CPCCBC4012B Assessment 4
CPCCBC4012B Assessment 4
CPCCBC4012B Assessment 4
1
Complete
Mark 1.0 out of 1.0
Flag question
Question text
Select one:
True
False
Question 2
Complete
Mark 1.0 out of 1.0
Flag question
Question text
Select one:
a. 2400mm
b. 2450mm
c. 2700mm
Question 3
Complete
Mark 1.0 out of 1.0
Flag question
Question text
The window to the Powder room is 1200mm high x 600mm wide and the window to the ensuite is
1800mm x 600mm wide. These are aluminium awning windows. The clear opening width in
brickwork for these windows is 610mm wide. These windows are not clear glazed, but obscured
as shown.
Select one:
True
False
Question 4
Complete
Mark 1.0 out of 1.0
Flag question
Question text
Select one:
a. GP = gas point
b. HWS = hot water system
c. GPO = general purpose outlet
d. AC = air conditioning
e. All of the given answers are correct
Question 5
Complete
Mark 1.0 out of 1.0
Flag question
Question text
Select one:
a. 10
b. 12
c. 14
d. 15
e. 16
Question 6
Complete
Mark 1.0 out of 1.0
Flag question
Question text
Select one:
True
False
Question 7
Complete
Mark 0.0 out of 1.0
Flag question
Question text
What is the thickness shown of the internal walls on the first floor?
Select one:
a. 70mm
b. 90mm
c. 100mm
d. 110mm
Question 8
Complete
Mark 1.0 out of 1.0
Flag question
Question text
Select one:
a. 5
b. 3
c. 4
d. 6
Question 9
Complete
Mark 1.0 out of 1.0
Flag question
Question text
Select one:
a. 70mm
b. 90mm
c. 100mm
d. 110mm
Question 10
Complete
Mark 0.0 out of 1.0
Flag question
Question text
Select one:
a. 12
b. 13
c. 14
d. 15
e. 16
Question 11
Complete
Mark 0.0 out of 1.0
Flag question
Question text
Select one:
True
False
Question 12
Complete
Mark 1.0 out of 1.0
Flag question
Question text
Select one:
True
False
Question 13
Complete
Mark 1.0 out of 1.0
Flag question
Question text
On the drawing sheet showing the West Elevation the handrail to the balcony is to be a minimum
of 1050mm above the finished floor level of the balcony.
Select one:
True
False
Question 14
Complete
Mark 1.0 out of 1.0
Flag question
Question text
The difference between the first floor level and the ceiling level of the ground floor is
Select one:
a. 250mm
b. 240mm
c. 275mm
Question 15
Complete
Mark 1.0 out of 1.0
Flag question
Question text
The bathroom includes a:
Question 16
Complete
Mark 1.0 out of 1.0
Flag question
Question text
Select one:
True
False
Question 17
Complete
Mark 1.0 out of 1.0
Flag question
Question text
Select one:
a. A security camera
b. A motion sensor
c. A smoke detector/alarm
d. A siren
Question 18
Complete
Mark 1.0 out of 1.0
Flag question
Question text
Select one:
True
False
Question 19
Complete
Mark 1.0 out of 1.0
Flag question
Question text
A downpipe is used to cover an expansion joint on the southeast corner of the building?
Select one:
True
False
Question 20
Complete
Mark 1.0 out of 1.0
Flag question
Question text
There are twelve (12) double GPOs on the ground floor plan when the double GPO to the meter
box stated in General Notes is ignored.
Select one:
True
False
Question 21
Complete
Mark 0.0 out of 1.0
Flag question
Question text
What is the floor area of Bedroom 2. Express in m2 and roundup your answer to one decimal
place.
Select one:
a. 12.4m2
b. 8.5m2
c. 12.5m2
d. 12.35m2
Question 22
Complete
Mark 1.0 out of 1.0
Flag question
Question text
The dashed and dotted line over the floor plan shows the roof line.
Select one:
True
False
Question 23
Complete
Mark 0.0 out of 1.0
Flag question
Question text
Question 24
Complete
Mark 1.0 out of 1.0
Flag question
Question text
Select one:
True
False
Question 25
Complete
Mark 0.0 out of 1.0
Flag question
Question text
The drawings show that external brickwork is cement rendered and painted to a selected colour.
Select one:
True
False
Question 26
Complete
Mark 1.0 out of 1.0
Flag question
Question text
The Balcony is directly accessible from the Bedroom 1 and the Rumpus
Select one:
True
False
Question 27
Complete
Mark 1.0 out of 1.0
Flag question
Question text
Select one:
a. Dirty Laundry Chute
b. Safe storage areas
c. air conditioning ducts
d. time capsules
Question 28
Complete
Mark 1.0 out of 1.0
Flag question
Question text
‘EJ’ denotes an expansion joint in the brickwork. How many are noted on the first floor plan?
Select one:
a. 7
b. 8
c. 9
d. 10
Question 29
Complete
Mark 1.0 out of 1.0
Flag question
Question text
General room GPOs are mounted 300mm above the main floor level.
Select one:
True
False
Question 30
Complete
Mark 0.0 out of 1.0
Flag question
Question text
What should be the width of the cavity to the brick veneer walls assuming that sheet bracing is
used. (Hint: check the specification)”
Select one:
a. 50mm
b. 40mm
c. 60mm