Professional Documents
Culture Documents
SMM 4R (2018) Searchable
SMM 4R (2018) Searchable
BUILDING WORKS
Hong Kong Standard Method of Measurement of Building Works
Fourth Edition Revised 2018
lncorporating Corrigenda 1
Authorised between
The Hong Kong lnstitute of Surveyors,
The Hong Kong Construction Association Ltd.,
The Architectural Services Department of the Hong Kong SAR Government,
The Housing Department of the Hong Kong SAR Government,
The Hong Kong lnstitution of Engineers,
The Hong Kong Electrical & Mechanical Contractors'Association,
The Chartered lnstitution of Building Services Engineers, and
The Association of cost Engineers (Hong Kong Region).
ISBN:988-984024-3
All rights reserved. No part of this publication covered by the above copyright may be reproduced, stored in a retrieval system or
transmitted in any form or by any means without the prior permission of the copyright owners.
Preface to Fourth Edition Revised 2018
as an interim solution, a transitional amendment be made to the cunent HKSMM4 before the publication of the new HKSMMS'
Paul Ho (Chairman)
Ellen Lau (Secretary)
William Fong
Leung Kam Moon
Sunny Choi
Tang WaiKwong
Alfred Hon
Raymond Lam
lan Kerswill
Howard Yuen
Lee Fook Pui Billy
CY Chow
November,2017
Preface to Fourth Edition 2005
The Hong Kong Standard Method of Measurement of Building Works, since its first Edition in 1962, has evolved to meet the changing methods of construction
and contracting procedures, through the second edition in 1966 and the third edition in 1979. This fourth edition, initiated by The Royal lnstitution of Chartered
Surveyors (Hong Kong Branch) was subsequently prepared under the auspices of The Hong Kong lnstitute of Surveyors. lt includes sections for Building
Services, which were previously published as a separate document in its first edition in 1993.
The new tabulated format for this fourth edition is based upon the United Kingdom SMM 7, but the Elemental format used in SMM 7 has, by general consent,
not been followed and the Trade Section maintained as being more suitable for the Hong Kong Contracting and Sub-contracting procedures.
It is hoped that the systematic tabulated format will make for easy reference and facilitate the compilation of standard phraseology for libraries of descriptions
and for computerisation.
November,2005
Preface to Third Edition 1979
The Standard Method of Measurement as first published in 1962 and revised in 1966 has provided a standard for the preparation of Bills of Quantities for a large volume of
building works both in the Public and Private sectors; it is incorporated into the Conditions of Contract for Public Works and the Standard Form of Building Contract issued
underthe sanction of The Hong Kong lnstitute of Architects, The Royal lnstitution of Chartered Surveyors (Hong Kong Branch) and The Society of Builders, Hong Kong; it is
recognised by The Royal lnstitution of Chartered Surveyors as a basis for local professional examinations; and it has been translated into Chinese and published as an
ancillary document.
ln view of the advancement in engineering technology and architectural design and the ever increasing sophistication of the construction industry in Hong Kong it was decided
that it was necessary to publish a revised edition.
The Committee appointed to administer revisions to the Standard Method of Measurement invited local quantity surveyors and buiding contractors to submit suggestions for
the improvement and amplification of the document in the light of their experience in its use. All of the suggested alterations were carefully considered, revisions were made
where applicable and new sections such as Demolitions and Alterations, Piling and Caissons, Prestressed Concrete Work and Proprietary Demountable Partitions were
incorporated.
ln addition the opportunity was taken to re-edit the document completely to remove uncertainties in interpretation whilst retaining the original intent.
Whilst an appreciable number of alterations have been made, there are very few which involve fundamental changes in the previously prescribed methods of measurement,
the majority of the changes are to update the document in line with the developments in building methods; to make clear the intention, where there appears to be possibility
of misinterpretation; to improve the style or to remove inconsistencies wilhin the document.
The proposalto change from the present system of measurement of mixed earth and rock excavation to a system where rock is measured separately as an "extra over" item
was discussed at length without resolution, the Committee being divided in its views of the practicality of the separate measurement of rock in the Hong Kong situation. The
item was left for further consideration by the Committee when preparing the next Edition.
The Third Edition will become operative on 1st February 1979 and is post dated accordingly.
ln view of the decision to adopt the use of the Metric System in the construction industry for all new projects initiated after 1st April 1977 the Third Edition has been published
in metric. lt was considered unwarranted to produce an lmperial version as well as the Metric version, although a limiled number of contracts already in various stages of
planning will be based upon lmperial Units after this edition becomes operative.
Bills of euantities prepared after 31st January 1979 in lmperial measurement will be based on this Third Edition, but units of measurement, and any staging or sizes required
to be stated, shall be as detailed in Appendix A.
The Committee expresses its gratitude to the Surveyors and Builders who submitted suggestions for the improvement of the document and to those Specialists who
contributed to the re-drafting of the insurance clauses and the drafting of the piling clauses.
iv
V
The Committee expresses its special gratitude lo the Sub-Committee responsible for carrying out so enthusiastically and so thoroughly the monumental task of translating the
Second Edition into Chinese. The members of this Sub-Committee were :-
B. J. White (Chairman)
K. E. N. Goodbourn
D. G. Levett
John H. P. Lok
Charles C. C. Wong
John W. L. Loo
Other gentlemen who have served on the Committee during the preparation of this edition are :-
H. Miller, the Chairman of the Joint Committee from its inception until his retirement from Hong Kong, R. B. Hanna and Geoffrey M. T. Yeh
September, 1978
Preface to Second Edition 1966
been recognised by The Royal lnstitution of Chartered Surveyors as a basis for local professional examinations.
revisions incorporated is small and of a minor nature and will therefore cause little disturbance in adopting the later edition.
H. Miller (Chairman)
K. E. N. Goodbourn
D. G. Levett
S. K. Ho
W L. Yau
G. Yeh
Mr. R. B. Hanna and Mr. G. Luk kindly served on the committee during the temporary absence of Mr. H. Miller and Mr. W. L. Yau respectively
June, 1966.
VI
Preface to First Edition 1962 vil
The vast development of the building industry in Hong Kong during the past decade has created a wide-spread realisation of the importance and usefulness of Bills of
Quantities. Local conditions have not justified the adoption of the English Standard Method of Measurement, which nevertheless has been followed in a general sense in
Government and private practice and adapted mainly by including most labours with the relative items. Adaptation, however, has been completely arbitrary, depending upon
the discretion or inclination ol the individual surveyor. The Services have for some while had their own "Rules of Measurement" for the Far East which is restricted in general
use and application in Hong Kong. Building Contractors, while becoming more and more "B.Q. conscious", have at the same time been faced with a growing diversity of
methods of measurement which has not only been deleterious to scientific estimating but has in fact resulted in the occurrence of serious errors.
The time, then, has clearly arrived for the introduction of a local standard method of measurement. To this end a meeting of Chartered Quantity Surveyors appointed a Sub-
Commitlee to consider ways and means of procedure. This Sub-Committee was subsequently joined by representatives of the local building industry to form a Joint Committee
which has now produced this First Edition. ln generalthe procedure was as follows:-
(a) the surveyor members prepared a preliminary draft to be handed lrade-bytrade to the builder members for reference to their association for comment or amendment;
(b) the fullcommittee met from time to time to discuss and agree progressively a secondary drafl;
(c) the secondary drafl was distributed to all interested parties for comment and suggestions;
(d) the full committee considered all suggestions received for adoption or rejection and agreed a final draft.
No afiempt has been made to cover every possible item which could arise but rather to produce in the first instance a document ensuring consistency of measurement ol those
items normally encountered in the Colony.
It is recommended by the Joint Committee that this document be reviewed annually to consider any revisions or addenda that may become advisable.
H. Miller (Chairman)
R. B. Hanna
C. R. Holmes
J. A. Lilley
J. V. Moore
K. E. N. Goodbourn (vice C. R. Holmes)
S. K. Ho
W L. Yau
January.1962.
SUMMARY OF CONTENTS
il General Principles 3
ill Preliminaries I
IV Demolitions and Alterations 19
V Piling and Gaissons 25
VI Excavation 45
vil Concrete Works 57
vilt Brickwork and Blockwork 75
IX Drainage (including Underground Pipe Ducts) 81
X Waterproofing 85
XI Stone Works 90
xil Roof Tiling 97
xilt Wood Works 99
XIV lronmongery 117
XV Steel and Metal Works 119
XVI Plastering and Paving 143
XVII Mechanical lnstallations 153
XVIII Electrical lnstallations M
xilt WOOD WORKS 99 0) Metal Profiled Sheet Roof Coverings and Wall Claddings 131
(a) StructuralTimber 99 (k) Fixed Partitions and Demountable Partitions 133
(b) GeneralClauses 100 (l) Toilet Cubicle Partitions and Office Cubicle Partitions and Fittings 135
(c) Flooring 101 (m) Suspended Ceilings 136
(d) Raised Access Floors 102 (n) Windows and Glazed Doors 138
(e) Sheet Linings / Claddings, Timber Suspended Ceilings, (o) Shop Fronts 139
Unframed Trims, lnsulation, Proofing Works and Fire Stops 103 (p) Curtain Walling 141
(f) Profiled Sheet Roof Coverings and Wall Claddings 107 (q) Furniture, Fittings, Shelving, Racks, Playground Equipment etc. 142
(g) Fixed Partitions and Demountable Partitions 108 xvt PLASTERING AND PAVING 143
(h) Toilet Cubicle Partitions, Office Cubicle Partitions and Fittings 1'10 (a) Spatterdash 143
(i) Doors, Hatches, Ventilators and the like and Frames and Linings 111 (b) Lathing and Plasterboard 143
(j) Stairs, Handralls and Balustrades 113 (c) GeneralClauses 144
(k) Furniture, Fittings, Shelving, Racks, Playground Equipmenl etc. 114 (d) ln-situ Surface Finishes and Screeds or Backings 145
(l) Minor Buildings and Structures mainly of Timber Construction 115 (e) Tile and Slab Finishes 148
(m) lnsulation / Proofing Works / Fire Stops 116 (f) Rubber and Plastic Sheet or Carpet Sheet / Tile Finishes
xtv IRONMONGERY 117 and the like 151
XV STEELAND METALWORKS 119 XVII M EC HANICAL I NSTALLATIONS 153
(a) StructuralSteel 1'19 (a) GeneralClauses 153
(b) Linings, Coverings and Claddings 122 (b) Equipment 154
(c) Roofing and Flashings etc. 123 (c) Sanitary and Laboratory Fittings 155
(d) Doors, Gates, Shutters, Grilles and Hatches 124 (d) Pipework 156
(e) Framed Work, Stairs, Handrails and Balustrades 125 (e) Gutters 160
(f) Fencing and Gates 127 (f) Ductwork 161
(g) Minor Buildings and Structures mainly of Metal Construction 128 (g) lnsulation 164
(h) Sundries 129 (h) Protective Coverings and Finishings 166
(i) Raised Access Floors '131 (i) Sundries 169
X
xl
DETAILED CONTENTS (continued)
(i) Earthing, Lightning Protection and Bonding 180 (e) Paperhanging (including Sheet Plastic and Fabric Linings) 199
0) Sundries 181 )o(ll LANDSCAPING 201
xtx COMMUNICATIONS / SECURITY/ CONTROL SYSTEMS 183 (a) Site Clearance and Excavating Works 201
(a) GeneralClauses 183 (b) Turfing and Grass Seeding 201
(b) Equipment 184 (c) Planting 2A2
(c) Distribution and Principal lnterconnections 185 (d) Boulders 203
(d) FinalCircuitPoints 186 (e) Removal of Water 203
(e) Sundries 189 (f) Green Planting Systems 204
(S) Statues, Sculptures and Stone Features 204
I USE OF TABUTATED FORMAT I
1 GENERALLY 4. SUPPLEMENTARYRULES(continued)
1.1 The rules in this document are set out in tables. Each section of the rules comprises information 4.3 Goverage rules draw attention to particular incidental work (both labour and material) which shall
(to be) provided, classilication tables and supplementary rules. be deemed to be included in the appropriate items in a Bill of Quantities to the exlent that such
work is included in the tender documents,
1.2 Horizontal lines divide lhe classilication tables and supplementary rules into zones to which
different rules apply. 4.4 The column headed Supplementary lnformation contains rules governing the information which
shall be given in addition to the information given as a result of the application of rule 3.4.
2. APPLICABILITY OF RULES
4.5 A separate item shall be given for any work which differs from other work with respect to any
matter listed as supplementary information.
2.1 Rules printed above a double line apply to all work following in the Section or Sub-section within
the Section, Other rules apply only to the particular group of items against which they are shown.
5. DESCRIPTIONS
3. CLASSIFICATIONTABLES
5.1 The requirements for information to be provided by the application of rules 3,4 and 4.4 may be
fulfilled by reference to other documents or drawings or published information.
3.1 Within the classification tables where a broken line is shown, the rules given above and below the 5.2 Headings to groups of items in a Bill of Quantities shall be read as part of the descriptions of the
broken line may be used as alternatives,
items to which the headings apply.
3.2 ln referring to columns in classification tables, the measurement unit column has been
5.3 The use of a hyphen between two dimensions in this document or in a Bill of Quantities shall
disregarded. The remaining four columns are herein referred to as the first, second, third and
mean a range of dimensions exceeding the first dimension stated but not exceeding the second.
fourth columns.
3.3 The first column lists the items commonly encountered. Each of these items may have one
qualifying sub.item if there is insufficient capacity in the 2nd, 3rd or 4th columns. The second and 6. CROSS.REFERENCES
third columns list sub-items into which each item or group of items are divided. These sub-items 6.1 Gross-references within the classification tables are given in the form:
may contain one or more descriptive features which are not mutually exclusive. The lists in these
columns are not intended to be exhaustive, The fourth column similarly provides for further sub- Work Work Number Number Number Number
division, and in addition lists further sub-items that may be required to complete the total Section Sub-section from first from second from third from fourth
description of the item, Number Number column. column. column. column.
3.4 Each item description shall identify the work with respect to one sub-item drawn from each of the
first three columns in the classification table and as many of the sub-items in the fourth column
as are applicable to the item. The general principle does not apply to Preliminaries in that it will be Example:
necessary to select as many sub-items as appropriate from each column. Formwork
3,5 Where the number of units is required to be stated in the item, as for example'0300 metres of vil (d).2.1.1
precast concrete lintols, in 258 number" or, in Building Services Works, "1,000 kg of fabricated
Formwork lo soffits of slabs
composite support structures, in 168 numbef, this is stated in the measurement unit column.
slab thickness < 200 mm
horizontal
4. SUPPLEMENTARYRULES
4,1 Measurement rules set out when work shall be measured and the method by which quantities
6.2 An aslerisk within a cross-reference represents all entries in the column in which it appears.
shall be computed.
4.2 Definition rules define the extent and limits of the work represented by a word or expression used
6.3 The digit 0 within a cross-reference represents no entry in the column in which it appears.
in the rules and in a Bill of Quantities prepared in accordance with the rules.
I
N
E
=
=
U:'
-
II GENERAL PRINCIPTES 3
1,1 Bills of Quantities shall fully describe the materials and workmanship and accurately represent 4.2 Each measurement shall be taken to the nearest 10 millimetres (i,e. 5 millimetres and over shall be
the work tO be executed; work which by its nature cannot be accurately measured shall be regarded as 10 miltimetres and less than 5 millimetres shall be disregarded), This rule shall not
described as provisional. Provisional quantities, items or sections shall represent the work to be apply to any dimensions stated in descriptions.
carried out as accurately as is reasonably possible.
1.2 ln orderto define the precise nature and extent ofthe proposed work itwill be necessary to give,
5 SYMBOLS AND ABBREVIATIONS
in descriptions or elsewhere, certain supplementary information including any limits on
tolerances, method, sequence etc. imposed by the designer' 5.1 The following symbols and abbreviations are used in this method of measurement:
m = Metre
2. PRINCIPLES OF MEASUREMENT m2 = Square metre
2.1 This Standard Method of Measurement, whilst aiming at providing uniform units of measurement m3 = Cubic metre
and standard allowances, etc., is a definition of principle rather than an inflexible document. ln mm = Millimetre
particular and exceptional cases the Surveyor is expected to use his discretion and to adopt
ipecial methods, provided the principles of measurement laid down are observed and the nt = Number
intention is made clear to the Estimator' kg = Kilogramme
lf it is in the interest of accurate and practical estimating, he may give more detailed information 2
than is demanded by strict adherence to this document.
= Equal to or greaterihan
> = Greaterthan/exceeding
2.2 The method of measurement for work not covered by the clauses of this Standard Method of
S
Measurement, and also deviations from, or qualifications to, this standard Method of = Equal to or less than/not exceeding
Measurement, shall be stated in the Preambles to the Bills of Quantities or in the description of <
the items to which they apply, The method adopted for work not covered shall, as far as possible,
= Less than
conform to that given in this document for similar work- dia. ' Diameter
min. = Minimum
3. APPLICABILITY OF METHODS OF MEASUREMENT
max. = Maximum
Prov'l = Provisional
3.1 The methods of measurement laid down shall equally apply to the preparation of Bills of
Quantities before the work is commenced and to the measurement of finished work.
6. DRAWINGSANDSPECIFICATION
4. UNITS OF MEASUREMENT 6.1 The Drawings from which the Bills of Quantities have been prepared shall be listed and reference
shall be made to any Specification on which the Bills of Quantities descriptions are based.
4.1 The following units of measurement shall, except as hereinafter provided, be adopted
throughout:- 6.2 lt should be noted that this is a separate requirement to the necessity of listing the Contract
Drawings and, where required by the Contract Document, the Contract Specification, as these
(a) ltems given by weight - kilograms;
may, in due course, be varied,
(b) ltems given cube - cubic metres;
(c) ltems given super - sQu?re metres;
7 UNITS OF BILLING
(d) ltems given run - linear metres;
7.1 Where the unit of billing is the metre, quantities shall be billed to the nearest whole unit.
(e) ltems enumerated - number or sets, as applicable; Fractions of a unit less than half shall be disregarded and all other fractions shall be regarded
(0 ltems given by time may be given in "Days" or "Hours" - if these items are used, they as whole units.
should be defined.
I
7. UNITS OF BILLING (continued) 12. MINIMUM DEDUCTIONS
7.2 Where the unit of billing is the kilogramme, quantities shall be billed to the nearest whole unit. 12.'l Where minimum deductions of voids are dealt with in this document they shall refer only to
Fractions of a unit less than half shall be disregarded and all other fractions shall be regarded as openings or wants detached from the boundaries of the space measured.
whole units, 12.2 Openings and wants caused by projections from the boundary of the space measured shall
7.3 Where the application of this Glause would cause an entire item to be eliminated, such item shall always be the subject of deduction, irrespective of size.
be billed as one whole unit.
7.1 When billing items of variation or remeasurement in adiustment of accounts, omissions and
13. PIPE OR TUBING SIZES
additions of items where the unit of billing is the metre shall be billed to the nearest one tenth of a
whole unit, and where the unit of billing is the kilogramme shall be billed to the nearest whole unit. 13.1 Pipes or tubing (which terms shall be synonymous for these rules of measurement) shall be
Where, however, one whole unit has been billed in conformity with rule 7,3 above, and the original described by their nominal sizes unless otherwise stated'
quantity has been deducted, then the whole unit shall be omitted'
14. DAYWORKS
8. WORKMEASUREDNET 14.1 As Contractors have differing practices in:
8.1 Unless otherwise stated, all work shall be measured net as fixed in its place. (a) the number of hours included in a normal working day;
(b) payment of overtime rates for hours worked in excess of a normal working day;
9. ORDER OF DIMENSIONS (c) payment of overtime rates for Sundays and Labour Holidays'
9.1 ln giving dimensions the order should be consistent, and generally in the sequence of length, some provision should be made in Dayworks Schedules for the differentials to be priced,
width and height. probably as percentage on-costs over the normal working days and normal working hours 08:00
to 18:00 hours. Where 'shift' work is envisaged that should be separately provided for.
ln general, rates may be different for:
10. DESCRIPTIONS OF ITEMS
10.1 Notwithstanding lhese principles of measurement, proprietary items may be measured in a
- Normal Working DaYs
manner appropriate to the manufacturer's tariff or customary practice. - Sundays
10.2 The descriptions of items in Bills of Quantities may refer to other documents or drawings and any - Labour Holidays
reference to such information shall be understood to fulfil any requirements ofthese principles of
and at times:
measurement; alternatively, reference may be made to published information.
- 08;00 to 18:00 hours
- 18:00 to 24:00 hours
11. COSTS HELD TO BE INCLUDED IN ITEMS
- 00:00 to 04:00 hours
11.1 Each item shall, unless otherwise staled, be held to include:
- 04:00 to 08:00 hours
(a) Labour and all costs in connection therewith;
(b) Materials, goods and all costs in connection therewith (e.g. conveyance, delivery,
unloading, storing, returning packings, handling, hoisting, lowering);
(c) Fitting and fixing materials and goods in position;
(d) Use of plant;
(e) All cutting and waste;
(0 Establishment charges, overhead charges and profit.
HK SMM 4R 4
II GENERAT PRINCIPTES
5
(a) The term 'Provisional Sum' shall mean a sum provided for work or for costs which cannot
be entirely foreseen, defined or detailed at lhe time the tendering documents are issued;
F
\o
E
-f
=
=
ct,
-
il GENERAI PRINCIPTES 7
APPENDIX "A" to Section ll . GENERAT PBINCIPLES
Being Classification of Building Services Works. inta Systems for Billing Purposes.
The wordings in this list are for reference only, and actual wording should follow those used in the drawings and specifications.
