GOVERNMENT OF JHARKHAND

RURAL DEVELOPMENT DEPARTMENT

DETAILED ESTIMATE

STATE :- JHARKHAND

DISTRICT :- HAZARIBAGH

BLOCK :- DARU

DIVISION :- RDD HAZARIBAGH

FINANCIAL YEAR :- 2023-2024

SPAN ARRANGEMENT :- 4 x 15.11 Meter c/c expension gap.

BRIDGE LENGTH :- 60.48 Meter

PREPARATION OF DPR FOR CONSTRUCTION OF HL


BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF
NAME OF THE WORK :- SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH
DISTRICT UNDER MUKHYA MANTRI GRAM SETU

Project cost :- 405.47 Lakh

EXECUTIVE ENGINEER
RURAL DEVELOPMENT SPECIAL DIVISION, HAZARIBAGH
Check List of D.P.R.
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER
1 Name of High Level Bridge - CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA
OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE
HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU
YOJANA.

2 Hydraulic Parameters - Attached Page

3 Total Cost of Bridge - Rs 405.47 Lac

Cost of Bridge Lac Lac


Rs 225.402

Cost Per Length of Bridge 3.73 Lac

4 i) Per metre cost of Bridge - 6.70 Lac

5 a) Type of Bridge - R.C.C. T-Beam & Slab Type


b) Type of Foundation - Pile

c) Length of Bridge - 60.48


d) Span Arrangement - 4 x 15.11 Meter c/c expension gap.
e) Overall Width of Bridge - 8.45 metre
f) Foot Path - No

g) Approach Road Length of Approach Road Page


Total Cost
Turibar Side Rachanga Side Total Length (in Lac)
150 metre 150 metre 300 metre 15.21

h) Protection works if any - No

i) Guard Wall Length of Guard Wall Page


Total Cost
Turibar Side Rachanga Side
Total Length (in Lac)
L R L R
15m 15m 15m 15m 60metre 10.52

i) Retaining Wall Length of Retaining Wall Page


Total Cost
Turibar Side Rachanga Side Total Length (in Lac)
30.00 40.00 70.00 40.67

ii) Hume Pipe Culvert Hume Pipe Culvert Page


Total Cost
Turibar Side Rachanga Side Total Nos. (in Lac)

0 0 0 0.00

6 Design Standard followed as


per IRC - YES/NO Page

(i) IRC - 5 : 1988 - YES

(ii) IRC - 6 : 2014 - YES

(iii) IRC - 21 : 2000 - YES

(iv) IRC - 78 : 2014 - YES

(v) IRC - SP - 13 : 2004 - YES


(vi) IRC - 89 : 1997 - YES

(vii) IRC - 38 : 1988 - YES

(viii) IRC - SP - 23 : 1993 - YES

7 List of Drawings enclosed - Page


(i) Index Map - YES

(ii) GAD - YES

(iii) Bore Log Chart - YES

(iv) Detail drawing of all the - YES


components of bridges

(v) L/S & C/S of River - YES

(vi) L/S & C/S of Approach - YES

Typical Section of Guard - YES


(vii) Wall/ Toe Wall/ Retaining
Wall

Plan of LHS and RHS - YES


(viii)
approach with curve details

8 Contents

(i) Abstract of Cost - - Attached Page

(ii) Detail Estimate - Attached Page

(iii) Hydrology - Attached Page

(iv) Soil Investigation - Attached Page

(v) Structural design - Attached Page

(vi) Working Drawing - Attached Page

Stamp and Signature of Consultant


ABSTRACT OF COST
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE
OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE
HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
RCD SOR 2023-2024

Construction cost
Sl No. DESCRIPTION
INR Rs.

1 Cost of Bridge (60.48 M) 22540219.77

2 Cost of Approach road (300 m) 1520735.16

3 Cost of Guard Wall without Carriage of Material (60m) 1052211.37

4 Cost of Retaining Wall (70m) 4066774.83

5 Carriage of material 4205776.45

7 Sub Total (1+2+3+4+5) 33385717.58

Goods and Service Taxes over


8 6009429.16
@18% over Sl. No. 6

9 Sub Total (6+7) 39395146.74

10 Labour Cess @ 1.0% over Sl. No. 8 393951.47

11 Quality Control @ 0.5% over Sl. No. 6 166928.59

12 Contingencies @ 0.5% over Sl. No. 8 196975.73

Consultancy Fee (including GST @1.18% )


13 393951.47
over Sl. No. 6
14 Grand Total (8+9+10+11+12): 40546954.00
SAY :- 40547000.00
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF
DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
BILLS OF QUANTITIES
SL. NH Sch. Item
DESCRIPTION UNIT QTY RATE AMOUNT
No. No.
A BRIDGE PART
Earth work in excavation of foundation of structures as per drawing and
technical specification, including setting out, construction of shoring and
1 12.01 (I) B bracing, removal of stumps and other deleterious matter, dressing of
sides and bottom and backfilling with approved material. Ordinary soil

(i) Depth upto 3m cum 1257.95 57.40 72206.330


(ii) Depth between 3m to 6m cum 0.00 63.20 0.000
Back filling behind abutment, wing wall and return wall complete as per
2 13.09 B drawing and technical specification cum 253.59 874.60 221789.810

PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in


foundation with crushed stone aggregate 40mm nominal size
3 12.04 mechanically mixed, placed in foudation and compacted by vibration cum 31.90 3376.10 107697.590
including curing for 14 days.)
Providing Steel liner 10mm thick for curbs and 6mm thick for steining of
4 12.22 wells including fabricating and setting out as per detailed drawing
MT 13.87 95570.80 1325197.200
Bored cast-in-situ M35 grade RCC Pile excluding reinforcement complete
5 12.25 as per drawing and technical specifications and removal of excavated metre 309.21 8162.90 2524050.310
earth with all lifts and lead upto 1000m. (Pile diameter 1200mm)
Pile Load Test on Single vetical Pile in accordance with IS: 2911 (Part-IV)
6 - (Vertical Load)
LS 472.80 300.00 141840.000
Pile Load Test on Single vetical Pile in accordance with IS: 2911 (Part-IV)
7 - (Lateral Load)
LS 30.00 5000.00 150000.000
Cement Concrete for Reinforced Concrete in Pile Cap complete as per
8 12.40 B (i) drawing and Technical Specification (RCC Grade M25 using batching cum 300.20 4295.80 1289581.980
plant & Concrete pump)
Providing and laying of PCC M15 levelling course 100 mm thick below
9 12.41 case-I the pile cap. PCC Grade M15 using batching plant & Concrete pump cum 31.90 3405.60 108638.640

PCC M-15 Grade Levelling Course below Approach Slab complete as per
10 14.10 Case i drawing and Technical specification PCC Grade M15 using batching cum 7.88 3405.64 26836.420
plant & Concrete pump
Plain/Reinforced cement concrete in Foundation complete as per
11 12.08 E drawing and technical specification, (RCC Grade M25 using batching cum 10.46 4378.30 45797.020
plant,transit mixer & Concrete pump)
Plain /Reinforced Cement Concrete in Sub-Structure complete as per
12 13.05 F (p) Case I drawing and technical specifications (PCC Grade M25 using batching
plant, transit mixer & concrete pump)
(p) Height Upto 5m cum 192.20 4630.90 890058.980
Providing weep holes in Brick masonry/ Plain/ Reinforced concrete
abutment, wing wall/ return wall with 100 mm dia AC pipe, extending
13 13.08 through the full width of the structure with slope of 1V:20H towards Each 172.00 110.50 19006.000
drawing face. Complete as per drawing and technical specification.
Furnishing and placing Reinforcement/ Prestressed cement concrete in
14 14.01C (ii)q Super-Structure a per drawing and Technical specification, RCC Grade cum 212.00 5495.90 1165130.800
M 30 RCC T-Beam & Slab (Height between 5m to 10m)
Reinforced cement concrete approach slab including reinforcement and
15 14.11 formwork complete as per drawing and Technical specification cum 15.75 8747.60 137774.700
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF
DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
BILLS OF QUANTITIES
SL. NH Sch. Item
DESCRIPTION UNIT QTY RATE AMOUNT
No. No.
Providing and laying of a strip seal expansion joint catering to maximum
horizontal movement upto 70 mm, complete as per approved drawings
16 14.21 and standard specifications to be installed by the manufacturer/supplier Per m 42.25 10290.00 434752.500
or their authorised representative ensuring compliance to the
manufacturer's instructions for installation.
Supplying, fitting and fixing in position true to line and level Elastomeric
bearing confirming to IRC:83 (Part-II) section IX and clause 2005 of
17 13.16 MORTH Specifications complete including all accessories as per drawing CC 202910.40 0.81 164357.420
and technical specification.
Providing drainage spout complete as per drawing and technical
18 14.09 specification Each 32.00 817.90 26172.800

Construction of railing of M30 grade in-situ with 20mm nominal size


aggregate, true to line and grade, tolurence of vertical RCC post not to
exceed 1 in 500, centre to centre spacing between vertical post not to
19 14.07 exceed 2000 mm, leaving adequate space between vertical post for metre 134.96 1987.60 268246.500
expansion, complete as per approved drawings and technical
specificatoins.
Providing and laying Cement Concrete Wearing Coat M-30 grade
20 14.04 including reinforcement complete as per drawing and Technical cum 34.02 10876.50 370018.530
Specification.
Supplying , fitting and placing un-coated HYSD bar reinforcement in
21 12.42 foundation complete as per drawing and technical specifications tonne 82.28 87394.80 7190844.140

Supplying , fitting and placing HYSD bar reinforcement in sub-


22 13.06 structure complete as per drawing and technical specifications tonne 28.53 87744.90 2503362.000

Supplying , fitting and placing HYSD bar reinforcement in super-


23 14.02 structure complete as per drawing and technical specifications tonne 33.33 87893.80 2929500.350

Providing and laying of filter media with granular materials/stones


crushed aggregates satisfying the requirements laid down in clause
2504.2.2 of MoRT&H specifications to a thickness of not less than 600
24 13.1 mm with smaller size towards the soil and bigger size towards the wall cum 76.56 1645.30 125964.170
and provided over the entire surface behind abutment , wing wall and
return wall to the full height compacted to a firm condition complete as
per drwaing and technical specification.

