RBM - RCM - Mms For Koc r1
RBM - RCM - Mms For Koc r1
Outline of Presentation
1
Why Adopt Risk Based Strategies?
Bhopal
Seveso
Piper A
2
Factors Influencing Operational Risk
People
Operational
Risk
Equipment Production
Design Error
Large property losses in the HC-chemical ind., a 4%
30 year review, 14th edition, M&M Protection
Consultants, 1992
3
Challenges Facing Inspection and Maintenance
Maximising
• Plant efficiency / reliability levels
• Product generation/throughput
whilst Minimising
• manning costs
• materials costs
• maintenance work load
• transportation and support
• downtime affecting revenue/operating costs
and Maintaining
• contractual nominations
• HSE requirements
4
Risk Based Maintenance (RBM)
Strategy Development
INSP, CMMS, DOC
Input data for screening Input data
DNV, for detailed
Equipment Screening Operator assessment
database Experience
Inspection,
Maintenance High Y Risk Based
history, Risk Level Containment
Risk RBI Maintenance
Failure Strategies
records N
(RBM)
-
Low Risk Y
Protective SIL Output:
Function y Inspection plans
y Equipment function testing
y Preventative maintenance
Minimum y Operator surveillance rounds
maintenance N y First line maintenance tasks
evaluation/ y Condition monitoring
y On-line maintenance
Corrective y Off-line maintenance
Maintenance y Turn around tasks
RCM
Output:
y Inspection plans
y Equipment function testing program
Up-load to y
y
Preventative maintenance routines
Operator surveillance rounds
CMMS y First line maintenance tasks
y Condition monitoring
y On-line maintenance
y Off-line maintenance
y Turn around tasks
5
DNV RBM Methodology – Asset Register
Plant
Unit
System
Sub-system
Function Equipment
Tag
Failure mode #1 Failure mode #2 Failure mode #3
What is RBI?
RBI is a method for using risk as a basis to prioritise
and manage the efforts of an inspection program
A systematic analysis that establishes the risk levels
associated with the operation of each piece of
equipment and ranks them
An inspection planning methodology which
Identifies the usually 10 to 20% of your equipment items
which carry 80 to 100% of your risk exposure
Identifies the type of inspection needed and quantifies
the benefits of it
lowers your risk exposure and optimises the spending on
inspection
6
RBM - Safety Integrity Level Assessment (SIL)
What is SIL?
Safety systems / Electrical, Electronic and Programmable
Electronic Systems (PES)
SIL is the discrete level for specifying the safety integrity
requirements of the safety functions where SIL 4 has the
highest level of safety integrity and SIL 1 has the lowest
Safety functions need to be addressed during design,
maintenance planning and operation & maintenance stages
Programmable
logic unit
Pressure
PLC Transmitter
ESD Blow
PT down
ESD 1 ESD 2
7
RBM- Reliability Centred Maintenance
What is RCM?
Type of RCM
Classical RCM
Streamlined RCM
Reverse RCM
Maintenance Optimization
8
Objectives of RCM
Version Slide 21
Deliverables
9
Deliverables
Operator Rounds
Surveillance and condition monitoring by operations
Surveillance Aids
Field displayed instructions
Organizational Development
Adjusted staffing and resourcing
What to do
Skill and tools needed to do it
How often to do it
An estimate of the required man-hours
Job packing to find when to do it
10
Results of a RCM Study
Spare parts
Awareness of safety and environmental issues on
maintainers level
Awareness of main contributors to production
unavailability
Documented preventive maintenance program
More efficient maintenance program that fits the
organisation (competence and crew)
Modifications
11
Inputs Required
Asset register
Safety Cases, Performance Standards
Drawings / Schematics / Flow diagram
Maintenance routines, if any
Maintenance manuals
Work Procedures, if any
Operations Procedures, if any
Known incidents/failure history
Estimated operational costs
Hourly costs -maintenance/ contracted personnel
Requirement against potential spill/pollution to the
environment
Requirement for operability / down time / availability
Identification of
Run to Failure failure causes
evaluation
Version
Task Selection and Optimization
2005-06-15 Slide 28
12
DNV RCM Methodology
Step 1: Screening
Qualitative analysis
Objective is to screen out low risk systems from medium
to high risk systems
Screening analysis is performed for each system
(process & utility) at equipment level
2x2 risk matrix is used to perform the analysis
PoF is assessed either as Low (<10-5) (category 1) or
High (>10-5)(categories 2,3,4&5)
CoF is assessed either as Low (category 1) or High
(categories 2,3,4&5) for safety, environmental, economic
and other impacts
Version 2005-06-15 Slide 29
13
DNV RCM Methodology
Step 2: Detailed RCM analysis - Failure Mode and Effects
Analysis (FMEA)
The first part under detailed analysis is performing
FMEA
This analysis is carried out at failure mode level to
study the effect of failure
The question of ‘what if?’ (if failure happens) is applied
and failure effects are analyzed
14
DNV RBM Methodology
Four areas of Risk
¾ Risks to people (Safety Risk)
¾ Risks to the environment
¾ Risks to the business interruption (Business Risk)
¾ Risks to capital assets (Follow Costs)
15
DNV RCM Methodology
Step 4: Detailed RCM analysis - Maintenance strategy
development
16
DNV RCM Methodology
CMMS Implementation
Concept
- Installation of management and control systems to
ensure continuous feedback and modification of the
maintenance strategy
Fosters a culture of continuous improvement and is a primary benefit
of the RCM process
Key performance indicators to align with the objectives and
performance requirements
Follow-up evaluation within one year
Constant feedback from field to optimize the tasks/cost
17
DNV RCM Methodology
Living Program
18
Benefits of RCM
Maximize Revenues
Sustain Business
Manage Risk
19
Software Solution - ORBIT+ EAMS
EAM (Engineering Asset Management)
GIS
AIM (Asset Integrity Management) Link
20
What is the CMMS doing?
The Central Role of Work Orders
Policy
" Procedure list Equipment Analysis/ is charged
" Blank maintenance forms. History Improvement •The craft leader assuming
Maintenance dossier:
the coordination is the craft
in the main activity
" Description of the equipment. PM based on •All sub task can be charged
" Equipment inventory Execution plan
" Technical data sheets
by diff. unit/craft and
CM based on
" Operating instructions experience resource their own acty.
(CR EXP 2.6.6)
Time Writing Overhauls
Maintenance documentation:
" PM schedules
" Maintenance procedures Note, corrective tasks may be generated, but they should be planned
" Troubleshooting instructions where possible.
" Inspection schedule
Version 2005-06-15 Slide 49
MMS
Technical Scheduled Maintenance
Asset Data
Databank Program Recommendation
Standard
Inspection Work Order Work
Program Management Template
Work Store
Equipment
Assignment Management
Monitoring
Maintenance Maintenance
Cost Work History
Performance Technical
EIS Indicators History
Version
21
Conclusions
Conclusions
22
Version 2005-06-15 Slide 53
23