DISPOSAL SYSTEMS VENTILATIONIAIR.GONDITION ING/HEATING/REFRIGERATION SYSTEMS
Laboratory/lndustrial Waste Drainage Sea Water
Sewage Pumping/Treatment Cooling Water
lncineration Plant Chilled Water
Gondensate Drainage
PLUMBING AND WATER SUPPLY AIR, PETROL, FUEL OILAND GAS SYSTEMS
General Supply/Extract
Sanitary & Laboratory Fittings
Toilet Extract
Soil, Waste, Ventilation and Rainwater Pipes
Kitchen Extract
Gufters
Gar Parking Extract
Potable Water
Smoke ExtracUSmoke Control
Hot and Cold Water
Safety Gabinefl Fume Gupboard Extract
Pressurised Water
Fume Extract
Flushing Water
Anaesthetic Gas Extract
lrrigation
Dust Gollection
Grey Water
Air-Gonditioning
Fountai nsMater Featu res
Window/Wall/Split Type Air-Conditioning Units
Treated/Deionised/Distilled Water
Air Gurtains
Swimming Pool Water Treatment
Air and Gas Supply and Distribution ELECTRICAL SUPPLY/POWER/LIGHTING SYSTEMS
Gompressed/lnstrument Air Electrical Generation Plant
Medical/Laboratory Gas HV Supply/Distribulion/Public Utility Supply
Natural Gas LV tupply/Public Utility Supply
Liquid Petroleum Gas General Lighting and Small Power
Vacuum Extra Low Voltage Supply
Steam DC Supply
Uninterrupted Power Supply
FIRE SERVICES INSTALLATION
Electric Underfloor Heating
Fire Hose Reels
Local Electric Heating Units
Wet Risers
Earthing/Lightning Protection and Bonding
Sprinklers
Deluge
Fire Hydrants
Gas Fire Fighting
Foam Fire Fighting
Fire Detection and Alarm
I I
APPEIIDIX 'rN' to Section ll. GENERAL PRINCIPLES lcontinuedl
Being Classification of Building Seryr'ces Works into Sysferns for Billing Purposes.
The wordings in this list are for reference only, and actual wording should follow those used in the drawings and specifications.
COMMUNICATIONS/SECURITY/CONTROL SYSTEMS
Telecommunications
Staff Paging/Location
Public Address/Sound Amplifi cation
Centralised Dictation
Radio/TVICCTV
Projection
Advertising Display
Glocks
Data Transmission
Access Gontrol
Security Detection and Alarm
Earthing and Bonding
Lightning Protection
Electromagnetic Screening
Building Automation including Central Control
HK SMM 4R I
9
III PRELIMINARIES
(See Secflon ll -- General Pinciples)
3. Site and lnspection 1. The position of the site 1. Aftention drawn to any Item
shall be described with adjacent or abutting
any particulars as to buildings
access and any
limitalions as to the
extent and position of the
working space.
2. Contractors tendering
shall be advised to visit
the site and inspect trial
holes (if any) and shall
be informed where keys
may be obtained, if
required, and where the
drawings and other
documents may be seen.
3. Any stipulation as to use
or disposal of sand,
gravel or rock that may
be found on the site are
stated.
k --1
{al Preliminary Particulars lcontinued}
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGF RULES SUPPLEMENTARY
RULES INFORMATION
4. Division of the 1. Where possession of Item
Works into Sections the site is to be given in
sections at different
dates, particulars shall be
given.
HK SMM 4R r0
ll
ilt PRELIMINARIES
(c) GeneralMatters
Items shall be given in respect of the following unless they are aheady covered in the Schedule of Clause Headings given in accordance with item lll (b) 5.1 hereof.
8. Plant, Tools, Sheds, 1. Plant, toojs, scaffolding Item M.2 Special scaffolding for D.1 ltems listed are not C.1 Works of a temporary
etc. and staging Nominated Sub- exhaustive and are for nature are deemed to
Contractors'and convenience of pricing include rates, fees, and
2. Offices, sheds,
Specialist Conhactors' only. charges related thereto.
messr00ms,
works are measured
accommodation and
under item lll (c) 32.4.1
attendances and other
hereof.
welfare facilities
3. Sanitary conveniences
4. Temporary screens
5. Telephones
F I
(c) General Matters (continued)
1'1. Construction lndustry Payment of the levy Payment will be made Item
Levy legally demandable collectively for the whole
under the Construction Gontract by the
lndustry Council Contractor, but in both
Ordinance the Main Contract and
Sub-Contract
Preliminaries Bills ii
should be stipulated that
the Sub-Contractors will
bear the levies applicable
to the Sub-Contract
works.
HK SMM 4R t2
r3
III PRELIMINARIES
(c) General Matters (continued)
16. Sub-Letting
1. The conditions under Item
which the Conlractor may
sub-let portions of the
Works.
1 7. Persons or Specialist
1. Permission for execution of Item
Contractors engaged by work by persons or
the Employer Specialist Contractors who
may be engaged by the
Employer.
J
(c) GeneralMatters (continued)
HK SMM 4R t4
t5
III PRELIMINARIES
20. Provisional and Prime 1. Provisional and Prime Prov'l Where the mst of
Cost Sums Cost (P.C.) Sums and Sum cartage, unloading,
the method of adjustment storing and returning
packing materials is to be
P.p. included in the sum, it is
Sum so stated.
30. Water '1. WaterfortheWorks, Item lf made available by the C.1 applies.
including that for Employer, details and
Nominated Sub- conditions are stated.
Contractors, Specialist
Contractors employed by
the Employer, statutory
undertakers and utility
companies and any
necessary temporary
plumbing and storage
HKSMM 4R l6
III PRELIMINARIES t7
33. Hoardings, etc. Provision of hoardings, 1. Providing and erecting Item Any special requirements C.1 applies. S.2 Design details, where not
fans, planked footways, are described and the at the discretion of the
2. Taking over existing and
guard rails, gantries, conditions regarding Contractor
repairing as necessary
lighting and the like as advertising rights are
may be required.
3. Maintaining, duration stated.
stated
4. Adapting, details stated
5. Clearing away and
making good all works
disturbed
(c) GeneralMatters(continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
34, Works by Public 1. Works to be canied out
Item
Authorities by Govemment
Departments, statutory
undertakers and utility
companies, e.g.:
(a) Taking up and
relaying the paving of
public roads and
footpaths
(b) Forming permanent
crossings
(c) Connections to fesh and
flush water, gas, electric
mains, telephone, intemet,
diainaqe and he like
35. Temporary Roads 1. Temporary roads and 1. Providing and Item C.1 applies. S.2 applies.
crossings where required constructing
with all relevant 2. Taking over existing and
particulars repairing as necessary
3. Maintaining, duration
stated
4. Adapting, details stated
5. Clearing away and
making good all work
disturbed
36. Drying the Building 1. Provision offuel and Item
attendance for drying the
building, if required
HKSMM 4R
l8
tv DEMOTITIONS AND ATTERATIONS I9
(See Secfibn ll * Qeneral Principles)
(al Demolitions
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
M,1 Works involving the 0.1 Old materials adsing C.1 Giving notice to S.1 $etting aside and
1. Generally
from demolitions shall Government Departments storing on site materials
removal of materials
(a) The location of existing buildings to be demolished shall be shown on tender drawings. containing asbesios, become the property of and utility companies, if remaining the property of
the Contractor unless their installations will be the Employer or those for
(b) Where buildings to be demolished contain prestressed members this shall be stated. toxic, dangerous or other
hazardous materials are otherwise stated. affected, and for the re-use
each given separately disconnection of services S.2 Meihod of operation
under a heading. are deemed to be
where by specmc means
included in the rates.
M.2 Where old materials S.3 Employer's
which have become the C.2 The rates for works
restrictions on methods
property of the Contractor involving ihe removal of
of disposal of materials
as stated in D-1. hereof asbestos, toxic, dangerous
are permitted to be used or other hazardous S.4 Method of temporary
in work are measured as materials are deemed to supports and scaffolding
new, they are so include the provision where of specific means
described. No adjustment and subsequent removal S.5 Employer's
is made to the measured of protective screens and restrictions or
quantities of or rates for enclosures, unless requirements in
new work in which such separately measured, and sequence of demolitions
old materials are used. provision of protective
measures for workmen,
M.3 Shoring and the public and adjoining
scaffolding incidental to properties.
demolftions are given in
the descriptions of the C.3 The rates for clearing
items. Other shoring, e.g. away old materials and
io old buildings left debris containing asbestos
standing is given in or asbestos producis,
accordance with item toxic, dangerous or other
lV (d).1 hereof. hazardous materials are
deemed to inc.lude
their being deposited in a
dump site approved for
the purpose.
t-
I
(a) Demolitions (continued)
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2. Demolishing Description of the The level to which Item 1. Materials remaining the M.4 Only temporarily
individual struclures structure given, stating structures are to be property of the diverting, maintaining or
the overall dimensions, demolished stated (e.9. Employer sealing off existing
3. Demolishing parts of
number of storeys, down io the top surface 2. Materials for re-use
services is measured
structures
nature of the general of concrete at the lowest under this rule.
4. Clearing the site of all construction and any floor level).
3. Making good structures
structures other relevant details 4. Leaving parts of existing
walls temporarily in
position to act as
buttresses
5. Temporarily diverting,
maintaining or sealing
off existing services
6. Toxic/hazardous
materials, type stated
HK SMM 4R 20
tv DEMOTITIONS AND ATTERATIONS 21
{bt Alterations
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 For Demolitions D.1 Old materials arising C.l, C.2 and C.3 for S.1 to S.5 for Demolitions
(a) applies equally to this from alterations shalI Demolitions apply equally apply equally to this Sub-
The scope and location of the work relative to the existing layout, indicating the existing buildings, shall
Sub-section. become the property of to this Sub-section. section.
be shown on tender drawings.
the Contractor unless
(b) Where buildings in which structural alterations are required contain prestressed members, this shall be
M.2 Alterations works C.4 Shoring, scaffolding,
otherwise stated. Old
which the Surveyor working platforms and
staled, materials permifted to be
considers would be most temp0rary supports
used in work measured
conveniently priced on incidental to alterations
as new are so described.
the site are grouped are deemed to be included
No adjustment is made to
together and given under in the items.
the measured quantities
an appropriate sub-
heading.
of or rates for new work C.5 Alterations works are
in which such old deemed to include all
M.3 Alterations works are materials are used. new fixing orjointing
described or grouped materials required.
according to location.
D.2 Location is stated
relative to existing
M.4 Shoring to old building.
buildings etc. left standing
is given in accordance
with Sub-section (d)
hereof.
3. Blocking up, or 1. Size of the opening and 1. Extending finishings Item 1. Taking outthresholds, M.5 applies
partially blocking up the nature and thickness and making good all lintols, arches, cills and
openings in old of the new work stated, works disturbed are given the like, bonding or
structures partially blocked up in the description. otherwise securing the
openings are fully new work to the old
described. structure is given in the
description.
I
(b) Alterations (continued)
CIASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
4. Toxic/hazardous
material, type stated
6, Taking out existing Detailed description of Item '1. Details of making good M.7 Altematively the
windows or doors and replacement doors or finishes and finishings replacement doors and
replacing with new windows windows may be
measured in detail in
accordance with the
appropriate rules.
7. Hacking out existing 1. Kind, quality and Item 1. If existing beads are to M.8 Altematively the C.6 Re-glazing is deemed to
door or window glass thickness of replacement be re-used, this is stated. replacement glazing may include:
and replacing with new glass and method of be measured in (a) Raking and curved
glazing accordance with Section cutting
XX Glazing.
(b) Putty or glazing
8. Removing finishes Item compounds
HK SMM 4R 22
IV DEMOTITIONS AND ATTERATIONS 23
(dl Shodns
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Shoring 'L Position and type of Item 1. Providing and erecting D.1 Shoring is other than C.1 Obtaining licences S.1 Design details, where
shoring stated, and the temporary support and paying fees and not at the discretion of
2. Taking over existing
nature of the structure to incidental to demolitions providing all necessary the Contractor
shoring and repair as
be shored with sufficient or alterations, wedges, cramps,
necessary
details for identification fastenings and bolts,
stated 3. Maintaining, duration welding and painting are
stated deemed to be included.
4. Adapting, details stated
5. Clearing away and
making good all works
disturbed
6. Cutting holes in the
structure, details stated
I
\t
ol
CE
-i
=
=
ui)
-
25
V PILING AND CAISSONS
(See Secfion // - General Pinciples)
2. Supplying, handling, 1. The design lengih, size m2 1. Raking piles measured M.1 Measured the area in D.1 The design length is C.1 Lengthening piles to
transpoding and of the cross-section of seperately plane (not developed) that specifically required achieve the design length
pitching steel sheet each pile and the elevation along the centre by the designer. is deemed to be included.
piling thickness, substance, line of the piling
section modulus or M.2 Separate items are
manufacturer's catalogue given for piles of each
reference stated design length.
3. Driving steel sheet 1. Size and cross-section m2 M.3 Measured from C.2 This work is deemed
piling of each pile and the formation level of the to include:
thickness, section ground to the boftom (a) lnitial trenching,
modulus or manufacturer's edge of the piling when strutting and waling for
catalogue reference driven and in plane (not driving, and any jointing
stated developed) elevation required to extend piling
along the centre line of vertically
the piling (b) Movement of piling
frames into position and
about the site, any
necessary excavation or
filling required to place the
frames,raising or lowering
the frames and any
staging, barges or the like
required to support the
frames
(c) Redriving or
intermittent driving
necessitated by
lengthening piles, or by
the removal of
obstructions under piles
or other causes including
moving and repositioning
the piling frame
HK SMM 4B 26
V PILING AND CAISSONS 27
6. Cutting or burning Size of the cross-section m M.5 Measured in plane (not C.3 Any necessary S.2 Requirements in respect of
through steel sheet of each pile and the developed) elevation excavation and disposal ownership and disposal of
piling thickness, substance, along the centre line of are deemed to be offcuts
section modulus or the piling included.
manufacturer's catalogue
reference staied
8. Withdrawing steel Size of the cross-section 112 M.6 Measured from S.3 Requirements in respect of
sheet piling of each pile and the formation level of the ownership and disposal of
thickness, substance, ground to the bottom withdrawn piles
section modulus or edge of the piling and in
manufacturer's catalogue plane (not developed)
reference stated elevation along the
centre line of the piling
9. Strutting and shoring 1. The length and height of Item M.7 Altematively such S.4 Any special requirements
to steel sheet piling the piling face to be strutting and shoring may
during subsequent upheld be measured in detail.
excavation and
foundation work
1 0. Pre-boring the pile 1. Size ofthe cross-section 1. Depth of individual bores m M.B Pre-boring is only C.4 This work is deemed to S.5 Materials for filling
holes of each pile stated < 10.00 m (nr measured where it is include:
I I
(c) Precast Goncrete Piles
(See Sectlon V (a) Piling General)
stated)
8, Pre-boring the pile holes 1. Size ofthe cross-section of 1. Depth of individual bores M.2 Pre-boring is only C.2 This work is deemed to S.2 Materials for filling
each pile stated < 10.00 m measured where it is include:
HK SMM 4R 28
V PITING AND CAISSONS 29
(cl PrecastGoncretePiles(continuedf
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
9. Driving piles m 1. Raking piles measured M.4 Measured from the C.4 This work is deemed
(nr separately and degree of point of entry to the shoe to include:
stated) rake stated point when driven (a) Strutting and bracing
for driving, use of driving
caps, and any jointing and
connections required to
extend piles, and the
consequent delay to
driving
(b) Movement of piling
frames into position and
about the site, any
necessary excavation or
filling required to place the
frames, raising or lowering
the frames and any
staging, barges or the like
required to support the
frames
(c) Re-driving or
intermittent driving
necessitated by
lengthening piles, or by
the removal of obshuctions
under piles or other
causes including moving
and repositioning the
piling frame
10. Dollying piles below 1. Size of piles stated m 1. Raking piles measured C.5 The rates are deemed
ground (nr separately and degree of to include provision
siated ) rake stated and use of dollies.
HK SMM 4R 30
V PITING AND CAISSONS 3r
TRIAL PILES
12. Trial piles M.5 Trial piles are C.4 Movement of piling frames S.3 lf retention on site of
measured in accordance into position and about the site, Tdal Pile Equipment is
with the rules for any necessary excavation or required this is stated.
production piles. filling required to place the
frames, raising or lowering the
frames and any staging, barges
or the like required to support
the frames, are deemed to be
included"
(dt Gast ln.Situ Goncrete Piles in Driven Gasings (continuedl
TEST LOADING PILES
HK SMM 4R 32
V PILING AND CAISSONS 33
(e) Bored Piles
(See Secfion V (a) Piling Genenl)
2. Boring the pile holes 1 . Size of bore cross-section 1. Depth of individual bores m Raking piles measured M.1 Measured from the point C.1 This work is deemed to S.1 Requirements regarding
stated < (nt sepamtely and degree of of entry into ground to include: disposal of the spoil
10.00 m
rake stated bottom of bore (a) Movement of piling
2. Depth of individual bores > stated)
'10.00 m in stages of 5.00 m frames into position and
about the site, any
necessary excavation or
filling required to place the
frames, raising or lowering
the frames and any staging,
barges or the like required
to support the frames
(b) Re-boring or intermiftent
boring necessitated by the
removal of obstructions
under piles or other causes,
including moving and
repositioning the piling
frame
(c) Provision of temporary
casings to shaft bores
including sinking and
withdnwal operations
(d) Additional excavation
required to accommodate
temporary casings and
permanent linings (if
specified) and the
consequent disposal of
additional excavated
material
----l
r
(e) Bored Piles (continued)
4. Concrete filling 1. Mix of concrete and size of m M.3 Measured from the boitom C.3 This work is deemed to
bore cross-section stated (nr of the bore to the cut-off include:
HK SMM 4R 34
V PILING AND CAISSONS 35
TRIAL PILES
9. Trial piles M.6 Trial piles are C.6 Movement of piling S.5 lf retention on site of
measured in accordance frames into position and Trial Pile Equipment is
with the rules for about the site, any required this is stated.
production piles. necessary excavation or
filling required to place the
frames, raising or lowering
the frames and any
staging, barges or the like
required to support the
frames, are deemed to be
included in the item.
r-
(e) Bored Piles (continued)
TESTING
10. Test loading of piles 1. Type of pile and test load to nr 1. First test loading C.7 Temporary pile caps and
be applied stated provision of all andrors,
2. Subsequent test loadings
platforms, loading materials
and the like are deemed to
be included.
l l, Sonic test 1. Sonictube 1. Size, thickness and material M.7 Measured from cutoff C.8 Grouting up holes upon S.6 Grouting materials
stated level to toe of pile mmpletion of test is
deemed to be included,
2. Sonictest nr M.8 Measured the number of
piles tested
12. Concrete coring test 1. Diameter of core stated m 1 . Starting level of drilling M.9 Measured the net length C.9 This work is deemed to S.6 applies.
below commencement level cored include:
(nr
stated) (a) Movement of the
equipment about the site
(b) Extracting, labelling,
boxing and transporting
cores to a testing laboratory
14. Pre-drilling 1. Diameter of borehole stated 1. Drilling depth measured in m 1. Commencing level of drilling M.'10 Drilling depth measured C.9 applies. S.6 applies.
stages of 1 5.00 m (nr stated from the mmmencing level
to the specified length
stated)
below the rock head
15. Post construction proof Commencing level of drilling l\4.11 Drilling depth measured C.9 applies. S.6 applies.
drilling below the speciiied coring from the commencing level C.10 This work is deemed to S.7 Diameter, length and
tube stated to the specified length further include coring tubes. material of the mring tube
below the concrete and rock
interface
HK SMM 4R 36
V PILING AND CAISSONS 37
(0 Steel Piles
(See Secfion V (a) Piling General)
4. Driving piles 1. Size of piles stated m M.1 Driving is measured C.1 This work is deemed
(nr of from the point of entry to to include:
piles the point when driven. (a) Strutting and bracing
stated) for drMng, use of driving
caps, and anyjointing and
connections required to
extend the piles, together
with any recoating with
bitumen, and the
consequent delay to driving
(b) Movementofpiling
frames into position and
about the site, any
necessary excavation or
filling required to place the
frames, raising or lowering
the frames and any staging,
barges or the like required
to support the frames
(c) Redriving or intermiftent
driving necessitated by
lengthening piles, or by the
removal of obstructions
under piles or other causes
including moving and
repositioning the piling
frame
(f) Steel Piles (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
5. Dollying piles below 1. Size of piles stated m Raking piles measured C.2 This work is deemed to
ground (nr separately and degree of include provision and use of
rake stated dollies.
stated)
8. Cutting off heads of piles Size of the cross-section of nr S.1 Requirements in respect of
to required levels each pile and the weight, ownership and disposal of
thickness, substance, offcuts shall be stated and
section modulus or provision made for credits
manufacturers' catalogue
reference stated
9. Pre-boring the pile holes L Size of piles stated 1. Depth of individual bores m Raking piles measured M.3 Pre-boring is measured C.3 This work is deemed to S.2 Materials for filling
s 10.00 m (nr separately and degree of only where it is specifically include:
rake stated required. (a) Movement of boring rigs
2. Depth of individual bores stated)
> 10.00 m in stages of M.4 Measured from the point into position and about the
5.00 m of entry into ground to site, any necessary
bottom of bore excavation or filling required
to place the rigs, raising or
lowering the rigs and any
staging, barges or the like
required to support the rigs
(b) Drilling to required
depths
(c) Filling voids between
sides of piles and bores
with approved materials
HK SMM 4R 38
V PITING AND CAISSONS 39
(f) Steel Piles (continued)
TRIAL PILES
10. Trial piles M.5 Trial piles are C.4 Movement of piling S.4 lf retention on site of Trial
measured in acmrdance frames into position and Pile Equipment is required,
with the rules for about the site, any this is stated.
production piles. necessary.excavation or
filling required to place
the frames, raising or
lowering the frames and
any staging, barges or
the like required to
support the frames, are
deemed to be included.
I 1. Test loading of piles 1. Type of pile and test load nr 1. Firsttest loading C.5 Temporary pile caps
to be applied stated 2. Subsequenttest loadings and provision of all
anchors, platforms,
loading materials and the
like are deemed to be
included.
12. Pre-drilling 1. Diameter of borehole 1. Drilling depth measured m '1. Commencing level of M.6 Drilling depth measured C.6 This work is deemed to S.5 Materials for filling or
stated in stages of 1 5.00 m drilling stated from the commencing include: grouting
13. Post construction (nr
level to the specified (a) Movement of the
proof drilling stated)
length below the rock equipment about the site
head
(b) Extracting, labelling,
boxing and transporting
cores to a testing
laboratory
(c) Any Iaboratory tests
and preparation of test
report as specified
(d) Filling up holes upon
completion of test
V PITING AND CAISSONS
0l Caissons
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES JUPPLEMENTARY
RULES NFORMATION
CAISSON EXCAVATION
HK SMM 4R 40
V PITING AND CAISSONS 4l
CAISSON LININGS
5. Caisson linings 1. Fully described with the m M.3 Linings are measured
minimum iniernal from the level at which
diameter stated shaft excavation
commences.