Providing and laying Pitching on slopes laid over prepared filter media
25 16.04A including boulder apron laid dry in front of toe of embankment complete cum 41.26 1158.40 47795.580
as per drawing and technical specifications. (Stone / Boulder )

Carrying out confirmatory boring for soil investigation/geotechnical


26 Lumpsum investigation for each foundation as per clause 2400 of MOST Per m 5.00 20000.00 100000.000
Specification.
Dewatering for Foundation diesel pump 10 HP 10
27 PM-29 WRD (2 x 8 hours x 8 days) = 128 x 12( A1 + A2 + 4 Pier ) HP/HR. 512.00 300.00 153600.000

Sub Total 22540219.770


B APPROACH ROAD PART
Construction of sub-grade and earthen shoulders with approved material
obtained from Borrow pits with approved material obtained from borrow
28 3.16 pits with all lifts and leads, transporting to site, spreading, grading to cum 675.00 129.90 87682.500
required slope and compacting to meet requirement of Table 300-2.
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF
DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
BILLS OF QUANTITIES
SL. NH Sch. Item
DESCRIPTION UNIT QTY RATE AMOUNT
No. No.
Construction of Embankment with Material Deposited from Roadway
Cutting. Construction of Embankment with approved materials deposited
29 3.17 at site from roadway cutting and excavation from drain and foundation of cum 943.46 61.48 58003.920
other structures graded and compacted to meet requirement of Table 300-
2.
Rate per cum after adding royalty @Rs 27.48/cum
Construction of embankment with approved materials obtained from
Borrow Pits with approved material obtained from borrow pits with all lifts
30 3.16 and leads, transporting to site, spreading, grading, to required slope and cum 3049.57 129.90 396139.140
compacting to meet requirement of table 300-2.
Compacting Original ground supporting sub-grade Loosening of the
ground upto a level of 500 mm below the sub-grade level, watered,
31 3.20 Case I graded and compacted in layers to meet requirement of Table 300-2 for cum 33.75 52.60 1775.250
sub-grade construction.
Granular Sub- Base with coarse graded material (Table 400-2)
(Construction of granular sub-base by providing coarse graded material,
32 4.01B (i) spreading in uniform layers with motor grader on prepared sruface,
mixing by mix in place method with rotavatory at OMC, and compactiing
with vibratory roller to achieve the desire density, complete as per clause
401)
for Grading - I Material
(i) cum 189.34 1437.60 272195.180
Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and
compacting graded stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in mechanical mix
33 4.14B plant carriage of mixed Material by tipper to site, laying in uniform layers
with grader in sub- base / base course on well prepared surface and
compacting with vibratory roller to achieve the desired density.
cum 177.19 1701.10 301417.910
Prime Coat over WMM/WBM Providing and applying primer coat with
SS1 grade bitumen emulsion on prepared surface of granular Base
34 5.01 A (i) including clearing of road surface and spraying primer at the rate of 0.70 sqm 1181.25 80.30 94854.380
kg/sqm using mechanical means.
Tack Coat on Bituminous surfaces Providiing and applying Tack Coat
with bitumen emulsion using emulsion pressure distributor at the rate of
35 5.02 (i) 0.20 kg per sqm on the prepared bituminous/granular surface cleaned sqm 1181.25 12.60 14883.750
with mechanical broom.
Open-Graded Premix Surfacing Providing, laying and rolling of open-
graded pemix surfacing of 20mm thickness composed of 13.2mm to
5.6mm aggregates using viscosity grade bitumen to required line, grade
36 5.07 and level to serve as wearing course on a previously prepared base, sqm 1181.25 148.40 175297.500
including mixing in a suitable hot mix plant of appropriate capcity not less
than 200 tonnes/hour, laying and rolling with a smooth wheeled roller
finished to required level and grades.
Seal Coat Providing and laying of premix sand seal coat with HMP of
appropriate capacity not less than 200 tonnes/hours using crushed stone
37 5.09 (ii) chipping 6.7mm size and penetration bitumen of suitable grade. Case-II : sqm 1181.25 54.10 63905.630
Type B
Boundary pillar (Reinforced cement concrete M15 grade boundary
38 8.16 pillars of standard design as per IRC:25, fixed in position including Nos 100.00 545.80 54580.000
finishing and lettering but excluding painting)

SUB TOTAL 1520735.160


C GUARD WALL PART
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF
DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
BILLS OF QUANTITIES
SL. NH Sch. Item
DESCRIPTION UNIT QTY RATE AMOUNT
No. No.
Earth work in excavation of foundation of structures as per drawing and
technical specification, including setting out, construction of shoring and
39 12.1 (I) B (i) bracing, removal of stumps and other deleterious matter, dressing of cum 213.00 57.40 12226.200
sides and bottom and backfilling with approved material.
Sand filling in foundation trenches as per Drawing and Technical
40 12.03 specification cum 21.20 567.80 12037.360

Plain/Reinforced cement concrete in Foundation complete as per drawing


41 12.04 and technical specification, (PCC Grade M10 ) PCC Grade M10 using cum 56.52 3376.10 190817.170
batching plant & Concrete pump
Stone masonry work in cement mortar 1:3 for foundation complete as per
42 12.07 (B) drawing and technical specifications. Random Rubble masonry cum 87.90 3458.60 304010.940
(coursed/uncoursed)
Stone masonry work in cement mortar 1:3 for substructure complete as
43 13.04 A per drawing and technical specifications. Random Rubble Masonry cum 141.30 3468.80 490141.440
(Coursed/uncoursed)
Providing weep hole in Brick, masonary/Plain/Reinforced Cement
Concrete abutment, wing wall/returnwall with 100mm dia AC pipe,
44 13.08 extending through the full widt of the structure with slope of 1V:20H Each 72.00 110.50 7956.000
towards drawing foce. Complete as per drawing and Technical
specification.
Pointing with cement mortar (1:3) on brickwork in substructure as per
45 13.02 Technical specifications 10 sqm 28.17 577.40 16265.360

Plain /Reinforced Cement Concrete in Sub-Structure complete as per


46 13.05 B(p) drawing and technical specifications (PCC garde M 20 ) For Coping PCC cum 4.50 4168.20 18756.900
Grade M20 using batching plant, transit mixer & concrete pump
SUB TOTAL 1052211.370
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA
SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI
GRAM SETU YOJANA.
BILLS OF QUANTITIES
SL. NH Sch. Item
DESCRIPTION UNIT QTY RATE AMOUNT
No. No.
C RETAINING WALL
Earth work in excavation of foundation of structures as per drawing and
technical specification, including setting out, construction of shoring and
1 12.1 (I) B (i) cum 615.97 57.40 35356.68
bracing, removal of stumps and other deleterious matter, dressing of sides
and bottom and backfilling with approved material.
Plain/Reinfoced Cement concrete in open foundation complete as per
2 12.04 drwaing and technical specifications. PCC Grade M10 using batching plant cum 47.79 3376.10 161343.82
& Concrete pump
Plain/Reinforced cement concrete in Foundation complete as per drawing
3 12.8 Case-I( E) and technical specification, RCC Grade M25 using batching plant,transit cum 166.95 4378.30 730957.19
mixer & Concrete pump

Plain/Reinforced cement concrete in sub-strucutre complete as per


drawing and Technical specifications RCC Grade M25 using batching plant,
4 13.05 F (p) cum 94.50 4630.90 437620.05
transit mixer & concrete pump

Supplying , fitting and placing un-coated HYSD bar reinforcement in


5 12.42 tonne 12.43 87394.80 1086317.36
foundation complete as per drawing and technical specifications
Supplying , fitting and placing HYSD bar reinforcement in sub-structure
6 13.06 tonne 15.70 87744.90 1377594.93
complete as per drawing and technical specifications
Providing and laying of Filter media with granular materials/stone crushed
aggregates satisfying the requirements laid down in clause 2504.2.2. of
MoRT&H specifications to a thickness of not less than 600 mm with smaller
7 15.24 size towards the soil and bigger size towards the wall and provided over the cum 126.00 1645.30 207307.80
entire surface behind abutment, wing wall and return wall to the full height
compacted to a firm condition complete as per drawing and Technical
Specification.
Providing weep hole in Brick, masonary/Plain/Reinforced Cement Concrete
abutment, wing wall/returnwall with 100mm dia AC pipe, extending through
8 13.08 the full widt of the structure with slope of 1V:20H towards drawing foce. Each 274.00 110.50 30277.00
Complete as per drawing and Technical specification.

