1.WELL
a) Lifting hooks having the lifting capacities and positions as shown.
b) Ventilation and heating, complying with the local building regulations, is
required to maintain the well air temperature between +5°C and +40°C.
B VALUES LIFT1 LIFT2
c) Verification that the wells are built to the dimensions and tolerances as **A 25A 32A
shown. **B 20A 25A
Fig. -1.
d) If necessary, pit access doors built to the dimensions shown and complying
with the local building regulations.
SINGLE LINE DIAGRAM
C
e) Landing door cut-outs to the dimensions shown.
f) Electrical sub-mains, fuses with neutral terminating at main switches near map CUSTOMER SCOPE KONE SCOPE
at top landing. The main switch unit should be with Lock out tag out Intercom wiring Twisted shielded pair/elevator
ELEVATOR INTERCOM
to master handset 2x0.75 SQmm
provision as shown in Fig. - 1.
g) Voltage between Earth & Neutral should be within 3V.
D
h) Safety barriers in front of all well openings during lift installation, to prevent
POWER SUPPLY
3Ø 415V±10%
50HZ
**A
MCB/RCB/RCCB/ELCB
CONTROLLER
**B
MCB
M
(300mA TYPE -A)
site personnel falling into well.
i) Pit access ladders to be provided if required or specified.
j) Permanent adequate shaft lighting to be given as mentioned in single line Car light Car light
E
10A SP MCB
diagram and same to be provided with two way switch connection in pit & 25A RCB 6A MCB
(30 mA)
POWER SUPPLY
mains panel. 1Ø 240V±10% Socket 16A
50HZ
***A
k) Where only one lift is erected in a common lift well, the builder must provide 25A
MCB 2W.SW 2W.SW
1 1
(FOR MIN.
adequate permanent protection for all openings left for future lifts.
2 2
Prepared by
Name
Site IIT PATNA, BIHTA CAMPUS, BIHTA, PATNA, BIHAR-801106.
DV Address
H
is handed over. Checked by
KR
Drg. title GENERAL ARRANGEMENT DRAWING
Approved by KEN. no
VSK 44092760-61
Job/Enq. Lift1 - Drg. no KEI/6569224_1_40 Dwg Issue Page
Rev Lift2 - KEI/6569224_1_64 00 5(5)
A1