6. Bottom kerbs '1. Fully described nr
7. Steel rings at bottom 1. Fully described nr
8. Linings to enlarged 1. Fully described nr
bases
9. Breaking up the 1. Minimum internal m C"3 Any necessary
lining above finished diameter of the lining (nr excavation and clearing
casting level of the stated stated) away are deemed to be
concrete core included in the item.
cArssoN coREs
I 0. Concrele cores 1. Minimum intemal 1. Any particular m M.4 Measured from cut- C.4 Dewatering each shaft
diameter of the lining, the requirements in placing, off level to founding level prior to concreting and
composiiion and mix (or pouring or vibrating stated keeping it free of water
strength) requirements of during concreting are
the concrete stated deemed to be included in
the item.
11. ltems measured as 1. Enlarged bases 1. Size and depth at which nr
extra over concrete they occur stated
cores
{sl Gaissons (continuedl
REINFORCEMENT
14. Test loading of 1. Type of caisson and test nr 1. First test loading C.6 Temporary caisson
caissons load to be applied stated caps and provision of all
2. Subsequent test anchors, platforms,
loadings
loading materials and the
like are deemed to be
included in the item.
lT.Drilling test cores in 1. Diameter of core and m M.6 Depths measured in C.8 This work is deemed
concrete caissons or grouting requirements (nr siages of 1 5.00 m to include:
rock under stated stated) (a) Movement of the
equipmeni about the site
(b) Extracting, labelling,
boxing and transporting
cores to a testing
laboratory
HK SMM 4R 42
43
V PILING AND CAISSONS
m Walli
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
'1. Generally
(a) Ground level in relation to high and low water tables and Principal Datum
(b) Soil investigation reports, nature ofstrata and details ofany bore holes
(c) The various levels from which work is expected to begin
(d) lrregular ground is so described
(e) Conditions under which Contractors will be permitted to carry out their own soil investigations during the tender period
(f) Details of special provisions in respect of noise suppression, noisy working and time limitations other than statutory
requirements
(g) Any particular requirement regarding phasing or sequence of working
3. Excavation and 1. Thickness ofwall stated 1. Maximum depth stated J13 M.1 The volume of C.2 This work is deemed to S.1 Details of support fluid
disposal excavation and disposal include:
S.2 Limitations on mehod of
is calculated using the (a) Excavating through
disposal
nominal lengths and any materials except
depths of the walls. The bedrock
depths are taken from (b) The use of support
the commencing surface. fluid to uphold sides of
excavalion
(c) Removal and disposal
of all types of excavated
materials and any
contaminated slurry
(d) Any over-excavation
to be filled with material
as specified
I I
I
Wall
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
C.3 This work is deemed to
4. ltems extra over 1. Breaking out bedrock 63
include any over-
excavation
excavation to be filled
with material as
M.2 Measured from work is deemed S.3 Materials and mix details
5. Walls 1. Concrete 1. Thickness ofwall stated 1.113
6. Reinforcement
measured in acmrdance
with the rules for
reinforced concrete in
Section Vll Concrete
Works.
C.4 This work is deemed to
7. Cutting off to specified 1. Thickness of wall stated m
include provision and
level
filling of working space
and
8. Trimming and cleaning 1. Details stated 912
face of wall
M.4 Waterproof joints are
9. Waterproof joints 1. Type and method stated m
only measured where
they are specifically
10. Guide walls 1. Limitations on design M.5 The lengths measured C.5 Excavation, disposal, S.5 Limitations on methods of
1. One side
for guide walls are those support, concrete, disposal
2. Both sides and construction stated
of the diaphragm walls. reinforcement, formwork
and the like are deemed
to be included.
C.6 Removal and disposal
of guide walls and any
consequent excavation,
backfilling or removal are
deemed to be included.
HK SMM 4R 44
V PILING AND CAISSONS 44cl
(i) Rock-Socketed Steel H-Piles
(See Secflon V (a) Piling General)
3. Permanent linings 1. Size, thickness and material m M.2 Measured from the C.2 This work is deemed to S.2 Backfilling materials
stated (nr designed level include:
4. Supplying, handling, Size of the cross-section of M.3 Measured from the bottom C.3 Any pile length required
transporting, pitching and each pile and the weight, of the bore to the cut-off above the culoff level is
installing steel piles thickness, substance, level of the pile deemed to be included.
section modulus or
manufacturers' catalog ue
reference stated
5. Grout filling 1. Mix of grout and cross- M.3 applies. C.4 Any grout filling required
section of bores stated above the cut-off level is
deemed to be included.
7. Cufting off heads of piles 1. Size of the cross section of nr C.5 Cufting through steel piles S.3 Requirements in respect of
to required levels each pile stated and disposal of debris are ownership and disposal of
deemed to be included. offcuts shall be stated and
provision made for credits.
HK SMM 4R 44b
V PILING AND CAISSONS 44c
(i) Rock-Socketed Steel H-Piles (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
8. Pre-drilling 1 . Diameter of borehole stated 1. Drilling depth measured in m 1 . Commencing level of drilling M.5 Drilling deph measured C.6 This work is deemed to S.4 Filling materials
stages of 15.00 m stated from the commencing level include:
9. Post construction proof (nr
to the specified length (a) Movement of the
drilling stated)
below the rock head equipment about the site
(b) Exhaciing, labelling,
boxing and transporting
cores to a testing laboratory
(c) Any laboratory tests and
preparation of test report as
specified
(d) Filling up holes upon
completion of test
10. Trial piles M.6 Trial piles are measured in C.1 applies. S.5 lf retention on site of Trial
accordance with the rules Pile Equipment is required,
for production piles. this is stated.
'l 1. Test loading of piles 1. Type of pile and test load to 1. Firsttest loading nr C.7 Temporary pile caps and
be applied stated provision of all anchors,
2. Subsequenttest loadings
platforms, loading materials
and the like are deemed to
be included.
0) Mini-Piles
(See Seclion V (a) Piling Genenl)
2. Boring the pile holes 1. Size of bore cross-section 1. Depth of individual bores m Raking piles measured l\/.1 Measured from the point C.'l This work is deemed to S.1 Requirements regarding
stated < 10.00 m (nr separately and degree of of entry into ground to include: disposal of the spoil
rake stated bottom of bore
2. Depth of individual bores stated) (a) Movement of boring rigs
> 1 0.00 m in stages of into position and about the
5.00 m site, any necessary
excavation or filling required
to place the rigs, raising or
lowering the rigs and any
staging, barges or the like
required to support the rigs
(b) Drilling to required
depths
(c) Additional excavation
required to acmmmodate
permanent casings and the
consequent disposal of
additional excavated
material
3. Permanent casings 1. Size, thickness and material M.2 Measured from the C.2 This work is deemed to S.2 Backfi lling matenals
stated designed level include:
(a) Fabricating
4. Grout filling 1. Mix of groul and cross- M.3 Measured from the bottom C.3 This work is deemed to
section of bores stated of the bore to the cut-off include any filling required
level of the pile above culoff levels.
HK SMM 4R 44d
44e
v PILING AND CAISSONS
0) Mini-Piles (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
8. Cutting off heads of piles 1. Size of piles stated 1. Length s 1.00 m nr C.4 Cutting through S.3 Requirements for
reinforcement and disposal preparation of cut surfaces,
to required levels 2" Length > 1.00 m in further
of debrls are deemed to be cleaning, straightening and
stages of 1.50 m
included. bending projecting
reinforcement and any
necessary protection
9. Pre'drilling '1. Diameter of borehole stated 1. Drilling depth measured in m 1. Commencing level of drilling M.6 Drilling depth measured C.5 This work is deemed to S.4 Filling materials
stages of 15.00 m stated from the commencing level include:
10. Post construction proof (nr
to the specified length (a) Movement of the
drilling stated)
below the rock head equipment about the site
(b) Extracting, labelling,
boxing and transporting
cores to a testing laboratory
(c) Any laboratory tests and
preparation of test report as
specified
(d) Filling up holes upon
completion of test
a
0) Mini-Piles (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
11. Trial piles M.7 Trial piles are measured in C.1 applies. S.5 lf retention on site of Trial
acmrdance with the rules Pile Equipment is required
for production piles. this is stated.
12. Test loading of piles 1. Type of pile and test load to nr 1. Firsttestloading C.6 Temporary pile caps and
be applied stated provision of all anchors,
2. Subsequent test loadings
platforms, loading materials
and the like are deemed to
be included.
HK SMM 4R 441
V PILING AND CAISSONS Mg
(k) Pressure Grouting
(See Secfion V (a) Piling General)
Providing and Item M.1 Grouting work is C.1 This work is deemed to
assembling the measured only where it is include:
equipment on the Site specifically required. (a) Providing sufficient
and the subsequent numbers of drilling rigs,
dismantling and pumps, mixers and other
removal equipment
(b) Provision,
maintenance and
removal of all temporary
works required as access
and working platforms
(c) Associated clearance
and reinstatement
(d) Diversion of
watermurses
(e) Setting up plant and
other equipment, and
moving between holes
(f) Removing plant and
other equipment off site
r (k) Pressure Grouting (continued)
CLASSIFICATION MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
TABLE RULES INFORMATION
2, Drilling grout holes 1. Vertically downwards 1. Drilling deph measured in m 1. Commencing level of M.2 Drilling depth measured C.2 This work is deemed to
stages of 15.00 m drilling stated from the commencing level indude:
2. Downwards at an angle 0o (nr
to the specified depth (a) Determining location of
- 450 to the vertical stated)
3. Horizontally or downwards
underground utilities and
obstructions before drilling
at an angle less than 450 to
commences, and
the horizontal
modif,ing drilling paftern to
4. Upwards atan angle 0o- take into account locations
45o to he horizontal of utilities and obstructions
5. Upwards at an angle less (b) Ddlling in any materials
than 45o to the vertical including soft material and
rock or artificial hard
materials induding the
provision of water,
mmpressed air and drilling
fluids
(c) Lining to grout holes
(d) Redrilling holes and
grouting tubes and flushing
(e) Disposal of any
excavated materials
(f) Single or multiple water
pressure tests as specified
(g) Temporary protection
of holes and subsequent
removal
(h) Reinstatement of
surfaces
HKSMM 4R Mh
441
V PILING AND CAISSONS
(k) Pressure Grouting (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
3. Grouting materials and 1. Cement grout kg M.3 Grouting malerial C.3 This work is deemed to
injection 2. Silicate based chemical measured by the dry include:
grout weight of the cement, (a) Trial mixes and
chemical or other grouting trials
3. Other grouting materials
material in the grout
stated (b) Mixing and injection
solution
of groul according to the
M.4 Altematively, grouting specified methods
materials and injection
(c) Water, sand, packers
are measured as an
item, stating the
and other materials
approximate grouting (d) Recording and
area in elevation (in mz). monitoring equipment
and checking accuracy of
such equipment
(e) All precautionary
measures to avoid any
disturbances or damages
to existing adjoining
structures and services
(f) Preparation and
submission of
monitoring, testing and
grouting records
-I
E-
vt EXCAVATION 45
(See Secllon II General Principles)
-
(al Excavation
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally S.1 Special requirements
in respect of upholding
Where practicable lhe nature of the soil shall be described and attention drawn to any existing trial holes.
and maintaining the
sides of earthworks
S.2 Whether or not
blasting is permitted and
any special restrictions
regarding the same given
S-3 Any requiremenis in
respect of phasing or
sequencing of excavation
2, Site clearance 1. Cutting down trees 1. Girth 0.60 - 0.90 m nr M.1 Tree girths are C.'1 This work is deemed S.4 Filling materials
measured at a height of to include:
2. Cutting down trees 2. Girth in further stages
1"00 m above ground.
which are not in an open of 0.30 m (a) Grubbing up roots
site area or are in an area
(b) Disposal of materials
without vehicular access,
details stated (c) Filling voids
3. Removal of existing tree 1. Described nr
stumps, where trees have
been cut down by others
4. Clearing site of tall 1. Approximaie area stated Item
grass, shrubs, bushes,
and the like and trees s
0.60 m girth
5. Cutting turf to be 1. Average depth stated m2 1. Method ofstoring and
preserved preservation and location
where turf is required to
be stacked stated.
6. Stripping top soil for m2 1. Method ofstorage and
preservation location stated
I
(a) Excavation(continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2. Site clearance 7. Disposal of existing spoil 1. Removal from site to a Item C.2 This work is deemed to
(continued) heaps or rubbish dumps specified dumping area include:
left by previous provided by Employer (a) Excavating from the
contractors 2. Removed from site to a spoil heaps
tip provided by (b) All multi-handling to
Contractor and from temporary spoil
heaps as and if
necessary
(c) Transport to specified
dump area; or provision
of, and transport to
shoot, dump or tip
3. Excavating 1. Surface excavation s '1. Average depth stated ffi M.2 ln measurement of D.1 The term planking and C.3 (a) This work is deemed
0.20 m in average depth excavation, an additional strufting means to include:
allowance for working everything requisite to (i) Excavating in any
space is included as uphold the face of ground enmuntered
follows: excavation other than including boulders and
(a) 0.25 m from the face shoring as required to be solid rock, and in any
measured under item (a) position in level or
of concrete requiring
formwork where the 5 hereof and covers the sloping
formwork does not exceed Contractor's respon-
(ii) Taking necessary
sibility for upholding and
0.60 m in height precautions to avoid
maintaining the sides of
(b) 0.60 m from the face damage lo tops of
earlhwork by whatever
of mncrete requiring means considered foundations and other
formwork where the works constructed
necessary.
formwork exceeds 0.60 m (iii) Excavating according
in height and the bottom to specifed profiles and
of the formwork exceeds stages
0.60 m below the starting
(iv) Grubbing up old roots
level of the excavation
and removing disused
(c) 0.60 m from the
cables, drain pipes,
finished face ofwork gullies, manholes and
below ground level where the like and sealing
externally applied damp- connections
proof coverings or
(v) Gefting out excavated
protection walls are
materials by any means
required or where the
necessary
method of construction
requires workmen to (vi) All levelling or grading
operate from the outside and ramming bottoms
(vii) Trimming sides
(To be Continued)
HK SMM 4R 45
VI EXCAVATION 46o
HK SMM 4R
)
t
E-.
VI EXCAVATION 47
(a) Excavation (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
3. Excavating (continued) 2. Excavation to reduce 63 M.2,M.2a, M.3 and M.4 D.1 applies. C.3 applies.
levels over site average apply.
depth stated if < 0.20 m
4. Basements and similar 1. ln successive stages of p3 1. Commencing levels M.2,M.2a, M.3 and M.4
excavations 1.50 m stated apply.
M.5 Basements and similar
excavations are
measured to the outside
of the foundations,
subject to M.2 (working
space clause) and M.2(a)
hereof; existing voids are
deducted.
t ../
{al Excavationlcontinuedl
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
3. Excavating 9. Trenches for curbs and 1. Average depth stated in m 1. Trenches forcurbs and D.1 applies. C.3 and C.4 apply S.4 applies.
(continued) the like multiples of 0.25 m the like without beds, and
those to be laid on beds
2. Size ofcurbs and the
are each measured
like stated
separately, and
commencing levels
stated.
10. Trenches for service 1. Average depth stated in m 1. Trenches for pipes NOTE: Trenches for drain
pipes, cables and the like multiples of 0.25 m withoui beds, and those to pipes and for pipe ducts
be laid on beds are each are measured under
2.Pipes or cables 3 55
measured separately and Section lX Drainage.
mm diameter
commencing levels
3. Pipes or cables > 55 stated.
mm and < 110 mm
diameter
4.Pipes or cables > 110
mm diameter, sizes statec
HK SMM 4R 48
vt EXCAVATION 49
5. Temporary shoring and For sides of excavation 1. Minimum and maximum Item C.6 This work is deemed to S.4 applies.
supports into banks for retaining face heights above include any extra
walls or similar reduced level and excavation required
constructions, with face approximate overall therefor and for the
height exceeding 1.50 m length stated subsequent backfilling.
6. Disposal 1. Of excavated material 1. Deposited on site Jp3 1. Specified locations, M.4 applies. C.7 The work is deemed to
details stated include all multi-handling
2. Ofexistingspoil heaps or
to and from temporary
rubbish dumps left by
spoil heaps as and if
previous contractors
necessary.
2. Removed from site to a 63 1. Dumping area stated C"8 This work is deemed to
dumping area provided include:
by Employer (a) All multi-handling to
and from temporary spoil
heaps as and if
necessary
(b) Transport to specified
dumping area
/
(a) Excavation(continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
7. Backfilling to 1. Arising from excavation 63 1. Selected, details stated M.6 Filling into excavations C.7 applies. S.5 Method of compaction
excavation 2. Obtained from materials 2. Special filling materials,
is measured as equal to
C.10 This work is deemed 5.6 lf deposited and
the void to be filled. compacted in layers this is
on site details stated to include:
3. Obtained from speciiied 3. Top soil (a) Additional material stated, giving thickness of
off-siie area layers.
4. Fabricated. details stated required to allow for
4. To be provided by compaction
Contractor from his own (b) Filling in layers,
s0urces spreading, levelling,
watering and mmpacting
8. Filling to make up rr13 M.7 Filling to make up levels
(c) Temporary retaining
levels or for forming or for forming
boards to edges and
embankments or embankments or tenaces
slopes
terraces is measured after
compaction. (d) Any necessary
handpacking at
9. Filling into planters and p13
steppings, thickening
the like, positions under slabs, behind walls
stated if not at ground and similar positions
level
'10. Hardcore or granular 1. < 0.30 m in depth 1. Beds p2 M.7 applies. S.5 and 5.6 apply.
filling 2. Handpacked vertical S.7 Kind and quality of materials
2. > 0.30 m in depth, 1J13 M.B Thickness of beds and
beds
(where part exceeds 0.30 filling to make up levels
m in depth, the whole is 3. Handpacked beds etc. is measured after
given cube) sloping > 150 from the compaction.
horizontal
HK SMM 4R 50
VI EXCAVATION 5l
(al Excavation(continuedf
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
13. Surface treatments 1. Formation of slopes m2
in filling
2. Formation of slopes m2
to cuttings
3. Trimming exposed m2 S.B Tolerances
surfaces of rock to
produce fair face
4. Preparation of existing 1. Method of preparation m2
ground or subsoil areas stated
for application of top soil
for turfing
5. Consolidation of sub- m2 S.9 Method of compaction
grade for roads and
pavings
6. Herbicide, selective m2
weed killer or insecticide
treatments
14. Turfing and grass M.9 Turfing and grass
seeding seeding work is measured
in accordance with
Section XXll (b).
15. Chunam surfacing 1. Sloping < 1 in 7 1. Details of mix and m2 C.10 This work is deemed
thickness to be applied to include any necessary
2. Sloping > 1 in 7 m2
stated scaffolding and hoisting
materials up and down
3. Formation of weep 1. Fully described nr
slopes.
holes
16. Sprayed concrete 1. Thickness stated m2 M.10 Steel mesh
surfacing to slopes reinforcement may be
included in the description.
M.11 Alternatively steel
mesh reinforcement may
be measured separately
in accordance with
Section Vll (c).5.
(al Exeavation (continuedf
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
17 Cufting or burning 1. Thickness stated M.12 Measured in
through steel sheet accordance with Section
piling to remove lhat not v (b).6
required for permanent
ryorks
18. Withdrawing steel M"13 Measured in
sheet piling installed by accordance with Section
others v (b).8
19. Cufting off heads of 1. Precastconcrete piles M.14 Measured in
concrete piles accordance with Section
v (c).12
2. Gast in-situ piles M.15 Measured in
accordance with Section
v (d).11
HK SMM 4R 52
VI EXCAVAIION 53
trl Underpinning
INFORMATION PROVIDED MEASUREMFNT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
(bl Underpinningleontinuedl
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
3, Excavation 1. Preliminary excavation 1. ln successive stages of m3 1. From one side only M.2 and M.4 of Sub-section D.1 of Sub-section (a) C.3 of Sub-section (a) S.2 Physicalrestrictions
down to the base of work 1.50 m, commencing (a) hereof apply. hereof applies. hereof applies. if known and any design
2. From both sides
to be underpinned levels stated constraints stated
M.2 Allowances for D.2 The commencing
2.Excavation below the working space are made level is defined as the
base of work to be in measurement of commencing level of the
underpinned excavation. The width of preliminary excavation.
the working space
(measured horizontally
from the face of the wall
to be underpinned, or
where projecting
foundations are to be
retained, from the face of
such projection) shall be
related to the depth of the
excavation (measured
from the commencing
levels to the underside of
the underpinning work).
The allowances are made
as follows, irrespective of
any physical restriction or
design constraints:
(a) 1.00 m from the wall
or projecting foundation
where the total depth of
the excavation does not
exceed 1.50 m
(b) 1.50 m from the wall
or projecting foundation
where the total depth of
excavation exceeds
1.50 m but does not
exceed 3.00 m
(c) 2.00 m from the wall
or projecting foundation
where the total depth of
the excavation exceeds
3-00 m
HK SMM 4B 54
vt EXCAVATION 55
cc,
-f
=
=
u:t
-
L
vil CONCRETE WORKS 57
(See Section // - GeneralPrinciples)
(a) Goncrete
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Labours to existing C.'1 Each item of concrete S.1 Composition and mix (or
work are measured. work is deemed to strength requirement) of the
M.2 All concrete work is include: concrete
measured cube except (a) Mixing, conveying, S.2 Particulars of any tests
as hereinafter provided. hoisting or lowering, required, both of materials
placing in position, and the finished work
M.3 Thickness of beds,
slabs, walls and the like vibrating, curing,
S.3 Requirements for
protection and complying
is stated. compaction
with temperature control
M.4 Any treatment of the
requirements S.4 Requirements for placing
face of concrete, other in position by a particular
(b) Forming grooves
than that required by method, or pouring at stated
(other than in fair faced
Sub-section (d) C.3 speeds; work to which
hereof, beyond ordinary concrete to form these requirements apply
depositing, spreading ornamental features), given separately
and levelling are chases, mortices and the
measured separately and like
given super. (c) Grouting in balusters,
(To be Continued)
1
(a) Concrete (continued)
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
HK SMM 4R 58
VII CONCRETE WORKS 59
(a) Goncrete(continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
3. Concrete beds 1. Thickness stated ps NOTE - For structural C.3 Laying in bays and the
movement joints see necessary formwork and
Item (a) 28 hereof. reinforcement to the
joints between bays
deemed to be included
(except those designed
by the Engineer)
5. Surface water channels 1. Shape, width, Excavation, disposal, m 1. Straightchannels M.11 Channels in level C.7 Angles, ends, outlets
thicknesses of sides and formwork and rendering ground and sloping and intersections
2. Curved channels
base and average depth described channels are measured deemed to be included
stated; expansion joints together. C.8 Rebates for channel
and spacing described covers deemed to be
included
6. Stepped channels to Shape, width, 1. Excavation, disposal,
slopes thicknesses of sides and formwork and rendering
base and average depth described
stated; height of steps 2. Any weep holes in steps
and gradient of channel described
between steps stated
and any weep holes in
steps described
1
(a) Concrete (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
13. Gopings
15. Strings
HK SMM 4R 60
VII CONCRETE WORKS 6l
17. Suspendedslabs 1. Thickness stated 63 '1. Horizontal M.12 The measurement of D.1 Coffered and troughed C.4 applies.
suspended slabs is taken slabs include margins
18. Coffered and 2. Sloping 1 150 C.9 This work is deemed to
across walls, columns whose width is < 500 include shoulders or
troughed slabs 3. Sloping > 150
and beams, except mm. Wider margins are haunchings of richer (or
lSa.Transfer plates where the walls, columns included with ordinary
stronger) mix including
or beams are of a slabs. any additional formwork
different mix. D.2 The descriptions of or permanent mesh
M.13 Where a shoulder or slabs and beams of separation baniers
haunching of richer (or horizontal, sloplng <1 50 required to form the
stronger) mix is required and sloping > 1 5o relate shoulders or haunchings.
at these junctions, or at to the top surface.
junctions of walls/
columns and beams, the
items are so described.