Sub Total C: 4066774.83


Material Statement
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE
HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
SL. No. DESCRIPTION UNIT QTY Sand Cement Boulder Aggregates Bitumen Bitumen Steel
(cum) (MT) (cum) (cum) Emulsion (MT) (MT)
(MT)
1 PCC M-10 Grade Concrete (1:3:6) cum 136.21 0.450 61.290 0.230 31.330 0.900 122.590

2 PCC M-15 Grade Concrete (1:2:4) cum 39.78 0.450 17.900 0.275 10.940 0.900 35.800

3 PCC M-20 Grade Concrete (1:1.5:3) cum 0.450 0.000 0.230 0.000 0.900 0.000

13 PCC garde M 20 ) For Coping cum 4.50 0.450 2.03 0.344 1.550 0.900 4.050

4 RCC M-25 Grade Concrete cum 764.31 0.450 343.940 0.403 308.140 0.900 687.880

5 RCC M-30 Grade Concrete cum 223.51 0.450 100.580 0.407 90.890 0.900 201.150

6 RCC M-35 Grade Concrete cum 349.71 0.450 157.370 0.422 147.580 0.900 314.740

7 Stone Masonary cum 87.90 1.050 92.300 0.510 44.830 1.100 96.690

8 Random Rubble Masonry cum 141.30 1.050 148.370 0.510 72.060 1.000 141.300

8 Ponting-Cement Mortar (1:3) cum 28.17 1.050 29.580 0.510 14.370

9 Boulder Pitching cum 41.26 1.200 49.510

10 Sand filling cum 21.20 1.20 25.440

11 Filter Media cum 202.56 1.200 243.070

12 GSB cum 189.34 0.538 101.950 0.808 152.930

14 WBM Gr-III cum

15 WMM cum 177.19 0.423 74.960 0.987 174.920

15 Prime Coat Sqm 1181.25 0.0007 0.830

16 Tack Coat Sqm 1181.25 0.0002 0.240

17 Premix Carpet Sqm 1181.25 0.0270 31.890 0.00146 1.720

18 Seal Coat Sqm 1181.25 0.0060 7.090 0.00068 0.800

19 Steel MT 174.70 174.700


Total: 1155.71 721.69 287.50 1976.11 1.07 2.52 174.70
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU
BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
CARRIAGE COST AND RATE ANALYSIS

Avg Lead (km) Hauling Hauling Hauling


On Charge on Charge on Charge on Loading &
SL. No. DESCRIPTION UNIT Quarry Name QTY on Surface On Kutcha M.F. Carriage Amount (in Rs.)
unsurfaced Suurface Unsurface Kutcha Unloading
Road Road Road Road Road
Road

1 Sand cum Barkagaon 1155.71 55.0 2.00 0.00 1.60 9.30 10.60 21.30 115.00 967.32 1117941.40

2 Cement MT Bokaro 721.690 135.0 2.00 0.00 1.00 9.30 10.60 21.30 409.60 1686.30 1216985.85

Ichak/Tatijah
3 Boulder cum 287.500 35.0 2.00 0.00 1.67 9.30 10.60 21.30 279.30 858.29 246758.38
riya

Ichak/Tatijah
4 Aggregate cum 1976.110 35.0 2.00 0.00 1.60 9.30 10.60 21.30 115.00 669.72 1323440.39
riya

5 Steel MT Bokaro 174.700 135.0 2.00 0.00 1.00 9.30 10.60 21.30 409.60 1686.30 294596.61

6 Bitumen MT Bokaro 2.520 135.0 2.00 0.00 1.00 9.30 10.60 21.30 409.60 1686.30 4249.48

7 Bitumen Emulsion MT Bokaro 1.070 135.0 2.00 0.00 1.00 9.30 10.60 21.30 409.60 1686.30 1804.34

Total : 4205776.45
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU
BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
QUANTITY CALCULATION (Abutment) & (Pier)
NH Sch. Item
SL. No. Items Unit No. Length Breadth Height QTY Remarks
No.
Excavation for structures in ordinary soil (Earth work in excavation of foundation
of structures as per drawing and technical specification, including setting out,
1 12.1 (I) B construction of shoring and bracing, removal of stumps and other deleterious
matter, dressing of sides and bottom and bockfilling with approved material)
Mechanical means

(i) Depth upto 3m


A1 cum 1 5.90 9.50 1.89 105.71
P1 cum 1 5.90 5.90 1.20 41.63
P2 cum 1 5.90 5.90 1.96 68.05
P3 cum 1 5.90 5.90 2.12 73.90
A2 cum 1 5.90 9.50 1.91 107.22
Total Qty :- 1257.95
(ii) Depth between 3m to 6m
Total Qty :- 0.000
Back filling behind abutment, wing wall and return wall complete as per drawing
2 13.9 B and technical specification
A1
Rectangular Portion cum 1 3.50 7.35 4.181 107.560
Cantiliver Portion cum 1 2.00 7.35 1.245 18.300
A2
Rectangular Portion cum 1 3.50 7.35 4.254 109.430
Cantiliver Portion cum 1 2.00 7.35 1.245 18.300
Total Qty :- 253.59
Levelling Course for Pile Cap (below cap) (PCC M15) PCC Grade M15 using
3 12.4 batching plant & Concrete pump

A1 cum 1 5.40 9.00 0.150 7.29


NH Sch. Item
SL. No. Items Unit No. Length Breadth Height QTY Remarks
No.
P1 cum 1 5.40 5.40 0.150 4.37
P2 cum 1 5.40 5.40 0.150 4.37
P3 cum 1 5.30 5.30 0.150 4.21
A2 cum 1 5.40 9.00 0.150 7.29
Total Qty :- 31.90
Providing Steel liner 10mm thick for curbs and 6mm thick for steining of wells
4 12.22 including fabricating and setting out as per detailed drawing

A1 MT 6 3.000 3.770 0.006 3.196


P1 MT 4 3.500 3.770 0.006 2.490
P2 MT 4 3.500 3.770 0.006 2.490
P3 MT 4 3.500 3.770 0.006 2.490
A2 MT 6 3.000 3.770 0.006 3.200
Total Qty :- 13.87
Bored cast-in-situ M35 grade RCC Pile excluding reinforcement complete as per
5 12.25 drawing and technical specifications and removal of excavated earth with all lifts
and lead upto 1000m. (Pile diameter 1200mm)
A1 Meter 6 13.120 78.72
P1 Meter 4 12.800 51.20
P2 Meter 4 13.045 52.18
P3 Meter 4 11.377 45.51
A2 Meter 6 13.600 81.60
Total Qty :- 309.21
Pile Load Test on Single vetical Pile in accordance with IS: 2911 (Part-IV) (Vertical
6 - MT 1.5*315.2 MT on 1 Pile from Pier Design 472.80
Load)
Pile Load Test on Single vetical Pile in accordance with IS: 2911 (Part-IV) (Lateral
7 - MT 1.5*40.14 MT on 1 Pile from Pier Design 30.00
Load)
Cement Concrete for Reinforced Concrete in Pile Cap complete as per drawing
8 12.38 B (i) and Technical Specification (RCC Grade M25 using batching plant & Concrete
pump)

A1 cum 1 5.10 8.70 1.800 79.866


P1 cum 1 5.10 5.10 1.800 46.820
NH Sch. Item
SL. No. Items Unit No. Length Breadth Height QTY Remarks
No.
P2 cum 1 5.10 5.10 1.800 46.820
P3 cum 1 5.10 5.10 1.800 46.820
A2 cum 1 5.10 8.70 1.800 79.870
Total Qty :- 300.196

Plain/Reinforced cement concrete in Foundation complete as per drawing and


9 12.8 E technical specification, (RCC Grade M25 using batching plant,transit mixer &
Concrete pump)
A1
Abutment Shaft (upto Ground level) cum 1 1.20 8.450 0.300 3.040
Return Wall cum 2 3.50 0.300 0.300 0.630
P1

Circular Shaft (upto G.L) cum 1 3.142 0.300 0.940


P2
Circular Shaft (upto G.L) cum 1 3.142 0.300 0.940
P3
Circular Shaft (upto G.L) cum 1 3.142 0.300 0.940
A2
Abutment Shaft (upto Ground level) cum 1 1.20 8.700 0.300 3.13
Return Wall cum 2 3.50 0.400 0.300 0.84
Total Volume 10.46
13.5 F (p) Case Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and
10 technical specifications (RCC M 25 using concrete mixer)
I
(p) Height Upto 5m
A1
Abutment Shaft (above Ground level) cum 1 8.450 1.200 2.031 20.590
NH Sch. Item
SL. No. Items Unit No. Length Breadth Height QTY Remarks
No.
Return Wall cum 2 3.50 0.400 4.581 12.830
Return Wall Cantilever cum 2 2.00 0.400 1.633 2.610
Rectangular part of Abutment cap cum 1 1.325 8.70 0.600 6.920
Dirt wall cum 1 0.300 8.450 1.275 3.230
Bracket triangular cum 1 0.300 8.450 0.150 0.380
Bracket rectangular cum 1 0.300 8.450 0.450 1.140
Pedestal cum 3 0.635 0.800 0.214 0.330
P1
Circular Shaft (above G.L) cum 1 3.142 2.521 7.920
Trapezoidal part cum 0.5 29.4 0.750 11.030
Rectangular part cum 1 2.1 7.000 0.750 11.030
Pedestal cum 3 1.240 0.800 0.214 0.640
P2
Circular Shaft (above G.L) cum 1 3.142 3.062 9.620
Trapezoidal part cum 0.5 29.4 0.750 11.030
Rectangular part cum 1 2.1 7.000 0.750 11.030
Pedestal cum 3 1.240 0.800 0.214 0.640
P3
Circular Shaft (above G.L) cum 1 3.142 2.794 8.780
Trapezoidal part cum 0.5 29.4 0.750 11.030
Rectangular part cum 1 2.1 7.000 0.750 11.030
Pedestal cum 3 1.240 0.800 0.214 0.640
A2

Abutment Shaft (above Ground level) cum 1 1.200 8.700 2.104 21.970
Return Wall cum 2 3.500 0.400 4.654 13.030
NH Sch. Item
SL. No. Items Unit No. Length Breadth Height QTY Remarks
No.
Return Wall Cantilever cum 2 2.000 0.400 1.633 2.610
Rectangular part of Abutment cap cum 1 1.325 8.700 0.600 6.920
Dirt wall cum 1 0.300 8.700 1.275 3.330

Bracket triangular cum 1 0.300 8.700 0.150 0.390

Bracket rectangular cum 1 0.300 8.700 0.450 1.170

Pedestal cum 3 0.635 0.800 0.214 0.330


Total Volume 192.20
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.

