1537 Minutes of Meeting

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Minutes of Meeting

Reviewer : Mr.Vuppu Eswara Rao-VP Works -VTP -P1/P2/P3 Doc No UTQM.00.MM.01


Date 2
Agenda for Meeting:Feedback of Dr .Jorg Nohl after RTP Shop Floor Visit Time 12:45 Hrs
Venue RTP Conference Hall
Page 1
Members Present : Mr.V K Mishra/Mr.M K Jain/Mr.Kanjolia/Mr.Vuppu Eswara Rao/Mr.Shaji Varghese/Mr.H K Subramanya/Mr.U
BalaRaghavan/Mr.AdithyaRavikumar/mr.Beson UD /Mr.R.Bharath/Mr.Madanraj/Mr.GopalaGowda/Mr.Kalleshappa CD/Mr.Vinay GR/Mr Robin Moolakat/Damodar V
Metri/C V Yogesha/Mr.Manik A Nadagowda/Rakesh Gupta/S.Sunilkumar/Mr.Prashanth Babu/Mr.Ranjith/Mr.Sudheer/S.Santosh/Mr.Pawan
Did not attend :--

Sl. No.
Subject Detailed actions/Observations Resp Target date Red /Green Remarks

Positive
1 Dedicated team with lot of emotions towards improvement
Observations

Improvement of Plant performnace year on year

Calendering creel room well maintained

2 Observations

2.1 Mixing Downstream in Mixing house keeping to be improved

Noise observed in mixing/buiilding /Curing etc due o machine


noise or air leakages .
Leakages are concern in terms of oil /air .Need to be corrected to
2.2 All over
maximum possible extent
Noise is mainly due to Pneumatic cylinder , needs to be
addressed for correction

When extruder stopped , ANDON was glowing.Need facility for


2.3 Extruder
auto stopping mechanism

2.4 Need tto provide cooling facility through out the inclined conveyor

Need to provide stair case for maintanence personnel in inclined


2.5
conveyor area for easy reach

Usage fo polythene is risky and waste .Need to identify actions fo


2.6 Tread Extruder
relimination in long run
Insulation of presses were not effective as observed in
2.7 Curing
curing .Need to be corrected

You might also like