22. Walls 1. Thickness stated 913 1. Walls M.16 Concrete walls are
2. Retaining walls
measured between
mlumns or projections.
23. Golumns p3 Concrete walls and
columns are measured
up to the soffits of beams
or slabs, except where
the beams or slabs are of
a different mix.
HK SMM 4R 62
VII CONCRETE WORKS 63
(al Goncrete{continuedf
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
27. Structural movement 1. Between two wall faces 1. Descriptions include m2 1. Plane M.20 Water stops in
joints steel dowels, formwork, structural movement
2. Curved joints are measured
fi llers, temporary fillets
and surface coatings and separately under item
formation of rebates or (a).30 hereof.
other labours.
2. ln beds '1. Sizes stated, m 1. Straight
descriptions include steel
3. ln suspended slabs 2. Curved
dowels, formwork, fi llers,
4. ln walls temporary fillets and
surface coatings and
5. ln beams
formation of rebates or
6. ln columns other labours.
7. Across beams 1. Sizes stated, or where nr
there are a large number
8. Across curbs
of similar items, the items
9. Similar items may be grouped in ranges
of sizes, descriptions to
include steel dowels,
formwork, fillers,
temporary fillets and
surface coatings and
formation of rebates or
other labours.
I I
(a) Goncrete(continued|
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
31, Accessories and L Bonding ties 1. Dimensioned description m2 1. Spacing dimensions M.22 Cast-in accessories D.3 Cast-inaccessories C.11 Perforations or S.5 Kind and quality of
sundry items cast stated are normally enumerated exclude reinforcement, recesses in formwork materials and sizes or
2. Steel angle column m
deemed to be included manufacturer's
into in-situ concrete Linear or area tying wire, distance
guards
measurement may be blocks, spacers, chairs, references
nr
3. Spout or weep pipes used provided that any strucfural steelwork,
appropriate spacing hollow blocks and fillers
4. Step irons
dimensions are given in blocks, permanent
5. Others, details stated descriptions. formwork, joints and all
components around which
concrete is cast, but
which are not fixed by the
Concretor (e.9. elechical
and plumbing
components, doors and
windows etc.).
32. Bridge bearing pads 1. Dimensioned description, nr
for concrete bridges, description to include for m
and the like bedding and holding down
bolts as appropriate
HK SMM 4R 64
VII CONCRETE WORKS 65
Reinforcement
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
steel stated
1. Generally M.1 Each type of steel is C.1a Provision and
given separately, e.g. submission of S.2 Particulars given of any
Mild Steel, High Yield reinforcement for testing tests required
Steel, etc. and test certificates S.3 Any special restrictions in
regard to hot or cold
bending
2. Bar reinforcement 1. Nominal size stated 1. General reinforcement kg 1. Round bars C.1 Variations in weight due
2. General reinforcement 2. lndented bars to rolling margin are
> 12 m in length, given in deemed to be included.
3. Square bars
stages of 3 m C.2 Cutting to lengths,
bending, hoisting, and
3. Links, stinups and
fixing and supporting in
binders position are deemed lo
4. Spacers and chairs be included.
designed by the C.3 Annealed iron tying
Engineer wire, precast concrete or
5. Helical reinforcement proprietary spacer blocks
and chairs and supports
6. Reinforcement bentto (other than spacers,
CUTVE
chairs and supports
designed by the
Engineer) and ordinary
spacer rods are deemed
to be included.
5. Fabric reinforcement Descriptions include the 1. Weight stated ff 1. Flat fabric M.3 Fabric reinforcement is C.6 Bending fabric
measured the nett area reinforcement,
extra materials in laps 2. Fabric specially bentto
which are also described. covered. notching around
CUTVE
M.4 No deduction is made obstructions and
for openings s 1.00 mz. allowance for extra
material in laps are
deemed to be included.
1. Generally M.1 Except where otherwise D.1 Formwork left-in is thai C.lAll formwork is deemed S.1 Kind and quality of
stated, formwork is which is not designed to to include all necessary materials and propping
measured to concrete remain in position but is materials and work for requirements for permanent
surfaces of the finished nonetheless impossible falsework and facing formwork
work which require to remove. panel erection,
S.2 Construction and/or lining
support during casting. D.2 Permanent formwork is supporting, easing, of formwork which is not at
that which is designed to
striking and removal, and the discretion of the
M.2 Formwork is measured
for re-propping as
super except as remain in position. Contractor
required.
hereinafter provided. S.3 Kind and quality of the
C.2 Coating surfaces in formed finishes required
M.3 No deduction is made for
contact with concrete
openings < '1.00 m2. S.4 'Formwork to produce
with approved
M.4 Formwork left-in and formed finishes' being
release agents is
permanent formwork are
deemed to be included
formwork required to
each measured produce certain standards
for formwork.
separately, except where of finishes
C.3 'Formwork to produce a
more delail is required in S.5'Specified Formwork' being
formed iinish' is deemed
items (d) 5 and 6 hereof. formwork which is not at the
to further include all
M.5 Formwork to produce a necessary sheet lining discretion of the Contractor,
formed finish is materials, forms or i.e. the Engineer/Architect
measured separately and linings and treating the may specify the
the finish described. face of the concrete to construction and/or lining
produce the required materials
formed finish.
C.4 Formwork is deemed to
include:
(a) Making allowance for
all cambers and pre-
cambers required on
beams and slabs, etc.
(b) Splayed edges,
notchings, allowance for
overlaps and passings at
angles, battens, fillets for
chases, grooves (other
than to form ornamental
features), recesses,
rebates, chamfered
edges, splayed angles
and the like
(c) Forming holes for pipes,
cables and the like and
boxings for openings s
0.50 m2 sectional area
HK SMM 4R 66
VII CONCRETE WORKS 67
(d) Formwork(continued)
CIASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2, Soffits of slabs 1. Slab thickness < 200 mm 1. Horizonial 1P 1. Height to soffit < 3.50 m M.6 The height of sofiit are D.3 Formwork to soffits of
2. Thereafter in 1.50 measured from the slabs includes formwork
3. Soffits of landings 2. Slab thickness > 200 mm 2. Sloping m
structural level, or from to landings occurring at
- thickness stated in
3. stages
3a. Soffits of stairs Curved the existing ground, or floor levels.
further slages of 100 mm
3b. Soffits of transfer 4. Curved in more than one formation level
plates direction immediately below the
soffit.
5. Wall faces and the like 1. Vertical 112 1. To one face only, wall M.7 Formwork is measured
thickness and to each face of walls
2. Sloping
background to other face requiring support.
3. Curved (Forwork curved
stated
in more than one
direction see ltem 17, 2. Lefi in
'Complex Shapes' below) 3. Permanentto both faces
)
I
(d) Formwork(continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
7. Sides and soffits of 1. Dephofbeams< 1.00m 1. Horizontal beams m2 1. Height to sofiit < 3.50 m M.8 Formworkto
beams (below sofft of slab)
2. Sloping beams 2. Thereafter in 1.50 m secondary beams is
measured up to the sides
7a. Sides and soffits of 2. Depth ofbeams > 1.00 m 3. Curved beams stages
of main beams, but no
transfer beams (below soffit of slab)
deduction is made from
the formwork of main
beams where secondary
beams intersect them.
M.9 Formwork to beams
which intersects with
stanchion casings,
columns, caisson or pile
caps, tie beams, walls
and the like is measured
up to them on all sides -
no deduction is made
from formwork to
stanchion casings,
columns, caisson or pile
caps, tie beams, walls
and the like at these
intersections.
8. Top formwork '1. Straight 1. Widlh > 300 mm J62 M.10 Top formwork is
measured for surfaces
9. Edges and breaks in 2. Curved
2. Width < 300 mm m sloping > 150 whether it
slabs and walls,
is provided or not, or
including soffits of
where otherwise
openings in walls and
specifically required.
sides of curbs
10. Risers and open
strings of stairs
HK SMM 4R 68
VII CONCRETE WORKS 69
11. Edges and soffits of 1. Straight 1. Girth > 0.50 m tr12 M.11 Where these features
copings, cills, strings, occur as projections on
2. Curved 2. Girth < 0.30 m
cornices, eaves walls, beams and similar
3. Girth > 0.30 m and surfaces the formwork to
overhangs and the like,
< 0.50 m them is measured as
grouped together
extra over the formwork
to the principal surface
from which they project.
HK SMM 4R 70
VII CONCRETE WORKS 7t
r
r
(f) Prestressed Goncrete Work (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
3. Ducts and grouting Number and size of Sheathing or other m 1. Straight ducts M.5 Ducts over 12.00 m C.1 Provision of supports to
ducts stated, number and material used in the long are so described the material used ln the
2. Curved ducts
diameter of tendons to formation of the ducts stating the length in formation ofducts, and
be enclosed stated described and details of further stages of 3.00 m. the forming and grouting
grouting given of air holes are deemed
to be included.
4. Tendons Supplying tendons, kg M.6 Measured net lengths C.1a Extra lengths required
ultimate strength and between outer faces of at ends for tensioning are
size of tendon stated anchorages deemed to be included.
M.7 Each size given
separately
3. Tensioning each tendon, nr 1. Tensioned from one end C.3 Cutting off ends is
size, length and jacking deemed to be included.
2. Tensioned from both
force stated ends
HK SMM 4R 72
VII CONCRETE WORKS 73
3. Cast in sections,
assembled and post-
tensioned before erection
4. Cast in sections for
assembly in-situ and pos!
tensioned after erection
5. Post-tensioned after
hoisting but capable of
self support
6. Posltensioned after
hoisting but requiring
support until tensioning is
complete
1
{gl Recast Prestrcssed Gonctete Work lcontinued}
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
3. Fixing precast units 1. $ize and length of unit nr 1. Height of bearing above M.3 Units of identical
and composition and mix ground level stated in seciion but varying length
of jointing material stated stages of 3.00 m are grouped together in
stages of 1.50 m and the
average length stated.
2. Special iemporary 1. Size and span of unit nr 1. Supports for uniis cast
supports required in stated in sections for assembly
connection with post- in-situ
tensioned units which are
2. Supports for units in
tensioned after hoisiing
one piece but requiring
support until tensioning
is complete
3. Height of support siated
in stages of 1.50 m above
ground
4. Reinforcement, M.4 Allare given in
ducts, tendons and accordance with Sub-
anchorages section (f) hereof.
HK SMM 4R 74
75
VIII BRICKWORK AND BLOCKWORK
(See Seclion // - General Principles)
2. Brick walls 1. Walls > one and a half 1. Various thicknesses all m2 1. Vertical walls D,1 Tapering walls are S.1 Kind and qualiiy and
bricks thick, and a grouped togeiher, wall of diminishing size of bricks
3. Brickwork in filling
multiple of half a brick in reduced to one brick
2. Tapering walls with one
thickness. S.2 Bond
openings face battering
thickness thickness and described D.2 Thickness stated for
4. lsolated piers and as reduced brickwork 3. Tapering walls with both S.3 Composition and mix
tapering walls is the mean of mortar
chimney stacks faces battering
thickness.
grouped together 4. Walls built battering S.4 Type of pointing
D.3 Walls built battering
5. Dwarfwalls are sloping walls with
supporting fittings, parallel sides.
tanks and the like,
grouped together
2. Walls 3 one and a half "1. Thickness stated m2
bricks thick
3.Walls noi a multiple of 1. Thickness stated, m2
half a brick thick description includes
all cutting
4. Hollowwalls 1. Thickness of inner and m2
outer skins and the width
of cavity stated and
disposition of ties
described
5.Brickwork in backing to 1. Description includes m2
masonry all cutting
6. Extra over brickwork m2 1, General faces S.5 Bond
for fair face 2. Built overhand 5.6 Composition and mix
of mortar
3.To battering faces,
described S.7 Type of pointing
4. To curved faces
HK SMM 4R
76
VIII BRICKWORK AND BTOCKWORK 77
(al Brickwor*andBlockwork(continuedf
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
10. Gills, copings etc. 1. Number of courses and 1. Straight m 1. Cills C.2 Angles, returned ends
projection (if any) stated and the like deemed to be
2. Curved 2. Cornices
included
3. Plinth cappings
4. Copings
5. Others, described
11. Sundry brick built 1. Dimensioned nr '1. Key blocks
items description
2. Corbels
3. Pier caps
4. Others, described
12. Block walls 1. Walls or partitions 1. Blocks described m2 1. Block walling and C.3 Block walls are S.8 Kind and quality and
formed of concrete blocks including size and finish pariiiions deemed to include size of blocks
2. Walls or partitions 2.Walling in isolated special solid blocks or
filling in hollow blocks at
S.9 Bond
formed of hollow tiles positions in pipe ducts
and the like ends and intersections. S.10 Composiiion and mix
3" Walls or partitions of mortar
formed of patent blocks
S.11 Typeofpointing
17. Gufting and bonding 1. Both walls described m C.5 Work is deemed to
walls of different include additional
construction materials and all cuttings.
18. Labours to existing 1. Labour and materials in '1. Thickness and nature of m M.7 Labours to existing
brickwork or blockwork cutting, toothing and walls stated brickwork or blockwork
bonding new walls to are given separately.
existing
2. Preparation of existing
walls for raising
20. Damp-proofcourses 1. Material and thickness l. Courses > 225 mm wide 62 1. Horizontal
(except asphalt) stated 2. Vertical
3. On curved walls
(description includes all
extra cutting)
21. Flues 1. Flue linings, described 1. Description includes M.B No deduction is made
all bends and easings for flues, lined flues or
formed by cutling. flue blocks where the
brick flue is < 0.25 m2 in
sectional area.
HK SMM 4R 78
VIII BRICKWORK AND BTOCKWORK 79
I I
o
@
EE
=
=
ct:)
-
L-
8l
lX DRAINAGE (including Underground Pipe Ducts)
Section ll -- General
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally S.1 Kind and quality of
materials
{a) Where practicable the nature ofthe soil is described, and attention is drawn to any existing trial holes.
S.2 Methods of jointing and
lixing
S.3 Gauge, thickness or
substance of materials
S.4 Tests with which materials
must comply
1. Pipes < 200 mm C.1 Grading boftoms, S.5 Description of any special
2. Excavating trenches Average trench depth m 1. Trench for pipes without
trimming sides, filling in backfilling materials required
for drain pipes diameter stated in multiples of beds
and ramming with
2. Pipes > 200 mm 0.25 m, and commencing 2. Trench for pipes on beds suitable excavated
diameter, size stated level stated
3. Trench for pipes on beds material, spreading and
3. More than one pipe, and sunounds leveling, disposal of
pipe sizes stated
surplus excavated
1. Pipes < 200 mm material, and any
3. Excavating trenches m
diameter planking and strutting
for pipe ducts
2. Pipes > 200 mm required are deemed to
diameter, sizes stated be included.
3" Multiple pipes or clusters
of pipes described
4. Concrete beds 1. Diameter of pipe and m C.2 Beds, haunches and
dimensions of concrete surrounds are deemed to
5. Concrete haunches stated include formwork,
6. Concrete surrounds 2. lf more than one pipe, the reinforcement and
dimensions of each pipe movement joints.
stated
3. Multiple pipes or clusters
of pipes described
C.3 Work is deemed to S.6 Method of jointing and
7. Drain pipes 1. ln trenches 1. Nominal size given m 1. Description given ofany M.1 Pipes are measured net
include short lengths and supports for pipes and ducts
2. In ducts below ground or wrapping required length as laid, over all
jointing, provision of
below floors bends, junctions and
loose collars and similar
similar fittings.
items, for jointing
materials and pipe
su0ports.
C.3 applies.
8. Pipe service ducb m
C.4 Pipe service ducts are
deemed to include slow
bends and draw
wires.
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
9. ltems extra over the 1. Bends 1. Dimensioned description, nr C.5 Pipe fittings are S.7 Method of jointing fittings
pipes in which they 2. Junctions any wrapping described deemed to include extra to pipes
occur 3. Diminishing pipes joints and cufting on
4" Connectors pipes.
5. Adapters
6. Mechanical ball joints
7. Puddle flanges
8. Other fittinqs
10, Pipe accessories 1. Gullies 1. Dimensioned description D.1 Accessories include
nr C.6 Accessories are S.B Method of jointing
given gullies, traps, inspection
2. Traps deemed to include accessories to pipes
shoes, fresh air inlets, connections to drains
3. Others non+etum flaps and the and bedding in concrete
like.
1 1. Brick or concrete piers 1. Dimensioned description nr
12. Concrete thrust blocks given
13. Manholes 1. Dimensioned description nr 1. Total depth between lhe M.2 These items C.7 ltems are deemed to
given for each type of cover level and invert enumerated and fully include:
design Ievel <1.00mdeep described, description (a) Excavation,
includes excavation, backfi lling and disposal
2. Thereafter in stages of
concrete, formwork, of surplus excavated
0.50 m deep
reinforcement, steel material off site
14. lnspection chambers joists, brickwork, (b) Blinding layer,
benchings, rendered concrete, precast
15. Soakaways
coatings, painting, concrete, brickwork,
16. Back inlet gully traps blockwork, formwork and
covers, step irons,
intercepting traps and moulds, reinforcement
other works. and structural steel joists
(c) Backdrops, step
M.3 Altematively, they are
irons, intercepting traps,
measured in detail in
chains, stoppers, covers,
accordance with the
frames, gratings,
rules in the appropriate
handles, lifting keys and
Sections.
other accessories
(d) Connections of
drains, and cutting
(e) Bedding and
haunching manhole
cover frames and setting
the covers
(f) Bedding and
surrounding intercepting
haps with concrete and
setting stoppers in lime
cement
HK SMM 4R
82
83
lX DRAINAGE (including Underground Pipe Ducts)
17. Cesspools 1. Dimensioned description nr M.2 and M.3 apply C.7 applies.
given for each type of
18. Septic tanks
design
19. Grease traps
23. Works to existing 1. Joints of pipes to existing '1. Size of pipe and wall nr C.9 All cuttings and making
manholes walls thickness stated good are deemed to be
included.
2. Alterations to concrete 1. Alterations described nr
channels and benchings
I
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
24. ltems extra over any Breaking up and '1. The thickness, if known, vf C.10 This work is deemed
type of excavation removing pavings, stated to include disposal.
surface concrete and the
like
4. Breaking up unreinforced 63
concrete and the like met
with in excavations
5. Breaking up reinforced p3
concrete met with in
excavations
HK SMM 4R 84
x WATERPROOFING (See Secfion tt
- GeneratPrinciptes) 85
(al Asphalt
{bt Liquid llembrane Waterproofing
INFORMATION PROVIDED MEASUREMENT DEIINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.'1 Work required to be C.1 Work is deemed to S.1 For asphalt work, the
canied out in sections, include: kind and quality of
such as in underpinning (a) Carrying out the work materials including
and to retaining walls, is at any height underlays and
given separately. (b) All temporary rules reinforcement, thickness
(c) Laying to falls and and number of coats and
M.2 No deduction is made
cunents, and intersections preparation of underlying
for voids < 0.50 m2.
to work io falls and surfaces
currents
(d) All narrow widths,
S.2 For liquid membrane
work materials are fully
arrises, fair and rounded
described including
edges and turn-ins priming, number of coats,
(e) Laps, cutting, notching
bonding between coats,
and bending of underlay
preparation of underlying
and reinforcement
surface and any surface
(f) Work carried out in treaiment of final coat
sections is deemed to
include jointing
between sections
(g) Working to metal or
other flashings and
working against frames of
manhole covers, duct
covers and the like
/
I
t4 Asphalt lcontinued|
(bl Liquid Membrane Waterproofi ng (eontinued|
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
3, lnternal angle fillets m
4. Cutting backand m
jointing new to old
asphalt
5. Skirtings 1. Height < 300 mm m 1. Siepped M.4 Height is measured D.3 Only work inclined to C.3 Work is deemed to
on face. more than 'l50 to ihe include edges, anises,
2. Height > 300 mm, heighi 2. Raking
horizontal is described as internal angle fillets,
stated
3. Curved raking. dressing over tilting fillets,
turning nibs into grooves,
intersections and angles
requiring angle fillets,
stopped ends, fair ends,
and materials for turning
into grooves.
6. Fascias 1. Girth s 300 mm m 1. Horizontal M.5 Girth is measured on D.3 applies C.4 Work is deemed to
face. include angles, drips,
7. Aprons 2. Girth > 300 mm, girth 2. Sloping
arrises, intemal angle
stated
8. Linings to gutters 3. Stepped fillets, dressing over tilting
9, Linings to channels 4. Curved fillets, turning nibs into
grooves, ends, angles and
10. Linings to valley intersections and extra
gutters materials for turning into
11. Coverings to curbs grooves.
HK SMM 4R 86
x WATERPROOFING 87
(al Asphalt {continued}
(bt Liquid llembrane Waterproofing (continuedf
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULFS SUPPLEMENTARY
RULES INFORMATION
'19. Solar protection by 1. Application rates of 1. Size of stone chippings m2 S.4 Method of application
dressing with bitumen bitumen and stone stated
and application of stone chippings stated
chippings
20. Application of 1. Number of coats stated m2
reflective paint to
asphalt surfaces
21. Testing Item S.5 Details stated
r
(cl Felt Hoofing
(dD Sheet Membrane Waterprooling
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 No deduction is made C.1 Work is deemed to S.1 Kind and quality of
for voids < 0.50 mz include: materials, including
underlays, description of
(a) Carrying out the work
each layer, type of
at any height
bonding between layers,
(b) All narrow widths nature and preparation of,
and method of fixing to,
(c) Laying to falls and
ihe underlying surface
currents
(d) Laps, cutting, notching
and bending of underlay,
felt and membranes and
turn-ins
2. Coverings to 1. Single layer felt roof m2 1. Horizontal M.2 Work is measured D.1 Work inclined to more C.2 Roof ventilators S.2 Details and spacing
surfaces covering the net area covered, than 1 50 to the horizontal deemed to be included of roof ventilators
2. Sloping is described as sloping, if
2^ Built-up felt roof 3. Vertical not more than 15o it is
covering included with horizontal.