QUANTITY CALCULATION (Super Structure & Approch )


SL. NH Sch. Item
No.
DESCRIPTION UNIT No. Length Breadth Height QTY
No.
Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/
return wall with 100 mm dia AC pipe, extending through the full width of the structure with
1 13.8 slope of 1V:20H towards drawing face. Complete as per drawing and technical
specification.
A1 Each 1 8.450 6.000 51.00
return wall Each 2 3.500 5.000 35.00
A2 Each 1 8.450 6.000 51.00
return wall Each 2 3.500 5.000 35.00
Total : 172.00
14.1C Furnishing and placing Reinforcement/ Prestressed cement concrete in Super-Structure
2 Case 1 (ii) a per drawing and Technical specification, RCC Grade M 30
q RCC T-Beam & Slab (Height between 5m to 10m)
Slab and Girders (53.00 m3 per span) cum 4 53 212.00
Total 212.00
PCC M-15 Grade Levelling Course below Approach Slab complete as per drawing and
3 14.10 Technical specification PCC Grade M15 using batching plant & Concrete pump cum 2 3.5 7.5 0.15 7.88

Approach Slab (M30 Grade) including reinforcement and formwork complete as per
4 14.11 drawing and Technical specification. cum 2 3.5 7.5 0.30 15.75

Strip Seal Expansion Joint ( providing and laying of a strip seal expansion joint catering
to maximum horizontal movement upto 70mm, complete as per approved drawings and
5 14.22 standard specifications to be installed by the manufacturer/supplier or their authorised Per m 5 8.45 42.250
representative ensuring complaince to the manufacturer's instructions for installation.

Supplying, fitting and fixing in position true to line and level Elastomeric bearing
6 13.14 confirming to IRC:83 (Part-II) section IX and clause 2005 of MORTH Specifications CC 24 63 22 6.10 202910.40
complete including all accessories as per drawing and technical specification.
7 14.9 Providing drainage spout complete as per drawing and technical specification Each 4 8 32.00
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.

QUANTITY CALCULATION (Super Structure & Approch )


SL. NH Sch. Item
No.
DESCRIPTION UNIT No. Length Breadth Height QTY
No.
Construction of railing of M30 grade in-situ with 20mm nominal size aggregate, true to
line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre
8 14.7 spacing between vertical post not to exceed 2000 mm, leaving adequate space between metre 2 67.480 134.96
vertical post for expansion, complete as per approved drawings and technical
specificatoins.
Providing and laying Cement Concrete Wearing Coat M-30 grade including
9 14.4 cum 1 60.480 7.50 0.075 34.02
reinforcement complete as per drawing and Technical Specification.
Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation
10 12.40 tonne Foundation 82.28
complete as per drawing and technical specifications
Supplying , fitting and placing HYSD bar reinforcement in sub-structure complete as per
11 13.6 tonne Substructure + Pedestal 28.53
drawing and technical specifications
Supplying , fitting and placing HYSD bar reinforcement in super-structure complete as
12 14.2 tonne Super Structure 33.33
per drawing and technical specifications
Providing and laying Filter material under pitching in slopes complete as per drawing
13 13.10 and technical specification

Inside Return Wall


Abutment-A1 cum 1 11.05 0.600 4.181 27.72
Abutment-A2 cum 1 11.05 0.600 4.254 28.20

Abutment-A1 (slop) cum 2 5.89 2.906 0.30 10.27


Abutment-A2 (slop) cum 2 5.95 2.906 0.30 10.37
Total cum 76.56
Providing and laying Pitching on slopes laid over prepared filter media including boulder
14 15.4A apron laid dry in front of toe of embankment complete as per drawing and technical
specifications
Stone /boulder
Abutment-A1 cum 2 5.89 2.906 0.60 20.53
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.

QUANTITY CALCULATION (Super Structure & Approch )


SL. NH Sch. Item
No.
DESCRIPTION UNIT No. Length Breadth Height QTY
No.
Abutment-A2 cum 2 5.95 2.906 0.60 20.73
Total cum 41.26
Carrying out confirmatory boring for soil investigation/geotechnical investigation for
15 Lumpsum each foundation as per clause 2400 of MOST Specification. LS 5 5.00

WRD sl. 47
item PM 29 Dewatering for Foundation diesel pump 10 HP 10 PER
16 1 512 512.00
and corr pg- (2 x 8 hours x 8 days) = 128 x 12( A1 + A2 + 4 Pier ) HP/HR.
28 sl-47
Sub Total
B APPROACH ROAD PART
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity
including cutting and loading in tippers, trimming bottom and side slopes, in accordance
1 3.6 with requirements of lines, grades and cross sections, and transporting to the
embankment location within all lifts and lead upto 1000m (including Royalty @ Rs. 30.00
per Cum but excluding watering, rolling & compaction)
TOTAL cum 0.00
Construction of embankment with approved materials deposited at site from roadway
2 3.17 (i) cutting and excavation from drain and foundation of other structures graded and cum 1 0.00
compacted to meet requirement of table 300-2.

Excavation for Abutment & Pier cum 1257.95


1257.95
Considering 75% of Excavation 943.46
Construction of embankment with approved materials obtained from Borrow Pits with
approved material obtained from borrow pits with all lifts and leads, transporting to site,
3 3.17 (i)
spreading, grading, to required slope and compacting to meet requirement of table 300-2.

4545.67
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.

QUANTITY CALCULATION (Super Structure & Approch )


SL. NH Sch. Item
No.
DESCRIPTION UNIT No. Length Breadth Height QTY
No.
Deduction 2/3rd Qty of Guard wall and Retaining wall cum -552.65
3993.03
Total Qty = ( Filling Qty-75% of Excavation Qty) 3049.57

Construction of sub-grade and earthen shoulders with approved material obtained


from Borrow pits with approved material obtained from borrow pits with all lifts and leads,
4 3.18 cum 1 300.00 7.50 0.30 675.00
transporting to site, spreading, grading to required slope and compacting to meet
requirement of Table 300-2.

3.19 Case II Compacting original ground supporting embankment ( Rolling with vibratory roller)
4 cum 1 30.00 7.50 0.15 33.75
(i)
Granular Sub- Base with coarse graded material (Table 400-2) (Construction of granular
sub-base by providing coarse graded material, spreading in uniform layers with motor
5 4.2 grader on prepared sruface, mixing by mix in place method with rotavatory at OMC, and
compactiing with vibratory roller to achieve the desire density, complete as per clause
401)
(i) for Grading - I Material (first 2x15m both side) cum 1 30.00 5.63 0.150 25.31
for Grading - I Material cum 1 270.00 4.050 0.150 164.03
Wet Mix Macadam (Plant Mix Method) 189.34
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the Material with water at OMC in mechanical mix plant
6 4.14 carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base /
base course on well prepared surface and compacting with vibratory roller to achieve the desired
density.
(ii) a cum 1 30.00 5.63 0.150 25.31
cum 1 270.00 3.75 0.150 151.88
177.19
Prime Coat (Providing and applying Primer Coat with bitumen emulsion on prepared
7 5.1 surface of Granular Base including clearing of road surface and spraying primer at the sqm 1 30.00 5.63 (Area) 168.75
rate of 0.60 kg/sqm using mechanical means)
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.

QUANTITY CALCULATION (Super Structure & Approch )


SL. NH Sch. Item
No.
DESCRIPTION UNIT No. Length Breadth Height QTY
No.
sqm 1 270.00 3.75 (Area) 1012.50
1181.25
Providiing and applying Tack Coat with bitumen emulsion using emulsion pressure
8 5.2 distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface sqm 1 30.00 5.63 (Area) 168.75
cleaned with mechanical broom.
sqm 1 270.00 3.75 (Area) 1012.50
1181.25
Open - Graded Premix Surfacing (Providing, laying and rolling of open graded premix
surfacing of 20mm thickness composed of 13.2 mm to 5.6mm aggregates either using
penetration grade bitumen or cut-back or emulsion to required line, grade and level to
9 5.10 (i) serve as wearing course on a previously prepared base, including mixing in a suitable
plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to
required level and grades.) (Case - I : Mechanical method using Penetration grade
Bitumen and HMP of appropriate capacity not less than 75 tonnes/hour)
sqm 1 30.00 5.63 (Area) 168.75
sqm 1 270.00 3.75 (Area) 1012.50
sqm 1181.25
Seal Coat - Type B (Providing and laying of premix sand seal coat with HMP of
10 5.12 (ii) appropriate capacity not less than 75 tonnes/hours using crushed stone chipping 6.7mm
size and penetration bitumen of suitable grade.
sqm 1 30.00 5.63 (Area) 168.75
sqm 1 270.00 3.75 (Area) 1012.50
1181.25
Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard
11 design as per IRC:25, fixed in position including finishing and lettering but excluding nos 2.00 2 x 25 100.00
painting)
C GUARD WALL PART
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.

