Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 9

Started on Wednesday, 8 July 2020, 7:26 PM

State Finished

Completed on Wednesday, 8 July 2020, 8:03 PM

Time taken 37 mins 47 secs

Grade 100.0 out of 100.0

Feedback Congratulations! You have passed this quiz.

Question 1
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
In the notation, ‘All cross rods Y12-350 lap to be 450 UNO’, UNO stands for:
Choose one answer.
Select one:
Under no-one
none of the given answers
Unless noted otherwise

Question 2
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
BMT stands for base metal thickness.
Select one:
True
False

Question 3
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
The roof ventilators have a radius of 800mm.
Select one:
True
False

Question 4
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
How many Y16 U bars are needed in the reinforcement cage for one PF2 pad footing?
Choose one answer.
Select one:
12
24
none
14

Question 5
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
“DJ” and “SC” are types of joints provided in the concrete floors.
Select one:
True
False

Question 6
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
The ‘throat’ dimension to the reinforced concrete stairs is:
Choose one answer.
Select one:
Y12-200
400mm
200mm
150mm

Question 7
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
The floor finishes to the buildings are:
Choose the most correct answer
Select one:
ceramic tiles to the ‘wet’ areas
carpet to the office area
concrete to the workshop areas
none of the given answers are true
all of the given answers are true

Question 8
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
The maximum allowable step in the footing beam is 400mm.
Select one:
True
False

Question 9
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
Steel rods tie the concrete wall panels to the concrete footings and floor slabs:
Select one:
True
False

Question 10
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
The pitch of the roof in degrees is:
Choose one answer.
Select one:
4
3 and 5
3
5

Question 11
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
The diameter of the piers under the pad footings is:
Choose one answer.
Select one:
none of the given answers are correct
500mm
600mm
750mm

Question 12
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
The pad footings are:
Select one:
1200X1200mm in area
all of the given answers are correct
made of concrete
0.6m in depth
1.44m2 in area
Question 13
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
The Alsynite fibreglass roof sheeting is to:
Choose one answer.
Select one:
provide natural light to each unit
none of the given answers are correct
provide contrast in the roof sheeting colour
prevent maintenance workers falling through the roof
prevent the passage of Alsyns into the building

Question 14
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
The roof sheeting is mainly 0.48mm in thickness BMT Trimdeck Hi-Ten zincalume finish
Select one:
True
False

Question 15
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
The footing beams can be constructed with joints if:
Choose one answer.
Select one:
The joint is dowelled
all of the given answers are correct
2 R20 dowels are provided per joint
a 450mm diameter pier is provided within 600mm of the joint

Question 16
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
If a dimension is not obvious from the plans, it is acceptable to scale from these
architectural drawings:
Select one:
True
False

Question 17
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
The height of the rear wall panels above ground floor finished floor level is:
Choose one answer.
Select one:
none of the given answers are correct
7235mm
6845mm
6200mm
Question 18
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
R20 dowel bars are provide across joints in the floor slabs to prevent differential movement
between the slabs:
Select one:
True
False

Question 19
Complete
Mark 5.0 out of 5.0

Flag question

Question text
Please refer to Project 3
The footing plan depicts:
Choose one answer.
Select one:
pad footings under columns
many circular bored piers
a pier and beam footing system with some pad footings
all of the given answers are correct
a footing beam under each wall

Question 20
Complete
Mark 5.0 out of 5.0

Flag question
Question text
Please refer to Project 3
The difference in height between the sunscreen and the top of the wall panels is:
Choose one answer.
Select one:
1035mm
none of the given answers are correct
1.14m
1140mm
1100mm

You might also like