4. Curved
3. Flexible sheet tanking
and damp-proofing
4. Flexible sheet roof
covering
3. Gutting back and 1" Single layer felt roofing m
jointing new to old
2. Built-up felt roofing
work
3. Flexible sheet tanking
or damp-proofing
4. Flexible sheet roof
covering
4. Aprons and turn- '1, Average expo.sed face m 1. Horizontal 0.2 Only work inclined to C.3 Aprons and turn-
downs height or depth stated more than 150 to the downs and skiriings and
2. Sloping turn-ups are deemed to
horizontal is described as
5. Skirtings and turn- 3. Vertical raking. include edges, drips,
ups dressing over tilting fillets,
4. Curved
turning nibs into grooves,
intersections and angles
requiring stopped ends,
fair ends, and materials
for tuming into grooves.
HK SMM 4R 88
x WATERPROOFING 89
{cl FeE Roofing (continuedl
(dN Sheet llembrane Waterptooling {continuedf
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
6. Linings to gutters 1. Average exposed face m C.4 Lining to gufters,
girth stated
7. Dishings to channels dishings to channels and
coverings to curbs are
8. Goverings to curbs deemed to include edges,
dressing over tilting fillets,
turning nibs into grooves,
ends, ang{es and
intersections, outlets and
extra materials for turning
into grooves.
L Linings to cesspools, 1. Exposed face size nr C.5 Linings to cesspools
sumps and the like stated and sumps are deemed to
include intemal angles
and outlets.
10. Cutting,fittingand nr M.3 Added together
dressing to outlet pipes irrespective of size
11. Gufting,fittingand
dressing to gullies
12. Cutting,fittingand
dressing around pipes
or railing standards and
the like and forming
collars around them
13. Solar protection by 1. Application rates of '1. Size of stone chippings m2 S.3 Method of application
dressing with bitumen bitumen and stone stated
and application of stone chippings stated
chippings
14. Application of 1. Number of coats stated m2
reflective paint to felt
roof covering
15. Testing Item S.4 Details stated
XI STONE WORKS
(See Seclion /l - General Pinciples)
1, Generally M.1 Labours to existing C.1 Stone works are S.1 Kind and quality of materials,
work are measured. deemed to include: and for rubble walling whether
(a) All labours, mitres, random or squared stones,
M.2 Curved work is
built with or without mortar. lf
measured the mean stops, retums, fair ends,
built dry, without mortar,
length. sunk joints and joggle
joints as required whether the interstices are
M.3 Granite, marble or slate filled with stone chippings or
tiling is measured in (b) Hoisting, setting,
spalls
accordance with Section fixing, bedding, jointing
S.2 The nature of the face finish
XVI(e). and pointing the work in
any position S.3 Composition and mix of
HK SMM 4R 90
XI STONE WORKS
9t
(a) Stone Construction (Continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2. Walling 1. Wall thickness stated '1. Walls faced one side sf 1. Random rubble M.4 Building against other C.2 Walls built against other
I
{al StoneGonstruction (continuedf
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
4. Labours io existing 1. Labour and materials in 1. Description includes m
stone work cutting, toothing and thickness and nature of
bonding new walls to existing and new walls.
existing
2.Preparation of existing
walls for raising
5. Pitching to slopes 1. Degree ofslope of 1. Description includes m2 1. Random rubble
sloping work is stated. the minimum thickness
6. Beds and sides to
of stones and the
2.Random rubble brought
watercourses up to courses (average
composition and
height of courses stated)
thickness of underlying
bed and the treaiment of 3. Squared and coursed,
joints. height of courses stated;
if in regularly diminishing
courses, the maximum
and minimum height of
courses stated
4. Dressed stonework
described
5. Others
7. Copings '1. Dimensioned description 1. Type and position or m 1. Straight C.4 Work is deemed to
spacing of metal cramps include angles,
8. Gurbs or dowels etc. stated
2. Curved
intersections, stops,
9. Others reiurned ends and the
like.
C.5 Metal cramps and
dowels etc. are deemed
io be included.
10. Steps 1. Dimensioned description 1. Straight steps m
2. Curved steps (nr
stated)
11. ltems measured 1. Fair ends nr
extra over steps
12. Bollards 1. Fully described nr
13. Seats
14. Others
HK SMM 4R 92
XI STONE WORKS 93
15. Arches 1. Fully described 1. The thickness and nr C.6 Work is deemed to
nature of the walls in include templates and
16. Moon gates
which these items occur centering.
and the method of
bonding thereto, is
included in ihe
description.
17. Weep holes and 1. Fully described and the nr
weep pipes thickness of wall stated
Stone to Structural ncludi Cast Marble and Gran
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
C.1 The work is deemed to S.1 Kind and quality of
1. Generally M.'l Work is measured, D.1 lntemal and extemal
include: materials
unless otherwise stated, work are each measured
(a) Fairjoints
the net area covered. separately. S.2 Size, shape and thickness
(b) Working over and
M.2 No deduction is D.2 The thickness stated is
around obstructions
of units
made for voids < 0.50 the thickness exclusive (c) Additional labour for S.3 Nature of base
p2. of keys, grooves and the
overhand work S.4 Preparatory work, bonding
M.3 Work to ceilings and like. (d) All cufting including
agents and coating backs
beams over 3.50 m cutting for nanow widths,
S.5 Nature of iinished surface,
above floor (measured to equal margins and
including any sealing and/or
ceiling level in both angles
polishing
cases) is so described, (e) Forming drainage
stating the height in holes S.6 Treatnent ofjoints
further 1.50 m stages. (f) Preparatory work,
S.7 Layout ofjoints
M.4 Curved work is so bedding mortars,
S.8 Mechanical fixing devices
described. adhesives, bonding
with spacing stated
agents and additives
(g) Fixing devices S.9 Adhesives
(h) Hoisting, setting,
fixing, bedding, jointing
and pointing
(i) Coating backs and
cleaning, sealing and
polishing faces and
exposed edqes
HKSiIM 4R 94
xt STONE WORKS 95
{b} Stone Facings to Structural Backgrounds {including Gast $tone, Marble and Granitel {eontinuedl
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
8. Strings 1. Height or width stated 1. Girth on face staied m C.5 Strings and aprons
are deemed to include
9. Aprons fair edges, rounded and
bullnosed edges, ends,
angles and ramps.
L
I
{b} Stone Facings to Structural Backgrounds (including Gast Stone, Marble and Granitef lcontinuedf
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
18. Corner pieces 1. Dimensioned description nr
2. Manufaciurer's
reference
19. ltems extra over the 1. Special units m D.3 Special units include
work in which they non-standard units to
2. Access units produce fair edges,
occur
nr
3. lsolated special units internal and external
angles, moulded edges
and coved junctions.
20. General counter tops 1. Dimensioned m C.8 Counier tops, seats
description and shelves are deemed
21. Seats
to include fair edges,
nr
22. Shelves rounded edges, bullnosed
edges, ends and angles.
HK SMM 4R 96
xil ROOF TITING 97
(See Secflon Il
- General Principles)
(al Ghinese Roof Tiling
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Work is measured C.1 Each item is deemed S.1 Kind, quality and size
net area covered. to include carrying out of materials
the work at any height
.2 Sloping work, vertical
and all narrow widths.
work and curved work are
each given separately.
M.3 No deduction is made
for voids < 0.50 m2.
'I /
(b) Proprietary Rool Tiling
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Work is measured C.1 Each item is deemed S.1 Kind, quality and size
net area covered. to include carrying out of materials
the work at any height
M.2 Sloping work, vertical
and all narrow widths.
work and curved work are
each given separately.
M.3 No deduction is made
for voids s 0.50 m2.
HK SMM 4R 98
99
xilt WOOD WORKS
(See Seclion // - General Pinciples)
1. Generally M.1 All sizes are nominal D.1 Metal fasteners, C.1 Work is deemed to S.1 Kind and quality of
sizes unless stated to be included in C.1, is include all labours and materials
finished sizes. defined as toothed jointing, riailing, screwing
S.2 Method of fixing where not
M.2 Wrought timbers are connectors, split ring and bolting in position,
at the discretion of
given separately. connectors or shear plate including dowels, bolts, the Contraclor
connectors. nuts, washers, plate
M.3 Unless othenruise stated washers and metal S.3 Methods of jointing and
all work is measured net forms of construction where
fasteners such as
as fixed in place and no not at the discretion of the
toothed connectors, split
allowance is made in Conhactor
ring connectors, shear
measurement for laps or plate connectors and S.4 Preservative treatments
joints.
other patent connectors. applied as part of
production processes
I _)
r
(b) General Glauses Applicable to the Following Sections (c)through (m)
1. Generally M.1 All sizes stated are C.1 All wood works are S.1 Thickness, kind and quality
finished sizes. deemed to include of materials
HK SMM 4R r00
xril wooD woRKs l0l
(cl Flooring
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Block flooring 1. Sizes of blocks or 1. Traversing for and m2 M.3 Floors are measured C.1Floors bedded in S.1 Nature of base
parquet fi ngers, pattem, nature of polishing stated nett area covered mastic or adhesive are stated
2. Parquet flooring
method of jointing and (measured over borders deemed to include the
bedding materials stated as item (c).6 hereof). mastic or adhesive.
L Mat wells
I )
I
4. Skirtings 1. Dimensioned description m M.2 Skirtings and perimeter C.2 Skirtings and perimeter
5. Perimeter edge trims edge trims not executed edge trims are deemed
as part of the access to include joints in
floors are measured in running lengths, mitres,
items (e). 13 and 19 ends and angles.
hereof.
HKSMM 4R 102
xil wooD woRKs r03
(e) Sheet Linings/Gladdings , Timber Suspended Ceilings, Unframed Trims, lnsulation, Proofing Works and Fire Stops
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
M.1 Where grounds and/or D.1 lnsulation/Proofing C.1 All work is deemed to
1. Generally
backings are included in worUFire stops include: include:
the item this is stated Flexible sheets, (a) Nailing, adhesives,
M.2 Work to ceilings and insulating boards and plugging, screwing,
beams over 3.50 m other materials, where cutting, splayed or
above floor (measured to not specified as part of rounded edges, notching,
ceiling level in both another section, laid, holes, housing ends,
cases) except to hung, or fixed shipJap joints, mitres,
staircase areas, it is so horizontally, sloping or ends, and shaped ends,
described stating the vertically as angles, junctions,
height in further 1.50 m waterproofing, vapour heading joints, short
stages. barriers, fire stops, fire lengths and the like
baniers, isolating (b) Sinking screw and
membranes, sound bolt heads and covering
insulation or thermal heads with approved
insulation. matching filler or pellet
(c) Provision of
adhesives, mastics and
other sundry jointing and
fixing materials
r 'I
(e) Sheet Linings/Claddings, Timber Suspended Geilings, Unframed Trims, lnsulation, Proofing Works and Fire Stops (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2. Sheet linings 1. To walls tr12 M.3 No deduction is made D.2 lnternal and external C.1a This work is deemed
for voids < 0.50 m2. work are each measured to include:
3. Sheet claddings 2. To ceilings and sides and
M.4 Sides and soffits of
separately. (a) Setting out panels
soffits of beams
beams are included in and lining up joints
3. To roofs
the item of ceilings and (b) Tongued angles,
4. To fittings sides and soffits of chamfers, rebates,
5. Others beams. grooves and the like
(c) All cutting for narrow
widths, around pipes,
conduits, power points,
sleeves, sprinkler and
detector heads, and
forming openings for
grilles, light fittings,
diffusers, speakers,
access panels and the
like, including extra
trimmers and supports
4. Laminated plastic 1. Backing and adhesive Jp2 C.1b This work is deemed
sheeting stated to include fixing with
adhesive.
HK SMM 4B 104
105
XIII WOOD WORKS
(e) Sheet Linings/Claddings, Timber Suspended Ceilings, Unframed Trims, lnsulation, Proofing Works and Fire Stops (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
5. Fabric linings Fabric lining and any 112 C.2 Work is deemed to
foam or other backing include extra material in
and adhesive or other laps and edge fixings.
method of fixing stated
6. Supports for 1. Skeleton grounds, '1. Fixed to soffit, 112 C.3 Work is deemed to
suspended ceilings described background and method include trimming and
2. Framework, described
offixing described extra supports and
framing around light
3. Frameworkforshaped 2. Suspended from soffit,
fittings, diffusers,
hangers and spacing
ceiling, described speakers and the like,
described wih depth of
and, where suspended,
suspension <1.50 m
for working around
3. Ditto with depth of
obstructions and services
suspension stated etc.
lhereafter in 1.50 m
stages
in suspended ceilings
9. Acoustic linings 1. Described 1. Sheets 1P 1. Plain areas M.4 applies. D.2 applies. S.2 Extent of laps where not at
M.5 lnsulation linings, the discretion of the
10. lnsulation linings 2. Quilts 2. Across members, D.3 Horizontal includes the
centres of members proofing works and fire upper surface of any Contractor
11. Proofing linings 3. Boards
stated stops are only measured sloping structure s 450
12. Fire stops 4. Loose fill independently in this from the horizontal.
3. Between members,
Sub-section where not
centres of members D.4 Vertical includes the
specified as part of
stated upper surface of any
another work section.
4. Horizontal sloping structure > 450
from the horizontal.
5. Vertical
D.5 To soffits includes the
6. To sofiits
underside of any
7. To structural steel horizontal or sloping
framing structure.
(el Sheet Linings/Gladdings, Timber Suspended Geilings, Unframed Trims, lnsulation, Proofing Works and Fire Stops (continuedf
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
13. Skirtings 1. Dimensioned desoiption, '1. Where services are to m M.6 Work is measured
14. Architraves built up work is so be located within built up net length as fixed.
described. work, this is so stated.
15. Picture rails M.7 Work tongued on or
housed is so described.
16. Dado or chair rails
M.8 Where grounds and/
17. Cornices or backings are included
18. Cappings in the item, this is stated.
19. Others
HK SMM 4R t06
xilt wooD woRKs t07
HK SMM 4R r08
xilr wooD woRKs r09
HKSMM 4R il0
XIII WOOD WORKS
ilt
(i) Doors, Hatches, Ventilators and the like and Frames and Linings
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Flush doors and Dimensioned description '1. Single leaf doors Sets 1. Rebated stiles, rounded M.1 Folding doors are C.1 All doors are deemed to S.1 Surface treatment applied
frames of doors, frames or stiles, meeting stiles, measured separately, the include: as part of the production
2. Folding doors
linings, stating the door beads and mouldings extreme width of each process
(a) Fitting and hanging
size, thickness,
3. Swinging doors stated leaf is stated in the
(b) Frames or linings, S.2 Bedding, jointing and
construction, facings and 4. Sliding doors description. pointing mmpounds
subjrames and/or
applied mouldings etc. 5. Sliding and folding doors M.2 Doors with shaped grounds
and size, number and heads are so described
type of glass panels and (c) Bedding and pointing
and measured the
louvres door frames or linings,
extreme size as square
door sub-frames,
and given separately.
grounds and backings in
M.3 Fire rated and non-fire mortar against concrete,
rated doors are brickwork or blockwork
2. Framed and panelled Dimensioned description 1. Rebated stiles, rounded measured complete with
(d) Forming openings for
doors and frames of doors, frames or stiles, meeting stiles, frames or linings, sub-
door having glazing
linings, stating the beads and mouldings are frames and/or grounds,
panels including glazing
sectional sizes of stiles, described. louvres, glazing, dowels,
and glazing beads and
rails, transoms, mullions, holdfasts and anchor
2. Doors with diminished compounds
panels and the like and bolts, etc. lronmongeries
stiles are so described.
size and number of are measured (e) Forming openings for
panels and glazed or 3. Doors with panels of separately. doors having louvres
unusual shaped or including louvres and
louvred panels
anangement are so frames
described.
C.2 Folding doors include
1. Fire rating stated labours to meeting stiles.
3. Fire rated doors and 1. Dimensioned description
frames of doors, frames or C.3 Swinging doors include
linings rounded edges to stiles.
C.4 Fire rated doors and
frames are deemed to
include all necessary
testing, test certification
and obtaining approval
from relevant authorities.
t /
I
(i) Doors, Hatches, Ventilators and the like and Frames and Linings (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
4. Louvres and frames 1. Size, thickness and 1. Louvres have nr 1. Sectional sizes offrames M.4 lndividual louvres and C.'l and C.4 apply S.1 and S.2 apply
construction stated dimensioned descrlption stated frames, where not
forming part of doors, are
measured here.
HK SMM 4R 112
xlll WOOD WORKS il3
0) Stairs, Handrails and Balustrades
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Fumiture 1. Drawing reference and/or Description includes nr '1. Where these items are to M.1 Altematively these C.1 For items provided by S.1 Such information as is
2. Fittings dimensioned description ironmongery and/or be provided by the items may be measured the Employer, accepting appropriate to the
as appropriate with metal fittings, glass Employer for the in detail in accordance delivery on site, storing procurement, design,
3. Shelving background for fixing panels etc. which are to Conhactor to fix, the with the appropriate and handling are execution, supply and/or
4. Racks stated be included in the item. method of fixing is rules. deemed to be included. manufacture ofthe item and
5. External fumiture and stated. its incorporation in the
C.2 Work is deemed to
equipment 2. For items provided by the include all components
Works
6. Sign boards and Employer, the provision required to mmplete the S.2 Finishes and surface
signage by the Contractor of any fittings etc. including: treatments applied in
additional mmponents, (a) All metalwork and manufacture or off site
7. Playground equipment
etc. is stated. joinery work, carcassing, S.3 Finishes and surface
8. Others
ironmongery, treatments applied on site
splashbacks, cupboard
doors including glazed
doors, mirrors forming
part of the fiftings,
drawers, glass shelving,
veneer or laminated
facings as specified
(b) All fixings, brackets,
etc. as required to secure
fittings in positions
(c) Site measurement,
assembly, scribing to
walls, pointing and
sealant
(d) All linishes or surface
treatments applied off
site and on site
HK SMM 4R 114
xril wooD woRKs lt5
(ll Minor Buildings and Structures mainly of Timber Gonstruction
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVFRAGE RULES SUPPLEMENTARY
RULES INFORMATION
'1. Minor buildings 1. Drawing reference and/ Item 1. Providing and erecting M.1 Alternatively these C.1 Work is deemed to S.1 Such information as
or dimensioned items may be measured include obtaining is appropriate to the
2. Other slructures
description as
2. Taking over existing and
in detail in accordance permission/licences, procurement, design,
repairing as necessary payment of rates, fees
appropriate with the appropriate rules. execution, supply and/or
3. Maintaining, duraiion and charges related manufacture of the item
stated ihereto. or component parts and
their incorporation in the
4. Adapting, details stated Works
5. Clearing away and S.2 Finishes and surface
making good all works
treatments applied in
disturbed
manufacture or off site
S.3 Finishes and surface
treatments applied on
site
I
(ml lnsulation/ProofingWorks/FireStops
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2. Sheets 1. Plain areas 1. Horizontal m2 1. Length>Sminone M.1 The area measured D.2 Horizontal includes C.1 Work is deemed to S.1 Extent of laps
continuous length, length is that covered. the upper surface of any include extra material
3. Quilts 2. Across members, 2. Vertical
stated sloping structure S 450 in laps.
S"2 Method of fixing,
centres of members M.2 Proofing works/fire where not at the
4. Boards
stated
3. To soffits
stops are only measured
from the horizontal. discretion of the
5. Loose fill
3. Between members,
independently in this D.3 Vertical includes any Contractor
Sub-section where not surface of any sloping
centres of members structure > 45o from the
specified as part of
stated
another work section. horizontal.
0.4 To soffits includes the
underside of any
horizontal or sloping
structure.
HK SMM 4R lt6
XIV IRONMONGERY 117
(See Secfion /l - General Pinciples)
2. Type of item, unit or set Locks which are included nr M.4 Handrail brackets,
stated in a master-keying suite where not included with
are so described handrails are included
here.
5. Water bars 1. Size siated m C.3 Work is deemed to S.4 Bedding materials
include bedding
nr materials.
7. Dowels '1. Size and length stated nr M.5 lndividual dowels, C.4 Dowels are deemed to S.5 Bedding materials
where not forming part of include mortice in
doors, are measured concrete and bedding.
here.
HK SMM 4R ll8
XV STEEL AND METAL WORKS il9
(See Secfion // - General Pinciples)
'1. Framing, fabrication and 1. Joists kg 1. Castellated M.1 The items listed in the D.1 Wires, cables, rods C.1 ltems for fabrication
2. Columns
1st mlumn are and bars include sag and erection are
erection 2. Channels 2. Tapered
3. Beams rods, ties and the like. deemed to include:
headings under which
4. Bracings 3. Angles 3. Curved the various sections in (a) Cutting, notching and
5. Purlins and cladding 4. Tees 4. Cambered the 3rd column are drilling
rails measured.
5. Tubular sections 5. Weights of sections (b) Shop and site rivets
6. Grillages stated M.2 The mass of framing (c) Bolts including black
6. Plates
members is measured bolts and high strength
7, Builhup columns, 7. Wires from their overall friction grip bolts
trestles and towers
B. Cables lengths with no complete with nuts and
8. Built-up trusses and deduction for splay washers
girders 9. Rods
cuts or mitred ends or
10. Bars (d) Welding materials
of the mass of metal
and welding tests
11 . Others removed to form
including X rays and
notches and holes.
1. Joists kS 1. Curved other non-destructive
9. Overhead crane rails 1. Framing, fabrication and
M.3 No allowance is made
erection
tests as specified
2. Channels 2. Weight of sections stated for the mass of weld
(e) Galvanising to
2. Details of fixing clips and 3. Angles fillets, bolts, nuts,
structural steelwork if
resilient pads and fittings washers, rivets,
stated
4. Tees specifred
proiective coatings and
5. Tubular sections (f) Performance tests
rolling margins.