QUANTITY CALCULATION (Super Structure & Approch )


SL. NH Sch. Item
No.
DESCRIPTION UNIT No. Length Breadth Height QTY
No.
Excavation for structures in ordinary soil (Earth work in excavation of foundation of
structures as per drawing and technical specification, including setting out, construction
12 12.1 (I) A (i) of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides
and bottom and bockfilling with approved material) Manual means.
Length of Guard Wall toward Turibar Side = cum 2 15.00 (L x Avg 3.55 106.50
Length of Guard Wall toward Rachanga Side = cum 2 15.00 Area) 3.55 106.50
Total cum 213.00
13 12.3 Sand filling in foundation trenches as per Drawing and Technical specification cum
` Length of Guard Wall toward Turibar Side = cum 2 15.00 2.36 0.15 10.60
Length of Guard Wall toward Rachanga Side = cum 2 15.00 2.36 0.15 10.60
Total cum 21.20
Plain/Reinforced cement concrete in Foundation complete as per drawing and technical
14 12.8A
specification, (PCC Grade M15 )
Length of Guard Wall toward Turibar Side = cum 2 15.00 (L x Avg 0.94 28.26
Length of Guard Wall toward Rachanga Side = cum 2 15.00 Area) 0.94 28.26
Total cum 56.52
Stone masonry work in cement mortar 1:3 for foundation complete as per drawing and
15 12.7 (b) technical specifications.
Length of Guard Wall toward Turibar Side = cum 2 15.00 (L x Avg 1.47 43.95
Length of Guard Wall toward Rachanga Side = cum 2 15.00 Area) 1.47 43.95
Total cum 87.90
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing
16 13.4 A and technical specifications.
Length of Guard Wall toward Turibar Side = cum 2 15.00 (L x Avg 2.36 70.65
Area)
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.

QUANTITY CALCULATION (Super Structure & Approch )


SL. NH Sch. Item
No.
DESCRIPTION UNIT No. Length Breadth Height QTY
No.
Length of Guard Wall toward Rachanga Side = cum 2 15.00 Area) 2.36 70.65
Total cum 141.30
Providing weep hole in Brick, masonary/Plain/Reinforced Cement Concrete abutment,
wing wall/returnwall with 100mm dia AC pipe, extending through the full widt of the
17 13.8 Each 2 72.00
structure with slope of 1V:20H towards drawing foce. Complete as per drawing and
Technical specification.
Pointing with cement mortar (1:3) on brickwork in substructure as per Technical
18 13.2 specifications
Gargaon Village 10 sqm 2 60.497 12.1
Mohanadi Village 10 sqm 2 80.333 16.07
Total 28.17
Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and
19 13.5 B(p)
technical specifications (PCC garde M 20 ) For Coping
Gargaon Village cum 2 15.00 0.50 0.15 2.25

Mohanadi Village cum 2 15.00 0.50 0.15 2.25

Total cum 4.50


PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI
TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU
YOJANA.
QUANTITY CALCULATION (RETAINING WALL)
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height QTY
No. Item No.
C RETAINING WALL
Excavation for structures in ordinary soil (Earth work in excavation
of foundation of structures as per drawing and technical specification,
1 12.1 (I) B including setting out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides and bottom
and bockfilling with approved material) Mechanical means

Turibar Side
4.5 m Height Retaining Wall cum 2 20.80 5.10 1.65 350.06
Rachanga Side
4.5 m Height Retaining Wall cum 2 15.80 5.10 1.65 265.91
Total 615.97
Plain/Reinfoced Cement concrete in open foundation complete as per
2 12.8 A drwaing and technical specifications. PCC Grade M10 using batching
plant & Concrete pump
Turibar Side
4.5 m Height Retaining Wall cum 2 20.20 4.50 0.15 27.27
Rachanga Side
4.5 m Height Retaining Wall cum 2 15.20 4.50 0.15 20.52
Total 47.79
Plain/Reinforced cement concrete in Foundation complete as per
drawing and technical specification, RCC Grade M25 using batching
3 12.8 E
plant,transit mixer & Concrete pump

Turibar Side
4.5 m Height Retaining Wall
Foundation Straight cum 2 20.00 4.300 0.300 51.60
Foundation Tapered toe cum 2 20.00 2.500 0.150 15.00
Foundation Tapered heel cum 2 20.00 1.200 0.150 7.20
Shaft cum 2 20.00 0.450 1.200 21.60
Rachanga Side
4.5 m Height Retaining Wall
Foundation Straight cum 2 15.00 4.300 0.300 38.70
Foundation Tapered toe cum 2 15.00 2.500 0.150 11.25
Foundation Tapered heel cum 2 15.00 1.200 0.150 5.40
Shaft cum 2 15.00 0.450 1.200 16.20
Total 166.95
Plain/Reinforced cement concrete in sub-strucutre complete as per
13.5 F (p)
4 drawing and Technical specifications RCC Grade M25 using batching
Case I
plant, transit mixer & concrete pump
Turibar Side
4.5 m Height Retaining Wall cum 2 20.00 0.45 3.00 54.00
Rachanga Side
4.5 m Height Retaining Wall cum 2 15.00 0.450 3.00 40.50
Total 94.50
Supplying , fitting and placing un-coated HYSD bar reinforcement in
5 12.40 tonne Foundation 12.43
foundation complete as per drawing and technical specifications
Supplying , fitting and placing HYSD bar reinforcement in sub-
6 13.6 tonne Substructure 15.70
structure complete as per drawing and technical specifications
Providing and laying of Filter media with granular materials/stone
crushed aggregates satisfying the requirements laid down in clause
2504.2.2. of MoRT&H specifications to a thickness of not less than
600 mm with smaller size towards the soil and bigger size towards the
7 15.5 wall and provided over the entire surface behind abutment, wing wall
and return wall to the full height compacted to a firm condition
complete as per drawing and Technical Specification.
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI
TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU
YOJANA.
QUANTITY CALCULATION (RETAINING WALL)
SL. NH Sch.
DESCRIPTION UNIT No. Length Breadth Height QTY
No. Item No.
Turibar Side
4.5 m Height Retaining Wall cum 2 20.00 0.60 3.00 72.00
Rachanga Side
4.5 m Height Retaining Wall cum 2 15.00 0.60 3.00 54.00
Total cum 126.00
Providing weep hole in Brick, masonary/Plain/Reinforced Cement
Concrete abutment, wing wall/returnwall with 100mm dia AC pipe,
8 13.8 extending through the full widt of the structure with slope of 1V:20H Each 274.00
towards drawing foce. Complete as per drawing and Technical
specification.
Sub Total A:
TYPICAL CROSS SECTION

7.50 M Formation Width


1.875 Earthen shoulder 3.75 M C/W 1.875 Earthen shoulder
OGPC , 20 MM Thick

WMM-150 MM THICK , 3.75 M C/W


Earth work

GSB-150 MM THICK , 4.05 M C/W


Earth work

Subgrade 300 MM Thick


Earth work
Quantity Calculation of Approach Road
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF
DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.

Approach Road filling in data:

LENGTH (Turibar Side =150m, Rachanga Side =150 m


= 300.00 m

Avg Ht of Embankement at A1 = 4.261 m


Avg Ht of Embankement at A2 = 4.334 m
Width of Embankement at top = 7.5 m
Width of GSB = 7.8 m
Depth of GSB = 0.15 m
Width of WBM Gr-II & Gr - III = 5.58 m
Depth of WMM Gr -II = 0.075 m
Depth of WMM Gr - III = 0.075 m
Width of Prime Coat, Tack Coat, Premix, Seal Coat = 5.58 m
Depth of Premix Surface = 0.02 m
RL of Ground at A-2 = 92.513 m
RL of Ground at A-1 = 92.586 m
HFL = 103.550 m

Average RL 97.167 m

4.1m
7.5m

1
Average RL 92.550 m
1.5

Sl. No Items No Length Breadth Height Q= LxbxH Total


(m) (m) (m) (m^3) (m^3)

1 Earth work in embankement (Turibar Side) 1 150.00 9.000 1.847 2,493.45 2,493.45
2 Earth work in embankement (Rachanga Side) 1 150.00 8.000 1.710 2,052.22 2,052.22
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE
MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU
BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.

Section of Guard Wall

0.5
Road Fill

G.L. G.L.
0.3
b2 b1
0.4

0.4 0.4
B1
0.4

B2

Cross Sectional Area of the given section: =

H 1.00 2.00 2.50 3.00 3.50 4.00


b1 0.15 0.25 0.30 0.35 0.40 0.45
b2 0.20 0.66 0.76 0.89 1.00 1.14
B1 0.85 1.39 1.55 1.75 1.90 2.09
B2 1.65 2.18 2.35 2.53 2.71 2.88
4 Total Area for SM 1.39 2.98 3.75 4.66 5.60 6.70
3 Total Area for PCC 0.66 0.87 0.94 1.01 1.08 1.15
width at GL 0.70 1.23 1.41 1.61 1.77 1.96
Area upto GL 0.89 1.32 1.45 1.61 1.73 1.89
Area above GL 0.50 1.66 2.30 3.05 3.87 4.81
1 Area for E/w Excavation 2.70 3.34 3.54 3.76 3.97 4.18
2 Area for back filling 1.81 2.02 2.09 2.15 2.24 2.29

Length of Guard Wall toward Turibar Side = 2 x 15

Length of Guard Wall toward Rachanga Side = 2 x 15


Ht. of Guard Wall toward Turibar Side at Start= 2 m
Ht. of Guard Wall toward Turibar Side at End= 1 m
Ht. of Guard Wall toward Rachanga Side at Start= 2 m
Ht. of Guard Wall toward Rachanga Side at End= 1 m
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF
SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH
DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.

