125 20000 50 B B 19950 0 19.95 124 1.59 3933.340 Top Horizontal
L
Stem j 8 200 450 50 350 128 0.61 4242 0.4 1028.260 Link Bar
Foundation f 8 125 450 75 300 128 0.56 6762 0.4 1503.870 Link Bar
Foundation f1 10 250 450 75 300 160 0.62 972 0.62 373.640 Link Bar
Total: 16062.560
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF
DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
Bar Bending Schedule of Retaining Wall for 4.5 m Height (Rachanga Side)
Length in
Mark Bar Width in Total Unit
Longitudin Clear Cutting
Location Designatio Diameter Spacing Transverse Shape Numbe Weigh Total Weight Remarks
al Cover L B Length
n d Direction r t
Direction
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (m) (Kg) (Kg)
Foundation a 16 120 3118 15000 75 2968 200 3.22 250 1.59 1279.160 Top Longitudinal
B
L
Foundation b 10 120 1837 15000 75 1687 200 1.94 250 0.62 300.240 Top Longitudinal
B
L
Foundation c 10 120 4300 15000 75 B 4150 200 4.55 250 0.62 705.250 Bottom Longitudinal
L
Foundation c1 16 200 4300 15000 75 B 14850 200 15.25 44 1.59 1066.890 Bottom Transverse
L
Foundation
d 10 120 2518 15000 75 L 14850 0 14.85 42 0.62 386.690 Top Transeverse
(Outside Face)
Foundation
e 10 120 1237 15000 75 L 14850 0 14.85 20 0.62 184.140 Top Transeverse
(Earth Face)
Stem h 12 180 15000 50 4400 200 4.80 168 0.89 717.700 Vertical Outside Face
L
B
Stem g 16 100 15000 50 4400 200 4.80 300 1.59 2289.600 Vertical Earth Face
L
B
Stem i 16 125 15000 50 B B 14950 0 14.95 124 1.59 2947.540 Top Horizontal
L
Stem j 8 200 450 50 350 128 0.61 3192 0.4 773.740 Link Bar
Foundation f 8 125 450 75 300 128 0.56 5082 0.4 1130.240 Link Bar
Foundation f1 10 250 450 75 300 160 0.62 732 0.62 281.380 Link Bar
Total: 12062.570