6. Plates
(g) Packings where
M.4 Where structural steel
required for connections,
7. Others is not a major part of
caps and bases
the structure it shall be
10. Connections kS grouped according to (h) Wedging and grouting
HK SMM 4R
r20
XV STEEL AND METAL WORKS t2t
(a) StructuralSteel(continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
11. Fittings 1. Fabrication and erection 1. Joists kg 1 . Weight of sections stated M.'1, M.2, M.3, M.4 and M.5 D.1 applies. C.1 applies.
2. Channels apply.
10. Bars
11. Ohers
17. Surface treatment 1. Sprayed metal coating 1. Surface preparation 1.112 C.2 Additional surface areas
1. Generally M,1 Curved work is so C.1 All work is deemed to S.1 Thickness and quality
described. include bending to shape, of materials
adhesives, screwing,
M.2 Where grounds and/ S.2 Finish
cuttings, notching, holes,
or backings are included
angles, joints and the like. S.3 Method of fixing
in the item this is stated,
M.3 Work to ceilings and
beams over 3.50 m
above floor (measured
io ceiling level in both
cases) except to
staircase areas, is so
described stating the
height in further 1.50 m
stages,
4. Others
HK SMM 4R 122
XV STEEL AND METAI WORKS 123
J
I
{dl Doors, Gates, Shutters, Grilles and Hatches
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Doors 1. Dimensioned description 1. Frames, linings, tracks nr 1. lronmongeryand M.1 Frames and linings, C.l Doors are deemed to S.1 Kind and quality of
(where the item is for and rails described accessories described. tracks, rails and shutter include fitting and materials
2. Sliding folding
doors and frames, the Alternatively these items hoods are included in the hanging.
pariitions S.2 Surface treatments
size of the doors is may be measured item,
C.2 ltems are deemed to applied as part of the
3. Hatches stated), reference to separately.
M.2 Wicket and access include: production process
drawing or reference to
4, Slrong room doors
manufacturer's catalogue
doors are described and
(a) lronmongery and S.3 Method of jointing or
included in the item.
5. Grilles, screens and accessories, except where form of construction
louvres stated to have been S.4 Method of fixing
measured separately
6. Gates S.5 Bedding, jointing and
(b) Operating equipment pointing compounds
7. Rolling grilles 1. Dimensioned description 1. Frames, linings, tracks nr
(c) Fixings and fastenings 3.6 Type of operating
(giving the clear opening and rails and shutter
8. Rolling shutters
size), reference to hoods described (d) Bedding and pointing equipment if required
L Folding doors drawing or reference to frames S.7 For fire doors and fire
manufacturer's catalogue
10. Folding shutters shutters the fire rating is
stated.
11, Collapsible gates
HK SMM 4R 124
XV STEEL AND METAL WORKS 125
Framed Stai Handrails and Balustrades
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Bars, flats, rods, C.1 Work is deemed to S.1 Kind and quality of
angles, tees, channels include: materials
and the like are each (a) Cutting to correct S.2 Grade and external
given separately and the lengths, splay cut ends diameter of tubular
size stated. and all drilling members
M.2 Curved work is so (b) Countersinking and S.3 Surface treatment applied
described. filling off burrs around as part of the production
holes pr0cess
S.4 Method of jointrng or form
of construction
S.5 Method of fixing where not
at the discretion of the
Contractor
S.6 Strippable protective
coverings or coatings
8. Wire work 1. Diameterof wire and size 112 M.7 Work not rectangular in
of mesh stated form is measured square
and described as in
irregular shapes
measured square.
HK SMM 4R 126
XV STEET AND METAT WORKS 127
ffl FencingandGates
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Where fencing and D.1 The height of fencing C"1 Work is deemed to S.1 Kind and quality of
gates consist of wire is measured from the include: materials
mesh, railings or other surface of the ground (or (a) Excavating holes for
S.2 Method of
infill material supported other stated base) to the supports, special supports
construction
by metal framing it is top of the infilling or and independent gate
measured in accordance where there is no infilling, posts in any ground met S.3 Surface treatments
with Sub-seciion (e) to the top wire. with, including breaking up applied as part of ihe
hereof. and removing any production process or
obstructions applied before delivery
(b) Backfilling and disposal to site
of surplus materials
S.4 Surface ireatment
(c) Earthwork support
applied on site
(d) Supports
(e) Making good existing S.5 Size and nature of
hard pavings backfilling
I /
I
HK SMM 4R 128
XV STEEL AND METAL WORKS 129
(h) Sundries
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
3. Angle frames to 1. Dimensioned description 1 . Method of fixing m (b) Fixing lugs, bedding
gratings for floor or mortar and any specified
surface water channels ironmongery
5. Manhole covers and Dimensioned description, 1. Rectangular cover and nr 1. Light duty C.2 Work is deemed to S.4 Sefting and sealing
frames and approximate weight, frame 2. Medium duty include bedding and compounds
opening size stated; ifto 2. Circular cover and frame haunching frames and
mmply with BS 497 or
3. Heavy duty
setting mvers in fine
other Standard this is 3. Double triangular cover 4. Single seal sand and grease.
and frame
stated 5. Double seal
6. Recessed paftern
6. Hinged covers to water 1. Dimensioned description, '1. Lock plate and padlock nr C.3 Work is deemed to
tanks and the like opening size stated described include bedding and
haunching frames and
setting covers in grease.
I
(h) Sundries (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
8. Pressed, folded or 1. Dimensioned description 1 . Background for fixing m 1. For duct skirtings or rails, C.4 Joints in the running S.5 Proprietary items have
exhuded metal skirtings stated the number of lengths, mitres, ends and catalogue numbers stated
9. Pressed, folded or compartments stated the like are deemed to be
extruded metal rails included.
10, Pressed orfolded metal 1. Dimensioned description nr C.5 Stripping protective 5.6 Method of iixing
window and door coverings or coatings are S.7 Strippable protective
surrounds deemed to be included. coatings
nr
HK SMM 4R r30
XV STEEL AND METAL WORKS r3r
Raised Access Floors
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
C.1 Raised access floors S.1 Kind and quality of
1. Generally M.1 No deduction is made
are deemed to include:
for voids s 0.50 m2. materials
(a) Panels, supporting
S.2 Supporting systems
structures, adhesives,
bearing pads, gaskets, S.3 Frames to panels
sealants, seals, edge S.4 Method of fixing
mouldings and the like
(b) Cutting and notching
and extra supports
(c) Forming openings for
building service
penetrations, electrical
floor boxes, air diffusers
and similar outlets
2. Floors 1. Type, modular size and 1. Height of cavity stated m2 1. Pattemed, details stated
surface finish of panels
stated
I
I
lil lletal Profiled Sheet Roof Coverings and Wall Gladdings (continuedl
CLASSIFICATION. TABLT MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2, Roof coverings 1. Pitch stated m2 1. Curved, radii stated M.1 No deduction is made C.1 Coverings and S.3Minimum side and
for voids s 1.00 m2. claddings are deemed to end laps
3. Wall claddings 2.Fixed through
include:
underlinings S.4 Jointing or sealing
(a) Work in forming voids
3 1.00 nP S.5 Nature, thickness
and spaclng of structural
(b) Holes for pipes, supports
standards and the like
(c) lniegral underlay
4. Abutments 1. Dimensioned cross- m 1. Raking M.2 Work to edges of C.2 Boundary work is
deemed to include
5. Eaves section description
2. Curved, radii stated
voids is only measured
bedding, pointing, ends,
where the void is >
6, Verges '1.00 m2. angles and interseciions
7. Ridges
8. Hips
9. Vertical angles
10. Valleys
11. Expansionjoints
12 Barge boards
13. Skirtings
{4. Flashings
15. Aprons and sills
16. Gutlers and linings
17- Jambs
18. Filler pieces
19. Sleeves and/or 1. Dimensioned description nr
flashings to holes
for pipes etc.
20. ltems extra over roof 1. Translucent sheeis 1. Dimensioned description nr
coverings 2. Sheets with soaker
21. ltems extra over wall flanges
cladding 3. Roof light units
4. Sheets with louvre
blades
5. Ventilators
6. Junctions
22. Cutting 1, Raking m
2. Curved
23. Fire stops 1. Dimensioned description m
HK SMM 4R r32
XV STEEL AND METAL WORKS r33
K Fixed Partitions and Demountable Partitions
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
C.1 Partitlons are deemed to
1. Generally M.1 Work is measured the D"1 Work is deemed
include all integral
S.1 Kind and quality of
mean lengths as fixed. intemal unless described materials
The following information shall be provided: components, holes, etc.
as external.
(a) Scope and location ofthework M.2 Curved work is so preformed at factory but S.2 Method of construction
described.
(b) The services to be located within the partitions exclude trims fixed on S.3 Required fire ratings,
M.3 Work obstructed by site. decibel reduction ratings,
integral services is so C.2 Wok is deemed to etc.
described. include cutting and fitting
S.4 Layout of joints
M.4 Factory applied finishes around obstructions etc.
S.5 Method of bedding, jointing
and site applied finishes and holes for services
and pointing
are only measured where including additional
bridging members, S.6 Details of ironmongery,
not at the Contractor's
blockings and llanges etc. glass, linings or the like to
discretion.
C.3 Partitions are deemed be included
to include: S.7 Proprietary partitions have
(a) Head and cill fixings
catalogue numbers stated
(b) All angles,
intersections, ends and
abutments etc.
(c) Bedding and pointing
frames as required
(d) Glazing and glazing
beads and mmpounds
(e) Extra framing
members, trimmers,
stiffeners, linings around
blank openinqs
HK SMM 4R r34
XV STEEI. AND METAI WORKS 135
3. Proprietary office 1. Dimensioned description nr D.2 Office partitions S.6 lntegral metalwork
partitions include doors, and ducting
Sets ironmongery, glazed
S.7 Glass and method of
panels and windows and
fixing
the like, bui exclude trims.
M.1 Soffit linings fixed to D.1 All work is deemed C.1 Ceilings are deemed to S.'1 Kind and quality of
Generally
soffits or on wooden intemal unless described include: materials
The following information shall be provided: (a) Rails, hangers,
support framework and as external. S.2 Method of construction and
(a) Scope and location ofthe work hangers are measured in spacers, suspension and
fixing to structure
(b) The services to be located within the ceiling void Section XlllWood framed members and lhe
S.3 Proprietary ceiling systems
Works. like
have catalogue numbers
(b) Ceiling tiles or panels
M.2 Suspended ceilings of stated
plasterboard or of or metal strips and the
like S.4 lntegral diffuser and
plastered metal lathing
(c) Working over and ventilation, lighting, speaker
are measured in Section
around obstructions and other fittings
XVI Plastering and
Paving. (d) Supports and S.5 Vapour barriers
accessories for fittings
M.3 Work over 3.50 m S.6 Insulation materials
(e) Bridgings to support
above floor (measured to
fittings or where trunking
ceiling soffit level) is so
in ceiling space obstructs
described stating the
the standard grids
height in further stages of
(f) Edge and angle trims
1.50 m stages.
(g) Forming openings
and holes
C.2 Work incorporating
integral fiftings is
deemed to include
additional hangers,
framing etc.
HK SMM 4R r36
ru STEEL AND METAL WORKS 137
5. Upstands and 1. Heights600mm m C.2a This work is deemed S.8 Method of support and
bulkheads to include strengthening depth of suspension
2. Thereafter in 300 mm
the ceiling suspension
stages
system as necessary.
6. Cavity fire barriers, 1. Plain 1. Height<300mm m C.3 Cavity fire barriers are
total thickness stated deemed to include all
2. Obstructed by services 2. Thereafterin 300 mm
scribing, angles, ends,
stages
and support work.
7. Collasto barriers 1. Pipes 1. Length ofsleeve, each nr M.7 Collars are measured S.9 Types
passing through fire side of banier stated where they are integral
2. Trunking
barriers with fire baniers.
1. Genenlly
The following information shall be provided
(a) Scope and location of the work
2. Windows Dimensioned description, Numberof fixed lights nr 1. Glazing described C.1 Windows and doors are S.1 Kind and quality of
3. Glazed doorc overall size and drawing and number and type of 2. lronmongery described deemed to include: materials
reference stated opening lights stated (a) Fixing including all S.2 Size or standard of
screws and bolts, shot sections
4. Composib metal Dimensioned description, Number of units and nr 1. Glazing described
fired fixings and lugs
windows overall size and drawing number and size of 2. lronmongery described
S.3 Surface treatment applied
reference stated mupling mullions and (b) Morticing ends of as part of the production
5. Composite metal
transoms siated, and transoms and mullions pr0cess
windows and doors
number of fixed lights and /or strengtheners to S.4 Strippable protective
and number and type of same coverings or coatings
opening lights stated (c) lronmongery and
S.5 Joint sealing, bedding and
fittings
6. Remote control gears Dimensioned description, nr pointing materials
stating number of lights (d) Glazing and glazing
S.6 Requirements for water
to be opened beads and mmpounds bars
(e) Easing all opening
sashes and oiling flttings
(f) Sealing alljoints and
bedding and pointing
frames
(g) Sealant or separator
to surfaces of aluminum
windows in contact with
mncrete, plaster or
brickwork
(h) Water bars where
required
(i) Stripping protective
coverings or coatings
C.2 Composite aluminum
units are deemed to
include galvanised steel
strengtheners inside
mullions and transoms.
HKSMM 4R t38
XV $TEEI AND METAT WORKS 139
(ol ShopFrcnts
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Work is measured D.1 Work is deemed C.1Shop fronts are S.'lKind and quality of
net lengths as hxed. intemal unless described deemed to include: materials
The following information shall be provided:
as extemal.
M.2 Curved work is so (a) All integral S.2 Size or standard of
(a) Scopeand locationofthework described. components, holes etc. sections
preformed at factory, but
S.3 Surface treatment
exclude trims
applied as part ofthe
(b) All screws and bolt production process
fixings, shot fired fixings
S.4 Sirippable protective
and fixing lugs
coverings or coatings
(c) Glass and linings or
S.5 Method of
solid panels
construction and layout
(d) Cutting and fifting ofjoints
around obstructions etc.
S.6 Joint sealing, bedding
and holes for services
and pointing materials
(e) Sealing all joints and
S.7 Details of
bedding and pointing
ironmongery, glass,
frames as required
linings and the like to be
(f) Stripping protective included
coverings or coatings
S.8 Proprietary systems
C.2 Aluminium shop fronts have catalogue numbers
are deemed to include stated
sealant or separator to
surfaces in contact with
concrete, plaster or
brickwork-
(ol Shop Fronts {continuedf
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RUTES SUPPLEMENTARY
RULES INFORMATION
2. Shopfronts 1. Dimensioned description '1. Cill boards and fascia nr 1. Shop fronts with sloping M.3. There is provision C.3 Enumerated shop
(Enumerated) and drawing reference panels etc. have heads and/or cills so here for shop fronts to be fronts are deemed to
stated, open framing or dimensioned descriptions. described and the average measured either by include:
partition above ceiling height stated enumeration as item (o).2 (a) Head and cill fixings
described in the item hereof, or linear
measurement as item (o). (b) All angles,
3 hereof at the Surveyor's intersections, ends and
discretion. lf linear abutmenis etc.
measurement is used
then item (o).6 hereof
must be used insiead of C.4 Shop fronts measured
3. Shop fronts (Linear m
item (o).5 hereof. linear are deemed to
measurement)
include head and cill
fixings.
5. ltems measured 1. Dooropenings 1. Dimensioned description nr M.4 ltem (o).5 is only D.3 'Openings" is a C.5 Openings are deemed
extra over lhe used in respect of general term for breaks in to include additional
2. Otheropenings enumerated shop fronts. the general construction integral components.
enumerated shop
fronts in which they of shop fronts and
C.6 Openings are deemed
occur includes the components.
to include ironmongery,
linings or the like, but
exclude trim.
C.7 Doors are deemed to
include easing and
adjusting doors and oiling
fitlings.
HK SMM 4R 140
XV STEEL AND METAL WORKS
t4r
(p) Curtain Walling
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 No deduction is made D.'1 Curtain walling
1 Curtain walling is
S.1 Kind and quality and
for voids < 1.00 mz. mmprises non- deemed to include (a)all
The following information shall be provided: thickness of materials
loadbearing walls of framing and fixing at
(a) Scope and location ofthework.
metal framing, fixed as
perimeters including S.2 Surface treatments applied
HKSMM 4R 142
)O/I PLASTERING AND PAVING 143
(See Seciion ll - General Pinciples)
(a) Spatterdash
CIASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Spatterdash 1. To all surfaces 62 M.1 All surfaces are C.1 This work is deemed to
measured together include applying in any
position and at any level.
I
I
(c) General Clauses Applicable to the Following Sub-sections (d), (e) and (f)
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Preparation of surfaces D.1 All work is deemed C.1 Work is deemed to S.1 Kind, quality, mmposition
is included in the internal unless described include: and mix of materials,
appropriate Sub-section. as exiernal. (a) Preparation of including bonding agents,
Preparation of old D.2 Base, in M.3, refers to backgrounds as specified waterproofi ng agents and
surfaces is given the structural other admixtures (except
(b) Narrow widths and
separately in Section XVI background, metal where at the Contractor's
small quantities
Plastering and Pavings. lathing or plasterboard. discretion)
(c) Laying or executing
M.2 Work to floors and S.2 Nature of surface
work in bays or between
ceilings is measured to treatment, includingwax
strips polishing or sealing coats
the area between
structural walls, (d) Temporary formwork and the like
deductions for columns and rules
and the like are (e) Joints between
measured the structural difierent types of work
size.
and between new and
M.3 Work to walls and the old work
Iike is measured to the (f) lntersections of curved
area of the base. surfaces
M.4 Curved work is so (g) All making good
described.
C.2 Work to floors and
M.5 No deduction is made pavings is deemed to
for vords s 0.50 mz, nor include laying or finishing
for voids < 300 mm wide.
to slopes, falls and
M.6 Work to ceilings and cunents and
beams where the ceiling intersections in slopes
is > 3.50 m from the floor and falls.
is given separately and
so described, the height
being stated in stages of
1.50 m.
HK SMM 4R 144
)O/I PLASTERING AND PAVING t45
f . Walls and columns 1. Thickness and numberof 1. Pattemed or grooved y12 1. Work in repairs slating M.1 Work measured in this D.1 The thickness stated is C.1 Work is deemed to S.1 Method of application
coats stated work, details stated, the approximate Sub-section includes the nominal thickness include:
2. Ceilings and sides and
coloured work, mlour or thickness of dubbing rendering, plastering, excluding keys, grooves (a) Cleaning off and
soffits of beams 2. On plasterboard,
colour group stated. For required screeding, granolithic or open joints in wetting sLirfaces of
thickness and number of
3. Sloping ceilings and screeds, lhe material to tenazzo, bitumen brickwork or lathing.
coats stated 2. Work canied out in one concrete slabs, and
sides and soffits of be received is stated. emulsion and asphaltic
operation with concrete washing with cement
beams 3. On metal lathing, concrete or macadam
is so described. grout if the concrete has
thickness and number of and the like. Each type of
4. Sloping soffits of stairs hardened
mats stated work is grouped under a
5. Flewing soffits of stairs (b) lnternal angles,
separate heading.
6. Floors anises, throats, drips and
the like
7. Roofs
(c) Coves, grooves and
8. Treads and risers
rounded external angles
9. Others
(d) Angles, stops,
10. Roads and pavings 1. Thickness stated 912 M.2 Bitumen emulsion, D"2 The thickness stated is intersections, fair ends, S.2 Method of consolidation
asphaltic concrete, that after consolidation" junctions, wreathed
macadam base murses, corners and the like on
wearing courses and coves, skirtings,
tack mats, are each channels, strings, curbs
measured separately. and the like
I l
(d) ln-situ Surface Finishes and Screeds or Backings (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
11. ltems measured extra 1. Coloured margins 1. Width and deph stated m 1. ln coloured work, colour
over the foregoing 2. Coloured bands or colour group stated
Items 1 to 10
3. Fillings to pipe trench
covers
4. Shallow channels within
the thickness of the
screed, flooring or paving
5. Finish to channels
formed in floor or roof
finish of a similar type
6. Filling to recessed nr
manhole covers, and the
like size stated
7. Filling to shaped insets,
described
B. Filling to mat sinkings,
size stated
HK SMM 4R 146
XVI PTASTERING AND PAVINO 147
nr
t
I
1. Generally M.1 Work measured under C.1 Each item of work in S.1 Kind and quality of
this Sub-section includes this section is deemed to materials
ceramic, synthetic include, except where S.2 Size, shape and thickness
rubber, granite, marble or special tiles or fiftings are of units
slate tiling, mosaic tiling, required:
S.3 Nature of base
precast items, and the (a) lnternal angles and
like. Each type of work is S.4 Preparatory work
arrises
grouped under a S.5 Method offixing and
(b) Cufting and fitting up
separate heading" treatment of joints
to frames and metalwork
M.2 Granite, marble, slate and around pipes and
etc. slabs are measured bracket ends and the like
in accordance with
(c) Mitres, stops,
Section Xl Stone Works
intersections, fair ends,
Sub-section (b).
junctions, wreathed
comers and the like on
mouldings, coves,
skirtings, gutters,
channels, strings, curbs
and similar
C.2 All work is deemed to
include:
(a) Bedding materials and
adheslve and laying in
the specified method
(b) Treatment of joints
HK SMM 4R 148
XVI PLASTERING AND PAVING 149
7. Margins in contrasting
mlour. width stated
17. Movementjoints 1. Dimensioned description m D.1 Movement joints include 5.6 Method of fixing
expansion joints.
18. Gover strips
21. Filling in to trench 1. Width and thickness stated m 1. Where jointing is required
covers to line with adjoining work
it is so stated.