STEEL CALCULATION
Superstucture
Per Span 8332.381 kg
SL Foundation Sub-Structure Excluding 5%
Structure Foundation Type (in Kg)
No. (in Kg) (in Kg)

1 Abutment A-1 Pile Foundation 20253.89 7696.83 -


2 Abutment A-2 Pile Foundation 20500.79 7810.79
3 Pier P-1 Pile Foundation 14043.94 3853.69
4 Pier P-2 Pile Foundation 14155.88 4128.18
5 Pier P-3 Pile Foundation 13328.39 4105.22
6 Pier P-4 Pile Foundation 0.00 0.00
7 Superstructure 8332.381 kg x 4 span - - 33329.52
8 Pedastal 24 nos. - 937.81 -
Total Excluding 5% westage :- 82282.88 28532.52 33329.52
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A1
No. of Structures: 1

Bar Total Uni


Bar Spacin Length
Location Bar Description Dia. Shape a b c d e Nos. Length Wt. Weight (Kg)
Mark g(mm) (mm)
(mm) (mm) (Kg/m)

a
Main bar b
Pile 2 25 - 500 17900 650 18890 150 2833500 3.851 10912.96
(Full length)
c

b
Pile 3A Ring 12 150 3484 3484 372 1296097 0.887 1150.11

b
Pile 3 Ring 12 100 3484 3484 438 1526050 0.887 1354.16

b
Pile 4 Spacer Bar 20 2000 3506 3506 36 126223 2.465 311.13

Top Bar (Along


Pile Cap 201 Longitudinal 20 125 a b c 1565 8550 1565 11680 41 474208 2.465 1168.88
Direction)

Top Bar
Pile Cap 202 (Along Transverse 25 125 a b c 1565 4950 1565 8080 69 557520 3.851 2147.24
Direction )

Pile Cap 203 Main bar Bottom 20 125 a b c 1565 8550 1565 11680 41 478880 2.465 1180.39

Pile Cap 204 Distributor (Bottom ) 20 125 a b c 1565 4950 1565 8080 69 557520 2.465 1374.23

Pile Cap 105 Chair bar 16 250 1565 700 300 5034 21 105714 1.578 166.77
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A1
No. of Structures: 1

Bar Total Uni


Bar Spacin Length
Location Bar Description Dia. Shape a b c d e Nos. Length Wt. Weight (Kg)
Mark g(mm) (mm)
(mm) (mm) (Kg/m)

Sideface
Pile Cap 206a reinforcement along 16 - a b c 500 4918 500 5918 20 118360 1.578 186.72
longitudinal direction

Sideface
Pile Cap 206 reinforcement along 16 - a b c 500 8550 500 9550 20 191000 1.578 301.31
transverse direction

a
Abutment Main bar (Earth b
110 25 150 700 4092 500 5292 65 343980 3.851 1324.81
Shaft face)
c

Main bar (river a


Abutment b
110 b face/Opposite to 20 150 700 4092 500 5292 65 343980 2.465 847.88
Shaft
Earth face) c

a
Abutment
110a Main bar (Side face) 25 150 b 700 4092 500 5292 16 84672 3.851 326.11
Shaft c

Abutment a
111 Distributor 12 150 b 1100 8350 1100 10550 24 253200 0.887 224.68
Shaft c

Abutment a
112 Link 10 - 1090 1350 108 145800 0.616 89.85
Shaft

Abutment
114 Top Bar 16 - a b a 500 8350 500 9350 16 149600 1.578 236.00
Cap
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A1
No. of Structures: 1

Bar Total Uni


Bar Spacin Length
Location Bar Description Dia. Shape a b c d e Nos. Length Wt. Weight (Kg)
Mark g(mm) (mm)
(mm) (mm) (Kg/m)

Abutment a
114 Bottom Bar 16 - b c 500 8350 500 9350 16 149600 1.578 236.00
Cap

Sideface
Abutment reinforcement along a c
114 16 - b 1100 8350 1100 10550 4 42200 1.578 66.57
Cap Longitudinal
direction
a
Abutment
113 6L Stirrup 16 150 b 251 500 5658 57 322506 1.578 508.76
Cap
a
Dirt Wall
Main bar (Opposite a
and 117 12 150 b 288 2628.5 863 3780 57 215432 0.887 191.17
to Eath face) c
Bracket

Dirt Wall a
Main bar
and 115 16 150 b 288 2628.5 675 3592 57 204716 1.578 322.95
(Eath face) c
Bracket
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A1
No. of Structures: 1

Bar Total Uni


Bar Spacin Length
Location Bar Description Dia. Shape a b c d e Nos. Length Wt. Weight (Kg)
Mark g(mm) (mm)
(mm) (mm) (Kg/m)

Dirt Wall a
Distributor (earth b
and 116 12 150 c 300 8350 300 8950 15 134250 0.887 119.13
face)
Bracket

Dirt Wall Distributor a


b
and 116a (Opposite to earth 12 150 c 300 8350 300 8950 15 134250 0.887 119.13
Bracket face)

a b c
Dirt Wall
and 120 Bracket haunch bar 12 125 350 600 500 922 500 2872 68 195293 0.887 173.30
d e
Bracket

Dirt Wall
Bracket stirrup b
and 118 10 250 a 580 230 1820 102 185640 0.616 114.40
(in 3 layers)
Bracket
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A1
No. of Structures: 1

Bar Total Uni


Bar Spacin Length
Location Bar Description Dia. Shape a b c d e Nos. Length Wt. Weight (Kg)
Mark g(mm) (mm)
(mm) (mm) (Kg/m)

Dirt Wall a
Dirt wall top
and 119 12 - 8350 8350 2 16700 0.887 14.82
longitudinal bar
Bracket
Dirt Wall
Bracket top a
and 121 12 - 8350 8350 5 41750 0.887 37.05
longitudinal bar
Bracket

a b
Return Main bar (Eath face
126 16 140 c 4630 1000 300 5930 34 201618 1.578 318.06
Wall-I up to abutment cap)

Return Main bar (Opposite a


125 12 140 b 4630 1000 300 5930 34 201618 0.887 178.91
Wall-I to Eath face) c

Return Main bar (Eath face a


126a 12 140 3720 1000 300 5020 38 190760 0.887 169.27
Wall-I dirt wall) c b

Main bar (Opposite a


Return
125a to Eath face dirt 12 140 b 3720 1000 300 5020 38 190760 0.887 169.27
Wall-I c
wall)

Return Vertical bar Return a


127 16 - b 250 4167 500 4917 8 39336 1.578 62.05
Wall-I wall junction c

a
Return b
124 Vertical bar 16 125 c 250 4167 500 4917 224 1101408 1.578 1737.51
Wall-I
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A1
No. of Structures: 1

Bar Total Uni


Bar Spacin Length
Location Bar Description Dia. Shape a b c d e Nos. Length Wt. Weight (Kg)
Mark g(mm) (mm)
(mm) (mm) (Kg/m)

Return a
Main bar (Opposite
Wall-I 125a 12 140 b c 250 1540 1790 14 25571 0.887 22.69
to Eath face )
Cantiliver

Return
Wall-I 125b 20 300 2380 2000 4680 4 18720 2.465 46.14
Cantiliver

Return a
Main bar Eath face
Wall-I 126a 16 140 b c 250 1540 1790 14 25571 1.578 40.34
)
Cantiliver

Total weight of the reinforcement for Foundation (HYSD bar) (Ton) : 20253.89
Total weight of the reinforcement required for Substructure: (HYSD Bar) (Ton) 7696.83
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A2
No. of Structures: 1

Bar Total Uni


Bar Spacin Lengt
Location Bar Description Dia. Shape a b c d e Nos. Length Wt. Weight (Kg)
Mark g(mm) h(mm)
(mm) (mm) (Kg/m)

a
Main bar b
Pile 2 25 - 500 18400 650 19390 150 2908500 3.851 11201.82
(Full length)
c

b
Pile 3A Ring 12 150 3484 3484 390 1358812 0.887 1205.76

b
Pile 3 Ring 12 100 3484 3484 438 1526050 0.887 1354.16

b
Pile 4 Spacer Bar 20 2000 3506 3506 36 126223 2.465 311.13

Top Bar (Along


Pile Cap 201 Longitudinal 20 125 a b c 1565 8550 1565 11680 41 474208 2.465 1168.88
Direction)

Top Bar
Pile Cap 202 (Along Transverse 25 125 a b c 1565 4950 1565 8080 69 557520 3.851 2147.24
Direction )

Pile Cap 203 Main bar Bottom 20 125 a b c 1565 8550 1565 11680 41 478880 2.465 1180.39

Pile Cap 204 Distributor (Bottom ) 20 125 a b c 1565 4950 1565 8080 69 557520 2.465 1374.23

Pile Cap 105 Chair bar 16 250 1565 700 300 5034 21 105714 1.578 166.77
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A2
No. of Structures: 1

Bar Total Uni


Bar Spacin Lengt
Location Bar Description Dia. Shape a b c d e Nos. Length Wt. Weight (Kg)
Mark g(mm) h(mm)
(mm) (mm) (Kg/m)

Sideface
reinforcement along
Pile Cap 206a 16 - b c 500 4918 500 5918 16 94688 1.578 149.37
longitudinal a
direction

Sideface
Pile Cap 206 reinforcement along 16 - a b c 500 8550 500 9550 16 152800 1.578 241.05
transverse direction

a
Abutment Main bar (Earth b
110 25 150 700 4192 500 5392 65 350480 3.851 1349.84
Shaft face)
c

Main bar (river a


Abutment b
110 b face/Opposite to 20 150 700 4192 500 5392 65 350480 2.465 863.90
Shaft
Earth face) c

a
Abutment
110a Main bar (Side face) 25 150 b 700 4192 500 5392 16 86272 3.851 332.27
Shaft c

Abutment a
111 Distributor 12 150 b 1100 8350 1100 10550 26 274300 0.887 243.40
Shaft c

Abutment a
112 Link 10 - 1090 1350 108 145800 0.616 89.85
Shaft

Abutment
114 Top Bar 16 - a b a 500 8350 500 9350 16 149600 1.578 236.00
Cap
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A2
No. of Structures: 1

Bar Total Uni


Bar Spacin Lengt
Location Bar Description Dia. Shape a b c d e Nos. Length Wt. Weight (Kg)
Mark g(mm) h(mm)
(mm) (mm) (Kg/m)

