DAILY ENGINEERING OPERATION REPORT (August 2, 2023)

EMD:

Wheat Intake/Storage and Substation


Trouble at grain silo 14ex elev. unusual sound. Found bucket obstruction. Removed & restart. For
monitoring. (4hrs) Elect. Mech.

Screens room and Pollard packing


Trouble at cleaning section ground floor Mill 2 drag chain conveyor tripped. Found out drag chain
is derailed. Work with mechanic, Fixed and tested. Still not performing well, removed/cut links
to improve tensioning. Okay and for monitoring. (4hrs) Elect. Mech.

Mill Proper
Test newly overhauled strato motor 4kw 3.475r/min 7.3A. L1 3.0, L2 2.8A, L3 3.8. RPM
3400/min. (2hrs) Elect. Mech.
Overhauling of Mill 1A strato motor 1883, Pull-out end plate of impact machine motor for build-
up. (8hrs) Elect. Mech.

Flour Silo, Flour Packing and warehousing


No Activities in this area.

Machining / Fabrication Shop.


No Activities in this area.

Activities in other area


Dismantling of unused pipes & wires at miller’s office. (8hrs) Elect.

Job Request
0 JR received yesterday.

Note: Engineering personnel utilized yesterday: 6 Elect. regular