22. Filling in to insets, 1. Sizes stated nr
sinkings
HKSMM 4R 150
XVI PLASTERING AND PAVING l5t
(0 Rubber and Plastic Sheet or Garpet Sheet/Tile Finishes and the like
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Work measured under D"1 Rounded internal and C.1 Work is deemed to S.'l Kind and quality and size
this Sub-section includes external angles > 100 include: of materials
synthetic rubber, mm radius are classified (a) Rounded intemal and S.2 Nature and number of
linoleum, cork, rubber, as curved work. external airgles s 100 underlays
vinyl sheeting, fibreglass mm radius S.3 Nature of base
membrane, ball court
(b) Seams and fair joints
finishes, acoustic S.4 Method of fixing and
sheetings, carpet and (c) Fixing at perimeter treatment of joints
carpet tiles, artifi cial (d) Cufting and fitting up S.5 Extent of laps
turfing, and the like. Each to frames and metalwork 5"6 Types ofseams
type of work is grouped and around pipes and
under a separate bracket ends and the like
S.7 Pattern, width and laying
heading. direction of materials
S.8 Surface treatment
8. Skirtings 1. Height stated 1. Flush m 1. Patterned, details stated C.5 Work to skirtings and
kerbs is deemed to
2. Raking 2. lnserts, size orsection
include fair, rounded,
stated
9. Kerbs 2. Girth stated 3- Vertical beaded and moulded
edges, coved junctions,
ends, angles and ramps.
tr
'1
(f) Rubber and Plastic Sheet or Carpet SheeUTile Finishes and the like (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2. Cover strips m
3. Dividing strips
HK SMM 4R
152
XVII MECHANICAI. INSTATTATIONS ls3
ll - General Principles)
(See Section
(al General Clauses Applicable to all techanical Sections
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVFRAGE RULES SUPPLEMENTARY
RULES INFORMATION
L Generally M.l Where composite D.1 Bonding is defined as C.1 Assembling and S.1 Any regulations,
(a) A general description of the installations shall be given where it is not evident from the drawings units are supplied by the permanent joining of jointing together the rules, bye-laws and the
required to be provided by this document. others, particulars are metallic parts to form an component parts of like with which the
included in the description electrically conductive composite units, including installations are required
(b) Detailed specifications shall be provided together with drawings indicating the scope of the work. of any assembly work path which will assure providing any nec€ssary to comply
involved. electrical continuity and connecting flanges and
has the capacity to jointing materials are S.2 Kind and quality of
M.2 Work is identified materials
conduct safely any deemed to be included.
whether intemal, extemal
or in plant rooms.
current likely to be
C.2 All necessary drilling
S.3Gauge orthickness
imposed. and substance of
of the background and
M.3 Temporaryworkand materials
provision of fixings, nails,
removal of temporary
work and making good
bolts, nuts, holes, screws, S.4 Any tests with which
plugs, shot fired pins and materials, plant and
shall each be so
the like are deemed to be equipment are required
described.
included. to comply
M.4 ln the event that only
a performance
C.3 Plates, discs and S.5Pressure and
labels for identification of temperature ratings
specification is available,
plant, equipment,
preamble clauses are S.6 Priming and/or
included in the bills, appliances, pipes, valves painting off site and
stating hat the rates are and the like are deemed proprietary finishes or
to include all costs of, to be included.
surface treatment applied
and costs in connection C.4 lnstruction notices, as part of the production
with, the design, supply warning signs for plant, process are described
and installation of the equipment, appliances, stating whether applied
complete installation. pipes, valves and the like before or afier fabrication
are deemed to be or assembly.
M.5 Systems, together
with their equipment, included,
pipeworK ductwork, C.5 Brackets and methods
insulation and sundries, of support are deemed to
are classified as shown in be included.
Appendix ?" to Section ll
General Principles.
C.6 Bonding is deemed to
be included in the items in
which they occur. Where
items of equipment are
supplied by others the
bonding is deemed to be
included in the items of
fixing the equipment.
(bl Equipment
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1, Chillers 1. Typeanddutystated 1. Cross-referenceto nr C.1 Each item is deemed
drawings or specification to include:
2. Cooling towers
(a) All necessary
3. Air handling units assembly
L Fans
(b) Orientation
5. Boilers (c) Alignment
6. Chimneys (d) Levelling and bolting
7. Tanks down
8, Heat exchangers (e) Provision of shims
and packing pieces
9. Pumps
10. Others
(0 Clocking of couplings
between drivers and
rotating equipment
(g) Anti-vibration
mountings
(h) Anti-vibration
materials in bases
(i)Sound Insulation in
bases
HK SMM 4R 154
XVll MECHANICAT |NSTALL/ATIONS r55
1. Fittings,accessories 1. Type, size and pattern, 1. Cross-referenceto nr 1. Ancillaries included with C.'l ltems are deemed to
capacity and method of drawings and/or fittings, details stated include:
fixing and supports stated specifications or (a) Providing everything
manufacturer's reference
necessary, including
couplers, enlarged pipe
sockets, W.C. connectors
and adapters for jointing
to services, overflow and
soil and waste pipes
(b) Sealing or pointing
around fittings
(c) Fixings and supports
2. Ancillaries not nr 1. Details stated C.2 Jointing ancillaries to
included with fittings fittings is deemed to be
included.
)
(dl Pipewod<
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Composite supports D.1 Pipes run in chases, C.1 Work is deemed to S.1 Method of jointing
are measured in kg and unless othenivise include:
(a) Any regulations, rules, byeJaws and the like with which the installations are required to comply. the number stated. described, do not include
S.2 Method of fixing and
(a) Joints in the running brackets and methods of
cutting away and making
lengths support
good.
(b) Joints between pipes S.3 Wall floor and ceiling
of differing materials plates
(c) Connections of
pipework to equipment
(d) Everything necessary
for alljointing
(e) Cufting and jointing to
puddle flanges
(f) Wall floor and ceiling
plates
HKSMM 4R t56
XVII MECHANICAL INSTATTATIONS t57
(dl Pipewor*(continuedf
CLASSIFICATION TABLE MEASUREMFNT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
2. Pipework 1. Type, size and method m ',l. Laid in ducts M.2 Pipework is measured D.2 Final supports are C.2 Pipework is deemed
of jointing over all in-line fittings, any element between the to include:
2. Laid in trenches
short running lengths and structure or the support
(a) Fittings for pipes < 50
3. Laid in chases branches, but not through structure and the pipe.
mm diameter (or 54 mm
items of ancillaries,
4. Embedded in in-situ D.3 The term 'pipework diameter in the case of
headings and trapping
concrete fittings' is deemed to copper pipes), including
sets.
include: connections
5. Embedded in screeds
M.3 Where an in-line (a) Bends (b) Any flanges, unions or
6. Suspended reduction in diameter
other devices used solely
occurs at a reducer or tee (b) Elbows
7. Fixed to walls or for erection purposes
columns eic., the largest diameier (c) Branches
shall be measured the full (c) Final supports
8. Laid on floors length of the fitting. (d) Reducers
(d) Made bends
9. Others M.4 Where pipes pass (e) Tees
(e) Pipe anchors and
through roofs or vertical (f) Reducing bends guides
cladding the requisite
slates, aprons and (g) Reducing tees C.3 Cutting and jointing
flashings are measured in pipes to fiftings are
(h) Caps
accordance with Section deemed lo be included.
Xlll Wood Works and (i) Flanges and the like
Section XV Steel and
Metal Works Sub-
sections (c) or (i).
I
{dl Pipework{continued}
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPTTMENTARY
RULES INFORMATION
3. Extra over pipework, 1. Bends nr M.5 Reducing fittings are C.4 The rates for reducing
other than copper, 2. Elbows identified by the largest fittings are deemed to
for fittings > 50 mm 3. Branches diameter. include additional
diameter reducing flttings to attain
4. Reducers the required sizes.
5. Tees
6. Reducing bends
7. Reducing tees
4. Extra over copper
L Caps
pipes for fittings 9. Flanged ends
> 54 mm diameter 10. Others
10, Flow and return 1. Length and size stated nr M.8 Flow and retum S.4 Method of
header pipes and number and size of header pipes forming part construction and method
each branch stated of plant or equipment are of jointing ends
included with the plant or
equipment.
HK SMM 4R t58
XVII MECHANICAT INSTATTATIONS 159
(d) Pipework(continued|
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
11. Special joints and 1. Type and method of 1. Nominal size stated nr D.4 Special joints or
connections jointing stated where different from pipe connections are joints
in which joint or which differ from those
connection occurs generally occurring in the
running length or are
conneciions to pipes of a
different profile or
material, connections to
existing pipes, sanitary
fittings or equipment.
12, Screwed sockets 1. Size and kind of pipe or nr C.6 Perforating the
flange concerned pipework or flange is
13. Tappings deemed to be included.
14. Bosses
15. Welding necks 1. Size and kind of both nr
welded to pipes or pipes stated
flanges
16. lnstrumentation 1. Thermostat complete 1. Size of pipe or flange nr M.7 applies.
with cock concerned
2. Pressure gauges
complete with cock
17. Connectionsto Prov'l
public mains, making Sum
good highway and
any other work which
may be carried out
by a utility company
or Local Authority
I I
(el Gutterc
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENlARY
RULES INFORMATION
'i-. Gutters 1. Straight 1. Type, nominal size m M.1 Gutters are measured C.1 Gutters are deemed S,1 Kind and quality of
over all fittings and to include: materials
2. Curved
branches. (a) Short lengths and S.2 Gauge, thickness or
joints in the running length substance of materials
(b) Fixings and supports
2. Extra over gutters 1. Angles nr M.2 Reducing fittings are C.2 Cutting and jointing
for fittings measured extra over the gufters to fittings are
2. Stopped ends
largest gutters in which deemed to be included.
3. Outlets they occur.
4. Others
3. Special joints and 1. Type and method of nr 0.1 Special joints and
connections jointing stated connections are joints
which difier from those
generally occurring in the
running lengths or are
connections to existing
gutters or gutters of a
difiering profile or
material.
HK SMM 4R t60
XVII MECHANICAT INSTALTATIONS l6l
fll Ductwork
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 Composite supports D.1 Final supports are C.1 Work is deemed to S.1 Method of jointing
are measured in kg and any element between the include:
(a) Any regulations, rules, bye.laws and the like with which the installations are required to comply. the number stated. structure or support
S.2 Method of fixing and
(a) Any necessary drilling brackets and all methods
structure and the
of the background and of support including
ductwork. provision of nails, bolts, proprietary and specialist
nuts, holes, screws, support systems and
plugs, shot-fired pins and spring compensated
the like components
(b) Provision and
installation of stifieners
and all straps and
hangers, rods, test holes,
bungs and the like
including proprietary and
specialist support
systems and spring
compensated components
(c) Alljoints, including
joints between ducts of
differing materials
(d) Everything necessary
for alljointing
HK SMM 4R 162
XVII MECHANICAT INSTATTATIONS r63
0 Ductwork{continuedf
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
6. Flexible ductwork 1. Type, size and length, in nr M.5 The length of flexible
stages of 0.50 m stated and extensible ductwork
7. Extensible ductwork is measured as it is fully
extended.
8. lsolated joints which 1. Size, kind ofduct and nr M.6 Alternatively these
differ from those given method of jointing stated items may be included in
in the description of the description of another
the ducts enumerated item.
i
lSl lnsulation
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally M.1 External insulation C.l Work is deemed to S.1 Kind and quality of
and internal lining are include: materials
(a) Any regulations, rules, bye-laws and the like with which the installations are required to comply. (a) All fixings and
measured separately. S.2 Size, thickness and
adhesives
(b) Forming laps, welts, finish of materials
cut outs, recesses and S.3 Method of application
the like
(c) Pointing, sealing,
trowelling smooth,
chamfered and sealed
edges and the like
(d) Working around
supports, small drains,
vents or similar
obstructions
(e) Special insulation of
load bearing density at
pipe supports
HK SMM 4R 164
XVll MECHANICAT INSTAII/ATIONS t65
El lnsulation(continuedl
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
6. lnsulation to 1. Type and thickness of m2 1. Vapour barier described M.3 lnsulation to C.4 Work is deemed to
rectangular ductwork insulation stated rectangular ductwork is include:
measured the nett area in
(a) Working around
contact with the base of
ducting fittings, stiffeners,
all ducting as installed joints and the like
and overall ducting fittings
and joints. (b) Forming of angles
and other labours
7. lnsulation to circular 1. Type and thickness of m C.5 Work is deemed to
or oval ductwork insulation and size and include working insulation
shape of ductwork stated around joints.
8. ltems measured 1" Bends 1. Type and thickness of nr M.4 Extra over insulation C.3 applies.
extra over insulation insulation for working around
2. Branches reducing fittings, iapers
to circular or oval
ductwork in which 3. Elbows and transformation fittings
they occur forworking etc. are identified by the
4. Reducers
the insulation around largest sectional size.
in-line fittings 5. Tees
6. Others
9. lnsulation to 1. Silencers 1. Details and size of nr
ductwork ancillaries ancillaries stated, and
2. Plenums
type and thickness of
3. Others insulation to ancillaries
given
HK SMM 4R
166
XVII MECHANICAT INSTATLATIONS 167
t
(hl ProteetiveCoveringsandFinishings{continued}
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
HK SMM 4R
r68
XVII MECHANICATINSTAIATIONS 169
{il Sundries
CLASSIFICATION TABLE MEASUREMENT DEFINITION RUTTS COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Supports for 1. Pylons 1. Described and, where nr
pipework necessary, method of
2. Poles
fixing and nature of
3. Pole stays structure stated
4. Others
2. Catenary cables 1. Number, type and size 1. Eye bolts, shackles and m
stated straining screws and
method of fixing stated in
description
3. Marking the 1. Where the nature of the Item
positions of all holes, work necessitates any of
mortices, chases and these to be formed during
the like in the construction, the relevant
structure particulars are given
--l
(il Sundries(continued|
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
HK SMM 4R 170
xvilr EtEcTRlcAt tNsTAttATtoNs t7t
(See Secfron II General Pinciples)
-
(al General Glauses Applicable to all Electrical Sections
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVFRAGE RULES SUPPLEMENTARY
RULES INFORMATION
Generally M.1 Where composite D.1 Bonding is defined as C.1 Assembling and S"1 Any regulations,
(a) A general description of the installations shall be given where it is not evident from the drawings units are supplied by the permaneni joining of jointing, together the rules, bye-laws and the
others, particulars are metallic parts to form an component parts of like with which the
required to be provided by this document.
included in the description electrically conductive composite units including installations are required
(b) Detailed specifications shall be provided together with drawings indicating the scope of the work. of any assembly work path which will assure providing any necessary to comply
involved. electrical continuity and connecting flanges, and
has the capacity to jointing materials are S.2 Kind and quality of
M.2 Work is identified materials
conduct safely any deemed to be included.
whether internal, external
or in plant rooms.
current likely to be
C.2 All necessary drilling
S.3 Gauge or thickness
imposed. and substance of
of the background and
M.3 Temporary work and materials
provision of fixings, nails,
removal of temporary
work and making good
bolts, nuts, holes, screws, S.4 Any tesis wiih which
plugs, shot fired pins and materials, plant and
shall each be so described.
the like are deemed to be equipment are required
M.4 ln the event that only included. to comply
a performance
specification is available,
C.3 Plates, discs and S.5 Type and voltage of
labels for the identilication maln electricity supply
preamble clauses are
of plant, equipment, stating the location of the
included in the bills
cables, switches and the main supply point
stating that the rates are
like are deemed to be
to include all costs of, S.6 Priming and/or
included. painting off site and
and costs in connection
with the design, supply C.4 lnstruction notices, proprietary finishes or
and installation of the warning signs for plant, surface treatment applied
complete system. equipment, cables, as part of the production
switches and the like are process are described
M"5 Systems, together
deemed to be included. stating whether applied
with their equipment,
before or after fabrication
trunking, ducting, cable C.5 Brackets and methods
or assembly
trays and sundries are of support are deemed to
classified as shown in be included.
Appendix "A" to Section ll
General Principles.
C.6 Bonding is deemed to
be included in the items in
which they occur. Where
items of equipment are
supplied by others, the
bonding is deemed to be
included in the item of
fixing equipment.
(bt Equipment and Switchgear
(See Secfion XVlll(a)
- General C/auses)
HK SMM 4R 172
xvilr ETECTRICAT INSTALTAIIONS 173
(cl Gonduits (except in Final Gircuitsl
(See Secfion XVlll(a)
- General C/auses)
1. Conduits 1. Type and external size 1. On surface m M.1 Conduit is measured D.1 Concealed conduits C.'l Draw wires, draw
staied, where draw wires, over all conduii fittings, are deemed to include cables, conduit boxes,
draw cables and the like
2. Concealed
boxes, short running conduits embedded in conduit fittings and the
to be provided for use by 3. Run in chase lengths and branches. concrete or in floor like, except those required
others they are given in screeds" io be measured under
ihe description
4. Others
item (c).2 hereof, are
D.2 Conduits run in
deemed to be included,
chases, unless otherwise
stated, do not include C.2 Bending, cutting,
cutting away and making screwing and provision of
good. all conduit fixings and
fittings (except those
D.3 The term 'conduit
required under item (c).2
fittings and fixings' is
hereof, are deemed to be
deemed to include
included.
saddles, tees, elbows,
bends, cover plates, C.3 Components and the
bushes, locknuts, forming of holes for
stopping plugs, reducing making connections of
bushes and the like. conduii into trunking and
the like are deemed to be
included.
2. ltems measured as 1. Outlet boxes 't. Type and size stated nr C.3 applies.
extra over the 2. Adaptable boxes C.4 Cutting and jointing to
conduit in which 3. Floor trap boxes conduits are deemed to
they occur
4. Purpose made boxes be included.
5. Junction boxes C.5 Cover plates to boxes
6. Boxes required for are deemed to be included.
drawing in cables
7. Flameproof boxes
8. Expansionjoints
9. Pedestal boxes
10. Others
3. Flexible conduits 1. Size and type stated 1. Overall length stated nr M.2 Flexible conduits are C.3 applies.
and adaptors described in stages of 0.50 m measured fully extended
C.6 Cutting, jointing and
providing all conduit
fitiings are deemed to be
included.
(dl Tnrnking and Busbar Trunking
(See Section XVlll(a)
- General C/auses)
HK SMM 4R 174
)NflII ETECTRICAT INSTATLATIONS 175
(el Trays and Ladders
(See Section XVIII(a) - General C/auses)
1. Trays L Type and size stated m M.1 Trays and ladders are C.1 All joints are deemed
measured over all short to be included.
2. Ladders running lengths and C.2 Cutting and jointing
branches. trays and ladders to
3. ltems measured extra 1. Stop ends nr M.2 Reducing fittings are fittings are deemed to be
over trays in which identified by the larger included.
2. Bends
size of iray or ladder.
they occur C.3 Cutting openings in
3. Tees
4, ltems measured extra trays is deemed to be
included.
over ladders in which 4. Reducing tees
they occur 5. Crosses
6. Offsets
7. Reducers
8. Others
/
fft Gables {except in Final Circuits}
(See Seclion XVlll(a) * General C,auses)
1. Cables 1. Laid in trench 1. Type, size, number and m M.1 Cables are measured C.1 Colour coding or other
size of cores and rating the net length between identification markings are
2. Laid in open duct
stated. Components for deemed to be included.
equipment, control gear,
3. Laid on arm or hanger supporting cables given fittings, accessories and
C.2 Determining circuits
4. Fixed to cable tray, in the description. (See the like, except that the
and lacing into circuit
ladder or other surface however altemaiive following standard groups are deemed to be
5. Drawn into measurement in item allowances are added for
included.
(f).7 hereof.) tails:
underground pipe duct
(net length of pipe duct (a) 0.30 m on each cable
measured) entering fittings and
6. Laid or drawn into accessories
trunking (b) 0,60 m on each cable
7. Drawn into conduit entering equipment and
8. Suspended from switch gear
insulators or catenaries
9. Wrapped around
pipework or equipment
10. Drawn into existing
conduits
11" Drawn into existing
ducts
12. Drawn inio existing
trunking
2. Cable joints 1. Type and size ofcable nr C.3 Materials and heat for
stated. Joint-boxes, making the joints are
sealing-boxes and the like deemed to be included.
given in the description
3. Line taps 1. Size and type of cable nr
C.4 Shrouds, if required,
stated are deemed to be included.
4. Cable terminalion NI
C.5 Shrouds, locknuts,
glands
bushes, earth tags and
cable lugs are deemed to
be included.
5. Cable termination '1. Type of box and type nr
C.6 Insulatingmaterials,
boxes and size of cable being jointing materials, locknuts,
terminated stated
bushes and the like are
deemed to be included.
HK SMM 4R 176
XVIil ETECTRICAI INSTATTATIONS 177
M.6 Alternativelyfinal
circuits may be measured
in detail in accordance wiih
Subsections (c) and (f)
hereof.
HK SMM 4R 178
XVIII ETECTRICAT INSTATIATIONS 179
(hl Fittings and Accessories
(See Section XVlll(a) * General Clauses)
HK SMM 4R r80
XVIII ETECTRICAT INSTALIATIONS r8r
o suNDRlEls
(See Section Wlll(a) - General C/auses)
HK SMM 4R
182
XIX COMMUNICATIONS/SECURITY/CONTROL SYSTEMS 183
(See Sectlo/l ll * General Principles)
(al General Glauses Applicable to all Communications/Security/Control Systems Sections
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RUTES INFORMATION
1. Generally M.1 Where composite 0.1 Bonding is defined as C.1 Assembling and S.1 Any regulations,
units are supplied by the permanent joining of jointing, together with the rules, bye-laws and the
{a) A general description of the installations shall be given where it is not evident from the drawings others, particulars are metallic parts to form an component parts of like with which the
required to be provided by this documeni. included in the description electrically conductive composite units, including installations are required
(b) Detailed specifications shall be provided together with drawings indicating the scope of the work. of any assembly work path which will assure providing any necessary to comply
involved. electrical continuity and jointing materials and
S.2 Kind and quality of
has the capacity to connecting flanges are
M.2 Temporary work,
conduct safely any deemed io be included.
materials
removal of temporary S.3 Gauge orthickness
current likely to be
work and making good C.2 All necessary drilling
and substance of
imposed.
are each so described. of the background and the
materials
provision of fixings, nails,
M.3 Systems, together
bolts, nuts, holes, screws, S.4 Any tests with which
with their trunking, plugs, shotfired pins and materials, plant and
ducting, cable trays and equipment are required
the like are deemed to be
conduits (unless to comply
included.
associated with more than
one installation) are C.3 Plates, discs and S.5 Priming and/or
classified as shown in labels for the identification painting off site and
Appendix "A" to Section ll of plant, equipment, proprietary finishes or
General Principles. cables, switches and the surface treatment applied
like are deemed to be as part of the production
M.4 Work is identified
included. process are described
whether internal, exiernal siating whether applied
or in plant rooms. C.4 lnstructionnotices,
before or after fabrication
warning signs for control
M.5 ln the event that only
equipment, cables,
or assembly
a performance
equipment control
specification is available,
switches, accessories
preamble clauses shall
and the like are deemed
be included in the bills
to be included.
stating that the rates are
to include all costs of, C.5 Brackets and methods
and costs in connection of support are deemed to
with, the design, supply be included.
and installation of the
C.6 Bonding is deemed to
complete system. be included in the items in
which they occur. Where
items of equipment are
supplied by others the
bonding is deemed to be
included in the item of the
fixing equipment.
r
FI Equipment
(See Section XX(a) - General
1. Central equipment 1. Central processing units 1. Described (or referred nr C.1 lnterfacing, connecting,
to in the equipment interconnecting cables,
2. Master stations
schedule/ appropriate jointing and making all
3. Operator stations specification clause) busbar, cable, conduit,
trunking and cable tray
4. Control console connections and the like
5. Display units and the provision of all
associated components
6. Printers are deemed to be
7. Disc drive units included in the items of
equipment^
B. Amplifiers
9. Others
C.2 Cable and conduit
connections from power
2. Peripheralequipment 1. Data gathering panels nr source/UPS units to all
2. Splitters equipment are deemed
to be included in the
3. Distribution process equipment items.
units
4. Others
3. Provision of all Item 0.1 Software includes C.3 Fees and charges for
software, including those for the operating softivare patents and
back-up copies systems and applications. licences are deemed to be
included in the item.