Abutment a
114 Bottom Bar 16 - b c 500 8350 500 9350 16 149600 1.578 236.00
Cap

Sideface
Abutment reinforcement along a c
114 16 - b 1100 8350 1100 10550 4 42200 1.578 66.57
Cap Longitudinal
direction

a
Abutment
113 6L Stirrup 16 150 b 251 500 5658 57 322506 1.578 508.76
Cap
a
Dirt Wall
Main bar (Opposite a
and 117 12 150 b 288 2628.5 863 3780 57 215432 0.887 191.17
to Eath face) c
Bracket

Dirt Wall a
Main bar
and 115 16 150 b 288 2628.5 675 3592 57 204716 1.578 322.95
(Eath face) c
Bracket

Dirt Wall a
Distributor (earth b
and 116 12 150 c 300 8350 300 8950 15 134250 0.887 119.13
face)
Bracket

Dirt Wall Distributor a


b
and 116a (Opposite to earth 12 150 c 300 8350 300 8950 15 134250 0.887 119.13
Bracket face)

a b c
Dirt Wall
and 120 Bracket haunch bar 12 125 350 600 500 922 500 2872 68 195293 0.887 173.30
Bracket d e

Dirt Wall
Bracket stirrup b
and 118 10 250 a 580 230 1820 102 185640 0.616 114.40
(in 3 layers)
Bracket
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A2
No. of Structures: 1

Bar Total Uni


Bar Spacin Lengt
Location Bar Description Dia. Shape a b c d e Nos. Length Wt. Weight (Kg)
Mark g(mm) h(mm)
(mm) (mm) (Kg/m)

Dirt Wall a
Dirt wall top
and 119 12 - 8350 8350 2 16700 0.887 14.82
longitudinal bar
Bracket
Dirt Wall
Bracket top a
and 121 12 - 8350 8350 5 41750 0.887 37.05
longitudinal bar
Bracket

a b
Return Main bar (Eath face
126 16 140 c 4630 1000 300 5930 36 213478 1.578 336.77
Wall-I up to abutment cap)

Return Main bar (Opposite a


125 12 140 b 4630 1000 300 5930 36 213478 0.887 189.43
Wall-I to Eath face) c

Return Main bar (Eath face a


126a 12 140 3720 1000 300 5020 36 180720 0.887 160.36
Wall-I dirt wall) c b

Main bar (Opposite a


Return
125a to Eath face dirt 12 140 b 3720 1000 300 5020 36 180720 0.887 160.36
Wall-I c
wall)

Return Vertical bar Return a


127 16 - b 250 4267 500 5017 8 40136 1.578 63.32
Wall-I wall junction c

Return a
124 Vertical bar 16 125 b 250 4267 500 5017 224 1123808 1.578 1772.85
Wall-I c

Return a
Main bar (Opposite
Wall-I 125a 12 140 b c 250 1540 1790 14 25571 0.887 22.69
to Eath face )
Cantiliver
559 PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA
GEDEYA SANDI TOLA OF DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER
MUKHYA MANTRI GRAM SETU YOJANA.
Name of the structure: Abutment-A2
No. of Structures: 1

Bar Total Uni


Bar Spacin Lengt
Location Bar Description Dia. Shape a b c d e Nos. Length Wt. Weight (Kg)
Mark g(mm) h(mm)
(mm) (mm) (Kg/m)

Return
Wall-I 125b 20 300 2380 2000 4680 4 18720 2.465 46.14
Cantiliver

Return a
Main bar Eath face
Wall-I 126a 16 140 b c 250 1540 1790 14 25571 1.578 40.34
)
Cantiliver

Total weight of the reinforcement for Foundation (HYSD bar) (Ton) : 20500.79
Total weight of the reinforcement required for Substructure: (HYSD Bar) (Ton) 7810.79
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
559
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
Structure Name: Pier PIER-01
No. of Structure: 1

Bar Total
Bar Spacing Length Uni Wt.
Location Bar Description Dia. Shape a b c d e f Nos. Length Weight (Kg)
Mark (mm) (mm) (Kg/m)
(mm) (mm)

a
b
Pile 2 Main bar ( Full length) 25 - 500 17400 650 18350 100 3.851 1835000 7067.33
c

b
Pile 3 Ring 12 150 3484 3484 232 0.887 808319 717.27

b
Pile 3A Ring 12 100 3484 3484 292 0.887 1017367 902.77

b
Pile 4 Spacer Bar 20 2000 3506 3506 20 2.465 70124 172.85

Top Bar (Along


Pile cap 202 16 150 b 1567 4950 1567 8084 34 1.578 274856 433.60
Longitudinal Direction) a c

Top Bar (Along


Pile cap 201 16 150 1567 4950 1567 8084 34 1.578 274856 433.60
Transverse Direction ) a b c

Pile cap 203 Main bar Bottom 25 125 a b c 1563 4950 1563 8075 41 3.851 331075 1275.10

Pile cap 204 Distributor (Bottom ) 25 125 b c 1563 4950 1563 8075 41 3.851 331075 1275.10
a

105 Chair bar 16 250 1563 700 300 4234 21 1.578 88914 140.27

Sideface reinforcement
Pile cap 206 along longitudinal 20 - a b c 500 4910 500 5910 12 2.465 70920 174.81
direction

Sideface reinforcement
Pile cap 206a along transverse 20 - a b c 500 4900 500 5900 12 2.465 70800 174.51
direction
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
559
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
Structure Name: Pier PIER-01
No. of Structure: 1

Bar Total
Bar Spacing Length Uni Wt.
Location Bar Description Dia. Shape a b c d e f Nos. Length Weight (Kg)
Mark (mm) (mm) (Kg/m)
(mm) (mm)

Equally a
Pier Shaft 207 Main bar 25 b 500 4726 500 5576 40 3.851 223040 859.02
Spaced
c

Pier Shaft 208 Binder 12 150 a 6169 6169 11 0.887 67859 60.22

Top Bar (along the


Pier Cap 209 length of pier cap 1st. 25 125 b a b 6900 900 8700 17 3.851 147900 569.62
layer)

Top Bar (along the


Pier Cap 210 length of pier cap 2nd. 25 125 b a b 6800 800 8400 17 3.851 142800 549.98
layer)

Bottom Bar (along the c


Pier Cap 211 16 125 1600 3202 900 9803 17 1.578 166653 262.90
length of pier cap) b
a

Bottom Bar (along the c


Pier Cap 212 16 150 1600 943 900 5287 47 1.578 248479 391.99
width of pier cap) b
a

Alround bar in
Pier Cap 213 Rectangular Portion in 16 150 b 7700 2500 200 20600 8 1.578 164800 259.98
a b
Pier Cap

Top Bar (along the b a


Pier Cap 214 16 125 b 2000 800 3600 47 1.578 169200 266.92
Width of pier cap)

Side face Bar (along b


Pier Cap 215 the Length of pier cap) 16 125 a b 4650 2050 200 13600 7 1.578 95200 150.18
(av)

Pier Cap 216 4L Stirrups 12 - b 980 1988 12448 12 0.887 149376 132.55
a
Total weight of the reinforcement for Pile & Pile Cap (HYSD bar) (Ton) : 14043.94
Total weight of the reinforcement required for Pier Shaft & Cap (HYSD Bar) (Ton) : 3853.69
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
559
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
Structure Name: Pier PIER-02
No. of Structure: 1

Bar Total
Bar Spacing Length Uni Wt.
Location Bar Description Dia. Shape a b c d e f Nos. Length Weight (Kg)
Mark (mm) (mm) (Kg/m)
(mm) (mm)

a
b
Pile 2 Main bar ( Full length) 25 - 500 17600 650 18550 100 3.851 1855000 7144.36
c

b
Pile 3 Ring 12 150 3484 3484 240 0.887 836192 742.01

b
Pile 3A Ring 12 100 3484 3484 292 0.887 1017367 902.77

b
Pile 4 Spacer Bar 20 2000 3506 3506 20 2.465 70124 172.85

Top Bar (Along


Pile cap 202 16 150 b 1567 4950 1567 8084 34 1.578 274856 433.60
Longitudinal Direction) a c

Top Bar (Along


Pile cap 201 16 150 1567 4950 1567 8084 34 1.578 274856 433.60
Transverse Direction ) a b c

Pile cap 203 Main bar Bottom 25 125 a b c 1563 4950 1563 8075 41 3.851 331075 1275.10

Pile cap 204 Distributor (Bottom ) 25 125 b c 1563 4950 1563 8075 41 3.851 331075 1275.10
a

105 Chair bar 16 250 1563 700 300 4234 21 1.578 88914 140.27

Sideface reinforcement
Pile cap 206 along longitudinal 20 - a b c 500 4910 500 5910 12 2.465 70920 174.81
direction

Sideface reinforcement
Pile cap 206a along transverse 20 - a b c 500 4900 500 5900 12 2.465 70800 174.51
direction
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
559
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
Structure Name: Pier PIER-02
No. of Structure: 1

Bar Total
Bar Spacing Length Uni Wt.
Location Bar Description Dia. Shape a b c d e f Nos. Length Weight (Kg)
Mark (mm) (mm) (Kg/m)
(mm) (mm)

Equally a
Pier Shaft 207 Main bar 25 b 500 6026 500 6876 40 3.851 275040 1059.29
Spaced
c

Pier Shaft 208 Binder 12 150 a 6169 6169 20 0.887 123381 109.48

Top Bar (along the


Pier Cap 209 length of pier cap 1st. 25 125 b a b 6900 900 8700 17 3.851 147900 569.62
layer)

Top Bar (along the


Pier Cap 210 length of pier cap 2nd. 25 125 b a b 6800 800 8400 17 3.851 142800 549.98
layer)

Bottom Bar (along the c


Pier Cap 211 16 125 1600 3202 900 9803 17 1.578 166653 262.90
length of pier cap) b
a

Bottom Bar (along the c


Pier Cap 212 16 150 1600 943 900 5287 47 1.578 248479 391.99
width of pier cap) b
a

Alround bar in
Pier Cap 213 Rectangular Portion in 16 150 b 7700 2500 200 20600 8 1.578 164800 259.98
a b
Pier Cap

Top Bar (along the b a


Pier Cap 214 16 125 b 2000 800 3600 47 1.578 169200 266.92
Width of pier cap)

Side face Bar (along b


Pier Cap 215 the Length of pier cap) 16 125 a b 4650 2050 200 13600 7 1.578 95200 150.18
(av)

Pier Cap 216 4L Stirrups 12 - b 980 1988 12448 12 0.887 149376 132.55
a
Total weight of the reinforcement for Pile & Pile Cap (HYSD bar) (Ton) : 14155.88
Total weight of the reinforcement required for Pier Shaft & Cap (HYSD Bar) (Ton) : 4128.18
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
559
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
Structure Name: Pier PIER-03
No. of Structure: 1

Bar Total
Bar Spacing Length Uni Wt.
Location Bar Description Dia. Shape a b c d e f Nos. Length Weight (Kg)
Mark (mm) (mm) (Kg/m)
(mm) (mm)

a
b
Pile 2 Main bar ( Full length) 25 - 500 16000 650 16950 100 3.851 1695000 6528.13
c

b
Pile 3 Ring 12 150 3484 3484 196 0.887 682890 605.97

b
Pile 3A Ring 12 100 3484 3484 292 0.887 1017367 902.77

b
Pile 4 Spacer Bar 20 2000 3506 3506 20 2.465 70124 172.85

Top Bar (Along


Pile cap 202 16 150 b 1567 4950 1567 8084 34 1.578 274856 433.60
Longitudinal Direction) a c

Top Bar (Along


Pile cap 201 16 150 1567 4950 1567 8084 34 1.578 274856 433.60
Transverse Direction ) a b c

Pile cap 203 Main bar Bottom 25 125 a b c 1563 4950 1563 8075 41 3.851 331075 1275.10

Pile cap 204 Distributor (Bottom ) 25 125 b c 1563 4950 1563 8075 41 3.851 331075 1275.10
a

205 Chair bar 16 250 1563 700 300 4234 21 1.578 88914 140.27

Sideface reinforcement
Pile cap 206 along longitudinal 20 - a b c 500 4910 500 5910 12 2.465 70920 174.81
direction

Sideface reinforcement
Pile cap 206a along transverse 20 - a b c 500 4900 500 5900 12 2.465 70800 174.51
direction
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
559
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
Structure Name: Pier PIER-03
No. of Structure: 1

Bar Total
Bar Spacing Length Uni Wt.
Location Bar Description Dia. Shape a b c d e f Nos. Length Weight (Kg)
Mark (mm) (mm) (Kg/m)
(mm) (mm)

Equally a
Pier Shaft 207 Main bar 25 b 500 5926 500 6776 40 3.851 271040 1043.89
Spaced
c

Pier Shaft 208 Binder 12 150 a 6169 6169 19 0.887 117211 104.01

Top Bar (along the


Pier Cap 209 length of pier cap 1st. 25 125 b a b 6900 900 8700 17 3.851 147900 569.62
layer)

Top Bar (along the


Pier Cap 210 length of pier cap 2nd. 25 125 b a b 6800 800 8400 17 3.851 142800 549.98
layer)

Bottom Bar (along the c


Pier Cap 211 16 125 1600 3202 900 9803 17 1.578 166653 262.90
length of pier cap) b
a

Bottom Bar (along the c


Pier Cap 212 16 150 1600 943 900 5287 47 1.578 248479 391.99
width of pier cap) b
a

Alround bar in
Pier Cap 213 Rectangular Portion in 16 150 b 7700 2500 200 20600 8 1.578 164800 259.98
a b
Pier Cap

Top Bar (along the b a


Pier Cap 214 16 125 b 2000 800 3600 47 1.578 169200 266.92
Width of pier cap)

Side face Bar (along b


Pier Cap 215 the Length of pier cap) 16 125 a b 4650 2050 200 13600 7 1.578 95200 150.18
(av)

Pier Cap 216 4L Stirrups 12 - b 980 1988 12448 12 0.887 149376 132.55
a
Total weight of the reinforcement for Pile & Pile Cap (HYSD bar) (Ton) : 13328.39
Total weight of the reinforcement required for Pier Shaft & Cap (HYSD Bar) (Ton) : 4105.22
559

Structure Name: Pedestal, Arrestor Block


No. of Structure:

Bar Total
Spacin Length Uni Wt.
Location Bar Mark Bar Description Dia. Shape a b c d e f Nos. Length Weight (Kg)
g(mm) (mm) (Kg/m)
(mm) (mm)

Bar along transverse a b


Pedestal M1 16 150 c 416 684 416 1420 4 1.578 5680 8.960
direction

Bar along longitudinal


Pedestal M2 16 150 416 504 416 1240 6 1.578 7440 11.737
direction a b c

Mess 8 23300 2 0.394 46600 18.378

For Pedestal : 39.076


For Pedestal 24 NO : 937.814

c
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI
RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF DIGWAR GRAM
PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA
MANTRI GRAM SETU YOJANA.
STEEL CALCULATION

Foundation Sub-Structure

Sub Total Sub Total


Structure
(Kg) (Kg)
Retaining Wall - Turibar Side
4.5 m Height Retaining Wall 7091.23 8971.33

Retaining Wall - Rachanga Side

4.5 m Height Retaining Wall 5333.99 6728.58


12425.22 15699.91
Total 12425.22 15699.91
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF
DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
Bar Bending Schedule of Retaining Wall for 4.5 m Height (Turibar Side)
Length in
Width in Total Unit
Mark Bar Longitudin Clear Cutting
Location Spacing Transverse Shape Numbe Weigh Total Weight Remarks
Designation Diameter d al Cover L B Length
Direction r t
Direction
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (m) (Kg) (Kg)

Foundation a 16 120 3118 20000 75 2968 200 3.22 332 1.59 1698.720 Top Longitudinal
B
L

Foundation b 10 120 1837 20000 75 1687 200 1.94 332 0.62 398.710 Top Longitudinal
B
L

Foundation c 10 120 4300 20000 75 B 4150 200 4.55 332 0.62 936.570 Bottom Longitudinal
L

Foundation c1 16 200 4300 20000 75 B 19850 200 20.25 44 1.59 1416.690 Bottom Transverse
L

Foundation
d 10 120 2518 20000 75 L 19850 0 19.85 42 0.62 516.890 Top Transeverse
(Outside Face)

Foundation
e 10 120 1237 20000 75 L 19850 0 19.85 20 0.62 246.140 Top Transeverse
(Earth Face)

Stem h 12 180 20000 50 4400 200 4.80 224 0.89 956.930 Vertical Outside Face
L
B

Stem g 16 100 20000 50 4400 200 4.80 400 1.59 3052.800 Vertical Earth Face
L
B

Stem i 16 125 20000 50 B B 19950 0 19.95 124 1.59 3933.340 Top Horizontal
L

Stem j 8 200 450 50 350 128 0.61 4242 0.4 1028.260 Link Bar

Foundation f 8 125 450 75 300 128 0.56 6762 0.4 1503.870 Link Bar

Foundation f1 10 250 450 75 300 160 0.62 972 0.62 373.640 Link Bar

Total: 16062.560
PREPARATION OF DPR FOR CONSTRUCTION OF HL BRIDGE OVER CHOURI RIVER IN THE MIDDLE OF SONDIHA GEDEYA SANDI TOLA OF
DIGWAR GRAM PANCHAYAT IN DARU BLOCK IN THE HAZARIBAGH DISTRICT UNDER MUKHYA MANTRI GRAM SETU YOJANA.
Bar Bending Schedule of Retaining Wall for 4.5 m Height (Rachanga Side)
Length in
Mark Bar Width in Total Unit
Longitudin Clear Cutting
Location Designatio Diameter Spacing Transverse Shape Numbe Weigh Total Weight Remarks
al Cover L B Length
n d Direction r t
Direction
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (m) (Kg) (Kg)

Foundation a 16 120 3118 15000 75 2968 200 3.22 250 1.59 1279.160 Top Longitudinal
B
L

Foundation b 10 120 1837 15000 75 1687 200 1.94 250 0.62 300.240 Top Longitudinal
B
L

Foundation c 10 120 4300 15000 75 B 4150 200 4.55 250 0.62 705.250 Bottom Longitudinal
L

Foundation c1 16 200 4300 15000 75 B 14850 200 15.25 44 1.59 1066.890 Bottom Transverse
L

Foundation
d 10 120 2518 15000 75 L 14850 0 14.85 42 0.62 386.690 Top Transeverse
(Outside Face)

Foundation
e 10 120 1237 15000 75 L 14850 0 14.85 20 0.62 184.140 Top Transeverse
(Earth Face)

Stem h 12 180 15000 50 4400 200 4.80 168 0.89 717.700 Vertical Outside Face
L
B

Stem g 16 100 15000 50 4400 200 4.80 300 1.59 2289.600 Vertical Earth Face
L
B

Stem i 16 125 15000 50 B B 14950 0 14.95 124 1.59 2947.540 Top Horizontal
L

Stem j 8 200 450 50 350 128 0.61 3192 0.4 773.740 Link Bar

Foundation f 8 125 450 75 300 128 0.56 5082 0.4 1130.240 Link Bar

Foundation f1 10 250 450 75 300 160 0.62 732 0.62 281.380 Link Bar

Total: 12062.570