HK SMM 4R 184
XIX GOMMUNICATIONS/SECURITY/CONTROI SYSTEMS r85
(cl DistributionandPrincipallntereonnections
(See Section XX(a) - General C/auses)
I
(dl Final Gircuit Points
(See Section XX(a)
- General C/auses)
HK SMM 4R r86
XIX COMMUNICATIONS/SECURIW/CONTROT SYSTEMS 187
I
(dD Final Ghcuit Points (eontinued|
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
HKSMM 4R 188
XIX COMMUNICATIONS/SECURIIY/CONTROL SYSTEMS r89
(el Sundries
(See Section XX(a) - General C/auses)
HK SMM 4R
190
XX GLAZING r9l
(see Secflon // - General Principles)
'1. M.1 Glass measured in this C.1 Work is deemed to S.1 Kind and quality of glazing
Generally
section is for general include: mmpounds and sealants
glazing. (a) Painting metal or wood S.2 Method of glazing
M.2 Glass in the following rebates with specified S.3 Method of securing
positions are measured in primer before glazing including details of gaskets,
the appropriate Sub- (b) Painting cut edges of glazing strips and drannels
sections of Section Xlll wired glass with specified S.4 Nature of frame or sunound
Wood Works and XV Steel paint
and Metal Works: S.5 Fire rated panes have fire
(c) Putty or glazing
rating stated
(a) Fixed and demountable compounds
partitions.
(d) Sprigs or glazing clips
(b) Ofiice partitions
(e) Bedding in glazing
(c) Shop fronts tape, wash leather, rubber,
(d) Curtain walling neoprene, butyl or other
plastic and the like
(e) Fumiture and littings
etc. (f)Where bedded in wood
frames with wooden beads
(f) Windows and glazed
the taking off and replacing
doors
the beads
(g) Drilling or forming all
holes for fixing or for
ironmongery and the like
1. Panesarea30.15mz 1. Type, quality and thickness 62 1. ln inegularshapes M.3 Panes of inegular shape C.2 Glazing is deemed to
2. Glazing
of glass stated (measured square) are measured the smallest include raking and curved
2. Panesarea>0.15and<
rectangle from whi6 the cutiing.
4.00 mz 2. ln flat panes setto curve
pane can be obtained.
z
3. Panes area > 4.00 m
M.4 Glass which is brilliant
cut or bent or in which
holes are cut or formed, is
enumerated.
4. Panes of glass with '1. Dimensioned description '1. Number, size and iype nr 1. lrregularshapes D.1 Cut or formed holes C.2 applies.
cut or formed holes of holes stated (measured square) are holes other than
those included by the
application of C.1 (g)
hereof.
7. Polished edges 1. Plain edges m 1. Curved edges M.5 Labours on glass are C.3 Edges are deemed to
grouped with the glass to include mitres.
2. Rounded edges 2. Bent panes
which they relate.
3. Bevelled edges, width
of bevel stated
HK SMM 4R 192
XX GLAZING t93
3. Minor wall linings 1. Dimensioned description 112 S.3 Details of silvering and
protective backing
4. Glass balustrades and 1. Dimensioned description m M.1 Balustrades and C.2 Work is deemed to
railings railings in different include:
locations shall each be
(a) Top rails, posts,
measured sepantely. glazing panels, glass
connectors, fixing clamps
at bottom, all supporting
metalwork, structural
sealant joints and linish
to exposed edges
(b) All ends, angles,
ramps and ramped
angles and he like
(cl llirrorsn Glass Shelves and Sundry Glazing Slo*s
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Generally S.1 Kind and quality of
glass
2. Minors 1. Dimensioned description 1. Polished or bevelled nr 1. lf drilled, number, size C.'l Work is deemed to S.2 Details of silvering
edges described and type of holes stated include fixings, backings and protective backing
and framing.
S.3 Method of fixing
S.4 Fixing through
vulnerable materials
S.4 Metal framing and
plywood or other
backings
HK SMM 4R 194
XXI PAINTING r95
(See Secflon ll - General Pinciples)
M.1 Work on concrete, D.1 Work is deemed to be C.1 Work is deemed to S.1 Kind and quality of
1. Generally
internal unless otherwise include: materials
brick, plaster, stone,
metal, wood or other described. (a) Multicoloured work S.2 Material required to be
surface is in each case D.2 Multi-coloured work is and cutting to line applied and/or finished by a
given separately. defined as the particular method stated
(b) Preliminary
M.2 The area or girth application of more than preparatory work before S.3 Preliminary preparation
measured is the area or one colour on an application work before application
girth covered including individual surface. On
(c) Rubbing down
allowances for the extra walls and columns and
between coats
girth of edges, on ceilings and beams,
mouldings, panels, it is defined as the (d) Painting on beads,
sinkings, corrugations, application, in one room, hinges and other fittings,
flutings, carvings, of more than one colour brackets, bolts, lugs and
enrichments and the like on walls and columns, or the like, and attached
unless otherwise on ceilings and beams. pipework and mnduits
provided for herein. painted at the same time
and in the same material
M.3 Work on existing
and colour as the surface
surfaces is given
to which they are
separately and
attached
preparatory treatment of
existing decoration such (e) Removing all
as washing down, ironmongery and similar
buming off, stripping and hardware before painting
the like is stated in the and reinstalling the same
description. after painting, or
protecting like items by
approved means
(al General Clauses Applicable to the following Sub.sections {b} through {el {continued}
INFORMATION PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARV
RULES INFORMATION
1. Generally(continued) M.4 Work required to be
executed on members
before fixing is so
described.
M.5 Work to ceilings and
beams, where the ceiling
is > 3.50 m from the floor
is so described, the
height being stated in
stage of 1.50 m.
M.6 No deduction is made
for voids < 0.50 m2.
M.7 Descripiions include
preparatory work such as
knotting and stopping,
priming and sealing coats.
The number of
undercoats and finishing
coats is staied.
HKSMM 4R r96
197
XXI PAINTING
(b) Painting and Similar Work
(See Section )C(l (a) - General Clauses)
B. On mesh covered or
ornamental fencing,
railings, gates and the
like, measured flat
overall on both sides
9. On grilled or louvred
surfaces, measured flat
overall on both sides
2. Painting on pipes and 1. Girth > 300 mm 792 C.3 Work is deemed to
conduits include painting on pipe
clips, holders, hangers,
3. Painting on eaves 2. Surfaces, girth < 300 m conduit boxes and the
gutterc mm like.
HK SMM 4R r98
199
XXI PAINTING
(dl Signwriting
(See Section XXI (a) * General Clauses)
MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
CLASSIFICATION TABLE
RULES INFORMATION
4. Letters, numerals nr
5. Stops and nr
puncluation marks
6. Ghinese characters nr
7. $ymbols or logos nr
1. Cultivating 1. Depth and maximum m2 1. Weeding, details stated D.1 Types ofsurface C.1 Cultivating is deemed S.1 Timing of operations
size of stones permitted applications include to include the removal of
S.2 Method of cultivating
to remain stated herbicides, selective stones above ihe
and degree of tilth
weedkillers, peat, maximum permitted size
fertilisers, compost, limit. S.3 Kind, quality and
mulch, ameliorants and composition of materials
C.2 Surface applications
the like" S.4 Definitions of size
are deemed to be
included working in if designation required
required. S.5 Size and type of pits,
2. Surfaceapplications 1. Type and rate stated m2
holes or trenches
3. Trees 1. Botanical name 1. Size designation nr 1. Supplying only D.2 Removing surplus C,3 ltems include
excavated or formed
excavated materials excavating or forming pits,
2. Girth, height and clear 2. Planting in existing 5.6 Type ofsupports and
means removing from holes or trenches, refilling,
stem and root system cultivated or grassed
site unless otherwise watering in, removing ties
stated areas or cultivated or
described. surplus excavated S.7 Special materials for
grassed areas prepared
material and labelling. refilling
by others, details stated
C.4 Refilling is deemed to
S.B Labelling
3. lnitial culback, details
include all necessary
stated S.9 Colouration of leaves
multiple handling.
4. Shrubs 't.Height and root system nr 4. Transplanted trees, or blossoms staied in
including provision of
C.5 Planting in cultivated specification
stated
or grassed areas prepared
temporary storage
2. Height and root system sP by others is deemed to
stated and spacing of 5. Collecting and include all necessary
plants or number per m2 transplanting trees from reinsiatement.
stated another source
C.6 Planiing trees in
5. Bamboos 1. Size, number of shoots nr 6. Supports and ties paved areas is deemed to
and size of container in include lifting tree grilles
which they are grown 7" Refilling with special and setting aside and
described materials, details stated subsequent relaying and
8. Watering, details stated replacing any damaged or
6. Herbaceous plants 1. Size stated nr
lost tree grilles.
9. Where trees are planted
7, Ground cover plants 2. Size and number per m2 m2
in paved areas this is
stated stated
8. Climbers 1. Size siated nr
2. Size and number of
shoots stated
HK SMM 4R 202
XXII TANDSCAPINO 203
(dl Boulders
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION
1. Boulders 1. Supplied and placed 1. Type of boulder, nr S.1 Source and quality of
dimensioned description, boulders
2. Selected from boulders
method of placing and
on site and placed
securing in position
1. Vertical green wall 1. For proprietary systems, ry12 M.1 Plants are measured C.1 For proprietary S.1 Design intent if not
systems catalogue references, separately. systems, work is deemed expressly described or
2. Horizontal green roof components of the M.2 Measured the area to include: shown in the drawing or
systems system and background covered by the green (a) Submission of shop specification
for fixing stated "ts planting system drawings, method
statement and structural
loading calculation
(b) Construction of mock-
up on site if specified
(c) Support system,
irrigation system,
drainage system,
planting media, any
additional components,
fiftings, accessories and
the like required in
compliance with the
design intent
HK SMM 4R 204
205
ALPHABETICAL INDEX
IX P.81
XIX P.189 Drain Pipe Trenches
Communications Systems, Sundries IX P.8'1
A vil P.61 Drain Pipes
il P.3 Concrete Beams ll P.3
Abbreviations vill P.77 Drawings, used for measurement
XVIII P.179 Concrete Block Walls XVII P.16'l
Accessories (Electrical) vlr P.62 Ductwork
XX P.191 Concrete Casing to Steelwork XVII P.162
Acrylic Sheet Glazing vil P.62 Ductwork, ln-Line Fittings
XVII P.154 Concrete Columns XVII Pj62
Air Handling Units vil P.59 Ductwork, Ancillaries
IV P.21 Concrete Pile CaPs
Alterations vil P.62 E
XVIII P.179 Concrete Walls XVIII P.1BO
Ancillary Fittings (Electrical) IX P.81 Earthing
XXII P.203 Concrete Beds for Drains or Pipe Ducts XVIII Pj72
Artificial Plants vlt P.60 Electrical Equipment & Switchgear
X P.85 Concrete Blinding XVIII P.179
Asphalt Work vlt P.60 Electrical Fittings & Accessories
Concrete Curbs, Cills, CoPings etc. XVIII P.171
B vll P.59 Electrical General Clauses
VI P.50 Concrete Foundations XVIII P.181
Backfi lling to Excavation vil P.61 Electrical lnstallations, Sundries
XV P"125 Concrete Ground Beams XVIII P.171
Balustrades, Glazed Balustrades, Metal P.30 Electrical lnstallations
xill P.113 Concrete Piles Cast in-situ in Casings VI P.46
Balustrades, Wood vlt P.61 Excavation, Surface
XVI P.145 Concrete SusPended Slabs VI P.47
Bitumen Emulsion, Asphaltic Concrete vll P.66 Excavation, Trenches
XVII P.154 Concrete, Formwork VI P.46
Boilers vil P.65 Excavation, Working SPace
XVIII P.180 Concrete, Reinforcement VI P.47
Bonding (Electrical) vil P.63 Excavation, Basements
P.33 Concrete, Structural Movement Joints VI P.47
Bored Piles
XXII P.203 Concrete, Water StoPS ln vI P.63 Excavation, Bases, Post Holes etc.
P.4B
Boulders, SuPPlYing and Placing Excavation, for Service Pipes & Cables VI
XVIII P.173
VIII P.79 Conduits (except in Final Circuits) VI P.47
Brick or Block Pavings XIX P.183 Excavation, to Reduce Levels
vilt P.75 Control Systems lt P.5
Brickwork & Blockwork XIX P.184 Existing Buildings, Work in
ll P.7 Control SYstems, EquiPment
Building Services, Classification in Billing XIX P.186 F
XVIII P.174 Control Systems, Final Circuits XXI P.199
Busbar Trunking XIX P.189 Fabric PaPerhanging
Control Systems, Sundries XVII P.154
c XVII P.154 Fans
XVIII P.176 Cooling Towers X P.88
Cables (excePt in Final Circuits) il P.4 Felt Roofing
P.40 Costs held to be included in items XV Pj27
Caissons XV P.122 Fencing & Gates, Metal
XVI P.151 Coverings, Sheet Metal XIX P.187
Carpet SheeUCarPet Tile Finishes XV P.141 Field Equipment for B.M'S.
P.30 Curtain Walling, Metal P,187
Cast in-situ Concrete Piles in Driven Casings VI P.45 Field Equipment for Communications XIX
XI P.94 Cutting Down Trees XIX P.187
Cast Stone Facings Field Equipment for Security Systems
XVI P.148 D XVIII P.178
Ceramic Tilling il P.4 Final Circuits (Cables etc.)
IX P.83 Dayworks xlll P.105
Cesspools IV P.20 Fire Stops
XVII P.154 Demolishing Parts of Structures xlll P.114
Chillers IV P.20 Fittings, Wood
XVII P.154 Demolishing Structures XV P.142
Chimneys XV P.133 Fittings, Metal
xll P.97 Demountable Partitions, Metal XV P.133
Chinese Tile Rooflng xlll P.108 Fixed Partitions, Metal
VI P.51 Demountable Partitions, Wood xlll P.108
Chunam Surfacing P.43 Fixed Partitions, Wood
XV Pj22 Diaphragm Wdling XV P.123
Claddings, Sheet Metal VI P.49 Flashings, Sheet Metal
XIX P.1 83 Disposal, Excavated Materials lll P.10
Communications SYstems xlll P.111 Form of Contract
XIX P.184 Doors, Wood lll P.10
Communications Systems, Equipment XV P.124 Form of Sub-Contract
XIX P.186 Doors, Folding Doors, Metal
Communications Systems, Final Circuits
ALPHABETICAL INDEX (continued)
Framed Work, Metal XV P"125 Landscaping XXII P.201 Partitions, Offi ce Cubicle xlll P.'110
Frames & Linings, Wood XIII P.111 Partitions, Sliding and Folding xilt P.109
Lathing XVI P.143
Fumiture, Metal XV P.142 Partitions, Toilet Cubicle xill P.110
Lightning Protection XVIII P.180
Furniture, Wood xil P.114 Linings, Sheet Metal XV P.122 Partitions, Wood, Glazed xilt P.108
G Liquid Membrane Waterproofi ng Pipework XVII P.156
X P.85
Gates, Collapsible Gates, Metal XV Pj24 Luminaires XVIII P.179 Pipework, Accessories XVII P.158
Glass Shelves XX Pj94 M Pipework, Ancillaries XVII P.158
Glass Balustrades & Parapets XX P.193 Macadam Pipework Supports XVII P.157
XVI P.145
Glass Block Walls & Panels VIII P.77 Marble Facings Planking & Strutting, incl Excavation VI P.46
XI P.94
Glass Wdl Linings XX P.193 Plant Pots & Containers XXII P.203
Marble Tiling XVI P.148
Glazed Wood Partitions xill P.108 Mechanical Equipment XVII P.154 Planting XXII P.202
Glazing - General Glazing XX P.'191 Mechanical lnstallations, Sundries Plasterboard XVI P.143
XVII P.169
Granite Facings XI P.% Mechanical lnstallations Plastering XVI P.143
XVII P.153
Granite Tiling XVI P.148 Plastic Sheet Finishes XVI P.151
Mechanical Section General Clauses XVII P.153
Granolithic Finishes, Terrazzo XVI P.145 Playground Equipment, Wood xilt P.114
Metal Doors, Gates, Shutters, Grilles XV Pj24
Grass Seeding & Turfing XXII P.201 Playground Equipment, Metal XV P.142
Metal Hatches XV P.124
Green Planting Systems XXII P.204 Polishing & Clear Finishing XXI P.198
Metal Work for Structural Timber xlil P.99
Grilles, Screens & Louvres, Metal XV P.124 Mini-Piles Polycarbonate Sheet Glazing XX P.191
P.44d
Gun Applied Reinforced Concrete vI P.64 Minimum Deductions il P.4 Precast Concrete vil P.70
Gutters XVII P.160 Precast Concrete Piles P.2B
Minor Buildings & Structures, Metal XV PJ28
H
Minor Buildings & Structures, Wood xilt P.115 Precast Prestressed Concrete vil P.73
Handrails, Metal XV P125 Miror Wall Linings Prestressed Concrete vil P.71
XX P.193
Handrails, Wood xilt P.113 Mirrors XX P-194 Prime Cost Sums lt P.5
Hardcore & Granular Filling VI P.50 Moon Gates, Stone Profiled Metal Sheet Roof Coverings XV P.131
XI P.93
Hatches, Wood xilt P.'111 Mosaic Tiling XVI P.148 Profiled Sheet Roof & Wall Claddings xllr P.107
Heat Exchangers XVII P.154 Mulching Planting Areas Profiled Metal Sheet Wall Claddings XV P.131
XXII P.203
Hydroseeding XXII P.2A1 N Proprietary Roof Tiling XI P.98
I
o Protective Goverings & Finishings XVII P.'166
ln-situ Surface Finishes & Screeds XVI P.145 Metal
Ofiice Cubicle Partitions, XV P.135 Provisional Sums ll P.5
lnsulation to Ductwork XVII P.165 Wood
Office Cubicle Partitions, Xlll P.1'10 Pumps XVII P.154
lnsulation to Equipment XVII P.165 Overhead Crane Rails XV P.120 a
lnsulation to Pipework XVII P.164 P R
lnsulation to Wall Linings, Claddings etc.
lronmongery
xlll P.105 Painting, General Clauses XXI P.195 Racks, Wood xilt P.114
XIV P.117 Paperhanging including Sheet Plastic & Fabric Linings Raised Access Floors, Metal XV P.131
J Raised Access Floors, Wood xilt P.102
XXI P.199
K Parquet Flooring Xlll P.101 Removal of Water ilt P.16
L
Wood
Partitions, Demountable, Xlll P.108 Rendering XVI P.145
Laboratory & Sanitary Fittings xvil P.1s5 Partitions, Fixed,Wood Xlll P.108 Reservoir, Works Under ll P.5
HK SMM 4R 206
207
Rock-Socketed Steel H-Piles P.44a Stone Beds & Sides to Watercourses XI P.92 W
xll Stone Construction XI P.90 Walling, Diaphragm P.43
Roof Tiling P.97
P.123 Stone Copings, Curbs, Steps etc. XI P.92 Windows & Glazed Doors, Metal XV P^138
Roofing and Flashings, Sheet Metal XV
Rubber Sheet Finishes XVI P.151 Stone Facings to Structural Backgrounds XI P.94 Wood Balustrades xlll P.113
Stone Moon Gates XI P.93 Wood Block Flooring xilt P.101
S
P.155 Stone Pitching to Slopes XI P.92 Wood Handrails xill P.113
Sanitary & Laboratory Fittings XVII
P.5 Stone Walling XI P.91 Wood Doors xlll P.111
Sea Water, Work Under lt
XIX P.183 Structural Timber xilt P.99 Wood Framed Suspended Ceilings xilt P.105
Security Systems
XIX P.1U Structural Steel XV P.119 Wood Frames & Linings xtil P.111
Security Systems, Equipment
Surface Finishes & Screeds, In-situ XVI P.145 Wood Hatches XIII P.111
Security Systems, Final Circuits XIX P.1 86
P.189 Surface Water Channels vil P.59 Wood Stairs xilr P.1'13
Security Systems, Sundries XIX
IX P.83 Suspended Ceilings, Metal XV P.136 Wood Strip Flooring xilt P.101
Sepilc Tanks
IX P.81 Suspended Concrete Slabs vil P,61 Wood Trims xilt P^103
Service Ducts
Switchgear & Equipment XVIII P.172 Wood Ventilators XIII P.111
Sheet Linings & Claddings xlll P.104
Symbols and Abbreviations il P.3 Working Space, for Excavation VI P.46
Sheet Membrane Waterproofi ng X P,8B
Synthetic Rubber Tiling XVI p.148 Work in Compressed Air il P.5
Sheet Plastic Paperhanging XXI P.199
Work in Existing Buildings il P"5
Shelving, Wood xlll P.114 T
Tanks XVII P.154 Work outslde the Site il P,5
Shelving, Racks, Metal XV P.142
Temporary Roofs IV P^23 Work under Reservoir, River or Sea Water il P.5
Shop Fronts, Metal XV P.139
IV P.23 Temporary Screens IV P.23 X
Shoring
XV P.124 Temporary Shoring for Bank Excavation VI P.49 Y
Shutters, Folding, Rolling, Metal
Sign Boards & Signage, Wood xlil P.114 Terrazzo Finishes XVI P.145 z
Sign Boards & Signage, Metal XV P.142 Tile & Slab Finishes XVI P.148
Signwriting XXI P.199 Toilet Cubicle Partitions, Wood xilt P.110
Site Clearance VI P.45 Toilet Cubicle Partitions, Metal XV P.135
Slate Tiling XVI P.148 Trays & Ladders XVIII P.175
Sliding and Folding Partitions xlll P.'109 Trenches for Pipe Ducts IX P.81